17.06.2014 Views

February Regular Board Meeting Minutes - Rocky River City Schools

February Regular Board Meeting Minutes - Rocky River City Schools

February Regular Board Meeting Minutes - Rocky River City Schools

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

KENSINGTON INTERMEDIATE SCHOOL ADDITION AND RENOVATION<br />

PROJECT:<br />

CHANGE<br />

EVENT<br />

DESCRIPTION CONTRACTOR AMOUNT<br />

089 Paint existing door frames<br />

at the Media Center/<br />

Commons and corridor<br />

tackboard trim to match the<br />

new color scheme. These<br />

items were blue in color and<br />

were not scheduled to be<br />

painted.<br />

091 The general trades<br />

contractor replaced<br />

acoustical ceiling tiles<br />

throughout the existing<br />

building for other<br />

contractors. The appropriate<br />

contractors are being<br />

backcharged for their<br />

portion of the work. A small<br />

portion of the tile<br />

replacements ($334.07)<br />

pertained to tiles that were<br />

damaged/stained prior to<br />

the start of the project and<br />

were requested to be<br />

replaced.<br />

094 The general trades<br />

contractor performed touchup<br />

painting throughout the<br />

existing building for other<br />

contractors. The appropriate<br />

contractors are being backcharged<br />

for their portion of<br />

the work.<br />

John G. Johnson<br />

Construction<br />

John G. Johnson<br />

Construction<br />

AAA American<br />

Abatement & Asbestos<br />

P K Mechanical<br />

Mid-West Telephone<br />

Service<br />

John G. Johnson<br />

Construction<br />

AAA American<br />

Abatement & Asbestos<br />

Enertech Electrical<br />

P K Mechanical<br />

Mid-West Telephone<br />

Service<br />

Digital Security<br />

Systems<br />

$549.78<br />

$2,722.05<br />

($466.91)<br />

($1,561.98)<br />

($359.09)<br />

$1,281.29<br />

($59.13)<br />

($280.90)<br />

($379.46)<br />

($280.90)<br />

($280.90)<br />

096 The piano in the Music<br />

Room was damaged by<br />

contractor work in that<br />

area. The school district<br />

John G. Johnson<br />

Construction<br />

Mid-West Telephone<br />

($200.00)<br />

($420.00)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!