The offices of PT. TÜV NORD Indonesia are at:<br />

Head office<br />

System Certification Management<br />

Perkantoran Hijau Arkadia Tower F, 7 th Floor<br />

Suite 706<br />

Jl. Let. Jend. TB Simatupang Kav. 88<br />

Jakarta 12520 – Indonesia<br />

Tel : +6221 7883 7338<br />

Fax : +6221 7883 7336<br />

Branch office<br />

Graha Pangeran 7-H1 Floor<br />

Jl. Jend. A Yani 286 Surabaya 60234 –<br />

Indonesia<br />

Tel : +6231 8292602<br />

Fax : +6231 8292723<br />

Laboratory Division<br />

Jl. Jababeka XVII E Blok U No. 27B<br />

Kawasan Industri Jababeka I<br />

Cikarang Bekasi 17530 – Indonesia<br />

President Director: Mr. Robert Napitupulu<br />

Email: rnapitupulu@tuv-nord.com<br />

Website : www.tuev-nord.de<br />

2.2 Assessment Methodology<br />

The certification assessment of PTTN, Langga Payung Mill and its supply base at North Sumatera<br />

was carried out from July 4 to 8, 2011. A pre audit also conducted in February 2011 to confirm the<br />

scope of certification and the preparedness of the organization before certification asessment. The<br />

assessment comprised four phases:<br />

• A desk audit (document check) with a customised <strong>RSPO</strong> audit checklist according to the <strong>RSPO</strong><br />

manual, procedures and palm oil mill and estate working instructions;<br />

• Review results of consultation with stakeholders prior to certification assessment. The detailed<br />

method is given in Point 2.8;<br />

• Background investigations (published disputes, public comments on preliminary<br />

announcement), followed by interviews with <strong>RSPO</strong> management, employees and other<br />

stakeholders (associated people, NGOs, land regulators, social watchers, labour union); and<br />

• Verification of proposed corrective actions followed by review of the assessment report by<br />

internal veto persons (Senior Manager of PT. TÜV NORD Indonesia).<br />

The summary public report of this certification assessment includes Corrective Action Requests,<br />

Corrective Actions Taken, Verification of Corrective Actions Taken and Progress in Implementation<br />

of Corrective Actions to be checked in the Surveillance Audit.<br />

The Non Conformities are broadly due to:<br />

• Major Non Conformities:<br />

- mistakes in interpretation of <strong>RSPO</strong> P&C by PTTN directly affecting the certification assessment;<br />

- requirements of some <strong>RSPO</strong> P & C not met or, in other words, non-compliance to the P&C on<br />

a major indicator(s);<br />

These raise doubt on the capability of PTTN to achieve the desired results.<br />

• Minor Non Conformities:<br />

Where information is insufficient, unclear or insufficiently transparent to establish whether a<br />

requirement is met, or non-compliance to the requirements of the <strong>RSPO</strong> P & C on a minor<br />

indicator(s);<br />

Public Summary Report PT. Tapian Nadenggan –Langga Payung Mill Page 12