28.06.2014 Views

SANTA CRUZ METROPOLITAN TRANSIT DISTRICT

SANTA CRUZ METROPOLITAN TRANSIT DISTRICT

SANTA CRUZ METROPOLITAN TRANSIT DISTRICT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Exclusion – for subcontracts totaling OVER $100,000), Document 7 (Certification of Proposed<br />

SubContractor Regarding Debarment, Suspension and Other Ineligibility And Voluntary<br />

Exclusion – for subcontracts totaling $100,000 or LESS.) and Document 8 (Disclosure of<br />

Governmental Positions) because the waiver does not give the bidders an unfair advantage by<br />

allowing the bidders to withdraw their bids without forfeiting their bid bonds. From the<br />

Document 6, 7 & 8 that were submitted, the bidders varied in the amount of documents<br />

submitted. A notice letter will be sent to the lowest responsive and responsible bid who has been<br />

approved for award to clarify any correctable deficiencies.<br />

METRO staff has researched, reviewed, and recommends that the Board of Directors adopt the<br />

findings based on information contained in this report, declare West Bay Builders as<br />

nonresponsive & nonresponsible, and reject their bid for the Judy K. Souza Operations Building<br />

Facility.<br />

IV.<br />

FINANCIAL CONSIDERATIONS<br />

Funds for the construction of the Judy K. Souza Operations Building Facility Component of the<br />

MetroBase Project are available within the funds the METRO has secured for the Project.<br />

V. ATTACHMENTS<br />

Attachment A:<br />

IFB 12-23 Bid Analysis Spreadsheet (4 pages)<br />

Attachment B01:<br />

12-23 West Bay – Legal Listed Sheet (1 page)<br />

Attachment B02:<br />

12-23 West Bay – Legal Not Listed Sheet (1 page)<br />

Attachment B03:<br />

12-23 West Bay – Listed Back Up 1 (43 pages)<br />

Attachment B04:<br />

12-23 West Bay – Listed Back Up 2 (35 pages)<br />

Attachment B05:<br />

12-23 West Bay – Not Listed Back Up (77 pages)<br />

Attachment B06:<br />

12-23 West Bay – Doc 2 Item 4 Supporting Document (3 pages)<br />

Attachment B07:<br />

12-23 West Bay – Doc 2 Item 5 Supporting Document (21 pages)<br />

6.4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!