SAN PEDRO WATERFRONT PROGRAM - Port of Los Angeles
SAN PEDRO WATERFRONT PROGRAM - Port of Los Angeles
SAN PEDRO WATERFRONT PROGRAM - Port of Los Angeles
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>SAN</strong> <strong>PEDRO</strong> <strong>WATERFRONT</strong> <strong>PROGRAM</strong><br />
Waterfront<br />
Enhancements<br />
Waterfront<br />
Gateway<br />
Cabrillo Marina, Ph 2<br />
San Pedro Waterfront
Agenda<br />
• Approved Projects<br />
– Waterfront Gateway<br />
– Waterfront Enhancements<br />
– Cabrillo Marina, Phase 2<br />
– Public Art<br />
• San Pedro Waterfront Project<br />
– Project Elements<br />
– Scoping Comments<br />
• Economic Development<br />
• Outreach Process (Going Forward)
Total Costs<br />
Approved Projects<br />
• Waterfront Gateway<br />
• Waterfront Enhancements<br />
• Cabrillo Marina Phase II<br />
$ 49.8 million*<br />
$ 56.8 million<br />
$153.1 million<br />
TOTAL<br />
$259.7 million**<br />
* $35 million completed<br />
** $44 million in fiscal year 07/08
<strong>WATERFRONT</strong> GATEWAY<br />
• Cruise Ship Promenade<br />
• Harbor Boulevard Parkway<br />
• Gateway Plaza<br />
• Harbor Boulevard<br />
Streetscape (Swinford St<br />
to 5 th Street)<br />
Total Cost: $49.8 million
<strong>WATERFRONT</strong> GATEWAY<br />
Cruise Ship Promenade<br />
• Project Elements:<br />
– Promenades<br />
– Landscaping & Seating<br />
– New Lighting<br />
– Interpretive Signage<br />
– Bocce ball courts<br />
– Public Art<br />
• Status: construction completed in<br />
December 2005<br />
• Cost: $14.1 million
<strong>WATERFRONT</strong> GATEWAY<br />
Cruise Ship Promenade – Public Art Elements<br />
Seat wall tiles by local harbor area artists<br />
“Tell Tales” by Doug Hollis
<strong>WATERFRONT</strong> GATEWAY<br />
Harbor Boulevard Parkway<br />
• Project Elements:<br />
– Multi-use promenade between<br />
Swinford & 5 th Street<br />
– Plazas at every street<br />
intersection<br />
– Dedicated bike path<br />
– Lighting<br />
– Interpretive Signage<br />
– Landscaping & Seating<br />
• Status: Construction complete<br />
October 2005<br />
• Cost: $24.3 million
• Project Elements:<br />
– Interactive water features<br />
– Plaza<br />
– Landscaping<br />
– Automatic Restrooms<br />
• Status: Under construction,<br />
est. completion Feb. 2008<br />
• Cost: $11.2 million<br />
<strong>WATERFRONT</strong> GATEWAY<br />
Gateway Plaza
<strong>WATERFRONT</strong> GATEWAY<br />
Harbor Boulevard Streetscape<br />
• Project Elements:<br />
– Decorative pedestrian<br />
crossings at Swinford,<br />
O’Farrell, 1 st and 5 th Streets*<br />
• Status: In Conceptual Design<br />
• Cost: $0.208 million<br />
*Original Scope included street<br />
widening, curbs, sidewalks,<br />
street lighting, landscaping, and<br />
irrigation<br />
Design<br />
START<br />
JAN 08<br />
FINISH<br />
JUN 08<br />
Construction<br />
NOV 08<br />
MAY 09
<strong>WATERFRONT</strong> ENHANCEMENTS<br />
• Downtown Plaza<br />
• 22 nd /Sampson Parking & Warehouse No. 1 Outlook<br />
• 22 nd Street Open Space<br />
• <strong>Port</strong>s O’Call Paseo/S.P. Slip<br />
• Cabrillo Beach<br />
• Angels Walk L.A.<br />
• Swinford Pedestrian Path Improvements<br />
Total Cost: $56.8 million
• Project Elements:<br />
– Pedestrian-oriented Plaza<br />
& Parking between 5 th<br />
Street and Maritime<br />
Museum<br />
– Sidewalk, crosswalk &<br />
landscaping<br />
improvements<br />
– Lighting improvements to<br />
match downtown<br />
– Signage<br />
<strong>WATERFRONT</strong> ENHANCEMENTS<br />
Downtown Plaza<br />
• Status: Completing design<br />
• Cost: $2.9 million<br />
Design<br />
START<br />
FINISH<br />
MAY 07<br />
Construction<br />
NOV 07<br />
JUN 08
<strong>WATERFRONT</strong> ENHANCEMENTS<br />
<strong>Port</strong>s O’ Call Paseo/S.P. Slip<br />
• Project Elements:<br />
• Wide and safe pedestrian pathway on<br />
landside <strong>of</strong> <strong>Port</strong>s O’ Call Village<br />
• Pedestrian linkage to 13 th Street<br />
• Landscaping, lighting & signage<br />
improvements<br />
• New restrooms<br />
• Plaza at head <strong>of</strong> S.P. Slip<br />
• Public art<br />
• Parking lot redesign<br />
• Status: Design in progress<br />
• Cost: $26.9 million<br />
START<br />
FINISH<br />
Design<br />
Construction<br />
FEB 08<br />
SEP 07<br />
SEP 09
<strong>WATERFRONT</strong> ENHANCEMENTS<br />
<strong>Port</strong>s O’ Call Paseo/S.P. Slip<br />
Public Art Elements
<strong>WATERFRONT</strong> ENHANCEMENTS<br />
22 nd Street/Sampson Parking<br />
• Project Elements:<br />
• Surface parking for <strong>Port</strong>s O’Call &<br />
events<br />
• Use <strong>of</strong> sustainable design elements<br />
including grass pavers and<br />
bioswales<br />
• Perimeter landscaping<br />
Sampson Way<br />
• Status: Design in progress<br />
• Cost: $5.6 million<br />
START<br />
FINISH<br />
Design<br />
Construction<br />
NOV 07<br />
JUN 07<br />
JUN 08<br />
22 nd Street
• Project Elements:<br />
– 4.5 acres <strong>of</strong> turf<br />
– 12 acres <strong>of</strong> native<br />
plantings and pathways<br />
– Use <strong>of</strong> sustainable design<br />
elements (bioswales)<br />
– Public Restrooms<br />
– Parking for visitors &<br />
marina businesses<br />
• Status: Design in progress<br />
<strong>WATERFRONT</strong> ENHANCEMENTS<br />
22 nd Street Open Space<br />
• Cost: $9.2 million<br />
START<br />
FINISH<br />
Design<br />
Construction<br />
DEC 07<br />
AUG 07<br />
DEC 08
• Project Elements:<br />
– Paseo along Shoshonean Way<br />
– Wider paseo along Cabrillo Beach<br />
with seating<br />
– Paseo to fishing pier<br />
– Landscaping<br />
– Improved picnic area<br />
– Public Art<br />
• Status: In Conceptual Design<br />
• Cost: $8.9 million<br />
<strong>WATERFRONT</strong> ENHANCEMENTS<br />
Cabrillo Beach<br />
Design<br />
Construction<br />
START<br />
DEC 08<br />
NOV 09<br />
FINISH<br />
JUN 09<br />
JUN 10
• Project Elements:<br />
– Wayfinding & Information<br />
Stanchions<br />
– Supports self-guided tours <strong>of</strong><br />
waterfront<br />
• Status: Design underway<br />
• Cost: $2.1 million<br />
<strong>WATERFRONT</strong> ENHANCEMENTS<br />
Angels Walk L.A.<br />
START<br />
FINISH<br />
Design<br />
Construction<br />
FEB 08<br />
SEP 07<br />
JUL 09
<strong>WATERFRONT</strong> ENHANCEMENTS<br />
Swinford Pedestrian Path Enhancements<br />
• Project<br />
Elements:<br />
– Landscaping<br />
– Lighting<br />
– Improvements to<br />
existing pedestrian<br />
walkway<br />
• Status: In Design<br />
• Cost: $1.2 million<br />
START<br />
FINISH<br />
Design<br />
Construction<br />
OCT 07<br />
MAY 07<br />
JUN 08
CABRILLO MARINA – PHASE II<br />
• Project Elements:<br />
– Redevelop existing slips<br />
& develop new slips<br />
– Landside storage <strong>of</strong><br />
boats (mast up)<br />
– Promenade ( )<br />
– Marina Buildings<br />
– Youth sailing facilities<br />
• Status: Design in<br />
progress<br />
• Cost: $153.1 million<br />
Design<br />
Construction<br />
START<br />
MAY 08<br />
FINISH<br />
DEC 07<br />
MAY 10
Project Deliverables Schedule<br />
2008<br />
• Gateway Plaza/Water feature February<br />
• Downtown Plaza June<br />
• 22 nd St. Parking June<br />
• Swinford St Pedestrian Path Enhcmts June<br />
• 22 nd Street Open Space December<br />
2009<br />
• Harbor Blvd. Streetscape May<br />
• Angel’s Walk LA July<br />
• <strong>Port</strong>s O’ Call Paseo/S.P. Slip September<br />
2010<br />
• Cabrillo Marina Phase II May<br />
• Cabrillo Bch. Enhancements June
San Pedro<br />
Waterfront Project
History<br />
May 2002 Waterfront Access Task Force<br />
for the Community and Harbor<br />
(WATCH) report<br />
Sept 2002 ULI Advisory Services Report<br />
June 2003 Coordinated Framework Plan<br />
(SMWM)<br />
Sept 2004 EE&K/Gafcon Master Plan<br />
received by POLA Board<br />
Sept 2005 NOP/NOI issued for project<br />
with several alternatives
Project Approach<br />
Programmatic vs Project Specific<br />
• Accelerate construction <strong>of</strong> elements<br />
common to most plans<br />
• Provide linkages, amenities and activities<br />
to promote public access<br />
• Serve as catalyst to enhance future<br />
development prospects<br />
• Include elements that require Corps<br />
permits/EIS<br />
• Revisions possible in response to<br />
comments
Other Waterfront Elements<br />
Handled Separately<br />
• Marine Research Park<br />
• Relocation <strong>of</strong> Breakbulk Operations<br />
• Westway Demolition/Clean-up
Current Project Elements<br />
• New harbor basins<br />
– North Harbor, Downtown Harbor,<br />
7 th Street Harbor<br />
• Waterfront promenade<br />
• Linkages/circulation<br />
– Sampson Way improvements, 13 th St<br />
waterfront access, parking, Red Car routes<br />
• Outer Harbor Cruise Facility
Current Project Elements<br />
• <strong>Port</strong>s O’ Call commercial development<br />
(redevelop 40,000 SF and 37,500 SF new)<br />
• Relocations <strong>of</strong> Lane Victory & Catalina<br />
Express<br />
• Ralph J. Scott Fireboat, Red Car Museum/<br />
Maintenance Facility<br />
• Jankovich lease renewal
San Pedro Waterfront<br />
Preliminary Project Costs<br />
- Transportation Improvements<br />
(Sampson Way realignment) $ 44.0 million<br />
- North Harbor, Downtown Harbors,<br />
<strong>Port</strong>s O’Call, promenade $123.0 million<br />
- Outer Harbor Cruise Terminal $ 64.0 million<br />
- Cruise Terminal Parking $120.0 million<br />
- Outer Harbor Park, promenade $ 36.0 million
San Pedro Waterfront<br />
Preliminary Project Costs<br />
- Salt marsh restoration $ 15.0 million<br />
- Red car line extensions $ 30.0 million<br />
TOTAL<br />
$432.0 million<br />
Contingency (30%)<br />
130.0 million<br />
$562.0 million<br />
Cost escalation (30%)<br />
168.6 million<br />
GRAND TOTAL $730.6 million
San Pedro Waterfront Project<br />
Public Scoping Process<br />
• Joint EIR/EIS with the Army Corp. <strong>of</strong> Engineers<br />
• NOP/NOI issued on December 22, 2006<br />
• Revised NOP for Red Car Extensions issued<br />
January 17, 2007<br />
• Comment Period from December 22, 2006 to<br />
February 28, 2007<br />
• More than 100 attendees and 30 speakers at<br />
Scoping Meeting on January 23, 2007<br />
• 90 comment letters received (posted on<br />
website)
NOP/NOI Comments<br />
Significant Issue Areas<br />
• Project Scope (5-year vs 30-year, long-term plan)<br />
• More Public Involvement in Process<br />
• Outer Harbor Cruise Impacts<br />
• Circulation Strategy<br />
• Downtown Linkage Strategy<br />
• De-industrialization<br />
• Economic Development
Outer Harbor Cruise Impacts<br />
• Issues:<br />
– Air Quality<br />
Impacts<br />
– Aesthetics<br />
– Traffic<br />
– Impacts to<br />
Recreational<br />
Boating<br />
– Security
Circulation/Downtown Linkages<br />
22 nd 13 th 6 th 1 st I-110<br />
1500 ft
Potential Red Car<br />
Extensions/Alignments
De-industrialization (red)<br />
• Marine Fuel Stations: Jankovich, Mike’s Marine<br />
• SSA<br />
• Crescent Warehouse<br />
• Westways
Proposed Responses to Comments<br />
Project Revisions<br />
• Additional Open Space<br />
– San Pedro Park expanded<br />
– Fisherman’s Park<br />
• Considering relocation <strong>of</strong> Mike’s Marine and<br />
Jankovich marine fueling stations<br />
• Parking at bluff site (Samspon/7 th St.)<br />
• Revised <strong>Port</strong>s O’Call Redevelopment<br />
• Reduce size <strong>of</strong> new North Harbor to<br />
accommodate additional small cruise vessel<br />
berth
Economic Development<br />
• Market Demand Study<br />
• <strong>Port</strong>s O’ Call Redevelopment<br />
Strategy<br />
• Outer Harbor Cruise Facility<br />
Financial Analysis<br />
• Economic Benefits
Market Demand Study<br />
Maximum Restaurant/Retail Absorption (2004-2008)<br />
San Pedro Waterfront<br />
5-Mile Ring<br />
–Population<br />
–Per Capita Income<br />
–Aggregate Income<br />
Potential Share <strong>of</strong> Aggregate Income<br />
–Restaurant<br />
–Other Retail<br />
Actual/Potential Sales<br />
–Restaurant<br />
–Other Retail<br />
Market Penetration<br />
–Restaurant<br />
–Other Retail<br />
Projected Gross Sales<br />
–Restaurant<br />
–Other Retail<br />
Typical Sales per Square Foot<br />
–Restaurant<br />
–Other Retail<br />
Maximum Absorption Along Waterfront<br />
–Restaurant<br />
–Other Retail<br />
211,000<br />
$23,000<br />
$4.8 billion<br />
4.6%<br />
1.4%<br />
$223 million<br />
$68 million<br />
22.4%<br />
22.1%<br />
$50 million<br />
$15 million<br />
$500<br />
$300<br />
100,000 SF<br />
50,000 SF<br />
Source: Keyser Marston
Background<br />
<strong>Port</strong>s O’ Call<br />
Redevelopment Strategy<br />
• 28 acre site with 1,800 parking spaces<br />
• 210,000 sf original leasable space<br />
• 59,000 sf <strong>of</strong> buildings demolished replaced<br />
with open space<br />
• Currently, 150,000 SF <strong>of</strong> leasable space<br />
(131,000 SF leased, 19,000 SF vacant)<br />
• Site primarily under lease to two operators<br />
- Specialty Restaurant Corp.<br />
- San Pedro Waterfront LLC
<strong>Port</strong>s O’ Call<br />
Redevelopment Strategy<br />
• Entitle redevelopment <strong>of</strong> existing site (150,000<br />
SF) plus 150,000 sf <strong>of</strong> incremental<br />
• Consider buy-out <strong>of</strong> existing Specialty<br />
Restaurant Corp. lease<br />
• RFQ to select master developer/operator<br />
• Solicit input from developers prior to RFQ<br />
process<br />
• Structure lease terms to allow developer to<br />
establish site in the near term<br />
• Retain key tenants<br />
• Consider parking fees with validation
<strong>Port</strong>s O’ Call<br />
Conference Center<br />
• Conference centers <strong>of</strong>ten times operate at a loss<br />
(require operational subsidy)<br />
• Benefits are in transit occupancy taxes on the hotel<br />
rooms booked as a result <strong>of</strong> a convention<br />
• Conference centers perform best with hotels adjacent<br />
• Lack <strong>of</strong> adjacent hotels for <strong>Port</strong>s O’ Call site will impact<br />
functionality <strong>of</strong> conference center<br />
• 250-300 booking days are necessary for conference<br />
centers to have the opportunity to be financially selfsustaining
World Cruise Center (2006)<br />
World Cruise Center (Berth 90 - 93)<br />
Acres (Including Parking) 37.5<br />
Passengers (CY 2006) 1,104,028<br />
Net Revenue (CY 2006) $ $/Passenger<br />
Passenger Fee $4,813,097 $4.36<br />
Dockage 849,387 $0.77<br />
Stores 217,465 $0.20<br />
Total Shipping $5,879,949 $5.33<br />
Parking (Net)* $3,390,000 $3.07<br />
Total Terminal $9,269,949 $8.40<br />
Revenue/Acre $247,199<br />
Existing Improvement Value (RCN)<br />
Wharf $15,255,659<br />
Buildings 45,358,376<br />
Backland 7,763,758<br />
Total $68,377,793<br />
* Estimated net parking for cruise passengers. Parking shared<br />
with Catalina Express.
World Cruise Center (WCC)<br />
Improvements*<br />
Berth 91-92 (16 Projects)<br />
Gangways (3) $8,100,000<br />
Fenders 1,000,000<br />
Check-in Booth 1,000,000<br />
Elevator/Escalators 1,000,000<br />
Other 12 Projects 3,600,000<br />
Subtotal 14,700,000<br />
Design/Mgmt (20%) 2,940,000<br />
Total 17,640,000<br />
Berth 93 (11 Projects)<br />
Gangways (2) 5,500,000<br />
Elevators/Escalators 1,300,000<br />
Fenders 1,000,000<br />
Other 8 Projects 2,000,000<br />
Subtotal 9,800,000<br />
Design/Mgmt (20%) 1,960,000<br />
CEQA 200,000<br />
Total 11,960,000<br />
Baggage Handling Bldg. 14,500,000<br />
Exterior Improvements/<br />
Waterside/Other 13,900,000<br />
Total Inner Harbor $58,000,000<br />
* Improvements to be constructed from FY 2008 – FY 2012
Cruise Capital Improvements<br />
Existing Future Total<br />
Cost Cost Cost<br />
(In Process) (All Concepts) (All)<br />
Berth 90-93<br />
Waterside $4,000,000 $4,000,000<br />
Landside 54,000,000 54,000,000<br />
Parking - -<br />
Total 58,000,000 - 58,000,000<br />
Berth 45-47<br />
Waterside - 10,000,000 10,000,000<br />
Landside - 90,000,000 90,000,000<br />
Parking - 120,000,000 120,000,000<br />
Total - 220,000,000 220,000,000<br />
Total<br />
Waterside 4,000,000 10,000,000 14,000,000<br />
Landside 54,000,000 90,000,000 144,000,000<br />
Parking - 120,000,000 120,000,000<br />
Total $58,000,000 $220,000,000 $278,000,000
2006 Cruise Study Highlights<br />
•Passenger Volume<br />
5% Growth (’06 – ’10)<br />
3% Growth (’10 – ’20)<br />
• Passenger Fee’s<br />
Competitive Range<br />
$7 to $9<br />
•Revenue Upside<br />
incremental<br />
Tariff increases in step<br />
with new investments<br />
•Parking Revenue<br />
Upside potential
Passenger (000)<br />
$35<br />
$30<br />
$25<br />
$20<br />
$15<br />
$10<br />
$5<br />
$-<br />
Projected Cruise Related Revenue<br />
2,400<br />
2,200<br />
2,000<br />
Parking<br />
Passenger<br />
1,800<br />
Shipping<br />
1,600<br />
1,400<br />
1,200<br />
1,000<br />
2008<br />
2009<br />
2010<br />
2011<br />
2012<br />
2013<br />
2014<br />
2015<br />
2016<br />
2017<br />
2018<br />
2019<br />
2020<br />
2007<br />
Revenue (Millions)
Cruising Right Along<br />
•Cruise Ship Facility Concept Design –<br />
Finished August 2007<br />
•Includes recommendations on facility design and operational<br />
feasibility<br />
•Discussions with Cruise Customers – Ongoing<br />
•Discuss designs, operational aspects, and customer needs<br />
•Finances refined
Outer Harbor Cruise Terminal<br />
• By 2012, approximately 430 new jobs (Some ship service jobs, primarily<br />
service sector)<br />
• $14M in additional income<br />
• $34M in additional revenue<br />
• Additional 20 vessel calls and 275,000 revenue passengers/year<br />
Commercial Development<br />
• Approximately 250 jobs created (primarily service sector)<br />
• Approximately $64M in sales generated<br />
Cargo Handling<br />
Economic Benefits<br />
• Existing breakbulk cargo operations will be relocated<br />
• Approximately 72 direct jobs preserved with expansion opportunities and<br />
potential job growth at new locations
Outreach<br />
Process<br />
(Going Forward)
Upcoming Outreach<br />
• CEQA Process<br />
• Stakeholder Meetings/Revised Project<br />
Description Process<br />
• Information Center Open House
CEQA Process<br />
San Pedro Waterfront Project<br />
May 17 Special<br />
BOHC Mtg<br />
Aug 16<br />
BOHC Mtg<br />
Revised<br />
Project<br />
Description
Next Steps<br />
• Meet with stakeholders & open storefront<br />
• Revise project description and alternatives<br />
• Study environmental impacts<br />
• Release Draft EIR/EIS