The flooding caused the major landowners in the valley to propose a plan<br />
to the city that would comply with the city’s new floodway regulations, safely<br />
accommodate floods such as occurred in 1978 and 1980, and allow them to develop<br />
their prime properties between the SR-163 and I-805 freeways. 38 This was the<br />
start of planning for the first major flood control project in the valley, which<br />
eventually carried the name, First <strong>San</strong> <strong>Diego</strong> River Improvement Project (FSDRIP),<br />
affectionately pronounced “FizzDrip.”<br />
This concept required some major work by the City Planning Department<br />
but, by early 1982, the plan was completed and the Environmental Impact Report<br />
for the project was ready for circulation. 39 The entire plan was approved by the<br />
city council on November 16, 1982. It became a part of the newly prepared Draft<br />
Mission Valley Community Plan, which had been six years in the making. 40 The<br />
specifics of the proposed FSDRIP plan were embodied in a separate document,<br />
the <strong>San</strong> <strong>Diego</strong> River Wetlands Management Plan. 41 The latter document included<br />
floodplain concepts for all of Mission Valley eastward to Zion Street, not just for<br />
the FSDRIP portion.<br />
With the plans approved, the city was well into the process of acquiring all the<br />
many permits needed to begin construction of the FSDRIP project by 1984. Work<br />
was soon underway, and the project was completed in the early 1990s (Figure<br />
14). Even before it was completed, there were good indications that it would be<br />
a biological success. 42<br />
Fig. 14. The FSDRIP channel nearing completion, November 1989. Photo by P.R. Pryde.<br />