EXHIBIT F<br />

BOARD OF EDUCATION MEETING<br />

<strong>February</strong> 21, 2013<br />

RESOLUTION TO APPROVE CHANGE MANAGEMENT ITEMS (CMI’S)<br />

BE IT RESOLVED by the <strong>Board</strong> of Education of the <strong>Rocky</strong> <strong>River</strong> <strong>City</strong> School<br />

District that the following Change Management Items for the <strong>Rocky</strong> <strong>River</strong> High<br />

School Additions and Renovation Project, Kensington Intermediate School Addition<br />

and Renovation Project and Goldwood Primary School Addition and Renovation<br />

Project be ratified as previously recommended by the Architect and the Executive<br />

Director of Construction Services.<br />

ROCKY RIVER HIGH SCHOOL SCHOOL ADDITIONS AND RENOVATION<br />

PROJECT:<br />

CHANGE<br />

EVENT<br />

DESCRIPTION CONTRACTOR AMOUNT<br />

073 Fur out existing walls in the<br />

Music Area with drywall due to<br />

the condition of the existing walls<br />

exposed by demolition. This work<br />

was performed on a time-andmaterial<br />

basis.<br />

107 Add a drywall soffit in Corridor<br />

1010 and delete a drywall soffit in<br />

Science Commons 2008 as a result<br />

of coordinating the routing of the<br />

M/E/P systems.<br />

115 Remove and relocate the<br />

ductwork feeding Instrumental<br />

Room 1114 to raise the elevation<br />

of the wall grille on the teaching<br />

wall. Work involves relocation of<br />

installed HVAC piping adjacent to<br />

the ductwork. The costs from the<br />

General Trades Contractor for<br />

masonry cutting and patching will<br />

be included in a future change<br />

proposal.<br />

150 Contractors were directed to work<br />

overtime on Saturdays to make up<br />

days lost on critical activities due<br />

to conditions encountered during<br />

the Summer 2012 work. The costs<br />

Mosser<br />

Construction, Inc.<br />

Mosser<br />

Construction, Inc.<br />

Castle Heating &<br />

Air<br />

Mosser<br />

Construction, Inc.<br />

(Interiors)<br />

Mosser<br />

$18,921.39<br />

No Change<br />

$4,502.92<br />

$19,285.34<br />

$8,759.60