October 23, 2012 Board Minutes - Placentia-Yorba Linda Unified ...
October 23, 2012 Board Minutes - Placentia-Yorba Linda Unified ...
October 23, 2012 Board Minutes - Placentia-Yorba Linda Unified ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Board</strong> <strong>Minutes</strong> - 8 <strong>October</strong> <strong>23</strong>, <strong>2012</strong><br />
NOTICES OF COMPLETION<br />
P.O. Number Contractor Project<br />
207488 Hardy & Harper, Inc. Kraemer Middle School Basketball Courts<br />
Bid No. 208-05 Asphalt/Earth Moving,<br />
Grading Unit Price Bid<br />
Remove, recompact, subgrade and<br />
replace with 6” AC paving, seal and<br />
restripe asphalt<br />
300373 Hardy & Harper, Inc. Kraemer Middle School Alley<br />
Bid No. 208-05 Asphalt/Earth Moving,<br />
Grading Unit Price Bid<br />
Remove, and replace 3” AC paving, grind<br />
existing asphalt, apply tack coat and<br />
overlay, seal and restripe asphalt<br />
300301 Hardy & Harper, Inc. Esperanza High School<br />
Bid No. 208-05 Asphalt/Earth Moving,<br />
Grading Unit Price Bid<br />
Grind existing asphalt, repave, remove,<br />
replace, seal and restripe.<br />
206825 Hardy & Harper, Inc. El Camino High School<br />
Bid No. 208-05 Asphalt/Earth Moving,<br />
Grading Unit Price Bid<br />
Overlay existing asphalt at removed<br />
portables, apply sealer, and restripe<br />
300681 Hardy & Harper, Inc. Valencia High School<br />
Bid No. 212-09<br />
North Campus Concrete Replacement<br />
Project