<strong>SAN</strong> <strong>PEDRO</strong> <strong>WATERFRONT</strong> <strong>PROGRAM</strong><br />

Waterfront<br />

Enhancements<br />

Waterfront<br />

Gateway<br />

Cabrillo Marina, Ph 2<br />

San Pedro Waterfront


Agenda<br />

• Approved Projects<br />

– Waterfront Gateway<br />

– Waterfront Enhancements<br />

– Cabrillo Marina, Phase 2<br />

– Public Art<br />

• San Pedro Waterfront Project<br />

– Project Elements<br />

– Scoping Comments<br />

• Economic Development<br />

• Outreach Process (Going Forward)


Total Costs<br />

Approved Projects<br />

• Waterfront Gateway<br />

• Waterfront Enhancements<br />

• Cabrillo Marina Phase II<br />

$ 49.8 million*<br />

$ 56.8 million<br />

$153.1 million<br />

TOTAL<br />

$259.7 million**<br />

* $35 million completed<br />

** $44 million in fiscal year 07/08


<strong>WATERFRONT</strong> GATEWAY<br />

• Cruise Ship Promenade<br />

• Harbor Boulevard Parkway<br />

• Gateway Plaza<br />

• Harbor Boulevard<br />

Streetscape (Swinford St<br />

to 5 th Street)<br />

Total Cost: $49.8 million


<strong>WATERFRONT</strong> GATEWAY<br />

Cruise Ship Promenade<br />

• Project Elements:<br />

– Promenades<br />

– Landscaping & Seating<br />

– New Lighting<br />

– Interpretive Signage<br />

– Bocce ball courts<br />

– Public Art<br />

• Status: construction completed in<br />

December 2005<br />

• Cost: $14.1 million


<strong>WATERFRONT</strong> GATEWAY<br />

Cruise Ship Promenade – Public Art Elements<br />

Seat wall tiles by local harbor area artists<br />

“Tell Tales” by Doug Hollis


<strong>WATERFRONT</strong> GATEWAY<br />

Harbor Boulevard Parkway<br />

• Project Elements:<br />

– Multi-use promenade between<br />

Swinford & 5 th Street<br />

– Plazas at every street<br />

intersection<br />

– Dedicated bike path<br />

– Lighting<br />

– Interpretive Signage<br />

– Landscaping & Seating<br />

• Status: Construction complete<br />

October 2005<br />

• Cost: $24.3 million


• Project Elements:<br />

– Interactive water features<br />

– Plaza<br />

– Landscaping<br />

– Automatic Restrooms<br />

• Status: Under construction,<br />

est. completion Feb. 2008<br />

• Cost: $11.2 million<br />

<strong>WATERFRONT</strong> GATEWAY<br />

Gateway Plaza


<strong>WATERFRONT</strong> GATEWAY<br />

Harbor Boulevard Streetscape<br />

• Project Elements:<br />

– Decorative pedestrian<br />

crossings at Swinford,<br />

O’Farrell, 1 st and 5 th Streets*<br />

• Status: In Conceptual Design<br />

• Cost: $0.208 million<br />

*Original Scope included street<br />

widening, curbs, sidewalks,<br />

street lighting, landscaping, and<br />

irrigation<br />

Design<br />

START<br />

JAN 08<br />

FINISH<br />

JUN 08<br />

Construction<br />

NOV 08<br />

MAY 09


<strong>WATERFRONT</strong> ENHANCEMENTS<br />

• Downtown Plaza<br />

• 22 nd /Sampson Parking & Warehouse No. 1 Outlook<br />

• 22 nd Street Open Space<br />

• <strong>Port</strong>s O’Call Paseo/S.P. Slip<br />

• Cabrillo Beach<br />

• Angels Walk L.A.<br />

• Swinford Pedestrian Path Improvements<br />

Total Cost: $56.8 million


• Project Elements:<br />

– Pedestrian-oriented Plaza<br />

& Parking between 5 th<br />

Street and Maritime<br />

Museum<br />

– Sidewalk, crosswalk &<br />

landscaping<br />

improvements<br />

– Lighting improvements to<br />

match downtown<br />

– Signage<br />

<strong>WATERFRONT</strong> ENHANCEMENTS<br />

Downtown Plaza<br />

• Status: Completing design<br />

• Cost: $2.9 million<br />

Design<br />

START<br />

FINISH<br />

MAY 07<br />

Construction<br />

NOV 07<br />

JUN 08


<strong>WATERFRONT</strong> ENHANCEMENTS<br />

<strong>Port</strong>s O’ Call Paseo/S.P. Slip<br />

• Project Elements:<br />

• Wide and safe pedestrian pathway on<br />

landside <strong>of</strong> <strong>Port</strong>s O’ Call Village<br />

• Pedestrian linkage to 13 th Street<br />

• Landscaping, lighting & signage<br />

improvements<br />

• New restrooms<br />

• Plaza at head <strong>of</strong> S.P. Slip<br />

• Public art<br />

• Parking lot redesign<br />

• Status: Design in progress<br />

• Cost: $26.9 million<br />

START<br />

FINISH<br />

Design<br />

Construction<br />

FEB 08<br />

SEP 07<br />

SEP 09


<strong>WATERFRONT</strong> ENHANCEMENTS<br />

<strong>Port</strong>s O’ Call Paseo/S.P. Slip<br />

Public Art Elements


<strong>WATERFRONT</strong> ENHANCEMENTS<br />

22 nd Street/Sampson Parking<br />

• Project Elements:<br />

• Surface parking for <strong>Port</strong>s O’Call &<br />

events<br />

• Use <strong>of</strong> sustainable design elements<br />

including grass pavers and<br />

bioswales<br />

• Perimeter landscaping<br />

Sampson Way<br />

• Status: Design in progress<br />

• Cost: $5.6 million<br />

START<br />

FINISH<br />

Design<br />

Construction<br />

NOV 07<br />

JUN 07<br />

JUN 08<br />

22 nd Street


• Project Elements:<br />

– 4.5 acres <strong>of</strong> turf<br />

– 12 acres <strong>of</strong> native<br />

plantings and pathways<br />

– Use <strong>of</strong> sustainable design<br />

elements (bioswales)<br />

– Public Restrooms<br />

– Parking for visitors &<br />

marina businesses<br />

• Status: Design in progress<br />

<strong>WATERFRONT</strong> ENHANCEMENTS<br />

22 nd Street Open Space<br />

• Cost: $9.2 million<br />

START<br />

FINISH<br />

Design<br />

Construction<br />

DEC 07<br />

AUG 07<br />

DEC 08


• Project Elements:<br />

– Paseo along Shoshonean Way<br />

– Wider paseo along Cabrillo Beach<br />

with seating<br />

– Paseo to fishing pier<br />

– Landscaping<br />

– Improved picnic area<br />

– Public Art<br />

• Status: In Conceptual Design<br />

• Cost: $8.9 million<br />

<strong>WATERFRONT</strong> ENHANCEMENTS<br />

Cabrillo Beach<br />

Design<br />

Construction<br />

START<br />

DEC 08<br />

NOV 09<br />

FINISH<br />

JUN 09<br />

JUN 10


• Project Elements:<br />

– Wayfinding & Information<br />

Stanchions<br />

– Supports self-guided tours <strong>of</strong><br />

waterfront<br />

• Status: Design underway<br />

• Cost: $2.1 million<br />

<strong>WATERFRONT</strong> ENHANCEMENTS<br />

Angels Walk L.A.<br />

START<br />

FINISH<br />

Design<br />

Construction<br />

FEB 08<br />

SEP 07<br />

JUL 09


<strong>WATERFRONT</strong> ENHANCEMENTS<br />

Swinford Pedestrian Path Enhancements<br />

• Project<br />

Elements:<br />

– Landscaping<br />

– Lighting<br />

– Improvements to<br />

existing pedestrian<br />

walkway<br />

• Status: In Design<br />

• Cost: $1.2 million<br />

START<br />

FINISH<br />

Design<br />

Construction<br />

OCT 07<br />

MAY 07<br />

JUN 08


CABRILLO MARINA – PHASE II<br />

• Project Elements:<br />

– Redevelop existing slips<br />

& develop new slips<br />

– Landside storage <strong>of</strong><br />

boats (mast up)<br />

– Promenade ( )<br />

– Marina Buildings<br />

– Youth sailing facilities<br />

• Status: Design in<br />

progress<br />

• Cost: $153.1 million<br />

Design<br />

Construction<br />

START<br />

MAY 08<br />

FINISH<br />

DEC 07<br />

MAY 10


Project Deliverables Schedule<br />

2008<br />

• Gateway Plaza/Water feature February<br />

• Downtown Plaza June<br />

• 22 nd St. Parking June<br />

• Swinford St Pedestrian Path Enhcmts June<br />

• 22 nd Street Open Space December<br />

2009<br />

• Harbor Blvd. Streetscape May<br />

• Angel’s Walk LA July<br />

• <strong>Port</strong>s O’ Call Paseo/S.P. Slip September<br />

2010<br />

• Cabrillo Marina Phase II May<br />

• Cabrillo Bch. Enhancements June


San Pedro<br />

Waterfront Project


History<br />

May 2002 Waterfront Access Task Force<br />

for the Community and Harbor<br />

(WATCH) report<br />

Sept 2002 ULI Advisory Services Report<br />

June 2003 Coordinated Framework Plan<br />

(SMWM)<br />

Sept 2004 EE&K/Gafcon Master Plan<br />

received by POLA Board<br />

Sept 2005 NOP/NOI issued for project<br />

with several alternatives


Project Approach<br />

Programmatic vs Project Specific<br />

• Accelerate construction <strong>of</strong> elements<br />

common to most plans<br />

• Provide linkages, amenities and activities<br />

to promote public access<br />

• Serve as catalyst to enhance future<br />

development prospects<br />

• Include elements that require Corps<br />

permits/EIS<br />

• Revisions possible in response to<br />

comments


Other Waterfront Elements<br />

Handled Separately<br />

• Marine Research Park<br />

• Relocation <strong>of</strong> Breakbulk Operations<br />

• Westway Demolition/Clean-up


Current Project Elements<br />

• New harbor basins<br />

– North Harbor, Downtown Harbor,<br />

7 th Street Harbor<br />

• Waterfront promenade<br />

• Linkages/circulation<br />

– Sampson Way improvements, 13 th St<br />

waterfront access, parking, Red Car routes<br />

• Outer Harbor Cruise Facility


Current Project Elements<br />

• <strong>Port</strong>s O’ Call commercial development<br />

(redevelop 40,000 SF and 37,500 SF new)<br />

• Relocations <strong>of</strong> Lane Victory & Catalina<br />

Express<br />

• Ralph J. Scott Fireboat, Red Car Museum/<br />

Maintenance Facility<br />

• Jankovich lease renewal


San Pedro Waterfront<br />

Preliminary Project Costs<br />

- Transportation Improvements<br />

(Sampson Way realignment) $ 44.0 million<br />

- North Harbor, Downtown Harbors,<br />

<strong>Port</strong>s O’Call, promenade $123.0 million<br />

- Outer Harbor Cruise Terminal $ 64.0 million<br />

- Cruise Terminal Parking $120.0 million<br />

- Outer Harbor Park, promenade $ 36.0 million


San Pedro Waterfront<br />

Preliminary Project Costs<br />

- Salt marsh restoration $ 15.0 million<br />

- Red car line extensions $ 30.0 million<br />

TOTAL<br />

$432.0 million<br />

Contingency (30%)<br />

130.0 million<br />

$562.0 million<br />

Cost escalation (30%)<br />

168.6 million<br />

GRAND TOTAL $730.6 million


San Pedro Waterfront Project<br />

Public Scoping Process<br />

• Joint EIR/EIS with the Army Corp. <strong>of</strong> Engineers<br />

• NOP/NOI issued on December 22, 2006<br />

• Revised NOP for Red Car Extensions issued<br />

January 17, 2007<br />

• Comment Period from December 22, 2006 to<br />

February 28, 2007<br />

• More than 100 attendees and 30 speakers at<br />

Scoping Meeting on January 23, 2007<br />

• 90 comment letters received (posted on<br />

website)


NOP/NOI Comments<br />

Significant Issue Areas<br />

• Project Scope (5-year vs 30-year, long-term plan)<br />

• More Public Involvement in Process<br />

• Outer Harbor Cruise Impacts<br />

• Circulation Strategy<br />

• Downtown Linkage Strategy<br />

• De-industrialization<br />

• Economic Development


Outer Harbor Cruise Impacts<br />

• Issues:<br />

– Air Quality<br />

Impacts<br />

– Aesthetics<br />

– Traffic<br />

– Impacts to<br />

Recreational<br />

Boating<br />

– Security


Circulation/Downtown Linkages<br />

22 nd 13 th 6 th 1 st I-110<br />

1500 ft


Potential Red Car<br />

Extensions/Alignments


De-industrialization (red)<br />

• Marine Fuel Stations: Jankovich, Mike’s Marine<br />

• SSA<br />

• Crescent Warehouse<br />

• Westways


Proposed Responses to Comments<br />

Project Revisions<br />

• Additional Open Space<br />

– San Pedro Park expanded<br />

– Fisherman’s Park<br />

• Considering relocation <strong>of</strong> Mike’s Marine and<br />

Jankovich marine fueling stations<br />

• Parking at bluff site (Samspon/7 th St.)<br />

• Revised <strong>Port</strong>s O’Call Redevelopment<br />

• Reduce size <strong>of</strong> new North Harbor to<br />

accommodate additional small cruise vessel<br />

berth


Economic Development<br />

• Market Demand Study<br />

• <strong>Port</strong>s O’ Call Redevelopment<br />

Strategy<br />

• Outer Harbor Cruise Facility<br />

Financial Analysis<br />

• Economic Benefits


Market Demand Study<br />

Maximum Restaurant/Retail Absorption (2004-2008)<br />

San Pedro Waterfront<br />

5-Mile Ring<br />

–Population<br />

–Per Capita Income<br />

–Aggregate Income<br />

Potential Share <strong>of</strong> Aggregate Income<br />

–Restaurant<br />

–Other Retail<br />

Actual/Potential Sales<br />

–Restaurant<br />

–Other Retail<br />

Market Penetration<br />

–Restaurant<br />

–Other Retail<br />

Projected Gross Sales<br />

–Restaurant<br />

–Other Retail<br />

Typical Sales per Square Foot<br />

–Restaurant<br />

–Other Retail<br />

Maximum Absorption Along Waterfront<br />

–Restaurant<br />

–Other Retail<br />

211,000<br />

$23,000<br />

$4.8 billion<br />

4.6%<br />

1.4%<br />

$223 million<br />

$68 million<br />

22.4%<br />

22.1%<br />

$50 million<br />

$15 million<br />

$500<br />

$300<br />

100,000 SF<br />

50,000 SF<br />

Source: Keyser Marston


Background<br />

<strong>Port</strong>s O’ Call<br />

Redevelopment Strategy<br />

• 28 acre site with 1,800 parking spaces<br />

• 210,000 sf original leasable space<br />

• 59,000 sf <strong>of</strong> buildings demolished replaced<br />

with open space<br />

• Currently, 150,000 SF <strong>of</strong> leasable space<br />

(131,000 SF leased, 19,000 SF vacant)<br />

• Site primarily under lease to two operators<br />

- Specialty Restaurant Corp.<br />

- San Pedro Waterfront LLC


<strong>Port</strong>s O’ Call<br />

Redevelopment Strategy<br />

• Entitle redevelopment <strong>of</strong> existing site (150,000<br />

SF) plus 150,000 sf <strong>of</strong> incremental<br />

• Consider buy-out <strong>of</strong> existing Specialty<br />

Restaurant Corp. lease<br />

• RFQ to select master developer/operator<br />

• Solicit input from developers prior to RFQ<br />

process<br />

• Structure lease terms to allow developer to<br />

establish site in the near term<br />

• Retain key tenants<br />

• Consider parking fees with validation


<strong>Port</strong>s O’ Call<br />

Conference Center<br />

• Conference centers <strong>of</strong>ten times operate at a loss<br />

(require operational subsidy)<br />

• Benefits are in transit occupancy taxes on the hotel<br />

rooms booked as a result <strong>of</strong> a convention<br />

• Conference centers perform best with hotels adjacent<br />

• Lack <strong>of</strong> adjacent hotels for <strong>Port</strong>s O’ Call site will impact<br />

functionality <strong>of</strong> conference center<br />

• 250-300 booking days are necessary for conference<br />

centers to have the opportunity to be financially selfsustaining


World Cruise Center (2006)<br />

World Cruise Center (Berth 90 - 93)<br />

Acres (Including Parking) 37.5<br />

Passengers (CY 2006) 1,104,028<br />

Net Revenue (CY 2006) $ $/Passenger<br />

Passenger Fee $4,813,097 $4.36<br />

Dockage 849,387 $0.77<br />

Stores 217,465 $0.20<br />

Total Shipping $5,879,949 $5.33<br />

Parking (Net)* $3,390,000 $3.07<br />

Total Terminal $9,269,949 $8.40<br />

Revenue/Acre $247,199<br />

Existing Improvement Value (RCN)<br />

Wharf $15,255,659<br />

Buildings 45,358,376<br />

Backland 7,763,758<br />

Total $68,377,793<br />

* Estimated net parking for cruise passengers. Parking shared<br />

with Catalina Express.


World Cruise Center (WCC)<br />

Improvements*<br />

Berth 91-92 (16 Projects)<br />

Gangways (3) $8,100,000<br />

Fenders 1,000,000<br />

Check-in Booth 1,000,000<br />

Elevator/Escalators 1,000,000<br />

Other 12 Projects 3,600,000<br />

Subtotal 14,700,000<br />

Design/Mgmt (20%) 2,940,000<br />

Total 17,640,000<br />

Berth 93 (11 Projects)<br />

Gangways (2) 5,500,000<br />

Elevators/Escalators 1,300,000<br />

Fenders 1,000,000<br />

Other 8 Projects 2,000,000<br />

Subtotal 9,800,000<br />

Design/Mgmt (20%) 1,960,000<br />

CEQA 200,000<br />

Total 11,960,000<br />

Baggage Handling Bldg. 14,500,000<br />

Exterior Improvements/<br />

Waterside/Other 13,900,000<br />

Total Inner Harbor $58,000,000<br />

* Improvements to be constructed from FY 2008 – FY 2012


Cruise Capital Improvements<br />

Existing Future Total<br />

Cost Cost Cost<br />

(In Process) (All Concepts) (All)<br />

Berth 90-93<br />

Waterside $4,000,000 $4,000,000<br />

Landside 54,000,000 54,000,000<br />

Parking - -<br />

Total 58,000,000 - 58,000,000<br />

Berth 45-47<br />

Waterside - 10,000,000 10,000,000<br />

Landside - 90,000,000 90,000,000<br />

Parking - 120,000,000 120,000,000<br />

Total - 220,000,000 220,000,000<br />

Total<br />

Waterside 4,000,000 10,000,000 14,000,000<br />

Landside 54,000,000 90,000,000 144,000,000<br />

Parking - 120,000,000 120,000,000<br />

Total $58,000,000 $220,000,000 $278,000,000


2006 Cruise Study Highlights<br />

•Passenger Volume<br />

5% Growth (’06 – ’10)<br />

3% Growth (’10 – ’20)<br />

• Passenger Fee’s<br />

Competitive Range<br />

$7 to $9<br />

•Revenue Upside<br />

incremental<br />

Tariff increases in step<br />

with new investments<br />

•Parking Revenue<br />

Upside potential


Passenger (000)<br />

$35<br />

$30<br />

$25<br />

$20<br />

$15<br />

$10<br />

$5<br />

$-<br />

Projected Cruise Related Revenue<br />

2,400<br />

2,200<br />

2,000<br />

Parking<br />

Passenger<br />

1,800<br />

Shipping<br />

1,600<br />

1,400<br />

1,200<br />

1,000<br />

2008<br />

2009<br />

2010<br />

2011<br />

2012<br />

2013<br />

2014<br />

2015<br />

2016<br />

2017<br />

2018<br />

2019<br />

2020<br />

2007<br />

Revenue (Millions)


Cruising Right Along<br />

•Cruise Ship Facility Concept Design –<br />

Finished August 2007<br />

•Includes recommendations on facility design and operational<br />

feasibility<br />

•Discussions with Cruise Customers – Ongoing<br />

•Discuss designs, operational aspects, and customer needs<br />

•Finances refined


Outer Harbor Cruise Terminal<br />

• By 2012, approximately 430 new jobs (Some ship service jobs, primarily<br />

service sector)<br />

• $14M in additional income<br />

• $34M in additional revenue<br />

• Additional 20 vessel calls and 275,000 revenue passengers/year<br />

Commercial Development<br />

• Approximately 250 jobs created (primarily service sector)<br />

• Approximately $64M in sales generated<br />

Cargo Handling<br />

Economic Benefits<br />

• Existing breakbulk cargo operations will be relocated<br />

• Approximately 72 direct jobs preserved with expansion opportunities and<br />

potential job growth at new locations


Outreach<br />

Process<br />

(Going Forward)


Upcoming Outreach<br />

• CEQA Process<br />

• Stakeholder Meetings/Revised Project<br />

Description Process<br />

• Information Center Open House


CEQA Process<br />

San Pedro Waterfront Project<br />

May 17 Special<br />

BOHC Mtg<br />

Aug 16<br />

BOHC Mtg<br />

Revised<br />

Project<br />

Description


Next Steps<br />

• Meet with stakeholders & open storefront<br />

• Revise project description and alternatives<br />

• Study environmental impacts<br />

• Release Draft EIR/EIS