SAN PEDRO WATERFRONT PROGRAM - Port of Los Angeles
SAN PEDRO WATERFRONT PROGRAM - Port of Los Angeles
SAN PEDRO WATERFRONT PROGRAM - Port of Los Angeles
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>WATERFRONT</strong> ENHANCEMENTS<br />
<strong>Port</strong>s O’ Call Paseo/S.P. Slip<br />
• Project Elements:<br />
• Wide and safe pedestrian pathway on<br />
landside <strong>of</strong> <strong>Port</strong>s O’ Call Village<br />
• Pedestrian linkage to 13 th Street<br />
• Landscaping, lighting & signage<br />
improvements<br />
• New restrooms<br />
• Plaza at head <strong>of</strong> S.P. Slip<br />
• Public art<br />
• Parking lot redesign<br />
• Status: Design in progress<br />
• Cost: $26.9 million<br />
START<br />
FINISH<br />
Design<br />
Construction<br />
FEB 08<br />
SEP 07<br />
SEP 09