download PDF - Puk
download PDF - Puk
download PDF - Puk
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
System overview, manuals for planning and installation<br />
Device cup UG45, pre-converted<br />
Assembly instructions – plug socket systems<br />
Device mounting cup UG, pre-converted<br />
Snap-in device mounting cup for round and angular installation units. For up to four heavy-current-engineering devices or three data-processingtechnology<br />
devices. Angle plug insert for fl oor constructions higher than 75 mm.<br />
Pre-converted device cup<br />
Delivery of factory-provided device cups,<br />
completed with sockets wired for coupler plugs.<br />
Device installation cup<br />
Insert the socket component of the preconverted<br />
3-pole cable into the snap-in piece<br />
of the device installation cup.<br />
Plug-in connector<br />
Self-locking and coded plug-in connectors<br />
provide for error-free assembly with the device<br />
cup. For unlocking unlatch the grey springcatch<br />
with a screwdriver.<br />
Connecting lines<br />
Choose cables according to colour (black:<br />
power supply system; white: data processing<br />
system) and pull them inside the hollow fl oor.<br />
Installation unit<br />
Insert the device cup (pre-mounted with<br />
connecting cables) bevelled into lock-in leads<br />
and lock in tightly at the opposing side. Use only<br />
the two bottom lock-in positions.<br />
Underfloor distributor<br />
Insert the plug of the 3-pole cable into one of<br />
the six output-sockets of the distributor and<br />
complete with 5-pole input.<br />
PUK-WERKE KG Kunststoff-Stahlverarbeitung GmbH & Co.<br />
Nobelstr. 45 – 55 12057 Berlin Phone: +49 30 68283-01 Fax: +49 30 68283-266 info@puk.com<br />
1
System overview, manuals for planning and installation<br />
Device cup UG, pre-converted<br />
Assembly instructions – plug socket systems<br />
Device mounting cup UG45, pre-converted<br />
<br />
Pre-converted device cup, complete with snap-in plug component and pre-wired sockets. Including all covers and mounting material. For latching into<br />
a round or square installation unit. For up to 4 heavy current engineering installation devices. For the installation of 3-pole connecting lines with plug<br />
connector and socket component.<br />
Pre-converted device cups<br />
Delivery of device cups: fully pre-mounted with<br />
sockets and pre-wired on connector plugs.<br />
Installation unit<br />
Place the complete installation unit with the<br />
device cups from the top into the existing fl oor<br />
opening and fi xate in the fl oor with claws.<br />
Device mounting cup<br />
Place the pre-converted device cup into the<br />
lock-in leads of the installation units as deep<br />
as possible.<br />
Plug connector<br />
Self-locking and coded plug connectors<br />
facilitate faultless mounting with the device<br />
cup. To release, unlatch the grey spring catch<br />
with a turn screw.<br />
Connecting lines<br />
Select cables according to colour (black: normal<br />
net, white: data processing net) and length.<br />
Insert the socket component of the 3-pole<br />
connecting line onto the snap-in piece in the<br />
device cup.<br />
Underfloor distributor<br />
Insert the plug of the 3-pole connecting line in<br />
one of the six output sockets of the distributor<br />
and complete with 5-pole input.<br />
<br />
<br />
2<br />
PUK-WERKE KG Kunststoff-Stahlverarbeitung GmbH & Co.<br />
Nobelstr. 45 – 55 12057 Berlin Phone: +49 30 68283-01 Fax: +49 30 68283-266 info@puk.com