incidental works and supply of all accessories or apparatus which may not have been<br />

specifically mentioned in the specification or drawings but otherwise necessary for<br />

ensuring complete erection and safe and sufficient working of the plant and equipment<br />

or installation.<br />

Deviation:<br />

In case the tenderer wish to deviate in any way from the General Conditions of<br />

contract or the Technical Specifications, he should draw specific attention to such<br />

departure in his tender. All such deviations shall be clearly mentioned in the Deviation<br />

Sheet giving the corresponding reference clause Number. Terms such as See covering<br />

letter or Tender printed General Terms & Condition are not acceptable, unless such<br />

deviations are submitted with the tender, it will be understood and agreed that the<br />

tenderers proposal is based on strict conformance to purchasers specification in all<br />

respects.<br />

Price:<br />

i. The unit rates quoted for design, engineering manufacturing supply at site,<br />

storage, handling installation, testing and commissioning shall be inclusive of<br />

all taxes, duties, royalties and all other taxes applicable such as sales tax on<br />

work contract and income tax etc.<br />

ii. The prices are to be quoted on the lump-sum price based on item rates as<br />

indicated in the specification. THE <strong>TENDER</strong>ER SHALL QUOTE FIRM PRICES FOR THE<br />

COMPLETE SCOPE OF WORK. The prices are to be quoted for the work complete in<br />

all respects in strict accordance with the specifications. Should the Tenderer<br />

wish to propose alternatives the same should be clearly mentioned in the<br />

deviation. Any action on the part of the Tenderer to revise the price/ prices/<br />

and/ or to change the structure of price/ prices at his own instance after<br />

opening of the tender may result in rejection of the tender.<br />

Terms of Payment:<br />

Subject to any deduction which the owner may be authorized to make under the<br />

contract, the contractor shall on the certificate of the engineer or his authorized<br />

representatives whose certificate will be final regarding evidence of materials at site<br />

and completion or erection etc. be entitles to payments generally as follows.<br />

1. 90% payment will be paid after receipt, verification, acceptance and erection, of the<br />

installation.<br />

2. Balance 10% will be released after testing & commissioning of the installation<br />

against submission of the B.G. equivalent to the 10% of the contract price.<br />

No. of Correction :<br />

No. of overwriting :<br />

Signature of the Contractor