Image Courtesy: Mott MacDonald<br />
TRANSPORTATION<br />
●From page 18<br />
stations, fire alarm & detection system<br />
layout drawings, procurement specifications<br />
and BOQ for all electrical<br />
equipment and preparing lighting protection<br />
layout for above ground buildings.<br />
One of the challenging part of the<br />
line to construct was Mandi House on<br />
Line 3. Mandi House Station is located<br />
under Sikandra Road, a busy and thriving<br />
thoroughfare in the city. Much of<br />
the station had to be built top-down.<br />
The diaphragm wall panels built from<br />
the ground level formed the permanent<br />
walls of the station.<br />
Phase II<br />
DMRC had set itself a target to complete<br />
the Phase II lines, which will add<br />
another 121 km to the new network, by<br />
2010 to coincide with Delhi’s hosting<br />
of the Commonwealth Games. In October<br />
2007, DMRC awarded Bombardier<br />
Transportation a $43 m contract for<br />
the design, manufacture, supply, installation<br />
and testing of signalling equipment<br />
and rolling stock order and E &<br />
C activities are proceeding as expected.<br />
DMRC had, as recently as September<br />
2008, said the overall progress of Phase-<br />
II project is 8.96%, since its inception.<br />
Delhi Metro Rail Network<br />
Delhi Metro’s master plan target is 241<br />
km to be reached by 2021. ICA<br />
PROJECT CREDITS:<br />
Asset Owner & Operator: Delhi Metro Rail<br />
Corporation (DMRC)<br />
Design Consultants: Mott McDonald<br />
Rolling Stock for Phase I: Consortia of<br />
Hyundai Rotem, Mitsubishi Corporation and<br />
Mitsubishi Electric Corporation, and Bharat<br />
Earth Movers Limited (BEML)<br />
Rolling Stock for Phase II: Bombardier<br />
Movia<br />
E & C Contractor for Phase II: Consortia<br />
of Alpine-Samsung-HCC and Afcons<br />
A Delhi Metro Station<br />
ROUTE DETAILS – PHASE 1<br />
Lines – Phase 1<br />
Distant / Stations<br />
Line 1: Shahdara-Tri Ngar-Rithala 22.06km (13.7 miles) / 18<br />
Line 2: Vishwa Vidyalaya-Central Secretariat 10.84km (6.7 miles) /10<br />
Line 3: Indraprastha-Barakhamba Road-Dwarka 32.10km (19.9 miles) / 31<br />
Sub City<br />
Volume 2 Issue 7 2008 ICA 19