Making our world safer<br />

<strong>RSPO</strong> <strong>CERTIFICATION</strong> <strong>ASSESSMENT</strong><br />

<strong>PUBLIC</strong> <strong>SUMMARY</strong> <strong>REPORT</strong><br />

Date of assessment<br />

04 to 08.07.2011<br />

PT. TUVNORD Indonesia<br />

System Certification Management<br />

Has assessed<br />

PT. Tapian Nadenggan<br />

Palm Oil Mill and Supply Base for Compliance to <strong>RSPO</strong> Principles and Criteria for<br />

Sustainable Palm Oil Production<br />

Langga Payung POM and Supply Base<br />

CPO 36,906.99 t & PK 9,492.28 t<br />

Revision 3<br />

Report prepared by<br />

Wieke Savitri<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 1


TABLE OF CONTENTS<br />

Summary 3<br />

Abbreviations Used 3<br />

1. SCOPE OF THE <strong>CERTIFICATION</strong> <strong>ASSESSMENT</strong> 4<br />

1.1 National Interpretations 4<br />

1.2 Scope of Certification 4<br />

1.3 Location 5<br />

1.4 1. Areas of estates<br />

2.Description of Supply Base<br />

7<br />

7<br />

3 Company Background and Ownership History 7<br />

1.5 Dates of Planting and Replanting Cycle 9<br />

1.6 Other Certifications Held 9<br />

1.7 Time-Bound Plan for Other Certification Units 10<br />

1.8 Approximate Tonnages Certified 11<br />

1.9 Date Certification Issued and Scope of Certificate 11<br />

2. <strong>ASSESSMENT</strong> PROCESS 11<br />

2.1 Certification Body 11<br />

2.2 Assessment Methodology 12<br />

2.3 Certification assessment checklist of principles and criteria 13<br />

2.4 Review of documents 13<br />

2.5 On-site and Follow-up interviews 13<br />

2.6 Resolution of Corrective actions 14<br />

2.7 Qualifications of lead assessor and assessment team 14<br />

2.8 Outline of how stakeholders were interviewed 16<br />

2.9 List of stakeholders 16<br />

2.10 Questions posed in interviews with stakeholders 17<br />

2.11 Date of next surveillance visit 17<br />

3. <strong>ASSESSMENT</strong> FINDINGS 15<br />

3.1 Summary of findings 18<br />

3.2 Detailed Non-Conformity Report, Corrective Actions taken and Auditors’<br />

36<br />

Conclusions<br />

3.3 1.Noteworthy positive components 46<br />

2. Some Recommendations for Improvement to the Mill and Estates 46<br />

3.4 Issues raised by stakeholders and findings of the assessment team 47<br />

3.5 Certified organization’s acknowledgement of internal responsibility 48<br />

3.6 Formal sign-off of assessment findings 49<br />

ANNEXES<br />

A Report SCCS-Langga Payung Mill 50<br />

B Draft <strong>RSPO</strong> Certificate 53<br />

C Certification Assessment Plan 55<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 2


Summary<br />

PT. TÜVNORD Indonesia (TNI) – Certification Body is a member of the worldwide German TÜV<br />

NORD group. TNI has performed a comprehensive certification assessment of PT. Tapian<br />

Nadenggan, and concludes that its operations comply with the <strong>RSPO</strong> Principles and Criteria<br />

Indonesia National Interpretation (<strong>RSPO</strong> INA-NIWG) version May 2008. TNI therefore recommends<br />

that PT. Tapian Nadenggan be approved as a producer of <strong>RSPO</strong> Certified Sustainable Palm Oil.<br />

This certification assessment is on Langga Payung Mill producing a total 36,906.99 t/year CPO and<br />

9,492.28 t/year PK*.<br />

(*January-December 2010)<br />

Abbreviations Used<br />

AMDAL<br />

ANDAL<br />

Bapedalda<br />

B3<br />

BOD<br />

BPN<br />

Analisis Mengenai Dampak Lingkungan (Environmental Impact Study Report)<br />

Analisis Dampak Lingkungan (Environmental Impact Analysis Report)<br />

Badan Pengendalian Dampak Lingkungan Daerah (Regional Environmental Impact<br />

Control Agency )<br />

Bahan Berbahaya dan Beracun (Toxic and Hazardous Materials<br />

Biological Oxygen Demand<br />

Badan Pertanahan Nasional (National Land Agency)<br />

CDM Clean Development Mechanism (Mekanisme Pembangunan Bersih )<br />

COD<br />

CPO<br />

CSR<br />

DAR<br />

Deperindag RI<br />

EFB<br />

FFA<br />

FFB<br />

GPS<br />

ha<br />

HCV<br />

HGU<br />

HSE<br />

IPM<br />

JAMSOSTEK<br />

K3<br />

KAN<br />

KLH<br />

Chemical Oxygen Demand<br />

Crude Palm Oil<br />

Corporate Social Responsibility<br />

Deutscher Akkreditierungs Rat (German Accreditation Body)<br />

Departemen Perindustrian dan Perdagangan (Department of Industry and Commerce of<br />

the Republic of Indonesia)<br />

Empty Fruit Bunch(es)<br />

Free Fatty Acid(s)<br />

Fresh Fruit Bunch(es)<br />

Global Positioning System<br />

Hectare(s)<br />

High Conservation Value<br />

Hak Guna Usaha (Land UseTitle)<br />

Health Safety Environment (Kesehatan, Keselamatan dan Lingkungan)<br />

Integrated Pest Management<br />

Jaminan Sosial Tenaga Kerja (Labour Social Insurance)<br />

Keselamatan dan Kesehatan Kerja (Occupational Safety and Health)<br />

Komite Akreditasi Nasional (The Indonesian Accreditation Committee)<br />

Kementrian Lingkungan Hidup (Ministry of Environment)<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 3


KUD<br />

LCC<br />

LD 50<br />

LSM<br />

MSDS<br />

OER<br />

P2K3<br />

P3K<br />

Permenaker RI<br />

PK<br />

PKO<br />

PMA<br />

POME<br />

PPE<br />

PTTN<br />

PTSKU<br />

RKL-RPL<br />

SMK3<br />

SOP<br />

SPSI<br />

TNI<br />

UKL/UPL<br />

Koperasi Unit Desa (Village Cooperative)<br />

Legume Cover Crop<br />

Lethal Dosage (50% mortality of tested population)<br />

Lembaga Swadaya Masyarakat (NGO(s))<br />

Material Safety Data Sheet(s)<br />

Oil Extraction Rate<br />

Panitia Pembina Keselamatan dan Kesehatan Kerja (Guiding Committee of<br />

Occupational Safety and Heath)<br />

Pertolongan Pertama Pada Kecelakaan (First Aid Emergency)<br />

Peraturan Menteri Tenaga Kerja (Regulation(s) of the Ministry of Labour of Republic of<br />

Indonesia)<br />

Palm Kernel<br />

Palm Kernel Oil<br />

Penanaman Modal Asing (Foreign Investment)<br />

Palm Oil Mill Effluent<br />

Personal Protective Equipment<br />

PT. Tapian Nadenggan<br />

PT. Satya Kisma Usaha<br />

Rencana Kelola Lingkungan dan Rencana Pemantauan Lingkungan (Environmental<br />

Management Plan – Environmental Monitoring Plan)<br />

Sistim Manajemen – Keselamatan dan Kesehatan Kerja (Management System of<br />

Occupational Safety and Health)<br />

Standard Operating Procedure(s)<br />

Serikat Pekerja Seluruh Indonesia (Worker Union)<br />

PT. TÜV Nord Indonesia<br />

Upaya Kelola Lingkungan/Upaya Pemantauan Lingkungan (Environmental Management<br />

Efforts and Environmental Monitoring Efforts)<br />

1. SCOPE OF THE <strong>CERTIFICATION</strong> <strong>ASSESSMENT</strong><br />

1.1 National Interpretation<br />

The standard requirements of the Indonesian National Interpretation of <strong>RSPO</strong> Principles and Criteria<br />

(<strong>RSPO</strong> INA-NIWG) version May 2008 were used to assess the operations of the Palm Oil Mill and the<br />

supply base of FFB for PT. Tapian Nadenggan.<br />

1.2 Scope of Certification<br />

The scope of certification is the production from 1 (one) mill supplied by 3 (three) companyowned<br />

estates. The mill also processes outgrower FFB, but they are not included in the claimed<br />

certification.<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 4


1.3 Locations<br />

PT. Tapian Nadenggan – Langga Payung Mill (PTTN) is offering 1 (one) mill and 3 (three) estates, 2<br />

estates are located in Kabupaten Padang Lawas Utara, and 1 (one) estate Normark Estate under PT.<br />

Satya Kisma Usaha (PTSKU) is located in Kabupaten Labuhanbatu Selatan, Province of North Sumatra,<br />

Indonesia for certification. The locations of the mill and estates are shown in Figures A-1 with their<br />

GPS coordinates (The readings for the estates are for their offices).<br />

Table 1: GPS Coordinates for Mill and Estates of Tapian Nadenggan (North Sumatra area) (Estate<br />

coordinates are for their offices)<br />

Code<br />

Unit<br />

Location<br />

GPS coordinates<br />

Longitude (E) Latitude (S)<br />

LPYM<br />

Langga Payung<br />

POM<br />

Ds . Huta Baru Nangka, Halongonan,<br />

Padang Lawas Utara, Sumatra Utara<br />

99º 53' 13'' E 1º 39' 16'' N<br />

LPYE<br />

PBNE<br />

Langga Payung<br />

Estate<br />

Ds . Huta Baru Nangka, Halongonan,<br />

Padang Lawas Utara, Sumatra Utara 99º 53' 22'' E 1º 38' 55'' N<br />

Paya Baung Estate Ds. Huta Baringin, Simangambat, 99º 58' 31'' E 1º 37' 12'' N<br />

Padang Lawas Utara, Sumatra Utara<br />

NRME Normark Estate Ds. Normark, Kota Pinang,<br />

Labuhanbatu Selatan, Sumatra Utara<br />

99º 59' 53'' E 1º 50' 57'' N<br />

Figure 1a. Map of Langga Payung Mill and Estates Location<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 5


Figure 1b. Overlay Map of Langga Payung Estate, Paya Baung Estates, and Normark Estate<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 6


1.4.1 Areas of Estates<br />

Three (3) estates are included in this certification assessment. Their land use data are given in<br />

Table 2.<br />

Table 2: Land use data for PT. Tapian Nadenggan – Langga Payung Mill ( June 2011)<br />

Langga Payung<br />

Estate<br />

Paya Baung<br />

Estate<br />

Normark<br />

Estate<br />

Total<br />

area<br />

Planted (ha) 4,961.04 2,507.39 1,900.89 9,369.32<br />

Others (building, public<br />

facilitiy) (ha)<br />

347.49 143.70 294.21 785.40<br />

HGU (ha) 5,308.53 2,651.09 2,195.10 10,154.72<br />

HCV (ha) (included in<br />

planted area) 229.45 27.7 226.83 483.98<br />

1.4.2. Description of Supply Base<br />

FFB for the mill are sourced from 3 (three) company-owned estates and also independent<br />

smallholders/ outgrowers. PTTN manages ± 10,154.72 ha of its own estates, and also receives FFB<br />

from independent smallholders. The smallholders are, however, independent, not beholden in any way to<br />

sell their fruits only to PTTN. The total independent smallholders/ outgrowers FFB received in 2010<br />

(January – December) was 86,671.37 t (33.89%) of the total processed by Langga Payung Palm Oil Mill.<br />

The respective volumes of FFB processed from the own-estates and independent smallholders are<br />

given in Table 3.<br />

Table 3: Sources of FFB processed by Langga Payung Palm Oil Mill (January – December 2010)<br />

Source of FFB<br />

FFB<br />

(t)<br />

Percentage<br />

(%)<br />

Langga Payung Estate 88,661.98 34.66<br />

Paya Baung Estate 47,943.19 18.74<br />

Normark Estate 32,503.61 12.71<br />

Total PTTN-Owned Estates 169,108.78 66.11<br />

Independent Smallholders 86,671.37 33.89<br />

Third party suppliers 0 0<br />

Total smallholders and third party 86,671.37 33.89<br />

Total FFB processed 255,780.15 100.00<br />

The smallholders was developed as part of PTTN’s commitment to help the local community<br />

development by advising them on how to plant oil palm. PTTN is committed to fully support<br />

smallholders develop their plots in a sustainable manner in compliance with the <strong>RSPO</strong> Principles<br />

and Criteria. However, their production is not within the scope of this current <strong>RSPO</strong> certification.<br />

1.4.3. Company Background and Ownership History<br />

PTTN is a subsidiary of Sinar Mas Agro Resources and Technology Tbk or known as PT.SMART<br />

Tbk Group. PT SMART Tbk is one of the largest, publicly-listed, integrated palm-based consumer<br />

companies in Indonesia which is committed to sustainable palm oil production. Founded in 1962,<br />

SMART's palm plantations have a total coverage area of approximately 137,500 hectares<br />

(including small holders). SMART also operates 15 mills, four kernel crushing plants and four<br />

refineries. SMART listed its shares on the Indonesia Stock Exchange in 1992. SMART is a<br />

subsidiary of Golden Agri-Resources Ltd ("GAR"), which is one of the largest palm-based<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 7


companies in the world which is listed on the Singapore Exchange. SMART also manages all of<br />

GAR's oil palm plantations, which has a total planted area of 445,100 hectares (including small<br />

holders) in Indonesia, as at 31 March 2011.<br />

SMART's primary activities are cultivating and harvesting of palm trees, processing of fresh fruit<br />

bunches into crude palm oil ("CPO") and palm kernel, and refining CPO into value-added products<br />

such as cooking oil, margarine and shortening. Besides bulk and industrial oil, SMART's refined<br />

products are also marketed under several brands such as Filma and Kunci Mas. Today, these<br />

brands have been recognised for their high quality and command significant market share in their<br />

respective segment in Indonesia.<br />

As a part of SMART Group, PTTN aim to be the leader in sustainable palm oil production by<br />

adopting the best industry practices and standards, managing the environment responsibly and<br />

empowering the communities where we operate while delivering shareholder value.<br />

PTTN sustainability strategy is implementing the best practices holistically in all dimensions of<br />

sustainability (the environment, community, market place and work place), benchmarking our<br />

practices against the Roundtable on Sustainable Palm Oil ("<strong>RSPO</strong>") and the United Nations Global<br />

Compact ("UNGC"), and engaging stakeholders proactively.<br />

PTTN has been established in 1979, and join with SMART since 1989 PTTN operations in<br />

Kabupaten Padang Lawas Utara and Kabupaten Labuhanbatu Selatan, Province of North<br />

Sumatera, consist of one mill and three estates : Langga Payung POM, Langga Payung Estate,<br />

Paya Baung Estate and Normark Estate The acquisition of lands has done in 1992 -1999 for<br />

Langga Payung Estate and Paya Baung Estate, and in 2005 for Normark Estate with total area<br />

10,154.72 ha..<br />

The summary of legal permist are shown in a table below :<br />

Company Unit Land Use Title /<br />

Hak Guna Usaha<br />

(HGU)<br />

PT. Tapian<br />

Nadenggan<br />

PT. Satya Kisma<br />

Usaha<br />

Langga Payung<br />

Mill/ Estate<br />

Paya Baung<br />

Estate<br />

Normark Estate<br />

23/HGU/DA/82<br />

23/HGU/DA/82/A/68<br />

14/HGU/1989<br />

5/HGU/BPN/2005<br />

Site Permit/ Izin<br />

Lokasi<br />

No. 593/40/K/<br />

BKPMD/1988,<br />

dated on<br />

16.07.1988 by<br />

Decree from<br />

Governor North<br />

Sumatra Province.<br />

Plantation<br />

Operation Permit /<br />

Izin Usaha<br />

Perkebunan<br />

No.763/Menhutbun/V<br />

II-2000, dated on<br />

29.06.2000 by<br />

Decree from Ministry<br />

of Forestry Republic<br />

of Indonesia.<br />

No.948/Menhutbun/V<br />

II-2000, dated on<br />

08.08.2000 by<br />

Decree from Ministry<br />

of Forestry Republic<br />

of Indonesia.<br />

HGU Decree<br />

HGU<br />

Number<br />

23/HGU/DA/82 1<br />

23/HGU/DA/82/A/68 1<br />

14/HGU/1989 1<br />

Area (ha) Location Issued of<br />

HGU<br />

1,209.15 Desa Batang Nadenggan<br />

18/12/1992<br />

1,765.47 Desa Sihopuk Baru<br />

4,985.00 Desa Huta Baringin dan<br />

Desa Ujung Batu Julu<br />

24/12/1992<br />

30/08/1999<br />

Validity of<br />

HGU<br />

31/12/2072<br />

31/12/2037<br />

31/12/2024<br />

5/HGU/BPN/2005 1<br />

2,195.10 Desa Perkebunan<br />

Normark<br />

25/02/2005<br />

31/12/2029<br />

Total HGU area<br />

10,154.72<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 8


1.5 Dates of Planting and Replanting Cycle<br />

In general, oil palm is replanted after 25 years, but possibly shorter / longer depending on the<br />

economics and status of the crop. The summary of planted oil palms is given in Table 4 and the<br />

detailed age profile of planted palms and total area is given in Table 5.<br />

Table 4: Area Summary of planted oil palms in Langga Payung Estate, Paya Baung Estate and Normark<br />

Estate for this certification assessment (as at June 2011)<br />

Estate<br />

Langga Payung<br />

Paya Baung<br />

Normark<br />

Area Summary (ha) *<br />

Planted Oil<br />

Location<br />

Palm<br />

Mature Immature<br />

Kec. Halongonan. Kab. Padang<br />

Lawas Utara, Sumatera Utara<br />

4,961.04 3.918,61 1,042.43<br />

Kec. Simangambat. Kab. Padang<br />

Lawas Utara, Sumatera Utara<br />

2,507.39 2.507,39 0<br />

Kec. Kota Pinang, Kab. Labuhan<br />

Batu Selatan, Sumatera Utara<br />

1,900.89 1.667.03 233.86<br />

Total 9,369.32 8,093.03 1,276.29<br />

Table 5 : Area statistics of planted oil palms in Langga Payung Estate, Paya Baung Estate and Normark<br />

Estate for this certification assessment (as at June 2011)<br />

Estates 0 - 5 % 6 - 10 % 11 - 15 % 16 – 20 % 21 - 30 % Total<br />

Langga<br />

Payung<br />

1,228.39 24.76 0 0 0 0 0 0 3,732.65 75.24 4,961.04<br />

Paya Baung 0 0 0 0 21.02 0.84 0 0 2,486.37 99.16 2,507.39<br />

Normark 570.55 30.01 836.76 44.02 239.55 12.60 - 254.03 13.36 1,900.89<br />

Total 1,798.94 836.76 260.57 6,473.05 9,369.32<br />

1.6 Other Certifications Held<br />

PTTN has been certified to:<br />

• ISO 9001:2008, Quality Management System for Langga Payung Mill by SAI Global since<br />

2002<br />

• SMK3, based on Permenaker No. 5 Tahun 2005 by the Ministry of Labor of the Republic of<br />

Indonesia since 2000 ;<br />

Organizational Information/ Contact Person<br />

All information in respect of this certification assessment for <strong>RSPO</strong> should be addressed to:<br />

Contact Person<br />

Position<br />

Organization name<br />

Address<br />

Mr. Ismu Zulfikar<br />

Head of Environment Department<br />

PT. TAPIAN NADENGGAN<br />

BII Plaza Tower 2, 10 th Floor<br />

Jl. MH. Thamrin Mo.51<br />

Postal code, city<br />

10350, Jakarta Pusat<br />

Country<br />

Indonesia<br />

Telephone Nr +6021-3181388<br />

Fax Nr +6221-3181389<br />

Email<br />

ismu-zulfikar@smart-tbk.com<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 9


1.7 Time-Bound Plan for Other Certification Units<br />

PTTN as a subsidiary of PT. SMART Tbk has commitment to obtain the <strong>RSPO</strong> certification for 1<br />

(one) mill and its supply base in North Sumatra this year and for other 3 (three) mills and its supply<br />

base in Kalimantan as the others companies under PT. SMART Tbk Group. PTTN also has future<br />

plans to provide training and awareness about the <strong>RSPO</strong> certification process to smallholders / out<br />

growers for the mill that receive the fruit from the plasma farmers/ outgrowers. The Bukit Subur<br />

KKPA in East Kalimantan will be proposed to get <strong>RSPO</strong> certification in 2012.<br />

The time-bound plan for doing so is set out in the table below:<br />

Time bound plan for mills and estates under PT. Tapian Nadenggan:<br />

No Name of Mill Supply Base<br />

1 Hanau Mill Hanau Estate<br />

Tasik Mas Estate<br />

Tanjung Paring Estate<br />

Langadang Estate<br />

Medang Sari Estate<br />

2 Semilar Mill Semilar Estate<br />

Sei Rindu Estate<br />

Mandang Estate<br />

Puri Estate<br />

3 Jak Luay Mill Pantun Mas Estate<br />

Pantun Mas KKPA<br />

Jak Luay Estate<br />

Jak Luay KKPA<br />

Long Buluh Estate<br />

Bukit Subur Estate<br />

Bukit Subur KKPA<br />

Company of<br />

Mill<br />

PT Tapian<br />

Nadenggan<br />

PT Tapian<br />

Nadenggan<br />

PT Tapian<br />

Nadenggan<br />

Location<br />

Central<br />

Kalimantan<br />

Central<br />

Kalimantan<br />

East<br />

Kalimantan<br />

Proposed Time for<br />

Certification<br />

2010*<br />

(Delayed due to<br />

grievance panel)<br />

2012<br />

2012<br />

Time bound plan for mills and estates under others companies (SMART Group)<br />

No Name of Mill Supply Base<br />

1 Padang<br />

Halaban Mill<br />

2 Batu Ampar<br />

Mill<br />

Padang Halaban Estate<br />

Pernantian Estate<br />

Adipati Estate<br />

Kanopan Ulu Estate<br />

Batu Ampar Estate<br />

Batu Mulia Estate<br />

Sungai Panci Estate<br />

Sungai Panci KKPA<br />

3 Tanah Laut Mill Tanah Laut Estate<br />

Kintapura Estate<br />

5 Leidong West<br />

Mill<br />

8 Gunung<br />

Kombeng Mill /<br />

Muara Wahau<br />

Mill<br />

Leidong West Utara<br />

Estate<br />

Leidong West Selatan<br />

Estate<br />

Bukit Intan Estate<br />

Bukit Mas Estate<br />

Gunung Kombeng Estate<br />

Gunung Kombeng KKPA<br />

Muara Wahau Estate<br />

Rantau Panjang Estate<br />

Rantau Panjang KKPA<br />

9 Jelatang Mill Batang Merangin Estate<br />

Kubang Ujo Plasma<br />

Pamenang Plasma<br />

10 Pelakar Mill Pelakar Estate<br />

Tiga Serumpun Estate<br />

Bukit Bungkul KKPA<br />

Company of<br />

Mill<br />

PT SMART Tbk<br />

PT SMART Tbk<br />

PT SMART Tbk<br />

PT Leidong<br />

West Indonesia<br />

PT Kresna Duta<br />

Agroindo<br />

PT Kresna Duta<br />

Agroindo<br />

PT Kresna Duta<br />

Agroindo<br />

Location<br />

North<br />

Sumatera<br />

South<br />

Kalimantan<br />

South<br />

Kalimantan<br />

Proposed Time for<br />

Certification<br />

2010*<br />

(has been<br />

assessed)<br />

2010*<br />

(Delayed due to<br />

grievance panel)<br />

2010*<br />

(Delayed due to<br />

grievance panel)<br />

Bangka 2011<br />

East<br />

Kalimantan<br />

2012<br />

Jambi 2012<br />

Jambi 2012<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 10


11 Langling Mill Bangko Inti Estate<br />

Bangko Plasma<br />

12 Sungai Bengkal Sungai Bengkal Estate<br />

Mill<br />

Batang Gading Estate<br />

Sungai Bengkal KKPA<br />

Batang Gading KKPA<br />

Kilis Estate<br />

Kilis KKPA<br />

13 Bukit Kapur Mill Sungai Cantung Estate<br />

Bukit Kapur Estate<br />

PT Kresna Duta<br />

Agroindo<br />

PT Satya Kisma<br />

Usaha<br />

PT SMART Tbk<br />

Jambi 2012<br />

Jambi 2012<br />

South<br />

Kalimantan<br />

2014<br />

1.8 Approximate Tonnages Certified<br />

All FFB produced from the company’s 3 (three) estates are processed by Langga Payung POM<br />

which has milling capacity 60 t FFB/ hour. The production from smallholders/ outgrowers FFB is not<br />

included within the scope of this assessment at this time. The volumes claimed for certification by<br />

Langga Payung POM are shown in Table 6:<br />

Table 6: Palm oil / palm kernel volumes claimed for certification<br />

Mill<br />

Estates<br />

Annual Production from company estates (t)<br />

CPO PKO PK<br />

Langga Payung 19,349.95 0 4,976.70<br />

Langga<br />

Paya Baung 10,463.32 0 2,691.11<br />

Payung POM<br />

Normark 7,093.72 0 1,824.47<br />

TOTAL<br />

36,906.99 0 9,492.28<br />

Note : The volumes are the actual production from January to December 2010, OER = 21.82%,<br />

1.9 Date Certification Issued and Scope Certificate<br />

The scope of the certificate to be issued covers the production from 1 (one) palm oil mill and 3<br />

(three) estates. The date of issuance of the certificate will depend on approval of this Assessment<br />

Report by the <strong>RSPO</strong> Secretariat. A draft certificate is shown in Annex B.<br />

2. <strong>ASSESSMENT</strong> PROCESS<br />

2.1 Certification Body<br />

PT. TÜV NORD Indonesia is a subsidiary of the German TÜV NORD Group. Our company is a<br />

market leader in Indonesia for inspection, testing and certification services. Through more than 600<br />

clients, we offer not just a high added-value service but also the trust and confidence embedded in<br />

our issued certificates / reports. We satisfy not only our direct customers but also other<br />

stakeholders, like regulators and interested society, including NGOs, through our competent<br />

auditors, inspectors and analysts.<br />

PT. TÜV NORD Indonesia, through its HQ in Germany, is a member of International Accreditation<br />

Forum (IAF) and accredited by DAR–German and locally by the Indonesian Accreditation<br />

Committee (KAN). Services provided by the Strategic Business Unit Systems Certifications are:<br />

Food Safety Management System ISO 22000, Information Security Management System ISO<br />

27001, Social Accountability SA 8000, Food Hygiene HACCP, Medical Device Directive MDD,<br />

ISO 13485, Occupational Health and Safety OHSAS 18001, Product Certification: GS-Mark,<br />

CE-Mark, SNI Mark, Inspection for ISPS Code, Clean Development Mechanism (CDM) Validation &<br />

Verification, British Retail Consortium, BRC Issue 5.<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 11


The offices of PT. TÜV NORD Indonesia are at:<br />

Head office<br />

System Certification Management<br />

Perkantoran Hijau Arkadia Tower F, 7 th Floor<br />

Suite 706<br />

Jl. Let. Jend. TB Simatupang Kav. 88<br />

Jakarta 12520 – Indonesia<br />

Tel : +6221 7883 7338<br />

Fax : +6221 7883 7336<br />

Branch office<br />

Graha Pangeran 7-H1 Floor<br />

Jl. Jend. A Yani 286 Surabaya 60234 –<br />

Indonesia<br />

Tel : +6231 8292602<br />

Fax : +6231 8292723<br />

Laboratory Division<br />

Jl. Jababeka XVII E Blok U No. 27B<br />

Kawasan Industri Jababeka I<br />

Cikarang Bekasi 17530 – Indonesia<br />

President Director: Mr. Robert Napitupulu<br />

Email: rnapitupulu@tuv-nord.com<br />

Website : www.tuev-nord.de<br />

2.2 Assessment Methodology<br />

The certification assessment of PTTN, Langga Payung Mill and its supply base at North Sumatera<br />

was carried out from July 4 to 8, 2011. A pre audit also conducted in February 2011 to confirm the<br />

scope of certification and the preparedness of the organization before certification asessment. The<br />

assessment comprised four phases:<br />

• A desk audit (document check) with a customised <strong>RSPO</strong> audit checklist according to the <strong>RSPO</strong><br />

manual, procedures and palm oil mill and estate working instructions;<br />

• Review results of consultation with stakeholders prior to certification assessment. The detailed<br />

method is given in Point 2.8;<br />

• Background investigations (published disputes, public comments on preliminary<br />

announcement), followed by interviews with <strong>RSPO</strong> management, employees and other<br />

stakeholders (associated people, NGOs, land regulators, social watchers, labour union); and<br />

• Verification of proposed corrective actions followed by review of the assessment report by<br />

internal veto persons (Senior Manager of PT. TÜV NORD Indonesia).<br />

The summary public report of this certification assessment includes Corrective Action Requests,<br />

Corrective Actions Taken, Verification of Corrective Actions Taken and Progress in Implementation<br />

of Corrective Actions to be checked in the Surveillance Audit.<br />

The Non Conformities are broadly due to:<br />

• Major Non Conformities:<br />

- mistakes in interpretation of <strong>RSPO</strong> P&C by PTTN directly affecting the certification assessment;<br />

- requirements of some <strong>RSPO</strong> P & C not met or, in other words, non-compliance to the P&C on<br />

a major indicator(s);<br />

These raise doubt on the capability of PTTN to achieve the desired results.<br />

• Minor Non Conformities:<br />

Where information is insufficient, unclear or insufficiently transparent to establish whether a<br />

requirement is met, or non-compliance to the requirements of the <strong>RSPO</strong> P & C on a minor<br />

indicator(s);<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 12


• Potential for Improvement<br />

Conditions and factors in PTTN that will allow it to better satisfy the requirements of the relevant<br />

standards;<br />

• Strengths, weaknesses, opportunities and threats of PTTN<br />

The final certification assessment was made after issuance of the Corrective Actions Taken<br />

statement by PTTN. The auditors have assessed the corrective actions taken and are satisfied that<br />

the results comply with the required standards. Based on the compliance effected, this certification<br />

assessment report is forwarded to <strong>RSPO</strong> for its consideration for approval.<br />

2.3. Certification Assessment Checklist of Principles and Criteria<br />

To systematically consider all the relevant <strong>RSPO</strong> P & C in the assessment, a checklist was used.<br />

The checklist has all the P & C against which the means employed by the management to satisfy<br />

them are noted. It serves the following purposes:<br />

- Organizes, details and clarifies the criteria that the management is expected to meet;<br />

- Ensures transparency in the certification process - whether the criteria have been satisfied by<br />

the management.<br />

The checklist was drawn up against the Indonesian National Interpretation of the <strong>RSPO</strong> P & C.<br />

2.4. Review of documents<br />

The PTTN documentation was submitted in June 2011 and its adequacy / completeness reviewed<br />

against the certification assessment checklist.<br />

2.5. Onsite and Follow-up interviews<br />

The audit team collected all the information on PTTN management for evidence of conformity to the<br />

<strong>RSPO</strong> P & C on a random sampling basis.<br />

Interviews with the respective staff, workers and some stakeholders in charge were carried out to<br />

ascertain the manner and circumstances in which the PTTN management system is implemented<br />

within the organization.<br />

The certification assessment was carried out from 04 to 08 July 2011. TÜV NORD Indonesia<br />

conducted on-site interviews with PTTN management, and palm oil mill / estate personnel to verify<br />

some information and resolve issues arising from reviews of the documents and PTTN<br />

management.<br />

The key points with respect to and concerned with the main topics of the interviews are summarised<br />

below:<br />

Interviewed Persons & Interview topics for Manager, Staff, Workers<br />

General aspects of the certification and the certification boundary;<br />

Chemical stores, Water management, Details on reduction of paraquat use;<br />

Approval documentation and status, Legal aspects related to PTTN management;<br />

Management Policy and Quality, SM-K3 and Environmental Management System;<br />

Involved personnel and their responsibilities;<br />

Justification of <strong>RSPO</strong> P & C;<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 13


Monitoring and measurement of environmental performance for waste water treatment;<br />

Identification of environmental aspects and impacts;<br />

Flora, fauna, ecology and biodiversity;<br />

Land and conversion planting, Replanting inspection and handling of chemical packaging<br />

wastes, Zero burning;<br />

Socio economic impacts on local population, Sanitary and hygiene of employees’ housing<br />

complexes;<br />

Licenses, operation & maintenance authority and responsibility;<br />

IPM (Integrated Pest Management);<br />

HCV identification;<br />

Mill operation, including Inspection of FFB received, Transport of FFB, Road maintenance and<br />

Workshops for heavy trucks, loaders, etc.<br />

Interviewed Persons & Interview topics for Stakeholders<br />

<br />

<br />

<br />

Environmental protection within the estates and mill including use of pesticides, wastes and<br />

effluent management, Company approach to community development;<br />

Provision of housing, sanitation, amenities and educational support;<br />

Biodiversity conservation within the estate(s) and surroundings (where possibly impacted by the<br />

estate / mill operations), Opportunities for earning fair wages, overtime and piece-rate work.<br />

2.6. Resolution of Non-Compliances<br />

For remedying any non-compliances, the required corrective actions were discussed. PTTN was<br />

required to close out the outstanding any major issue(s) by responding to the Non Conformity<br />

Report by describing, with evidence, the corrective action(s) taken.<br />

In this certification assessment, the auditing team raised 4 major non-conformities and 6 minor nonconformities<br />

and noted some improvements to be made. The non conformities and suggested<br />

improvements are all documented in this report.<br />

2.7. Qualifications of the lead assessor and assessment team<br />

Lead Assessor<br />

: Sudarmadji<br />

He has a background in electrical engineering; and qualified in environmental auditing with<br />

sustainability management system such as EMS. He has completed training as Lead Auditor ISO<br />

14001, ISO 900, Occupational Health & Safety management system and CDM certification. He has<br />

completed training as Lead Assessor / Internal Assessor Sustainable Palm Oil by Indonesia Palm<br />

Oil Board and KAN (National Accreditation Committee). He is an experienced auditor in several<br />

audits palm oil manufacturers assessment based on ISO 14001, with a total minimum 15 days of<br />

audit. As team member involved in <strong>RSPO</strong> certification assessment for PT. PP London Sumatra<br />

Indonesia, Tbk (North Sumatera Province) in October – November 2008; and PT. Sahabat Mewah<br />

dan Makmur in December 2009.<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 14


Assessor<br />

: Wieke Savitri<br />

Graduated from Agriculture Faculty in Bogor Agricultural University, then, consultant at Perkumpulan<br />

Untuk Peningkatan Usaha Kecil supporting by GTZ, a foundation to promote small scale enterprises<br />

by offering training and consultation in business management, human resources, marketing and IT.<br />

Before joining TUV NORD Indonesia, she spent 7 years working for Danone–Aqua, a beverage<br />

company, in which she held various positions, such as Quality Control Manager at Pandaan factory in<br />

East Java before her last position as Quality Assurance Manager at Klaten factory in Central Java.<br />

Her passion for environmental and social issues had led her to join Aqua Foundation even while<br />

working in Danone-Aqua - to develop community development programs for people living around her<br />

factory. She also attended a Workshop for Community-based Environmental Educators by the United<br />

Nations of Environmental Program in Bangkok. Finally,joined PT. TUV NORD Indonesia in September<br />

2006 as QMS auditor, and appointed Surabaya Branch Manager. She is an experienced auditor in<br />

palm oil manufacturing and oil palm estates. Attended DOEN <strong>RSPO</strong> auditors training in 2008. As<br />

team member involved in <strong>RSPO</strong> P &C certification assessment in PT. Perkebunan Nusantara IV, PT.<br />

Aek Tarum- Sampoerna Agro, PT. PP. London Sumatra Tbk, Musi Banyuasin Region and North<br />

Sumatra. She is also team member for <strong>RSPO</strong> Supply Chain Certification System in PT. Multimas<br />

Nabati Asahan, PT. Mustika Sembuluh, PT. Kerry Sawit Indonesia and PT. Sinar Alam Permai<br />

(Wilmar Group).<br />

Assessor<br />

: Anita Masduki<br />

She has a bachelor degree in Chemical Engineering from Institute Technology Bandung (ITB), and<br />

holds diploma in Biological Treatment from Hiroshima University, Japan, besides holds diploma in<br />

Environmental Management from Institute Environmental Management and Assesment in UK. She<br />

attended trainings such as Ozone Depleting Substance Program; Indonesia Cleaner Industrial<br />

Program.. She is an experienced auditor in quality management system ISO 9001, environmental<br />

management system ISO 14001 and OHSAS 18001 in various organization. Before joining TUV<br />

NORD Indonesia in 2011, she has a long time job as a consultant for 17 years in management<br />

system. She attended <strong>RSPO</strong> lead assessor training in 2011.<br />

Technical Expert<br />

: Dr. Hariyadi<br />

He holds a doctorate in Agriculture Environment from Bogor Agricultural University (IPB), and has a<br />

strong background and experience in the socio-environment aspects of agriculture as a lecturer in<br />

Agriculture and Socio-environment. Assisted in socio-environmental impact assessments and did<br />

research in Green Giant NPK fertilizer effects on immature oil palm growth. Has extensive experience<br />

in research in plant water and nutrient requirements, irrigation and fertilizer application, seedling<br />

selection and Integrated Pest Management. Qualified in biodiversity assessment and biodiversity<br />

science. Underwent auditor training in oil palm estates and palm oil mill in EMS and <strong>RSPO</strong> P & C.<br />

Completed training in EMS course for ISO 14001:2004 and has experience in oil palm estate waste<br />

management, disposal of EFB and fertilizer packaging and environmental impact on employees’<br />

housing complexes. Member of the team in <strong>RSPO</strong> certification assessment of PT. London Sumatra<br />

Indonesia Tbk in 2008, PT. Perkebunan Nusantara IV and PT. Aek Tarum –Sampoerna Agro.<br />

Technical Expert<br />

: Ir. Basita Ginting, M.A, Ph.D<br />

He has bachelor degree in Agriculture Socio-economics from Bogor Agricultural University (IPB), and<br />

holds a doctorate in Community Development from University of The Philippines. He has a strong<br />

background and experience in the Evaluation for Social Impact Assessment and aspects of<br />

agriculture as a lecturer for Villager Sociology in Human Ecology Faculty, IPB. Has extensive<br />

experience in researches and consultation for more than 15 years such as Landownership structures<br />

and levels of living settlers in the transmigration areas; Community participation in the family welfare<br />

movement, etc.<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 15


2.8. Outline of how stakeholders were interviewed<br />

Stakeholder consultations began with notification of the upcoming assessment in the websites of<br />

<strong>RSPO</strong> and PTTN. Telephone calls, e-mails, facsimiles or letters were sent to the applicable<br />

stakeholders. PTTN has held regular meetings with its stakeholders in accordance with its<br />

communication procedure “SOP Komunikasi dan Konsultasi dengan Stakeholder No. PT.TN-<br />

LPYM/<strong>RSPO</strong>-SOP/03 dated on 01.07.2010 “. Before the assessment proper, the audit team trawled<br />

the proceedings of all the meetings to update itself on the current situation and issues involved. The<br />

stakeholders were then invited to discuss critical issues in community development, including the<br />

latest progress plans for community development and the targets to be achieved. Some of the items<br />

on the agenda for the stakeholders’ meeting were the maintenance of infrastructure - roads, irrigation<br />

and drainage network, bridges and schools. In addition, to provide financial support, scholarships,<br />

welfare, sanitation and improved hygiene for the people living near the employees’ housing<br />

complexes, palm oil mill and supply bases. The discussion with stakeholders was well organized. The<br />

audit team then visited some of them for interviews for both positive / negative information on any<br />

issue in connection with the operations of the PTTN palm oil mill and supply bases. The stakeholders<br />

meeting conducted by assessor team and interviews without the presence of the company<br />

personnel/staff to obtain more comprehensive feedback.<br />

2.9. List of Stakeholders<br />

The table below lists the stakeholders involved:<br />

Statutory Body<br />

Contact Person<br />

(if applicable and address)<br />

Location<br />

Phone<br />

Kabagtapem Pemkab LaBuSel Zulkifli Kota Pinang 08126265418<br />

Asisten 1 Pemkab Paluta Amas Hasibuan Gunung Tua 08126569707<br />

Camat Halongonan Pangaribuan Dalimunthe Sipaho 082166735400<br />

Camat Sei Kanan Igani S.Sos Langga Payung 08126007320<br />

Kapolsek Sei Kanan H.A. Siregar Langga Payung 081361900838<br />

Kapolsek Gunung Tua M.Sijabat Gunung Tua 081363205666<br />

Danramil Pd.Bolak Chaidir Harahap Gunung Tua 081376629919<br />

Danramil Sei Kanan Hotman Langga Payung 081376809990<br />

DisHutBun Labuhan Batu Erwin Rantau Prapat 081376006244<br />

KaDisHutBun Paluta Marataib Harahap Gunung Tua 08127604281<br />

PPL DisHutBun Paluta Suwito Hutaimbaru 081362011819<br />

PPL DisHutBun Labusel Wahidin Ranto Jiur 081370568420<br />

Kasubbidwasnaker Disnaker I Ngarak Karo karo Rantau Prapat 081361590714<br />

Labuhan Batu<br />

Disnaker Padang Lawas Utara Olopon Simbolon Gunung Tua 081376252160<br />

Kasie Sengketa BPN Labuhan Sujono Rantau Prapat 081361333656<br />

Batu<br />

Kasie Sengketa BPN Pd<br />

Adi Irwansyah P.Sidempuan 081397549515<br />

Sidempuan<br />

Kades Situmbaga Faisal Situmbaga 081265568868<br />

Kades Huta Baru Nangka Saur Harahap Huta Baru Nangka 081397002196<br />

Kades Bt. Nadenggan Yahya Harahap Tapian 081375535550<br />

Kades Ujung Gading Abdul Hakim Ujung Gading 081362443310<br />

Kades Sihopuk Baru Rohman Sihopuk Baru 081263639096<br />

Kades Sihopuk Lama Sanaran Harahap Sihopul Lama 081397810180<br />

Kades Siancimun Parlaungan Harahap Siancimun 081396252259<br />

Kades Rondaman Alpian Harahap Rondaman 081396996075<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 16


Smallholders / Outgrowers<br />

Contact Name<br />

Phone<br />

E mail<br />

(if applicable and address)<br />

H. Repelita 081361445500<br />

H. Dahyar 08126381123<br />

H. Daham 081370674461<br />

H. Pandu Husin 081370999977<br />

Independent supplier of<br />

Contact Name<br />

Location<br />

Phone<br />

materials and services (if applicable and address)<br />

PT.Altrak Bp.T.Mulja Tirto Medan 061-8449978<br />

PT.United Traktor Bp.Joseph Tarigan Medan 061-7865133<br />

PT.Traktor Nusantara Bp. Ilham S.Nasution Medan 061-7874455<br />

PT.Trakindo Bp.M.Ridwan Medan 061-7865311<br />

Worker Organization<br />

Contact Name<br />

Location<br />

Phone<br />

(if applicable and address)<br />

Ketua SPSI Resman Purba Pondok Ry II LPYE 085270098025<br />

Ketua Kop Kar Tapian Makmur Ismail Pondok Div.1 081265657266<br />

LPYE<br />

NGO<br />

Contact Name<br />

Location<br />

Phone<br />

(if applicable and address)<br />

Khatulistiwa Parulian Sihopuk Baru 082166048466<br />

Koran Lokal "Dinamika Rakyat" Sutan Parbonuan Hrp Hutaimbaru 081260649588<br />

2.10. Questions posed in interviews with stakeholders<br />

• Does PTTN provide information on the <strong>RSPO</strong> certification exercise including plans for safety and<br />

health to the public and stakeholders?<br />

• Does PTTN hold regular meetings on community development?<br />

• Does PTTN respond well to complaints in respect of <strong>RSPO</strong> P & C implementation?<br />

• Is there a clear grievance and complaints procedure in the company?<br />

• Are there any complaints on land acquired by PTTN for planting oil palm?<br />

• Is there any environment impact caused by the operations of PTTN?<br />

• Is there a procedure for settlement of conflicts communicated to the local community?<br />

• Does PTTN meet with stakeholders regularly to discuss issues on community development?<br />

• Are the workers paid in accordance with government regulations?<br />

• Is there a system to disseminate information quickly in emergencies to the local communities<br />

around the palm oil mill and supply bases?<br />

All the responses / comments, whether positive or negative, were recorded by the audit team by<br />

hand. It then verified the information by the standard operating procedure.<br />

.<br />

2.11. Date of next surveillance visit<br />

The next surveillance audit has to be within 12 months from the date of <strong>RSPO</strong> approval of the Initial<br />

Certification. The surveillance audit has to be conducted yearly for a 5-years period.<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 17


3. <strong>ASSESSMENT</strong> FINDING<br />

3.1 Summary of findings<br />

Objective evidence was obtained separately for each of the indicators for the mill / estates in the<br />

certification assessment. The information was comprehensively asked from the 1 (one) mill and 3<br />

(three) estates, and outgrowers.<br />

The results for each indicator from the different operational areas were aggregated to assess the<br />

overall conformance of the Company's operations to it. A finding is made for each indicator.<br />

Nonconformities were raised against 4 (four) Major Indicators, and 6 (six ) Minor Indicators with some<br />

opportunities for improvement noted. Where a nonconformity / observation is assigned,<br />

reference is made at the end of the text of the Indicator to which it refers.<br />

PTTN has prepared a Corrective Active Plan and submitted evidence which has been accepted by TNI. The<br />

effectiveness of the corrective actions for the minor nonconformities will be checked on the next<br />

surveillance but the major non-compliance has to be closed within 60 days and on-site verification is<br />

taken on September 6, 2011.<br />

The following is a summary of the findings for compliance with the <strong>RSPO</strong> Principles & Criteria.<br />

Criterion 1.1<br />

Oil palm growers and millers provide adequate information to other stakeholders on<br />

environmental, social and legal issues relevant to <strong>RSPO</strong> Criteria, in appropriate languages and<br />

forms to allow for effective participation in decision making.<br />

PTTN has a procedure for communicating with stakeholders as decribed in “SOP Komunikasi dan<br />

Konsultasi dengan Stakeholder No. PT.TN-LPYM/<strong>RSPO</strong>-SOP/03 dated on 01.07.2010 All the heads<br />

in the mill / estates are required to provide adequate information as required by the <strong>RSPO</strong> criteria.<br />

There was no specific form, but PTTN provide information boxes placed in front of estate/ mill office<br />

and checked regularly every week. Stakeholders requests, especially on donation will be considered<br />

under the CSR program, or immedeately if the amount is reasonable, for example : request from<br />

Police Office Padang Lawas Utara about 31 flag poles dated on April 29, 2011, had been replied<br />

promptly on May 4, 2011, and fulfilled on July 9, 2011. Mechanisme to perform the CSR was<br />

conducted through the SOP No. 014/SOP.CSR/05/2011, dated 1 July 2011. The requests and<br />

responses for information are recorded in the „ Buku Komunikasi Konsultasi dan Tanggapan. (1.1.1).<br />

The response(s) are within one week after the request had been received whether they are approved<br />

or not. (1.1.2). The records of requests / responses will be kept for 5 (five) years as stated in “SOP<br />

Pengendalian dan Masa Simpan Dokumen No.PT.TN-LPYM/<strong>RSPO</strong>-SOP/04 dated on 01.07.2010.<br />

(1.1.3).<br />

Compliance Status : Full.<br />

Criterion 1.2<br />

Management documents are publicly available, except where this is prevented by commercial<br />

confidentiality or where disclosure of information would result in negative environmental or<br />

social outcomes.<br />

Management documents on legal, environmental, health safety and social issues are publicly<br />

available upon request or regular reports are submitted to related stakeholders according to “SOP<br />

Daftar Informasi dan Stakeholder Terkait” or List of Information and Related Stakeholders (Form<br />

PTTN IUS dated on 01.07.2010).<br />

The legal documents are reported to Dinas Perkebunan (Agriculture Agency), BPN (Land Agency)<br />

such as:<br />

Izin Lokasi (Site Permit),<br />

Izin Usaha Perkebunan (Plantation Operation Permit)<br />

HGU (Land Use Title).<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 18


HGU signboard also publicly available at the entrance gate of estate, as seen in Figure 2.<br />

In accordance with environmental issue, PTTN has prepared Environmental and Social Impact<br />

Assessment (AMDAL / UKL-UPL) and Environmental Management And Monitoring Reports (Laporan<br />

RKL-RPL), for Semester 2 in 2010 and submitted to BLH (Environmental Agency). Area of planting<br />

and production and fertilizers implementation documents are ubmitted to Agriculture Agency.<br />

Since PTTN is a labour-intensive company, it is required to comply with the mandatory SMK3<br />

(Occupational Health and Safety Management System). Progress on the Health and Safety Program<br />

(K3 program) is reported regularly to the Ministry of Labour of Republic of Indonesia.<br />

Social and financial documents such as list of number of employees and list of employee’s salary are<br />

submitted regularly to Dinas Tenaga Kerja & Transmigrasi (Labour & Transmigration Ministry in<br />

Regency & Province) and to JAMSOSTEK. Taxes documents are submitted to Regency and<br />

Province Goverment also to Local House of Representative (DPRD) .<br />

Besides the regular reports to related stakeholders, some documents are available upon request such<br />

as CSR program and social impact assessment for social base NGO, report of RKL/RPL for<br />

environmental base NGO. The stakeholder should ask the documents/ information officially according<br />

to “SOP Komunikasi dan Konsultasi dengan Stakeholder No. PT.TN-LPYM/<strong>RSPO</strong>-SOP/03” dated on<br />

01.07.2010 , the organization will respond to the request of information within one week whether it<br />

will be approved or not depending on the urgency. The top management is the the responsible<br />

person to decide it. (1.2.1).<br />

All the records are properly kept for the proper periods as stated in ““SOP Pengendalian dan Masa<br />

Simpan Dokumen No.PT.TN-LPYM/<strong>RSPO</strong>-SOP/04 dated on 01.07. e.g., safety, health and<br />

environment and social records 5 years and legal records indefinitely (1.2.2). Notwithstanding this,<br />

environmental and social data are presented during the yearly public consultation with stakeholders<br />

as part of its CSR program.<br />

Compliance Status : Full.<br />

Figure 2. Sign board of HGU (Land Use Title) at the entrance gate of estates<br />

Criterion 2.1<br />

There is compliance with all applicable local, national and ratified international laws and<br />

regulations<br />

PTTN keeps copies of all the legislations / regulations applicable to it from the applicable regulation<br />

list in “SOP Evaluasi Pemenuhan peraturan dan Persyaratan Lain (P. TN-LPYM/<strong>RSPO</strong>-SOP/06 dated<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 19


on 01.07.2010. Evaluation is done regulary every six month by <strong>RSPO</strong> Officers in each unit which<br />

has to keep track of its (PTTN’s) legal requirements and make sure that they are complied with.<br />

Since PTTN has SM-K3 certification by Ministry of Labor of Republic Indonesia, the <strong>RSPO</strong> Officer has<br />

to make sure that the responsible personnel – engineers, boiler men, electricians, have the necessary<br />

qualifications, and the equipments – boilers and diesel generators – have the necessary certifications<br />

and the permits are still valid. The evidence of evaluation is recorded in “Form evaluasi kepatuhan<br />

kepada Peraturan, Perundangan dan Persyaratan lainnya (02/ENVD-EK-LH/X/2010)”, the last<br />

evaluation was done on 24.01.2011. All the documents were checked and mostly found to be in legal<br />

compliance. However, compliance for some regulations at regency (Kabupaten) level was<br />

outstanding due to the division of Kabupaten Tapanuli Selatan into Kabupaten Padang Lawas Utara<br />

and Labuhanbaru Selatan. Nevertheless, PTTN has taken the required steps to fulfill the outstanding<br />

regulation compliance as it needs time for the regency government to process them.<br />

Compliance Status : Full.<br />

Criterion 2.2<br />

The right to use the land can be demonstrated and is not legitimately contested by local<br />

communities with demonstrable rights<br />

Currently, there are no claims on PTTN-Langga Payung Mill by anyone based on interview with local<br />

communities and other stakeholders during public consultation. SMART Tbk took over the land from<br />

established company PT. Tapian Nadenggan in 1989, not directly from the local community. The mill /<br />

estate managers have ensured proper registration of their HGU certificates in register. (2.2.1). The<br />

boundaries of PTTN land were easily identified being demarcated by T-0 pillars, their identification<br />

numbers corresponding with points in the maps in HGU (Land Use Title) (2.2.2). There is mechanism<br />

to monitor and maintain the boundary stones periodically as shown in “Data Monitoring dan<br />

Perawatan Patok Batas BPN Report ”, which conducted every 6 month by HCV Officer,<br />

acknowledged by Estate Manager. The maintenance include cleaning and repainting the boundaries<br />

stones, and sometimes repairing the damaged boundaries stones or repositioning using GPS if the<br />

boundaries stones are relocated or missed. There is procedure for resolving any conflict over land<br />

refers to “Pedoman Teknis Persiapan Lahan SMART No. SOP/NP/SMART/XII/MCAR001, Chapter<br />

XII,. Penanganan Keluhan dan Ketidakpuasan” dated on 1 July 2010 and “SOP Penanganan Keluh<br />

Kesah dan Ketidakpuasan No. PT. TN-LPYM/<strong>RSPO</strong>-SOP/02, (2.2.3).<br />

Compliance Status : Full.<br />

Criterion 2.3<br />

Use of land for oil palm does not diminish the legal rights or customary rights of other users,<br />

without their free, prior and informed consent<br />

As far as could be ascertained, there is no customary right of other users, according to HCV<br />

assessment report there was no indigenous people around the mill and estates.<br />

Compliance Status : Full.<br />

Criterion 3.1<br />

There is an implemented management plan that aims to achieve long term economic and<br />

financial viability<br />

PTTN has long term projection (2010 – 2020) for its crop, including key performance data for its mill<br />

and estates as part of its long term economic planning for all corporate of SMART Tbk Group,<br />

including mill allocation, production of FFB (tonnage) FFB/ ha (yield); OER, by predicting inflation<br />

rate; exchange rate; interest rate; portion cash; dividen; non deductible expenses; working hours;<br />

turnover; % allowance for doubtful accounts, age of asset; price of FFB purchase. During the<br />

projection period the mill capacity is 60 FFB/ hour and no plan to increase the mill capacity.<br />

Compliance Status : Full.<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 20


PTTN has developed projected annual replanting program until 2017 as seen in this table below:<br />

Unit<br />

Replanting a r e a (Ha)<br />

2011 2012 2013 2014 2015 2016 2017<br />

LPYE 737 289 559 161 730 639 953<br />

PBNE 228 262 304 523<br />

NRME 254<br />

TOTAL 737 543 559 389 992 943 1476<br />

Criterion 4.1<br />

Operating Procedures are appropriately documented and consistently implemented and<br />

monitored<br />

PTTN has Standard Operating Procedures with the best practices for its mill and estates operations.<br />

The mill have been certified to QMS ISO 9001 and HSE management SMK3 by the Ministry of Labour<br />

of Indonesia. Most of the Standard Operation Procedures are incorporated in the SM-K3 management<br />

The following procedures applicable and implemented within sustainable palm oil, such as :<br />

a. SOP for Oil Palm (containing aspects from nursery, land preparation, planting, upkeep,<br />

harvesting, waste management, HCV, emergency preparedness and response, and<br />

environmental monitoring).<br />

b. SOP for Palm Oil Mill (containing stages of process, boiler, power generation, water treatment,<br />

land application, electrical system, quality (inc monitoring of CPO parameters), dispatch and<br />

laboratory).<br />

c. Manual and SOP for Environment Management System, Health & Safety and SPO (containing<br />

application of pesticides, use of PPE , emergency preparadness) .<br />

Operational inspection for harvesting, maintenance, fertilizing, workshops, and other farming<br />

operations by the Vice President of Agronomy (VPA) and Regional Controler (RC) which is performed<br />

every 3 months. However, not all the procedures established are adequate or properly implemented.<br />

It was found that in Standard Operating Procedure for replanting doesn’t explain the timetable to plant<br />

legume cover crops. A Major non-compliance was issued.<br />

There was not clear which operating working instruction (WI) implemented in weeding, spraying and<br />

harvesting process, as there were two IK available: IK-12, IK-20, IK-21 (Rev 00, dated 02.07 2011) or<br />

IKPBNE/01, 02, 04 (Rev.00, dated 01.07 2011). A Major non-compliance was issued.<br />

Compliance Status : Not Compliant (See NCR T-01.07/2011 and T-04.07/2011)<br />

Criterion 4.2<br />

Practices maintain soil fertility at, or where possible improve soil fertility, to a level that<br />

ensures optimal and sustained yield<br />

SMARTRI, a corporate owned Research Institute has laboratory services to provide annual fertilizer<br />

recommendations based on soil sampling and analysis which are carried out once in 3 years while<br />

leaf sampling and analysis are regularly performed on yearly basis. For soil fertility and nutrient<br />

uptake correlation purpose, soil sampling units are arranged to coincide with the leaf sampling units.<br />

Parameters analyzed for soil samples consist of physical analysis ( texture), pH, organic carbon, total<br />

N, P and K, available P and Cation Exchange Capacity. Soil sampling is conducted in accordance<br />

with existing standard operating procedures (Soil Sampling Unit (SSU) Work Instruction)<br />

There are some agronomic practice to improve and maintain soil fertility implemented in PTTN :<br />

1. Using organic fertilizer<br />

2. Plant Legume Cover Crops<br />

3. Pruning and frond stacking<br />

4. Weeding,<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 21


The application of POME as organic fertilizer in Langga Payung Estate based on land application<br />

research by Lembaga Penelitian Universitas Sumatera Utara, the last record refered to No. 01 –<br />

03/H5.2.3.1/PPM/K5/2011 dated on 07.01.2011. The test result of BOD range of the applied POME<br />

in three ponds are between 1,264 – 1,516 mg/l, still below the maximum standard 5,000 mg/l as<br />

required by “PerMenLH No.29/2009” The application of EFB in Langga Payung Estate in Division<br />

area II, IV, V and VI with the dosage 30 t/ha. Fertilizing program developed by SMARTRI covers time<br />

of application and type and dosage of fertilizer. Combination application of EFB and POME in Langga<br />

Payung Estates in recent years show that usage of chemical fertilizer was being reduced.<br />

Compliance Status : Full..<br />

Criterion 4.3<br />

Practices minimise and control erosion and degradation of soils<br />

PTTN has soil maps for each estate (Langga Payung Estate, Paya Baung Estate, and Normark<br />

Estate) which categorize the classes of land suitability based on parameters of slope, texture and soil<br />

limiting factors. There are no fragile or problem soils being classified on all the 3 soil maps.<br />

PTTN has established management strategy to minimize and control erosion and degradation of soils<br />

by planting Legume Cover Crops, terracing on undulating to steep areas, pruning and frond stacking<br />

besides having routine road maintenance program. Roadmaintenance is carried out bysandstone<br />

(sirtu) gravelling to make the road surface hard and compact.<br />

PTTN established procedure for land preparation for replanting, however , it was found during the<br />

field visit that the replanting area in Division 1 (LPYE11B21) with slope 16 - 40 % was not<br />

appropriately covered by Muccuna brachteata.<br />

A Minor non-compliance was issued. (See NCR T-02.07/2011)<br />

Compliance Status : Not Compliant<br />

Figure 3 Soil map in Normark Estate<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 22


Criterion 4.4<br />

Practices maintain the quality and availability of surface and ground water<br />

PTTN has an implemented water management plan, such as : reuse condensate water from Cooling<br />

turbine into Water Treatment, using condensate from steam boiler as water dilution mixing in CPO<br />

processing, minimize water leakages from water pipes in the mill and estates, using dust conveyor<br />

instead of using water for dust collector boiler, installing float switch to all bathrooms. Record of<br />

water using per ton FFB is available, there is reduction from 1.24 m3 water/ t FFB in 2008 to 1.15m3<br />

water/ t FFB in 2010.. BOD Analysis of surface water is tested regularly by SMARTRI laboratory, the<br />

last record dated on 01. 06.2011. The BOD levels and other parameters such as pH must comply with<br />

the local requirements in the Liquid Waste regulations in environmental decree by Province of North<br />

Sumatra . The BOD data are submitted six-monthly in RKL/ RPL to BAPEDALDA (Regional<br />

Environmental Monitoring Body). Checks on records show that all the data complied with regulation.<br />

The auditor team checked that there were installation of chemical traps and oil traps in the mill to<br />

avoid water and soil contamination around the mill. To avoid the contamination of river water, HCV or<br />

riparian zones are in the process of being restored along the river banks. There are several sign<br />

boards of HCV 4.1 to warn people for not hunting and fishing and to remind workers for not applying<br />

fertilizer and pesticides to the palms in the riparian zones – a 50 meter belt along the river banks on<br />

both sides. Palms with red x markings within the riparian zones will not be maintained. No new<br />

palms will be planted in the riparian zones during replanting. SOP HCV monitoring in the riparian<br />

zone has been established and the records is well maintained. PTTN also established SOP agrochemicals<br />

mixing to avoid mixing of agro-chemicals in proximity of water courses, interview with<br />

spraying workers confirmed that they understood the both of the SOPs well.<br />

Compliance Status : Full.<br />

Figure 4. Sign board of HCV area along the river bank. No fertilizer and pesticide applications for<br />

marked palms within the limit zone.<br />

Criterion 4.5<br />

Pests, diseases, weeds and invasive introduced species are effectively managed using<br />

appropriate Integrated Pest Management (IPM) techniques<br />

PTTN has formulated an Integrated Pest Management (IPM) as recorded in “Laporan Sensus”,. PTTN<br />

practiced incorporating cultural, biological, mechanical or physical methods, by :<br />

1. Identification of pests, diseases and weeds before it become an outbreak of maximum level<br />

2. Introducing of beneficial plants for hosts of pests.<br />

3. Introduction Barn Owl (Tyto alba)<br />

4. Planting LCC<br />

5. Frond stacking<br />

6. Minimise use of agrochemicals.<br />

The use of pesticides is minimized through selective spraying instead of blanket spraying for cases of<br />

severe infestation of weeds.. Oil Palm Leaf Eater Control includes detection, cencus, examination,<br />

treatments, evaluation, monitoring and organisation. Checks on records confirmed there was no<br />

outbreak during the last 5 years. Planting beneficial plants, such as Bunga pukul delapan (Turnera<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 23


subulata) and air mata pengantin (Antigonom leptosus) to harbour predators of the crop pests. PTTN<br />

provide maps shows the planting area of beneficial plants, for example in Paya Baung Estate as seen<br />

in Figure 2a.<br />

The barn owl or Burung hantu (Tyto alba) is protected and encouraged as a natural predator of rats,<br />

as PTTN have not used rodenticide anymore since 2009. There is a maps shows the location of barn<br />

owl boxes as seen in Figure 2b. Census of Tyto Alba is conducted monthly using PVC stick and<br />

lenses as ‘”periscope”, for example, during July 2011 there were 28 barn owl boxes occupied by<br />

couples of birds and their chicks in Paya Baung Estate”. The existence of the birds observed by<br />

detecting the feathers, faeces, sound and bones of preys. ..<br />

Pesticide toxicity units (a.i. / LD 50 / FFB tonnage) are monitored to herbicides such as :Glyphosate,<br />

Methyl metsulfuron, Paraquat, Triclopyr TEA salt, Fluroxypir; insecticides such as:Deltramethrin;<br />

Fungicides such as :Benomyl. The records were well maintained.<br />

Compliance Status : Full.<br />

Figure 5a. Maps of beneficial plants in Paya Baung<br />

Estate<br />

Figure 5b. Maps of Tyto alba boxes in Paya Baung<br />

Estate<br />

Figure 5c. Cencus of Tyto alba using PVC stick and lenses as”periscope”<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 24


Criterion 4.6<br />

Agrochemicals are used in a way that does not endanger health or the environment. There is<br />

no prophylactic use of pesticides, except in specific situations identified in national Best<br />

Practice guidelines. Where agrochemicals are used that are categorised by the World Health<br />

Organization as Types 1 A or 1 B, or are listed by the Stockholm or Rotterdam Conventions,<br />

growers are actively seeking to identify alternatives and this is documented.<br />

There is a List of pesticides used and pesticides stocks is listed in the”Balance Stock Agrochemical in<br />

2008, 2009, 2010”., such as : Ally 20 WDG (active ingredient : Metil metsulfuron), Roll Up 480 SL<br />

(Isopropil amina glyphosat), those can be bought for application are in accordance with the<br />

Permentan No 1/2001, WHO and Rotterdam convention, are issued and distributed to Procurement<br />

division. Only procurement division can buy and supply the materials. PTTN has a procedure on how<br />

to apply agrochemicals, refers to Peraturan Menteri Pertanian No. 07/Permentan /SR.140/ /2007, or<br />

Regulation No. 07/ Permentan /SR.140/ 2/2007 Ministry of Agriculture Republic of Indonesia.. All the<br />

agrochemicals used are registered and approved by Pusat Perizinan dan Investasi Sekretariat<br />

Jenderal Departemen Pertanian 2008, or Invesation and Permit Center, Agriculture Department,<br />

Republic of Indonesia. Checks on records show that the pesticide use (including active ingredients<br />

used, area treated, amount applied per ha and number of applications) is appropriate for the target<br />

species, given at correct dosage and applied by trained personnel in accordance with the product label and<br />

related SOP/ Working Instruction.<br />

PTTN has established procedure to handling hazardous agrochemicals, and provide facilities and<br />

proper PPE for workers who have contact with agrochemicals, including field sprayers, fertilizer applicators,<br />

warehouse helper and chemical mixer. However, it was found that MSDS of Rollixone in Agrochemical<br />

Warehouse at Payabaung Estate, and also for other MSDS, indicated that there must be shower<br />

water and soap available if emergency situation happened. The shower water was available, but it<br />

didn’t work and there was no soap available in place. The facility doesn’t provide bin for hazardous<br />

wastes, sand, and fabric cotton waste as required by SOP/PBNE/LBH (Rev.00, dated 01.07.2011. A<br />

Major non-compliance was issued. (See NCR T-08.07/2011).<br />

PTTN also established procedure for handling hazardous agrochemicals spills and only trained<br />

persons for pesticide application technique are permitted and instructed for pesticides application in<br />

the field. However, it was found Working instruction regarding handling of hazardous agrochemicals<br />

spill (SOP /PBE/LBH (Rev,00, 1 Juli 2010) was not available in Agrochemical Warehouse of<br />

Payabaung Estate. MSDS for agrochemicals are translated into Bahasa Indonesia, however, the<br />

warehouse helper didn’t understand the meaning. Symbol of hazardous chemicals was not in<br />

apropriate manner and the person in charge who handle agrochemicals found has not enough<br />

competence in his job, i.e MSDS, symbol, and working instruction. A Major non-compliance was<br />

issued. (See NCR T-09.07/2011).<br />

Waste material from agrochemicals including pesticides containers were collected by licensed contractor<br />

and the records of hazardous waste manifest were well maintained. PTTN has a plan to return the<br />

waste container to the vendor and the mutual agreement has been signed.<br />

Checks on the records of agrochemicals used found that they complied with the regulation. Usage of<br />

paraquat in 2008, 2009, and 2010 is reduced. Regular training/ socialization for chemical sprayers<br />

was conducted. There was evidence of regular medical check-ups for workers involved in handling<br />

hazardous chemicals. PTTN has policy that pregnant and breast-feeding women are prohibited from<br />

working with pesticides, and there are records of socialization of the policy to the female workers.<br />

Compliance Status : Not Compliant..<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 25


Criterion 4.7<br />

An occupational health and safety plan is documented, effectively communicated and<br />

implemented<br />

PTTN has established a safety, health and environment policy and certified SMK3. The organisation<br />

structure of Panitia Pembina Keselamatan dan Kesehatan Kerja (P2K3), or Guiding Committee on<br />

Occupational Health and Safety, has been established. Explanation and communication of the policy<br />

is the responsibility of the safety engineer (SM-P2K3) who daily monitors and inspects all facilities in<br />

the mill and estates for emergencies. There are regular monthly meetings between the management<br />

and workers on health and safety issues. All the permanent employees and contract workers are<br />

insured under JAMSOSTEK A record of JAMSOSTEK payment installment was sighted. All<br />

employees, especially those in high risk work, undergo an annual health examination with the results<br />

submitted to Dinas Tenaga Kerja – Balai Hiperkes Dan Keselamatan Kerja Provinsi Sumatera Utara<br />

(Department of Labor, Province of North Sumatra). PTTN provide 3 company clinics and 1 central<br />

clinic and there are 2 company physicians, nurses and midwives to serve the employees and their<br />

dependents in estates. However, there was no record or evidence that clinical weighing scale and<br />

stethoscope in Payabaung clinic in good condition. A Minor non-compliance was issued. (See NCR<br />

T-05.07/2011).<br />

The physicians visit the clinic twice a week. During their absence, the daily operations are conducted<br />

by the nurses, sometimes include giving prescription to the patients. However, it was found that there<br />

was no working instruction for nurses to prescribe medicine for patients, especially antibiotic.. A Minor<br />

non-compliance was issued. (See NCR T-06.07/2011)<br />

Medical waste from Payabaung clinic, periode April-June was kept not in appropriate manner, such as<br />

no labelled of waste, and not kept in appropriate place. A Minor non-compliance was issued.<br />

All the operations have been risk assessed for obtaining SMK3 certification. The P2K3 team<br />

identified and analysed the risks for all routine and non-routine activities in Langga Payung POM,<br />

Langga Payung Estate, Paya Baung Estate and Normark Estate. However, it was found that none of<br />

harvesting workers wear safety helmet in Langga Payung Estate, Paya Baung Estate and Normark<br />

Estate because the company doesn’t provide it for workers. The risk assessment and related SOP do<br />

not emphasize the need to wear appropriate PPE against the risk of being hit by harvested FFB fallen<br />

from palms. A Minor non-compliance was issued. (See NCR T-03.07/2011)<br />

The P2K3 team responsible to assured that all P2K3 and K3 equipment, such as fire extinguishers,<br />

PPE, hydrants, P3K tool kits (medical box) are available on worksites by regular checking in the mill<br />

and estates. However, it was found that one of the operators was not wearing appropriate safety<br />

shoes as required in “IK12 rev00, dated 02.07.2010” while uprooting woody growths (Dongkel Anak<br />

Kayu) in Block 26. A Minor non-compliance was issued. (See NCR T-10.07/2011)<br />

PTTN has developed procedures for accidents and emergency preparadness The effectiveness of<br />

this procedure is tested every year. Workers in hazardous areas are provided training to minimize<br />

their risk in an annual training program on safety and health issues including training for K3<br />

regulations and legislations of the Republic of Indonesia, first aid training and emergency drills.<br />

Records of work accidents were compiled every month and cases of accidents being fully investigated<br />

by the company physician which had been trained Hyperkes and assigned as P2K3 officer as<br />

required in SMK3 report, the records are kept 5 years and regularly submitted to DISNAKER, the<br />

Regional Labor Department, and JAMSOSTEK for insurance claims.<br />

Compliance Status : Not Compliant.<br />

Criterion 4.8<br />

All staff, workers, smallholders and contractors are appropriately trained<br />

Mill / estate managers have identified the training needs in each section / department to organize an<br />

annual training program. Records of training for each employee in the mill and plantations such as<br />

attendance sheets, documented training plans/ programs and records of training sessions held,<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 26


documented evidence of evaluation for staff/workers trained being kept. The training program in 2010<br />

- 2011 include <strong>RSPO</strong> P & C, SMK3, MSDS, First aid, PPE, Waste handling, SOP for mill and estates,<br />

emergency preparadness, training for nurses and midwives. The training also covers contractors and<br />

smallholders (independent farmers).<br />

Compliance Status : Full.<br />

Figure 6a. Emergency drills<br />

Figure 6b. Training for nurses and midwives<br />

Figure 6c. Restricted pesticides training by<br />

Pesticide Committee from Plantation Agency<br />

Figure 6d. Sprayer training by SMARTRI<br />

Figure 6e. MSDS training by <strong>RSPO</strong> Coordinator<br />

Figure 6f. Welding training by Labor Agency<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 27


Criterion 5.1<br />

Aspects of estate and mill management, including replanting, that have environmental impacts<br />

are identified, and plans to mitigate the negative impacts and promote the positive ones are<br />

made, implemented and monitored, to demonstrate continuous improvement<br />

PTTN has conducted the assessment of environmental impacts that has been mentioned in Environmental<br />

Impact Assessment (AMDAL and RKL-RPL). This document has been approved by the Regional<br />

Environmental Impact Control Agency (BAPEDALDA) and every 6 months PTTN shall submit the<br />

progress reports, namely Monitoring Report of RKL-RPL to the agency. Last records of Semester II,<br />

July-December 2010, was sent to the Environmental Protection Agency of Padang Lawas District,<br />

North Sumatera Province, on February 10,2011. It was confirmed that the PTTN done this obligation,<br />

and kept the record of submission letter properly. The environmental parameters reported in all mill<br />

and estates are such as:<br />

Liquid wastes, recorded monthly<br />

Water quality in the observation well, recorded every 6 months<br />

Gaseous emissions are recorded every 6 months<br />

Soil fertility is analysed yearly<br />

Hazardous wastes, recorded every three months.<br />

There is replanting program for all 3 estates, and PTTN has identified aspects of the replanting in<br />

AMDAL document.<br />

Until now, there is no correction from BAPEDALDA regarding the report since the test result complied<br />

with the regulation. PTTN will revise the AMDAL documents and the consultation will be held with<br />

relevant stakeholders if there were change in their operation as required by regulation, for example :<br />

POME (palm oil mill effluent) has been permitted to be used as land application after the research<br />

conducted by University of North Sumatera. Any adverse impacts identified will be studied for<br />

mitigation. Mitigation plans for land application such as :<br />

regular flatbeds monitoring for POME application to avoid leakage of POME into the drains and<br />

rivers<br />

the last two or three fladbeds remained empty to avoid uncontrollable flow.<br />

PTTN also conduct water quality analysis from observation wells in communities housing complex<br />

nearby the land application location<br />

Compliance Status : Full.<br />

Figure 7a. Regular flatbeds monitoring<br />

Figure 7b. The last two flatbeds remained empty<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 28


Criterion 5.2<br />

The status of rare, threatened or endangered species and high conservation value habitats, if<br />

any, that exist in the estate or that could be affected by estate or mill management, shall be<br />

identified and their conservation taken into account in management plans and operations.<br />

PTTN had a HCV assessment done on 7-10 August 2010 at Normark Estate and on 13-20 August<br />

2010 for Langga Payung Estate and Paya Baung Estate by HCV Team from` Environmental<br />

Department that consists of <strong>RSPO</strong> approved HCV assessors, such as Norman FM, Nugroho Wahyu,<br />

Bambang Setyaji. which has identified HCV area that cover of total area 483.98 ha. The HCV’s areas<br />

are recognized with HCV’s 1.1, 1.2 and 4.1.. The peer review has been conducted by independent<br />

consultant, Ir. Siswo, M.Si Public consultation for HCV has been done on 3-4 Novemebr 2010. The<br />

HCV’s area was identified with sufficient signboards that contain warnings of what people should not<br />

do to the protected HCVs such as prohibition to practice land burning. hunt protected animsal, illegal<br />

fishing that can damaged the river/ body water (poisoning, using exploding materials, illegal logging<br />

and disturb protected flora. Identification of HCV’s was recorded in” List of Protected Species”of<br />

operating procedure SOP/PBNE/KPHCV, which identified of 6 aves, 2 mammals and 1 reptil and 2<br />

protected flora according to CITES, IUCN or national regulation PP 7 Year 1999. Some sites of Bunga<br />

bangkai (Amorphopalus sp) were found during visit and protected by bamboo fences. There is HCV<br />

management plan and monitoring program developed by Environmental Department, while HCV<br />

monitoring is conducted by trained HCV officers in each estates.<br />

Compliance Status : Full.<br />

Criterion 5.3<br />

Waste is reduced, recycled, re-used and disposed of in an environmentally and socially<br />

responsible manner<br />

PTTN has identified all waste and pollutions sources in the mill and estates and listed them in<br />

accordance with its related procedure that classified the wastes as office wastes, household wastes,<br />

mill wastes, workshop wastes and pesticide wastes. The records of actual wastes in the mill and<br />

estates are documented properly in Wastes Management Plan (5.3.1). Suitable methods have been<br />

established to minimize the production of wastes and to minimize their environmental impacts. EFB is<br />

used to mulch young palms in the field near mill in Langga Payung Estate Division II, IV, V and VI with<br />

the dosage 30 t/ha, liquid wastes treated as in Instalasi Pengolah Air Limbah /IPAL (waste water<br />

treatment) to reduce their BOD and COD, with their pH monitored to the requisite standards.<br />

Analyses of POME for BOD, COD and pH are done regularly to ensure the parameters meet the<br />

standards, the last report in Semester II 2010 ( 5.3.2 and 5.3.4) showing compliance. POME is used<br />

as land application in the field near mill in Langga Payung Estate instead of dispatching into rivers or<br />

body waters.<br />

The hazardous waste were collected by licensed contractor and the records of hazardous waste<br />

manifest were well maintained. PTTN has a plan to return the waste container to the vendor and the<br />

mutual agreement has been signed. (5.3.3).<br />

Compliance Status : Full.<br />

Criterion 5.4<br />

Efficiency of energy use and use of renewable energy is maximized<br />

PTTN has a renewable energy program in which it continually strives to improve energy efficiency and<br />

use more renewable vis-à-vis fossil fuels. The mill have energy use monitoring records in kilowatt<br />

hours per tonne of palm product, and has program to increase energy efficiency by reducing fossil fuel<br />

consumption, since the generator set is only used as backup to generate electricity when the main<br />

turbine is down. Regular maintenance of mill engines ( e.g: boiler, sterilizer, BPV, Steam separator,<br />

Motor Compressor, turbine) and motor vehicles also contribute to increase energy efficiency rate.<br />

Compliance Status : Full.<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 29


Criterion 5.5<br />

Use of fire for waste disposal and for preparing land for replanting is avoided except in<br />

specific situations, as identified in the ASEAN guidelines or other regional best practices<br />

The use of fire for any waste disposal is strictly prohibited such as in land preparation for new<br />

development and replanting. PTTN has a well implemented zero burning policy both in mill and<br />

estates. The wastes that are generated by mill and plantation activities are properly disposed off<br />

without burning. A notable achievement has been the total avoidance of use of fire for the disposal of<br />

garden wastes and packaging materials at the housing sites.<br />

Compliance Status : Full.<br />

Criterion 5.6<br />

Plans to reduce pollution and emissions, including greenhouse gases, are developed,<br />

implemented and monitored<br />

PTTN has identified pollution and emission sources, which comes mainly from boilers, generator sets<br />

and motor vehicles (5.6.1). Monitoring of their exhaust emissions is done regularly by independent<br />

laboratory - the smoke opacity results are recorded as part of its RKL-RPL (Environment Management<br />

and Monitoring) Semester Report. The parameters tested for are SO 2 , NO 2 , H 2 S and particulates as<br />

per the Ministry of Environment, Republic of Indonesia, regulation Peraturan Menteri Lingkungan<br />

Hidup No. 07 Tahun 2007. A check on the reports found that the levels complied with the standards<br />

(5.6.2). PTTN has a pollution and emission reduction program in which is prohibited the burning of<br />

EFB and domestic wastes in the mill, estates and housing complex; The domestic wastes were<br />

collected by contractor.. (5.6.3). There is SOP to treat POME and the records of monitoring POME<br />

are kept properly and were sighted.<br />

Compliance Status : Full.<br />

Criterion 6.1<br />

Aspects of estate and mill management including replanting that have social impacts are<br />

identified in a participatory way, and plans to mitigate the negative impacts and promote the<br />

positive ones are made, implemented and monitored to demonstrate continuous improvement<br />

PTTN has a method to monitor social information from the locals and its employees through SOP on<br />

Communication SOP/PBNE/Kom Rev.00 issued 1 July, 2010. and also conducted . Stakeholders<br />

meeting regularly every year . Some of social issue from local communitiies that has been<br />

responded by PTTN : provide job vacancies and job opportunities for local communities by<br />

conducting open and transparent employee recruitment process. Monitoring report : data of local<br />

communities employees was well maintained. The information is assessed and the results reported<br />

to the Environment Manager and concerned parties, such as the environmental impact-controlling<br />

agency, as a part of RKL/ RPL. The RKL/ RPL report covered the classifying the activities into<br />

negative and positive impact. The positives impact such as labour vacancy, cover crop planting,<br />

planting of main crops, maintenance of immature and mature crops. The negative impact arised from<br />

land clearing issues, and potential land conflict. A social impact also assessed the impact of<br />

company activities on the local communities. Interviews with the stakeholders indicated that the<br />

practice has resulted in improved relationships with the local communities.<br />

Compliance Status : Full.<br />

Criterion 6.2<br />

There are open and transparent methods for communication and consultation between<br />

growers and/or millers, local communities and other affected or interested parties<br />

PTTN has an effective communication and consultation procedure with smallholders and its local<br />

communities. It has also drawn up an external communication procedure. Consultation with<br />

stakeholders is done at least yearly, and minutes of the meeting on 10.06.2011 at Langga Payung Mill<br />

Office were sighted. The feedback from stakeholder consultation meeting that approved by<br />

management will become CSR and Community Development program Adjacent estate officers are<br />

responsible for communication with the respective parties on estate activities, while the Environment<br />

and CSR Department assumes overall responsibility for communication and consultation with<br />

stakeholders and to ensure that community programs are run effectively. A list of PTTN stakeholders<br />

includes the local communities, NGOs, labour union, contractors and local government.<br />

Compliance Status : Full.<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 30


Figure 8. Stakeholders meeting at Langga Payung Mill Office on 10.06.2011<br />

Criterion 6.3<br />

There is a mutually agreed and documented system for dealing with complaints and<br />

grievances, which is implemented and accepted by all parties<br />

PTTN has a complaints, grievance and dispute procedure as stated in “SOP Penanganan Keluh<br />

Kesah dan Ketidakpuasan No. PT. TN-LPYM/<strong>RSPO</strong>-SOP/02, Internal complaints and grievances are<br />

also resolved according the Mutual Working Agreement (Perjanjian Kerja Bersama). These<br />

procedures have been communicated to all stakeholders at each mill / estates. Interviews during<br />

public consultation confirmed that they understood the procedure well. It was noted that the<br />

responses from stakeholders have been positive that the company respond to the complaint from<br />

stakeholders, such as to give priority for job vacancies to local communities than outsider. During<br />

visits to stakeholders, the audit team confirmed that there were no serious complaints, grievances and<br />

disputes at the moment. Local communities and stakeholders obey and respect the company legal<br />

rights, reciprocated by the company’s respect for their traditional rights.<br />

Compliance Status : Full.<br />

Criterion 6.4<br />

Any negotiations concerning compensation for loss of legal or customary rights are dealt with<br />

through a documented system that enables indigenous people, local communities and other<br />

stakeholders to express their views through their own representative institutions<br />

PTTN has developed “Pedoman Teknis Persiapan Lahan SMART No.<br />

SOP/NP/SMART/XII/MCAR001 dated on 01.07.2010, Chapter XII to resolve land conflict. In this<br />

certification assessment, the audit team studied the whole compensation mechanism, and found it<br />

satisfactory with no legal action being taken by any party against another. The mechanism has been<br />

communicated to the stakeholders. Checks on the records and interviews with the local communities<br />

confirmed that there is no current claim on any land. Based on HCV studies and ANDAL report there<br />

is no customary rights of local community. Inteviews with the Chief of Local Community confirmed that<br />

they have no customary rights.<br />

Compliance Status : Full.<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 31


Criterion 6.5<br />

Pay and conditions for employees and for employees of contractors always meet at least the<br />

legal or industry minimum standards and are sufficient to provide decent living wages<br />

A policy on pay and working conditions in PTTN was established in Perjanjian Kerja Bersama or<br />

Mutual Working Agreement that dealt with BKS-PPSS (Badan Kerja Sama Perusahaan Perkebunan<br />

Sumatera). The salary scales and conditions of work are described in detail for all the positions of<br />

employment. PTTN follows all the legislations on working days, working time, salary levels, regional<br />

minimum pay and employee insurance, deductions, sickness, holiday entitlement, maternity leave,<br />

dismissal reasons, period of notice for termination . HRD staff inform the workers before-hand of their<br />

salary adjustments whenever any are in the offing. The policy about wages is also socialized in<br />

agreements with contractors, for example :agreeement with CV. Bintang Meriah mention that the<br />

contractor shall in compliance with relevant labor regulation and the contractor’s workers shall be<br />

covered by JAMSOSTEK.(6.5.1.and 6.5.4). Records were sighted that the pay complied with the<br />

regional minimum salary for North Sumatra in January 2011 as stated by Decree of Governor North<br />

Sumatera No.188.44/674/KPTS/2010. A daily permanent worker (Syarat Kerja Umum Harian or<br />

Pekerja Harian Tetap), will get Rp 1,090,425 a month, above regional minimum salary which was Rp<br />

1,035,500,- Employees also provided with rice allowance, for head of family is 15 kg plus 9 kg for<br />

wife and 7.5 kg for each children (maximum 3 children). All PTTN permanent employees are insured<br />

under JAMSOSTEK. All workers, if heads of families, are provided with a housing unit type G2 (48<br />

m2), equipped with electricty and piped clean water for washing and bath, however the test analysis<br />

of potable water using reverse osmosis method fulfill the requirements of potable water standard by<br />

PerMenkes/416/1990. There are 3 company clinics in housing site and one central clinic where sick<br />

employees / dependents get free treatment. The more serious cases are referred to the regional<br />

hospital. There are nearby state schools ( 1 kindergarten, 4 elementary schools, and 1 junior high<br />

school which have been donated by PTTN as CSR program (6.5.3).<br />

Compliance Status : Full.<br />

Criterion 6.6<br />

The employer respects the right of all personnel to form and join trade unions of their choice<br />

and to bargain collectively. Where the right to freedom of association and collective<br />

bargaining are restricted under law, the employer facilitates parallel means of independent and<br />

free association and bargaining for all such personnel<br />

PTTN has an agreement with the workers and management staff to allow them to establish a labour<br />

union in accordance with national legislation UU No. 13/ 2003. However, only non-staff employees<br />

can be Union officers to obviate any conflict of interest. The Union and management of PTTN<br />

negotiate the Perjanjian Kerja Bersama, or Mutual Working Agreement regularly. The minutes of<br />

some meetings were checked and the meetings found to be properly conducted. Union Worker also<br />

provided with the facility of room/ building and furniture.<br />

Compliance Status : Full.<br />

Criterion 6.7<br />

Children are not employed or exploited. Work by children is acceptable on family farms, under<br />

adult supervision, and when not interfering with education programmes. Children are not<br />

exposed to hazardous working conditions.<br />

PTTN has a policy on child and female workers as stated in “Peraturan Perusahaan PT. Smart SE<br />

larangan mempekerjakan anak di bawah umur No. 002/SE-HRDV/03/09” dated on 13.01.2009 and<br />

socialized in agreements with suppliers / contractors (6.7.1). No one under 18 years of age is to be<br />

employed. Records of personal data of employees - age, marital status, position and rank, location of<br />

work, date of commencing employment - are kept. Checking the records of the last recruitment on<br />

26.12.2010 confirmed that no one under 18 years old has been employed - in compliance with<br />

Indonesian national legislation UU RI No. 13 Tahun 2003, article 68 . (6.7.2).<br />

Compliance Status : Full.<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 32


Criterion 6.8<br />

Any form of discrimination based on race, caste, national origin, religion, disability, gender,<br />

sexual orientation, union membership, political affiliation, or age, is prohibited.<br />

A policy on equal rights regardless of race, caste, national origin, religion has been established as<br />

stated in “Peraturan Perusahaan PT. Smart Tbk pasal 5, SE No.146/CEO1-SE/04/2010” dated on<br />

13.04.2010 and also socialized in agreements with suppliers/ contractors. PTTN is an equal<br />

opportunity employer, with promotion mainly based on merit. The company policy regarding equal<br />

opportunity employer can be seen on notice boards in estates and mill office and socialized through<br />

meetings, morning muster. Males and females with same qualification status receive the same pay for<br />

the same type or same nature of job, for example administration clerk (not staff), mandor (foremen/<br />

forewomen) at estates, laboratory staff at mill. Interviews with workers and checks on records found it<br />

conformed.<br />

Compliance Status : Full.<br />

Criterion 6.9<br />

A policy to prevent sexual harassment and all other forms of violence against women and to<br />

protect their reproductive rights is developed and applied<br />

PTTN has established a policy on prevention of sexual harassment and protection of reproductive<br />

rights of its female workers such as : maternity leave, menstruation leave, breastfeeding permit as<br />

stated in “Peraturan Perusahaan pasal 5 ayat 3, SE No.145/CEO1-SE/04/2010 tanggal 13 April 2010<br />

perihal sosialisasi masalah sexual harassment“. The policy was socialized to the workers and<br />

contractors. There is gender committee establised to resolve if sexual harassment occurs. Interviews<br />

with female workers confirmed that they really understood the policy about sexual harassment and the<br />

reproductive rights.<br />

Compliance Status : Full.<br />

Criterion 6.10<br />

Growers and mill deal fairly and transparently with smallholders and other local businesses.<br />

PTTN has fair, legal and transparent agreements with its suppliers / contractors and independent<br />

smallholders/ outgrowers. There are transactions and purchase contracts with contractors and local<br />

companies on sale and purchase of FFB, FFB transport and service, maintenance and repair of mill<br />

equipment. The price for FFB is determined by the Head of Regional Plantation Section, Agriculture<br />

Department of Province North Sumatra via a mechanism based on the CPO price, kernel price (index<br />

K) from all palm oil producers and palm oil estates in North Sumatra. Interviews with some<br />

contractors confirmed that they understood the terms of their contracts well and thought them fair,<br />

legal and transparent andfound no grievance about the price. Payment to contractors and<br />

independent smallholders have always been on time as evidenced by their lack of complaints<br />

Compliance Status : Full.<br />

Criterion 6.11<br />

Growers and millers contribute to local sustainable development wherever appropriate<br />

PTTN is committed to support sustainable development of the local communities through its<br />

Corporate Social Responsibility programs which are presented in its Stakeholder meeting.<br />

Identification of projects is based on community needs, the priorities of each mill / estates and the<br />

budget available. The CSR programs in 2010-2011 are :<br />

Education:<br />

• Repairs Junior High Schools “SMP Satu Atap” and religious school in Langga Payung Estate,<br />

• Donation for Junior High School “SMP Satu Atap” in Langga Payung Estate to attend Science<br />

Olympiad in Medan.<br />

• Donation for Elementary School “SDN Mampang” and “SDN Normark” in Normark Estate.<br />

Religious program:<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 33


• Gifts/ packages for mosque’s administrators.<br />

• Repairs mosques in Hutabaru Nangka and Sihopuk Baru<br />

• Donation for islamic music instruments in Hutabaru Nangka.<br />

• Donation for MTQ (Al Qur’an recital contest) in Sei Kanan, Halongonan and Padang Lawas<br />

Utara<br />

Social<br />

• Heavy equipments aid to repair road in Batang Gogar Village and Situmbaga Village.<br />

• Bridge repair in Siancimun Village.<br />

• Clean water supply for villagers.<br />

• Bazaar/ cheap market for local community<br />

Health<br />

• Mass circumcision for moslem boys in Sei Kanan.<br />

• Eye medication for students in Elementary School in SDN Sei Kanan Halongonan<br />

• Nutrition supplements for infants and pregnant/ breastfeeding women in Sei Kanan<br />

Compliance Status: Full.<br />

Figure 9a. CSR social programs : road maintenance in Batang Gogar Village and Situmbaga Village<br />

.<br />

Figure 9b: CSR for religion program : packages for mosque’s administrator and donation for Islamic<br />

music instruments<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 34


Criterion 7.1<br />

A comprehensive and participatory independent social and environmental impact assessment is<br />

undertaken prior to establishing new plantings or operations,or expanding existing ones, and the<br />

results incorporated into planning, management and operations.<br />

There are no new plantings in PTTN supply base plantations , thus, this criterion is Not Applicable.<br />

Criterion 7.2<br />

Soil surveys and topographic information are used for site planning in the establishment of new<br />

plantings, and the results are incorporated into plans and operations.<br />

There are no new plantings in PTTN supply base plantations , thus, this criterion is Not Applicable.<br />

Criterion 7.3<br />

New plantings since November 2005, have not replaced primary forest or any area required to<br />

maintain or enhance one or more High Conservation Values<br />

There are no new plantings in PTTN supply base plantations , thus, this criterion is Not Applicable.<br />

Criterion 7.4<br />

Extensive planting on steep terrain, and/or on marginal and fragile soils, is avoided.<br />

There are no new plantings in PTTN supply base plantations , thus, this criterion is Not Applicable.<br />

Criterion 7.5<br />

No new plantings are established on local peoples’ land without their free, prior and informed<br />

consent, dealt with through a documented system that enables indigenous peoples, local<br />

communities and other stakeholders to express their views through their own representative<br />

There are no new plantings in PTTN supply base plantations , thus, this criterion is Not Applicable.<br />

Criterion 7.6<br />

Local people are compensated for any agreed land acquisitions and relinquishment of rights, subject<br />

to their free, prior and informed consent and negotiated agreement<br />

There are no new plantings in PTTN supply base plantations , thus, this criterion is Not Applicable.<br />

Criterion 7.7<br />

Use of fire in the preparation of new plantings is avoided other than in specific situations, as<br />

identified in the ASEAN guidelines or other regional best practice.<br />

There are no new plantings in PTTN supply base plantations , thus, this criterion is Not Applicable.<br />

Criterion 8.1<br />

Growers and millers regularly monitor and review their activities and develop and implement<br />

action plans that allow demonstrable continuous improvement in key operations.<br />

PTTN has committed to a process of continuous improvement by adopting the <strong>RSPO</strong> P & C and getting<br />

certified QMS ISO 9001 for and SMK3 for Langga Payung POM. An internal audit and management<br />

review is done at least yearly to evaluate the systems. Action plans have been developed for the next<br />

one to three years for continual improvement in key operations through quality objectives for the mill<br />

and also can be implemented in estates, The continual improvement program are typically similar for<br />

the mill and 3 estates, but the target date it depends on the estate capability and resources such as<br />

reducing fossil fuel consumption, reducing usage of agrochemicals especially paraquat, and has plan to<br />

return waste container to the vendor.<br />

Compliance Status : Full.


3.2. Detailed Non-Conformity Report, Corrective Actions Taken and Auditors’ Conclusions<br />

Non Conformity Report – T01.07/11<br />

Date of issued 07.07.2011 NCR issued by : Wieke Savitri<br />

Location<br />

PT. Tapian Nadenggan (Langga Payung<br />

Estate)<br />

Discussed with<br />

: Managers and staffs<br />

<strong>RSPO</strong> – Criterion : 4.1<br />

Operating procedures are appropriately documented and consistently implemented and<br />

monitored.<br />

Description of Finding:<br />

In Standard Operating Procedure for replanting doesn’t explain the timetable to plant legume cover<br />

crops.<br />

Classification Major Minor<br />

Corrective Action Taken:<br />

Had revised the Working Instruction IK/LPYE/RPL/04 “Nursery, Planting and Maintenance of<br />

Legumes Cover Crops” dated on 15.07.2011 by defining the timetable to plant LCC 2 weeks after<br />

chipping process in flat area or 2 weeks after terracing process in undulating area.<br />

Auditee sign:<br />

Auditor Comments:<br />

Auditor Comments and Conclusion<br />

To check in next verification visit<br />

Appropriate action not taken<br />

Appropriate action taken<br />

Corrective action in compliance with the requirement<br />

Date of verification: 06.09.2011<br />

Auditor(s) sign:<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 36


Non Conformity Report – T02.07/11<br />

Date of issued 07.07.2011 NCR issued by : Wieke Savitri<br />

Location<br />

PT. Tapian Nadenggan (Langga Payung<br />

Estate)<br />

Discussed with<br />

<strong>RSPO</strong> – Criterion : 4.3<br />

Practices minimise and control erosion and degradation crisis.<br />

: Managers and staffs<br />

Description of Finding:<br />

It was found during the field visit that the replanting area in Division 1 (LPYE11B21) with slopes of<br />

16-40% was not appropriately covered with Mucuna bracteata<br />

Classification Major Minor<br />

Corrective Action Taken:<br />

Mucchuna brachteata has been planted in Division 1 (LPYE11B21) since July to August 2011 for<br />

total area 37.83 ha as required by Working Instruction IK/LPYE/RPL/04 dated on 15.07.2011 by<br />

monitoring the rainfall.<br />

Auditee sign:<br />

Auditor Comments:<br />

Auditor Comments and Conclusion<br />

To check in next verification visit<br />

Appropriate action not taken<br />

Appropriate action taken<br />

Corrective action in compliance with the requirement<br />

Date of verification: 06.09.2011<br />

Auditor(s) sign:<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 37


Non Conformity Report – T03.07/11<br />

Date of issued 07.07.2010 NCR issued by : Wieke Savitri<br />

Location<br />

PT. Tapian Nadenggan (Langga P ayung<br />

Estate, Paya Baung Estate), Normark<br />

Estate)<br />

Discussed with<br />

: Managers and staffs<br />

<strong>RSPO</strong> – Criterion : 4.7<br />

An occupational health and safety plan is documented, effectively communicated and and implemented.<br />

Description of Finding:<br />

None of harvesting workers wear safety helmet in Langga Payung Estate, Paya Baung Estate and<br />

Normark Estate because the company doesn’t provide it for workers. The risk assessment and<br />

related SOP do not emphasize the need to wear appropriate PPE against the risk of being hit by<br />

harvested FFB fallen from palms..<br />

Classification Major Minor<br />

Corrective Action Taken:<br />

1. Had revised the “Hazard Identification Risk Assessment and Control (HIRAC) and<br />

WorkingInstruction of Fruit Harvesting IK/PBNE/PNN/01” by providing the appropriate PPE<br />

for workers<br />

2. Had made Purchase Order and distributed safety helmets and goggles to the workers<br />

Auditee sign:<br />

Auditor Comments:<br />

Auditor Comments and Conclusion<br />

To check in next verification visit<br />

Appropriate action not taken<br />

Appropriate action taken<br />

Corrective action in compliance with the requirement<br />

Date of verification:06.09.2011<br />

Auditor(s) sign:<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 38


Non Conformity Report – T04.07/11<br />

Date of issued 07.07.2010 NCR issued by : Anita Masduki<br />

Location<br />

PT. Tapian Nadenggan<br />

(Payabaung Estate)<br />

Discussed with<br />

: Managers and staffs<br />

<strong>RSPO</strong> – Criterion : 4.1<br />

Operating procedures are appropriately documented and consistently implemented and<br />

monitored<br />

Description of Finding:<br />

There was not clear which operating working instruction (WI) implemented in weeding, spraying<br />

and harvesting process, as there were two IK available: IK-12, IK-20, IK-21 (Rev 00, dated 02.07<br />

2011) or IKPBNE/01, 02, 04 (Rev.00, dated 01.07 2011<br />

Classification Major Minor<br />

Corrective Action Taken:<br />

1. Had revised the Working Instruction for weeding IK/PBNE/PNN/01; spraying<br />

IK/PBNE/TBM/03and harvesting process IK/PBNE/TBM/04 rev.01 dated on 15.07.<br />

2. Had withdrawn all the obsolete documents and distributed those that had been currently<br />

revised.<br />

Auditee sign:<br />

Auditor Comments:<br />

Auditor Comments and Conclusion<br />

To check in next verification visit<br />

Appropriate action not taken<br />

Appropriate action taken<br />

Corrective action in compliance with the requirement<br />

Date of verification: 06.09.2011<br />

Auditor(s) sign:<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 39


Non Conformity Report – T05.07/11<br />

Date of issued 07.07.2010 NCR issued by : Anita Masduki<br />

Location<br />

PT. Tapian Nadenggan<br />

(Payabaung Estate)<br />

Discussed with<br />

: Managers and staffs<br />

<strong>RSPO</strong> – Criterion : 4.7<br />

Operating procedures are appropriately documented and consistently implemented and<br />

monitored<br />

Description of Finding:<br />

There was no record or evidence that clinical weighing scale and stethoscope in Paya Baung clinic<br />

are in good condition.<br />

Classification Major Minor<br />

Corrective Action Taken:<br />

1. Had carried out calibration for all weighing scales and rectification for stethoscopes<br />

2. Had updated the status of the master list of equipment.<br />

Auditee sign:<br />

Auditor Comments:<br />

Auditor Comments and Conclusion<br />

To check in next verification visit<br />

Appropriate action not taken<br />

Appropriate action taken<br />

Corrective action in compliance with the requirement<br />

Date of verification:06.09.2011<br />

Auditor(s) sign:<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 40


Non Conformity Report – T06.07/11<br />

Date of issued 07.07.2010 NCR issued by : Anita Masduki<br />

Location<br />

PT. Tapian Nadenggan<br />

(Payabaung Estate)<br />

Discussed with<br />

: Managers and staffs<br />

<strong>RSPO</strong> – Criterion : 4.7<br />

Operating procedures are appropriately documented and consistently implemented and<br />

monitored<br />

Description of Finding:<br />

There was no working instruction for nurses to prescribe medicine for patients, especially antibiotic.<br />

Classification Major Minor<br />

Corrective Action Taken:<br />

Had established Internal Memo regarding medicine labeling, i.e: prescription for medicine with red<br />

label should only be given under medical doctor’s supervision supervision.<br />

Auditee sign:<br />

Auditor Comments:<br />

Auditor Comments and Conclusion<br />

To check in next verification visit<br />

Appropriate action not taken<br />

Appropriate action taken<br />

Corrective action in compliance with the requirement<br />

Date of verification:06.09.2011<br />

Auditor(s) sign:<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 41


Non Conformity Report – T07.07/11<br />

Date of issued 07.07.2010 NCR issued by : Anita Masduki<br />

Location<br />

PT. Tapian Nadenggan<br />

(Payabaung Estate)<br />

Discussed with<br />

: Managers and staffs<br />

<strong>RSPO</strong> – Criterion : 4.7<br />

Operating procedures are appropriately documented and consistently implemented and<br />

monitored<br />

Description of Finding:<br />

Medical waste from Payabaung clinic, periode April-June was kept not in appropriate manner, such<br />

as no labelled of waste, and not kept in appropriate place.<br />

Classification Major Minor<br />

Corrective Action Taken:<br />

1. Medical waste from period April – June 2011 had been sent to Medical Center Padang Halaban<br />

before it burned in incinerator at Rantau Parapat Hospital<br />

2. Had established rain and leakage proof medical waste storage which is properly locked to<br />

avoid unintended usage..<br />

Auditee sign:<br />

Auditor Comments:<br />

Auditor Comments and Conclusion<br />

To check in next verification visit<br />

Appropriate action not taken<br />

Appropriate action taken<br />

Corrective action in compliance with the requirement<br />

Date of verification:<br />

Auditor(s) sign:<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 42


Non Conformity Report – T08.07/11<br />

Date of issued 07.07.2010 NCR issued by : Anita Masduki<br />

Location<br />

PT. Tapian Nadenggan<br />

(Payabaung Estate)<br />

Discussed with<br />

: Managers and staffs<br />

<strong>RSPO</strong> – Criterion : 4.6<br />

Agrochemicals are used in a way that does not endanger health or the environment. There is<br />

no prophylatic use of pesticides, except in specific ituations identified in national Best<br />

Practice guidelines. Where agrochemicals are used that are categorised as World health<br />

Organisation Type 1A or 1B,or are listed by the Stockholm or Rotterdam Conventions,<br />

growers are actively seeking to identify alternatives, and this is documented.<br />

Description of Finding:<br />

Working instruction regarding handlling of hazardous agrochemicals spill (SOP /PBE/LBH<br />

(Rev,00, 1 Juli 2010) was not found in Agrochemical Warehouse of Payabaung Estate. Symbol of<br />

hazardous chemicals was not in apropriate manner and the person in charge who handle<br />

agrochemicals found has not enough competence in his job, i.e MSDS, symbol, and working<br />

instruction.<br />

Classification Major Minor<br />

Corrective Action Taken:<br />

1. Working Instruction regarding handing of hazardous agrochemicals spill has been placed in<br />

Agrochemical Warehouse.<br />

2. Hazardous chemical symbols and MSDS have been positioned in proper place.<br />

3. Had conducted refresher training for warehouse helpers on 18.07.2011.<br />

Auditee sign:<br />

Auditor Comments:<br />

Auditor Comments and Conclusion<br />

To check in next verification visit<br />

Appropriate action not taken<br />

Appropriate action taken<br />

Corrective action in compliance with the requirement<br />

Date of verification:06.09.2011<br />

Auditor(s) sign:<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 43


Non Conformity Report – T09.07/11<br />

Date of issued 07.07.2010 NCR issued by : Anita Masduki<br />

Location<br />

PT. Tapian Nadenggan<br />

(Payabaung Estate)<br />

Discussed with<br />

: Managers and staffs<br />

<strong>RSPO</strong> – Criterion : 4.6<br />

Agrochemicals are used in a way that does not endanger health or the environment. There is<br />

no prophylatic use of pesticides, except in specific ituations identified in national Best<br />

Practice guidelines. Where agrochemicals are used that are categorised as World health<br />

Organisation Type 1A or 1B,or are listed by the Stockholm or Rotterdam Conventions,<br />

growers are actively seeking to identify alternatives, and this is documented.<br />

Description of Finding:<br />

MSDS of Rollixone in Agrochemical Warehouse at Payabaung Estate, and also for other MSDS,<br />

indicated that there must be shower water and soap available if emergency situation happened.<br />

The shower water was available, but it didn’t work and there was no soap available in place. The<br />

facility doesn’t provide bin for hazardous wastes, sand, and fabric cotton waste as required by<br />

SOP/PBNE/LBH (Rev.00, dated 01.07.2011.<br />

Classification Major Minor<br />

Corrective Action Taken:<br />

1. Emergency shower has been equipped with soap and water tank which can always operate if<br />

emergency situation happened.<br />

2. Had provided hazardous waste bin and fabric cotton as required under SOP/PBNE/LBH.<br />

Auditee sign:<br />

Auditor Comments:<br />

Auditor Comments and Conclusion<br />

To check in next verification visit<br />

Appropriate action not taken<br />

Appropriate action taken<br />

Corrective action in compliance with the requirement<br />

Date of verification:06.09.2011<br />

Auditor(s) sign:<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 44


Non Conformity Report – T10.07/11<br />

Date of issued 07.07.2010 NCR issued by : Anita Masduki<br />

Location<br />

PT. Tapian Nadenggan<br />

(Payabaung Estate)<br />

Discussed with<br />

: Managers and staffs<br />

<strong>RSPO</strong> – Criterion : 4.7<br />

An occupational health and safety plan is documented, effectively communicated and and implemented.<br />

Description of Finding:<br />

One of the operators was not wearing appropriate safety shoes as required in IK12 rev00,<br />

dated 02.07.2010 while uprooting woody growths (Dongkel Anak Kayu) in Block 26.<br />

Classification Major Minor<br />

Corrective Action Taken:<br />

.<br />

Had provided and distributed appropriate safety shoes for weeding workers as required under IK12.<br />

Auditee sign:<br />

Auditor Comments:<br />

Auditor Comments and Conclusion<br />

To check in next verification visit<br />

Appropriate action not taken<br />

Appropriate action taken<br />

Corrective action in compliance with the requirement<br />

Date of verification:06.09.2011<br />

Auditor(s) sign:<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 45


Table 7: Summary of findings by <strong>RSPO</strong> Criterion<br />

Audit type<br />

Certification Assessment<br />

Criterion Audited<br />

Compliance<br />

NC NC NC<br />

Major Minor Total<br />

1.1 Yes<br />

1.2 Yes<br />

2.1 Yes<br />

2.2 Yes<br />

2.3 Yes<br />

3.1 Yes<br />

4.1 No 2 2<br />

4.2 Yes<br />

4.3 No 1 1<br />

4.4 Yes<br />

4.5 Yes<br />

4.6 No 2 2<br />

4.7 No 5 5<br />

4.8 Yes<br />

5.1 Yes<br />

5.2 No<br />

5.3 Yes<br />

5.4 Yes<br />

5.5 Yes<br />

5.6 Yes<br />

Audit type<br />

Certification Assessment<br />

Criterion Audited Compliance<br />

NC NC NC<br />

Major Minor Total<br />

6.1 Yes<br />

6.2 Yes<br />

6.3 Yes<br />

6.4 Yes<br />

6.5 Yes<br />

6.6 Yes<br />

6.7 Yes<br />

6.8 Yes<br />

6.9 Yes<br />

6.10 Yes<br />

6.11 Yes<br />

7.1 N/A<br />

7.2 N/A<br />

7.3 N/A<br />

7.4 N/A<br />

7.5 N/A<br />

7.7 N/A<br />

7.7 N/A<br />

8.1 Yes<br />

Total of Nonconformities 4 6 10<br />

3.3.1. Noteworthy observations<br />

There is no land conflict in this area, the relationship between PTTN and local<br />

communities and other stakeholders is in harmony.<br />

<br />

<br />

<br />

<br />

<br />

<br />

The mill is certified to ISO 9001 and SMK3, making it easier for PTTN to progress to<br />

<strong>RSPO</strong> Certification;<br />

The use of paraquat is being reduced;<br />

PTTN maintains a 50 m riparian strip along its rivers as conservation area;<br />

PTTN has a zero burning policy for pollution control in its estates;<br />

EFB used for mulching young palms, besides, treated POME also applied to the fields as<br />

organic fertilizer<br />

CSR programs have improved sustainable development of the local communities.<br />

3.3.2. Some Recommendations for Improvement in the Mill and Estates:<br />

Langga Payung POM & Estate<br />

<br />

<br />

<br />

Correction factor should be considered in status label of monitoring devices to ensure that<br />

the amount of deviation in a measurement that is accounted for in the calibration process.<br />

Data of dominant diseases should be classified between workers and family of workers to<br />

identify work-related diseases/ disorder or common diseases.<br />

Medical waste bin should be covered.<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 46


Some records should be signed by authorized person.<br />

Waste pond should be bordered by fences.<br />

Agrochemical in warehouse should be placed on pallets or shelves not directly on the floor.<br />

The same documents/ procedures at mill and estates should be in line not overlapping.<br />

Paya Baung Estate :<br />

Report of RKL-RPL should follow the Technical Manual of RKL-RPL issued by related<br />

Ministry.<br />

A cheklist should be established to monitor FFB transporter equipped with safety net, ropes,<br />

PPE as required by SPK No.PBNE/JKTO/01/11/001-ATBS dated onl 03.01.2011.<br />

Normark Estate<br />

Benchmark for Normark Estate Office at coordinate 1°50'57" N, 99°59'53" should be<br />

adjusted. .<br />

List of Fire Fighting Equipments should be provided with pump capacity data, e.g; Suction<br />

head (M), L/second.<br />

CSR activities have been carried out in social, economical , educational and health sectors<br />

partially not comprehensively to all surrounding villages, it should be better if it can be<br />

improved into Community Development Program by involving the community (PRA,<br />

Participative Rural Appraisal).<br />

3.4. Issues raised by stakeholders and findings of the assessment team<br />

The audit team did not receive any major complaints in the stakeholder meeting on environmental<br />

impacts and social performance of the mill and estate operations. Most of the stakeholders agreed<br />

that PTTN has had a positive influence in the area. Interviews were used to obtain feedback –<br />

whether positive or negative - from the stakeholders, for which the audit team had prepared some<br />

questions. The questions are given in Section 2.10.<br />

A stakeholder meeting was held on June 10, 2011 by PTTN to obtain feedback - positive or<br />

negative – on its <strong>RSPO</strong> Certification Assessment. The minutes were taken along with PTTN<br />

responses to the queries made. Most of the stakeholder comments on <strong>RSPO</strong> certification were<br />

positive, and support <strong>RSPO</strong> certification for PTTN, under which were usually requests for help.<br />

TUV NORD led Public consultation meeting with stakeholders on July 05, 2011. The<br />

stakeholders meeting conducted by assessor team without the presence of the company<br />

personnel/staff to obtain more comprehensive feedback.<br />

Some comments are given below:The CSR Program for Budgeting year 2012 and “ expectation<br />

of stakeholders” should be monitored, e.g :<br />

- Providing school buses<br />

- Donation for elder people<br />

- Scholarship for student in need<br />

- Build facility for public bath and wash<br />

- Building passing road to Normark<br />

- Community Development for raising cattle.<br />

Public Summary Report PT. Tapian Nadenggan‐Langga Payung Mill Page 47


3.5 Certified organization’s acknowledgement of internal responsibility<br />

Please sign on the certification assessment and confirm acceptance of this assessment report,<br />

including its findings. The company General Manager and Senior Manager will sign for the certification<br />

assessment report. The complete signatures can be seen in Section 3.6.<br />

Public Summary Report PT. Tapian Nadenggan ‐Langga Payung Mill Page 48


3.6 Formal sign-off of assessment findings<br />

Medan,<br />

September.2011<br />

Head of Environment and CSR<br />

Coordination<br />

Signed for and on behalf of<br />

PT. Tapian Nadenggan<br />

CEO PSM 1<br />

Ismu Zulfikar<br />

Antonius Costan<br />

Jakarta,<br />

September.2011<br />

Signed for and on behalf of<br />

PT. TÜV NORD Indonesia – System Certification Management<br />

Auditor<br />

: Wieke Savitri<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 49


ANNEX A :<br />

<strong>RSPO</strong> SUPPLY CHAIN CHECKLIST FOR LANGGA PAYUNG MILL (MASS BALANCE MODUL)<br />

PT. Tapian Nadenggan, Langga Payung POM is doing some efforts to comply with the supply chain<br />

system procedures as required in the <strong>RSPO</strong> certification. The company has set the supply chain system<br />

applied in Langga Payung POM called Mass Balance.<br />

STANDARD SOP/Policy/Others Records/Evidence<br />

E.1.Documented Procedure<br />

.1.1<br />

a) Complete and up to date<br />

procedures covering the<br />

implementation of all the<br />

elements in these<br />

requirements.<br />

There is procedure SOP Supply<br />

Chain<br />

Declaraton 1<br />

Declaration 2<br />

The SOP is available on site.<br />

b) The name of the person<br />

having overall responsibility<br />

for and authority over the<br />

implementation of these<br />

requirements and<br />

compliance with all<br />

applicable requirements.<br />

This person shall be able to<br />

demonstrate awareness of<br />

the facilities procedures for<br />

the implementation of this<br />

standard.<br />

There is Decree letter assignment<br />

for SCCS Officer<br />

The Decree letter is available on site.<br />

1.2 The facility shall have<br />

documented procedures for<br />

receiving and processing<br />

certified and non-certified FFBs.<br />

E.2 Purchasing and goods in<br />

2.1 The facility shall verify and<br />

document the volumes of<br />

certified and non-certified FFBs<br />

received.<br />

FFBs has been separated based on<br />

their sources, whether from PTTN<br />

own estates (sustainable product)<br />

and the FFB from supplier (Nonsustainable).<br />

List of documented<br />

procedures for receiving and<br />

processing certified and noncertified<br />

FFB are :<br />

SOP Supply Chain<br />

SOP Receiving FFB<br />

SOP Dispatch CPO<br />

SOP FFB Processing<br />

WI Receiving FFP<br />

WI Dispatch CPO<br />

There is SOP Receiving FFB<br />

The records of documented volumes of<br />

certified and non certified FFBs can be<br />

traced down in:<br />

Laporan Penerimaan TBS Certified<br />

Tahun 2011 (Certified FFB Receiving<br />

Report 2011)<br />

Laporan Penerimaan TBS Non<br />

Certified Tahun 2011(Non-certified<br />

FFB Receiving Report 2011)<br />

Laporan Produksi CPO Certified<br />

Tahun 2011 (Certified CPO<br />

Production Report 2011)<br />

Laporan Produksi CPO Non Certified<br />

Tahun 2011(Non-certified CPO<br />

Production Report)<br />

Laporan Pengiriman CPO Certified<br />

Tahun 2011(Certified CPO Dispatch<br />

Report 2011)<br />

Laporan Pengiriman Non CPO<br />

Certified Tahun 2011(Non-certified<br />

CPO Dispatch Report 2011)<br />

The records of documented volumes of<br />

certified and non certified FFBs can be<br />

traced down in:<br />

Laporan Penerimaan TBS Certified<br />

Tahun 2011 (Certified FFB Receiving<br />

Report 2011)<br />

Laporan Penerimaan TBS Non<br />

Certified Tahun 2011(Non-certified<br />

FFB Receiving Report 2011)<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 50


STANDARD SOP/Policy/Others Records/Evidence<br />

2.2 The facility shall inform the CB<br />

immediately if there is a<br />

projected overproduction.<br />

Can be traced down in Production Budget<br />

Report<br />

E.3 Record keeping<br />

3.1 The facility shall maintain<br />

accurate, complete, up-to-date<br />

and accessible records and<br />

reports covering all aspects of<br />

these requirements.<br />

All documents and records have<br />

been in controlled according to SOP<br />

Pengendalian Dokumen dan<br />

Rekaman (SOP Document<br />

Control and Record Control)<br />

The records have been checked.<br />

3.2 Retention times for all records<br />

and reports shall be at least five<br />

(5) years.<br />

3.3 a) The facility shall record and<br />

balance all receipts of<br />

<strong>RSPO</strong> certified FFB and<br />

deliveries of <strong>RSPO</strong> certified<br />

CPO, PKO and palm kernel<br />

meal on a three-monthly<br />

basis.<br />

Declaration 5<br />

Retention times of all records have<br />

been determined in SOP<br />

Pengendalian Dokumen dan<br />

Rekaman (SOP Document<br />

Control and Record Control)<br />

.<br />

The records have been checked.<br />

Can be trace down in CPO Production<br />

Report 3 Monthly Basis<br />

b) All volumes of palm oil and<br />

palm kernel oil that are<br />

delivered are deducted<br />

from the material<br />

accounting system<br />

according to conversion<br />

ratios stated by <strong>RSPO</strong>.<br />

Can be trace down in CPO Stock Report<br />

and in CPO Dispatch Report<br />

c) The facility can only deliver<br />

Mass Balance sales from a<br />

positive stock. However, a<br />

facility is allowed to sell<br />

short.<br />

Declaration 6<br />

Can be trace down in CPO Stock Report<br />

and in CPO Dispatch Report<br />

3.4 The following trade names<br />

should be used and specified in<br />

relevant documents, e.g.<br />

purchase<br />

Can be trace down in Sales contract<br />

E.4 Sales and good out<br />

4.1 The facility shall ensure that all<br />

sales invoices issued for <strong>RSPO</strong><br />

certified products delivered<br />

include the following information:<br />

a) The name and address of the<br />

buyer; b) The date on which the<br />

invoice was issued; c) A<br />

description of the product,<br />

including the applicable supply<br />

chain model (Segregated) d)<br />

The quantity of the products<br />

delivered; e) Reference to<br />

related transport documentation.<br />

Declaration 4<br />

The available evidence is the invoice of oil<br />

delivery in form of Delivery Order (DO)<br />

document issued for every oil delivery.<br />

The information written on the Delivery<br />

Order document are: the invoice issue<br />

date, name and address of buyer, ordered<br />

product details, and the transportation<br />

system for product transportation.<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 51


STANDARD SOP/Policy/Others Records/Evidence<br />

E.5 Training<br />

5.1 The facility shall provide the<br />

training for all staff as required to<br />

implement the requirements of<br />

the Supply Chain Certification<br />

Systems.<br />

Procedure for training is described in<br />

SOP Training Human Resources<br />

Record of Training SCCS is available.<br />

E.6 Claims<br />

6.1 The facility shall only make<br />

claims regarding the use of or<br />

support of <strong>RSPO</strong> certified palm<br />

oil that are in compliance with<br />

the <strong>RSPO</strong> Rules for<br />

Communication and Claims.<br />

Declaration 7<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 52


Annex B :<br />

D r a f t C E R T I F I C A T E<br />

In accordance with TÜV NORD Indonesia procedures, a certificate is hereby awarded<br />

PT. Tapian Nadenggan<br />

Head Office:<br />

Jl. A Plaza BII Tower 2, 10th floor, Jl. MH. Thamrin No.51 Kav. 22<br />

Jakarta 10350<br />

Indonesia<br />

Langga Payung Palm Oil Mill<br />

Mill Location<br />

Ds . Huta Baru Nangka, Halongonan,<br />

Kabupaten Padang Lawas Utara, Nortth<br />

Sumatera<br />

GPS location<br />

Longitude (E) Latitude (N)<br />

99º 53' 13'' E 1º 39' 16'' N<br />

In recognition of the fact that it applies a Palm Oil Management System for Sustainable Palm<br />

Oil Production according with the 2008 National Interpretation of <strong>RSPO</strong> Principles and<br />

Criteria of the Republic of Indonesia for producing the following volumes of CPO and PK:<br />

Production of Crude Palm Oil and Palm Kernel<br />

CPO claimed<br />

36,906.99 t / year<br />

Palm Kernel claimed<br />

9,492.28 t/ year<br />

Certificate Registration No: TNI – <strong>RSPO</strong> – G - 1201<br />

Audit Report No. P &C-G-122<br />

Issued date of Certificate : <strong>RSPO</strong> approval date Valid Certificate : -<br />

President Director<br />

This certification was carried out in accordance with the TÜV NORD Indonesia auditing and certification procedures and is<br />

subject to regular surveillance audits. PT. TÜV NORD Indonesia is a subsidiary of TÜV NORD CERT GmbH<br />

Langemarckstrasse 20 D - 45141 Essen, Germany<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 53


Annex to Certificate – <strong>RSPO</strong> (Supply Base)<br />

Certificate Registration No: TNI-<strong>RSPO</strong>-G-1201<br />

The scope of certification of Mill and Supply base<br />

cover is<br />

Estate<br />

Location<br />

FFB<br />

Production<br />

(t)<br />

GPS Coordinates<br />

Longitude (E) Latitude (N)<br />

Langga<br />

Payung<br />

Estate<br />

Paya<br />

Baung<br />

Estate<br />

Ds . Huta Baru Nangka, Halongonan,<br />

Kabupaten Padang Lawas Utara,<br />

North Sumatera<br />

Ds. Huta Baringin, Simangambat<br />

Kabupaten Padang Lawas Utara,<br />

North Sumatera<br />

88,661.98<br />

47,943.19<br />

99º 53' 22'' E 1º 38' 55'' N<br />

99º 58' 31'' E 1º 37' 12'' N<br />

Normark<br />

Estate<br />

Ds. Normark, Kota Pinang,<br />

Kabupaten LabuhanbatuSelatan,<br />

North Sumatera<br />

32,503.61<br />

99º 59' 53'' E<br />

1º 50' 57'' N<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 54


Annex C : Certification Assessment Plan<br />

Client:<br />

PT. Tapian Nadenggan (SMART Tbk)<br />

Address: Plaza BII Tower 2, 10th floor, Jl. MH. Thamrin No.51 Kav. 22 Jakarta 10350-<br />

Indonesia<br />

MR Name, Pos.: Mr. Ismu Zulfikar<br />

Number of Mills: 1 Number of estate(s): 3 Order No. - Business No. -<br />

Mill(s), Location<br />

Estates, Locations<br />

- Langga Payung POM, Kab. Padang<br />

Lawas Utara, Sumatera Utara;<br />

Standard: <strong>RSPO</strong> P&C (Principles & Criteria) May 2008;<br />

1. Langga Payung Estate, Kab. Padang Lawas Utara,<br />

Sumatera Utara<br />

2. Paya Baung Estate, Kab. Padang Lawas Utara,<br />

Sumatera Utara<br />

3. Normark Estate, Kab. Labuhanb atu Selatan,<br />

Sumatera Utara<br />

Type of Certification Audit Audit date: 4-8.07.2011<br />

Lead<br />

Auditor:<br />

Auditor(s):<br />

Sudarmadji (SD) Expert: Hariyadi (HR), Basita Ginting<br />

(BG)<br />

Wieke Savitri (WS), Anita Audit days on-site:<br />

5 days (with traveling)<br />

Masduki (AM)<br />

Date / Time 1) Site / Shift / Organizational Unit Auditor<br />

(Abbrev.)<br />

Interviewpartner<br />

2)<br />

Day – 1: 04.07.2011 Traveling to site location from Medan to Rantau Prapat<br />

Day – 2: 05.07.2011 Langga Payung POM & Estate Office<br />

08:00-08:30 Opening meeting<br />

08:30 – 12:00<br />

- Sites: Langga Payung POM<br />

Office for all documents<br />

(legal, financial, production,<br />

environment, social) PT.<br />

Tapian Nadenggan (POM,<br />

estates : Langga Payung,<br />

Paya Baung and Normark<br />

Estate)<br />

SD, WS,<br />

AM, HR,<br />

BG<br />

SD,<br />

WS,AM,<br />

HR, BG<br />

<strong>RSPO</strong><br />

team<br />

Requirements<br />

Introduction team and fine tune audit<br />

plan (if necessary)<br />

- General issues for <strong>RSPO</strong><br />

certification assessment<br />

- The SPO documentations and<br />

records<br />

- Environmental Policy<br />

- Justification for <strong>RSPO</strong> principles<br />

and criteria<br />

- Principle – 1: 1.1, 1.2<br />

- Principle - 2: 2.1<br />

- Principle – 3: 3.1<br />

12:00 – 13:30 Break and lunch :<br />

Stakeholders contacted at Langga Payung Estate, Paya Baung Estate, Normark Estate<br />

13:30 –<br />

17:00<br />

Langga Payung Office :<br />

SD, WS,<br />

AM, HR,<br />

BG<br />

-<strong>RSPO</strong><br />

team<br />

17:00: End of day assessment<br />

Mr. Sudarmadji and Mr. Basita Ginting travelling to Normark Estate<br />

Mrs. Anita to Paya Baung Estate<br />

- Consultation, Interviews<br />

stakeholders (Indigenoes people ,<br />

NGO, Chief of village)<br />

- Housing facilities<br />

- Public facilities<br />

- School, Health program,<br />

- Social Responsibility program<br />

- Workshop, Clinic<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 55


Date / Time 1)<br />

Site / Shift / Organizational<br />

Unit<br />

Auditor<br />

(Abbrev.)<br />

Days – 3: 06.07.2011 Langga Payung Estate<br />

Interviewpartner<br />

2)<br />

Requirements<br />

Langga Payung :<br />

08:00 -12:00<br />

Estate Operations<br />

12:00 – 13:00 Break and lunch<br />

Langga Payung Mill:<br />

13:00-17:00<br />

Mill Operations<br />

17:00: End of day assessment<br />

WS, HR<br />

WS, HR<br />

-<strong>RSPO</strong> team<br />

<strong>RSPO</strong> team<br />

- Flora, fauna, ecology and<br />

biodiversity<br />

- Land and conversion planting<br />

- Decreased paraquat use<br />

- HCV identification<br />

- IPM (Integrated Pest Management)<br />

- Replanting and handling of<br />

chemical packaging wastes<br />

- Zero burning<br />

- Principle - 4 : 4.1, 4.2, 4.3, 4.4,<br />

4.5, 4.6, 4.7, 4.8<br />

- Principle – 5 : 5.1, 5.2, 5.5<br />

- Principle – 6 : 6.1, 6.2, 6.3, 6.5,<br />

6.6, 6.7, 6.8, 6.10, 6.11<br />

- Principle – 7<br />

- Principle – 8 : 8.1<br />

- Quality, SM-K3 and Environmental<br />

Management System.<br />

- Involved personnel and<br />

responsibilities<br />

- Chemical stores.<br />

- Monitoring and measurement of<br />

environmental performance of<br />

waste water treatment plant.<br />

- Mill operation including inspection<br />

of incoming FFB, FFB transport,<br />

road maintenance and workshops<br />

for heavy trucks, loaders, etc.<br />

- Principle - 4 : 4.1, 4.4, 4.7, 4.8<br />

- Principle – 5 : 5.4, 5.6<br />

- Principle – 6 : 6.1, 6.2, 6.3, 6.5,<br />

6.6, 6.8, 6.10, 6.11<br />

- Principle – 8 : 8.1<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 56


Date / Time 1) Site / Shift /<br />

Organizational Unit<br />

Days – 3: 06.07.2011 Normark Estate<br />

Auditor<br />

(Abbrev.)<br />

Interviewpartner<br />

2)<br />

Requirements<br />

08:00-12:00<br />

Sites: Normark Estate<br />

office : Estate oprations<br />

SD, BG<br />

<strong>RSPO</strong> team<br />

- Flora, fauna, ecology and<br />

biodiversity<br />

- Land and conversion planting<br />

- Decreased paraquat use<br />

- HCV identification<br />

- IPM (Integrated Pest Management)<br />

- Replanting and handling of<br />

chemical packaging wastes<br />

- Zero burning<br />

- Principle - 4 : 4.1, 4.2, 4.3, 4.4,<br />

4.5, 4.6, 4.7, 4.8<br />

- Principle – 5 : 5.1, 5.2, 5.5<br />

12:00 -13:30 Break and lunch<br />

13:30 – 17:00<br />

<br />

Estate operations<br />

SD, BG<br />

<strong>RSPO</strong> team<br />

- Principle – 6 : 6.1, 6.2, 6.3, 6.5,<br />

6.6, 6.7, 6.8, 6.10, 6.11<br />

- Principle – 7<br />

- Principle – 8 : 8.1<br />

17:00: End of day assessment Traveling to site location Langga Payung Estate<br />

Date / Time 1) Site / Shift / Organizational Unit<br />

Days – 3: 06.07.2011 Paya Baung Estate<br />

Auditor<br />

(Abbrev.)<br />

Interviewpartner<br />

2)<br />

Requirements<br />

08:00-12:00 Sites: Payabaung Estate office AM <strong>RSPO</strong> team<br />

12:00 -13:30 Break and lunch<br />

13:30 – 17:00 Estate operations<br />

AM <strong>RSPO</strong> team<br />

- Flora, fauna, ecology and<br />

biodiversity<br />

- Land and conversion planting<br />

- Decreased paraquat use<br />

- HCV identification<br />

- IPM (Integrated Pest Management)<br />

- Replanting and handling of<br />

chemical packaging wastes<br />

- Zero burning<br />

- Principle - 4 : 4.1, 4.2, 4.3, 4.4,<br />

4.5, 4.6, 4.7, 4.8<br />

- Principle – 5 : 5.1, 5.2, 5.5<br />

- Principle – 6 : 6.1, 6.2, 6.3, 6.5,<br />

6.6, 6.7, 6.8, 6.10, 6.11<br />

- Principle – 7<br />

- Principle – 8 : 8.1<br />

17:00: End of day assessments<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 57


Date / Time 1) Site / Shift / Organizational Unit<br />

Day- 4: 07.07.2011 Langga Payung Estate<br />

Auditor<br />

(Abbrev.)<br />

Interviewpartner<br />

2)<br />

Requirements<br />

09:00 – 12:00 Reporting and<br />

discussion<br />

12:00 -13:30 Break and lunch<br />

SD, WS,<br />

AM, HR,<br />

BG<br />

13.30 -.15.00 Closing meeting and<br />

Presentation of audit<br />

finding<br />

End of day assessment<br />

SD, WS,<br />

AM, HR,<br />

BG<br />

<strong>RSPO</strong> team<br />

Day – 5: 08.07.2011 Traveling to Medan and back to Jakarta<br />

End of Certification Assessment <strong>RSPO</strong> P & C Audit<br />

Public Summary Report PT.Tapian Nadenggan –Langga Payung Mill Page 58