SEPTEMBER 2010 - Proactive Investors
SEPTEMBER 2010 - Proactive Investors
SEPTEMBER 2010 - Proactive Investors
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Brewery Creek Project – Yukon<br />
• NI 43-101 indicated 3.98 MM tonnes Au @ 1.135<br />
g/t (0.038 oz/t) and inferred 2.20 MM tonnes Au<br />
@ 2.01 g/t (0.059 oz/t) using a cut-off grade of<br />
0.5 g/t Au (5)<br />
• Operated from 1996 through 2002 and produced<br />
a total of 278,484 ounces of gold<br />
• Mining and production permits in place to 2021<br />
• 90% of previous drilling less than 50 m deep<br />
• Option from Alexco Resources to earn a 75%<br />
interest by spending C$6.0 MM before 2015<br />
• Extensive RC & core drill campaign is underway<br />
to expand existing oxide resource<br />
• Comprehensive new structural model;<br />
regionally applicable<br />
Brewery Creek<br />
William Sheriff, CEO reviews core with Mike<br />
Burke, YGS<br />
TSX:GPD | Golden Predator Corp. | 15