CENTRAL COALFIELDS LIMITED<br />
OFFICE OF THE GENERAL MANAGER(KTA)<br />
P.O. KATHARA : DIST. BOKARO.<br />
No. GM(KTA)/EXCV/TENDER/SHOVEL/KTC/2013/967 DT. 18.02.2013<br />
TENDER NOTICE<br />
Sealed tender are invited from reputed and experienced repairers for under taking <strong>the</strong> following<br />
job at Kathara Area.<br />
SL.<br />
NO.<br />
DESCRIPTION OF WORK<br />
1. Repairing <strong>of</strong> Crowd Mechanism <strong>of</strong> 182 M<br />
Marion Shovel sl no EXC-1851 <strong>of</strong><br />
Kathara Colliery. The work is consisting<br />
<strong>of</strong> following jobs:<br />
a) Dismantling <strong>of</strong> stoppers from dipper<br />
handle.<br />
b) Removal <strong>of</strong> Dipper handle from<br />
machine.<br />
c) Removal <strong>of</strong> bucket from dipper<br />
handle.<br />
d) Removal <strong>of</strong> bucket door form bucket.<br />
e) Removal <strong>of</strong> saddle bocks and shipper<br />
shaft.<br />
f) Cutting & removal <strong>of</strong> worn-out boom<br />
bushings.<br />
g) Fitting <strong>of</strong> boom bushings (Provided by<br />
dept.)<br />
h) Repairing <strong>of</strong> saddle blocks bores &<br />
worn-out body.<br />
i) Fitting <strong>of</strong> bushes in saddle blocks (One<br />
no provided by dept & three nos.<br />
provided by repairer)<br />
j) Repairing <strong>of</strong> shipper shaft.<br />
k)Repairing <strong>of</strong> crowd clutch with<br />
changing <strong>of</strong> disc & roto seal, springs<br />
etc.<br />
l) Making <strong>of</strong> two nos. Crowd motor<br />
pinions.<br />
m) Fitting <strong>of</strong> shipper shaft, saddle blocks,<br />
dipper handle and bucket assly. etc.<br />
n) Fitting <strong>of</strong> crowd clutch & its fittings.<br />
o) Changing <strong>of</strong> damaged/failed hoses <strong>of</strong><br />
crowd system.<br />
ESTIMATED<br />
VALUE<br />
(Rs.)<br />
EARNEST<br />
MONEY @ 1%<br />
OF<br />
ESTMIATED<br />
VALUE (Rs.)<br />
COST OF<br />
TENDER<br />
PAPER<br />
(Rs.)<br />
3,86,000.00 3,860.00 500.00<br />
+ 14.00%<br />
VAT<br />
COMPLE-<br />
-TION<br />
TIME<br />
Within 10<br />
(TEN)<br />
Days<br />
1. COST OF TENDER PAPER : To be de<strong>po</strong>sited with Sr. Cashier, Kathara Colliery in<br />
cash on any working day from 06.03.2013 to 11.03.2013<br />
during working Hrs. The tender documents can also be<br />
directly downloaded from our website (www.ccl.gov.in)<br />
and in such case <strong>the</strong> cost <strong>of</strong> tender document is to be de<strong>po</strong>sited<br />
in form <strong>of</strong> demand draft payable on on SBI, Kathara / BTPS,<br />
Bank <strong>of</strong> India, Sawang in favour <strong>of</strong> CENTRAL COALFIELDS<br />
LIMITED, KATHARA AREA in separate sealed envelop<br />
along with envelop No. 1.<br />
Contd. ……P/2.
: 02 :<br />
2. SELLING OF TENDER PAPER : From 06.03.2013 to 11.03.2013 (up to 1 PM) from <strong>the</strong> <strong><strong>of</strong>fice</strong><br />
<strong>of</strong> S.O.(Excv)(KTA), Kathara.<br />
3. SUBMISSION / RECEIPT OF : On 12.03.2013 up to 3.00 P.M. in <strong>the</strong> <strong><strong>of</strong>fice</strong> <strong>of</strong> <strong>the</strong> General<br />
TENDER PAPER<br />
Manager(KTA), Kathara in <strong>the</strong> tender box kept under <strong>the</strong><br />
custody <strong>of</strong> Security Section <strong>of</strong> G.M.(KTA)’s Office.<br />
4. OPENING OF THE TENDER : On 12.03.2013 at 4.00 P.M. in presence <strong>of</strong> <strong>the</strong> T.C.<br />
PAPER<br />
members and attending tenderer or <strong>the</strong>ir authorized<br />
representatives.<br />
5. EARNEST MONEY : To be de<strong>po</strong>sited in <strong>the</strong> form <strong>of</strong> Bank Draft payable on SBI,<br />
Kathara / BTPS, Bank <strong>of</strong> India, Sawang in favour <strong>of</strong><br />
CENTRAL COALFIELDS LIMITED, KATHARA<br />
AREA, without Earnest Money, no tenders will be<br />
considered. No adjustment will be entertained in this<br />
connection.<br />
6. ESTIMATED VALUE : For <strong>the</strong> pur<strong>po</strong>se <strong>of</strong> tender estimated value has been taken.<br />
However, actual may differ.<br />
7. INSPECTION OF JOB : The Job may be inspected at <strong>the</strong> site <strong>of</strong> Kathara Colliery.<br />
8. GUARANTEE : The repair job shall be guaranteed for minimum 12 months or<br />
3000 Working Hours which ever is earlier from <strong>the</strong> date <strong>of</strong><br />
completion <strong>of</strong> job.<br />
9. OTHER TERMS & CONDITIONS : i) Inspection & Execution <strong>of</strong> jobs will be done at Kathara<br />
Colliery <strong>of</strong> Kathara Area, Central Coalfields Ltd.<br />
ii) The tenderes have to arrange required Tools & Tackles and<br />
man<strong>po</strong>wer for inspection and execution <strong>of</strong> <strong>the</strong> jobs. However<br />
lifting and handling equipments will be provided by <strong>the</strong><br />
Project, if requested by <strong>the</strong> tenderer.<br />
10. L. D. CLAUSE : If <strong>the</strong> delivery is not made within <strong>the</strong> stipulated period, penalty<br />
@ 1/2% (half percent) <strong>of</strong> <strong>the</strong> value <strong>of</strong> <strong>the</strong> bill for each week or<br />
part <strong>the</strong>re <strong>of</strong> <strong>limited</strong> to 5% (five percent) and where felt<br />
necessary, <strong>the</strong> limit <strong>of</strong> 5% can be increased to 15% (fifteen<br />
percent) at <strong>the</strong> discretion <strong>of</strong> consignee and <strong>the</strong> same will be<br />
deducted from bill.<br />
11. PAYMENT : 90% payment will be released after handing over <strong>the</strong> items<br />
after completion <strong>of</strong> required repair work. Balance 10% will be<br />
released after satisfactory fitment and performance <strong>of</strong> <strong>the</strong><br />
repaired items for a period <strong>of</strong> 12 months or 3000 Working<br />
Hours which ever is earlier. Payment will be made through<br />
Electronic Transfer System / RTGS/NEFT/CBS/ Intra Bank<br />
Transfer.<br />
12. SAFETY : The safety <strong>of</strong> <strong>the</strong> workman engaged by <strong>the</strong> contractor shall be<br />
<strong>the</strong> sole res<strong>po</strong>nsibility <strong>of</strong> <strong>the</strong> contractor. Contractor shall make<br />
all <strong>po</strong>ssible measures to ensure safety as per statutory and<br />
working requirement. Any claim on account <strong>of</strong> compensation<br />
shall be born by <strong>the</strong> contactor.<br />
13. SUBMISSION PROCEDURE : Tenders will be received in three separate sealed envelops<br />
OF TENDER<br />
as per following:<br />
(A) ENVELOP NO. 1 : Only Earnest Money in <strong>the</strong> shape <strong>of</strong> Bank Draft.<br />
Contd. ……P/3.
: 03 :<br />
(B) ENVELOP NO. 2 : a) Complete <strong>of</strong>fer detailing <strong>the</strong> jobs to be carried.<br />
b) Containing copies <strong>of</strong> satisfactory completion<br />
Performance certificate for HEMM repairing works<br />
performed during last seven years ending last day <strong>of</strong><br />
month previous to <strong>the</strong> one in which bid applications are<br />
invited (i.e. eligibility period) should be ei<strong>the</strong>r <strong>of</strong> <strong>the</strong><br />
following:<br />
Three similar completed works each costing not less<br />
<strong>the</strong>n <strong>the</strong> amount equal to 40% <strong>of</strong> <strong>the</strong> estimated value.<br />
OR<br />
Two similar completed works each costing not less <strong>the</strong>n<br />
<strong>the</strong> amount equal to 50% <strong>of</strong> <strong>the</strong> estimated value.<br />
OR<br />
One similar completed work costing not less <strong>the</strong>n <strong>the</strong><br />
amount equal to 80% <strong>of</strong> <strong>the</strong> estimated value.<br />
c) Current Sales Tax / VAT Clearance Certificate from<br />
Sales Tax Department.<br />
d) VAT / TIN Registration Certificate.<br />
e) Partnership / Proprietorship / Company deed etc.<br />
f) Photo copy <strong>of</strong> PAN Card, SSI/ NSIC Certificate<br />
g) Bank Account operation statement or soundness<br />
Certificate from any Indian Nationalized Bank.<br />
h) Average annual financial turnover during <strong>the</strong> last three<br />
years ending 31 st March <strong>of</strong> <strong>the</strong> previous financial years<br />
should be at least 30% <strong>of</strong> <strong>the</strong> estimated cost.<br />
i) Current affidavit, not older than 01 (One) Year from<br />
<strong>the</strong> date <strong>of</strong> receipt <strong>of</strong> tender, certifying that <strong>the</strong> bidder is<br />
not involved in any criminal cases, not related to any<br />
employees <strong>of</strong> <strong>the</strong> company, not black listed by <strong>the</strong><br />
company and firm registration details.<br />
j) P.F. Regn. No.<br />
k) ESI Regn. No.<br />
l) Full address, Phone No. Bank A/c No. with name <strong>of</strong><br />
Bank and Branch.<br />
N O T E : All original documents pertaining to above have to be produced before <strong>the</strong> Tender<br />
Committee at <strong>the</strong> time <strong>of</strong> opening <strong>of</strong> tender.<br />
NOTE : For purchasing <strong>the</strong> tender documents, an application is to be made by <strong>the</strong> party to Staff<br />
Officer(Excv)(KTA), Kathara <strong>the</strong>n only permission will be given to de<strong>po</strong>sit cost <strong>of</strong> tender documents.<br />
C) Envelop No. 3 : Only Price Bid.<br />
Each envelops should be clearly superscribed <strong>the</strong> tender notice number and date, name <strong>of</strong> works, envelop<br />
No. i.e. 1, 2 and 3 etc. If <strong>the</strong> above three envelops are not found in order, it is liable to be rejected.<br />
After opening <strong>of</strong> 1 st envelop, if it is found in order in terms <strong>of</strong> NIT <strong>the</strong>n only 2 nd envelops will be opened.<br />
If 2 nd envelop is found in order in terms <strong>of</strong> NIT <strong>the</strong>n only 3 rd envelop will be opened.<br />
Contd. ……P/4.
: 04 :<br />
Service Tax: Service Tax, will be extra if payable by <strong>the</strong> company. The service provider has to give a<br />
declaration on affidavit on a non-judicial stamp paper duly notorized to <strong>the</strong> effect that <strong>the</strong> service provider has<br />
made payment <strong>of</strong> Service Tax <strong>of</strong> <strong>the</strong> preceding months every time while making claim for payment in<br />
accordance with law.<br />
General and o<strong>the</strong>r Terms & Conditions will be governed as per <strong>CCL</strong> rule circulated from time to time.<br />
Management reserves <strong>the</strong> right to accept or reject any or all <strong>the</strong> tenders fully or partly without assigning<br />
any reason whatsoever and is not bound to accept <strong>the</strong> lowest tender. Management fur<strong>the</strong>r reserves its right to<br />
cancel <strong>the</strong> tender without assigning any reason whatsoever.<br />
This issues with <strong>the</strong> approval <strong>of</strong> <strong>the</strong> competent authority.<br />
Staff Officer(Excv)(KTA),<br />
Kathara.<br />
Distribution to:<br />
1. The C.G.M./G.M.(KTA), Kathara/Kargali/Charhi/Dhori/Rajrappa/Kuju/NK Area<br />
/Piparwar/Barkakana/Barka-Sayal/Argada.<br />
2. The Project Officer, Kathara( C)/Jarangdih(C )/Sawang-Gov. Project.<br />
3. The A.F.M.(KTA), Kathara.<br />
4. The S.O.(Security)(KTA), Kathara.<br />
5. All Tender Committee Members.<br />
6. The Sr. Cashier, Katrhara Colliery.<br />
7. Notice Board.
GENERAL TERMS AND CONDITION<br />
1. DEFINITIONS:<br />
a) The word ‘ADMINISTRATION’ wherever occurs in <strong>the</strong> condition it means <strong>the</strong> CENTRAL<br />
COALFIELDS LIMITED represented by <strong>the</strong> General Manager(KTA), Kathara, or <strong>the</strong> Project<br />
Officer <strong>of</strong> any o<strong>the</strong>r Officer who issued <strong>the</strong> work order.<br />
b) The word ‘ Contractor’ wherever occurs <strong>the</strong> successful tenderer whose tender has been accepted by<br />
<strong>the</strong> Administration.<br />
c) The word ‘Work Order’ wherever occurs means work order, Delivery order or Supply Order as <strong>the</strong><br />
case may be.<br />
2. SUPERVISION AND EMPLOYMENT BY CONTRACTOR:<br />
a) The contract shall keep <strong>the</strong> work, a competent Supervisor and necessary assistants who shall<br />
represent <strong>the</strong> contractor in his absence. Such supervisor and / or assistant shall be present at all<br />
times to receive and comply all directives issued by <strong>the</strong> Administration.<br />
b) The contactor shall comply only competent skilful and orderly men to do <strong>the</strong> work. The<br />
Administration shall have all right to ask <strong>the</strong> contractor to remove any it will be binding on <strong>the</strong><br />
contractor to remove him within three hours.<br />
c) The contractor shall not employ any person who is employed by <strong>the</strong> Administration nor shall<br />
indulge in any activity which is detrimental to <strong>the</strong> interest <strong>of</strong> <strong>the</strong> Administration.<br />
3. ORGANISATION OF WORK BY CONTRACTOR:<br />
a) The contractor is deemed to have inspected into site and familiarizes himself with details <strong>of</strong> <strong>the</strong><br />
work.<br />
b) The contractor shall at his own cost make his own arrangement for all materials, trucks, trans<strong>po</strong>rt<br />
arrangement, tools staff and labour required for <strong>the</strong> contracted work.<br />
c) The contractor shall not sublet <strong>the</strong> work to any o<strong>the</strong>r party without approval in writing by <strong>the</strong><br />
General Manager(KTA), Kathara.<br />
d) The contract shall familiarises himself with all statutes, rules and orders applicable to his work and<br />
shall be governed by <strong>the</strong>m. He shall be res<strong>po</strong>nsible for compliance <strong>of</strong> such statutes etc.<br />
4. SAFETY PRECAUTIONS :<br />
a) The contractor shall observe all safety precautions and measures as required or recommended by<br />
all applicable statutes, rules, orders etc. and shall be res<strong>po</strong>nsible for compliance <strong>of</strong> <strong>the</strong> provisions <strong>of</strong><br />
such statutes etc. In case <strong>of</strong> any accident he shall be res<strong>po</strong>nsible for compliance with all<br />
requirements <strong>of</strong> Workmen’s Compensation Act or any o<strong>the</strong>r similar laws in force and shall<br />
indemnify <strong>the</strong> Company against any claim on this account.<br />
5. PAYMENT TO WORKMEN EMPLOYED BY THE CONTRACTOR AND MAINTENANCE OF<br />
RECORDS:<br />
a) The contractor shall not pay less than <strong>the</strong> minimum wages to <strong>the</strong> labour engaged by him and as per<br />
Minimum Wages Act or such o<strong>the</strong>r legislation <strong>of</strong> Award <strong>of</strong> Agreement or as directed by <strong>the</strong><br />
Administration. Decision <strong>of</strong> General Manager(KTA), Kathara shall be final and binding in this<br />
matter.<br />
b) The contractor shall also implement provisions <strong>of</strong> CMPF and Bonus Scheme.<br />
c) In case <strong>of</strong> any injury on duty <strong>the</strong> contractor shall pay diet and medical expenses in addition to<br />
injury allowance.<br />
d) All accounts shall be maintained in ENGLISH/HINDI. The Administration shall have <strong>the</strong> right <strong>of</strong><br />
access <strong>the</strong> inspection to payment <strong>of</strong> labour. The Administration may arrange for witnessing <strong>the</strong><br />
payment to <strong>the</strong> labour by it representative.<br />
Contd….P/2.
: 02 :<br />
6. INDEMNITY:<br />
a) If any matter which is not expressly provided for or against <strong>the</strong> conditions <strong>of</strong> any matter or practice<br />
appear prejudicial to <strong>the</strong> interest <strong>of</strong> <strong>the</strong> Administration or <strong>the</strong> public, <strong>the</strong> Administration may call<br />
u<strong>po</strong>n <strong>the</strong> contractor to remedy / modify or remove such matter or practice forthwith and this shall<br />
be binding on <strong>the</strong> contractor.<br />
b) The contractor shall in addition to any indemnity provided by Law indemnify <strong>the</strong> Administration<br />
against all liabilities whatsoever arising out <strong>of</strong> <strong>the</strong> Workmen’s Compensation Act, 1923 or any<br />
enactment and amendments <strong>the</strong>reto and shall be wholly res<strong>po</strong>nsible for observance <strong>of</strong> all statutory<br />
rules and regulations under any act or award <strong>of</strong> <strong>the</strong> GOVT. in force in matters relating to employer<br />
payment, retrenchment <strong>of</strong> labour and o<strong>the</strong>r matter relating to <strong>the</strong> work awarded to him. No claim<br />
shall lie against <strong>the</strong> Administration or damage done by any act <strong>of</strong> GOD or on account <strong>of</strong><br />
circumstances beyond <strong>the</strong> control <strong>of</strong> <strong>the</strong> Administration.<br />
7. DISPUTE :<br />
In case <strong>of</strong> any dispute, question or controversy in any matter relating to <strong>the</strong> contract, <strong>the</strong><br />
decision <strong>of</strong> General Manager(KTA), Kathara shall be final and binding.<br />
8. DAMAGES :<br />
The contractor shall make good all damages which may be caused to property belonging to<br />
<strong>the</strong> Administration or any o<strong>the</strong>r person by act or fault <strong>of</strong> <strong>the</strong> contractor or his servants in<br />
connection with execution <strong>of</strong> <strong>the</strong> contract provided that <strong>the</strong> Administration at its own option<br />
may make good such damages and charge <strong>the</strong> contractor <strong>the</strong> expenses <strong>the</strong>re<strong>of</strong>.<br />
9. LICENCE :<br />
The contractor shall have to obtain license application under <strong>the</strong> contractors labour<br />
(Regulation & Abolition) Act 1970 and will produce.<br />
10. DOCUMENTS TO BE SUBMITTED BY THE CONTRACTOR:<br />
THE CONTRACTOR MUST SUBMIT THE FOLLOWING DOCUMENTS:<br />
(A) ENVELOP NO. 1 : Only Earnest Money in <strong>the</strong> shape <strong>of</strong> Bank Draft.<br />
(B) ENVELOP NO. 2 :<br />
a) Complete Offer detailing <strong>the</strong> jobs to be carried.<br />
b) Containing copies <strong>of</strong> satisfactory completion performance certificate for HEMM repairing works<br />
performed during last seven years ending last day <strong>of</strong> month previous to <strong>the</strong> one in which bid applications are<br />
invited (i.e. eligibility period) should be ei<strong>the</strong>r <strong>of</strong> <strong>the</strong> following:<br />
Three similar completed works each costing not less <strong>the</strong>n <strong>the</strong> amount equal to 40% <strong>of</strong> <strong>the</strong> estimated value.<br />
OR<br />
Two similar completed works each costing not less <strong>the</strong>n <strong>the</strong> amount equal to 50% <strong>of</strong> <strong>the</strong> estimated value.<br />
OR<br />
One similar completed work costing not less <strong>the</strong>n <strong>the</strong> amount equal to 80% <strong>of</strong> <strong>the</strong> estimated value.<br />
c) Current Sales Tax / VAT Clearance Certificate from Sales Tax Department.<br />
d) VAT / TIN Registration Certificate.<br />
e) Partnership / Proprietorship / Company deed etc.<br />
f) Photo copy <strong>of</strong> PAN Card, SSI/ NSIC Certificate. B<br />
g) Bank Account operation statement or soundness certificate from any Indian Nationalized Bank.<br />
h) Average annual financial turnover during <strong>the</strong> last three years ending 31 st March <strong>of</strong> <strong>the</strong> previous<br />
financial years should be at least 30% <strong>of</strong> <strong>the</strong> estimated cost.<br />
i) Current affidavit, not older than 01 (One) Year from <strong>the</strong> date <strong>of</strong> receipt <strong>of</strong> tender, certifying that <strong>the</strong><br />
bidder is not involved in any criminal cases, not related to any employees <strong>of</strong> <strong>the</strong> company, not black<br />
listed by <strong>the</strong> company and firm registration details.<br />
j) Full address, Phone No. Bank A/c No. with name <strong>of</strong> Bank and Branch.<br />
k) P.F. Regn. No.<br />
l) ESI Regn. No.<br />
Contd….P/3.
: 03 :<br />
INFORMATION REGARDING OWNERSHIP OF THE CONTRACTOR’S FIRM SUCH AS:<br />
a) If it is Private Limited Co. <strong>the</strong> Registration No. <strong>of</strong> <strong>the</strong> Company, Name <strong>of</strong> <strong>the</strong> Directors and<br />
name <strong>of</strong> <strong>the</strong> Director who shall be res<strong>po</strong>nsible for operating <strong>the</strong> contract.<br />
b) If it is partnership firm Photostat copy <strong>of</strong> <strong>the</strong> partnership deed and name <strong>of</strong> <strong>the</strong> partner who<br />
shall be res<strong>po</strong>nsible for operating <strong>the</strong> contract.<br />
c) If it is proprietary firm, name <strong>of</strong> <strong>the</strong> proprietor and declaration to <strong>the</strong> effect that it is<br />
proprietary firm.<br />
d) The contractor shall have to obtain License under <strong>the</strong> Contract Labour (Regulation &<br />
Abolition) Act 1970 and shall produce a Photostat copy <strong>of</strong> <strong>the</strong> same, if applicable.<br />
N O T E : All original documents pertaining to above have to be produced before <strong>the</strong> Tender<br />
Committee at <strong>the</strong> time <strong>of</strong> opening <strong>of</strong> tender.<br />
NOTE :<br />
For purchasing <strong>the</strong> tender documents, an application is to be made by <strong>the</strong> party to<br />
Staff Officer(Excv)(KTA), Kathara <strong>the</strong>n only permission will be given to de<strong>po</strong>sit cost <strong>of</strong> tender<br />
documents.<br />
C) Envelp No. 3 : Only Price Bid.<br />
i. WORK OPRDER :<br />
The work shall be ascertained by <strong>the</strong> contractor only against work orders issued by <strong>the</strong> Staff<br />
Officer(Excv)(KTA), Kathara and have to be completed within stipulated period with entire<br />
satisfaction <strong>of</strong> <strong>the</strong> Administration.<br />
12) SECURITY MONEY :<br />
The contractor shall de<strong>po</strong>sit security money at <strong>the</strong> rate <strong>of</strong> 10% <strong>of</strong> <strong>the</strong> value <strong>of</strong> <strong>the</strong> work order,<br />
which shall be deducted from each on account bill in equal installments after adjustment <strong>of</strong><br />
de<strong>po</strong>sited 2% Earnest Money.<br />
13) PARALLEL CONTRACT :<br />
The Administration reserves <strong>the</strong> right to enter into parallel Contract separately with any o<strong>the</strong>r<br />
party for getting <strong>the</strong> work done.<br />
RISK OF THE CONTRACTOR :<br />
If <strong>the</strong> contractor fails to execute <strong>the</strong> work awarded to <strong>the</strong> satisfaction <strong>of</strong> <strong>the</strong> Administration within<br />
<strong>the</strong> stipulated period <strong>the</strong> Administration reserves <strong>the</strong> right to get <strong>the</strong> work executed even at a<br />
different price and value <strong>of</strong> work shall be realized from any amount due to <strong>the</strong> contractor.<br />
15) TERMINATION OF CONTRACT :<br />
The Administration may terminate <strong>the</strong> CONTRACT / WORK ORDER at any time by giving 15<br />
days notice without assigning any reason.<br />
16) TAX AND DUTIES :<br />
Tax and Duties shall be charged / paid extra as applicable as per rule.<br />
Contd….P/4.
: 04 :<br />
17. RATE OFFER : The tenderer shall submit <strong>the</strong>ir <strong>of</strong>fer as per format given in<br />
scheduled <strong>of</strong> work / Bill <strong>of</strong> Quantity:<br />
a) The envelops shall be inscribed with <strong>the</strong> heading as above in Capital Letters along with name <strong>of</strong><br />
Tenderer / Companies, Correction / Over writing should be signed by <strong>the</strong> tenderer. No additional terms<br />
& Conditions o<strong>the</strong>r prescribed in <strong>the</strong> tender documents will be entertained and conditional tender shall<br />
be liable to be rejected.<br />
b) The tenderer should sign on all pages <strong>of</strong> <strong>the</strong> documents in token <strong>of</strong> acceptance <strong>of</strong> all <strong>the</strong> conditions.<br />
c) Corrections where unavoidable, shall be made by crossing out and rewriting in <strong>the</strong> tender documents<br />
may disqualify <strong>the</strong> tenderer.<br />
d) The tender shall be submitted in English / Hindi.<br />
e) Canvassing in connection with <strong>the</strong> tenders in any shape or from <strong>the</strong> strictly prohibited and tenders<br />
submitted by tenderer(s) who resort to canvassing shall be liable to rejection.<br />
f) The detailed Tender Notice shall be deemed to be part <strong>of</strong> <strong>the</strong> work contract.<br />
g) Indenting tenderer(s) before submitting <strong>of</strong> <strong>the</strong>ir tender must satisfy <strong>the</strong>mselves regarding <strong>the</strong>ir eligibility<br />
as per criteria explained and must enclosed <strong>the</strong> required documents duly au<strong>the</strong>nticated by <strong>the</strong> tenderers.<br />
All o<strong>the</strong>r terms and conditions will remain same as per company rules circulated time to time.<br />
Staff Officer(Excv)(KTA),<br />
Kathara.
SL.<br />
NO.<br />
CENTRAL COALFIELDS LIMITED<br />
OFFICE OF THE GENERAL MANAGER(KTA),<br />
P.O. KATHARA : DIST. BOKARO.<br />
BILL OF QUANTITY<br />
DESCEIPTION OF WORK QUANTITY QUOTED<br />
RATE<br />
1 Repairing <strong>of</strong> crowd system <strong>of</strong> 10CUM Marion Shovel Exc1851 <strong>of</strong><br />
<strong>the</strong> Kathara Colliery.<br />
01<br />
SCOPE OF WORK:<br />
1 a) Dismantling <strong>of</strong> stoppers from dipper handle.<br />
b) Removal <strong>of</strong> Dipper handle from machine.<br />
c) Removal <strong>of</strong> bucket from dipper<br />
handle.<br />
d) Removal <strong>of</strong> bucket door form bucket.<br />
e) Removal <strong>of</strong> saddle bocks and shipper shaft.<br />
f) Cutting & removal <strong>of</strong> worn-out boom bushings.<br />
g) Fitting <strong>of</strong> boom bushings (Provided by dept.)<br />
h) Repairing <strong>of</strong> saddle blocks bores & worn-out body.<br />
i) Fitting <strong>of</strong> bushes in saddle blocks (One no provided by<br />
dept & three nos. provided by repairer)<br />
j) Repairing <strong>of</strong> shipper shaft.<br />
k)Repairing <strong>of</strong> crowd clutch with changing <strong>of</strong> disc & roto<br />
seal, springs etc.<br />
l) Making <strong>of</strong> two nos. Crowd motor pinions.<br />
m) Fitting <strong>of</strong> shipper shaft, saddle blocks, dipper handle and<br />
bucket assly. etc.<br />
n) Fitting <strong>of</strong> crowd clutch & its fittings.<br />
o) Changing <strong>of</strong> damaged/failed hoses <strong>of</strong> crowd system<br />
01 set<br />
NOTE:<br />
TAXES ETC. IF ANY TO BE INDICATED SEPAREATELY.
CENTRAL COALFIELDS LIMITED<br />
OFFICE OF THE GENERAL MANAGER(KTA),<br />
P.O. KATHARA : DIST. BOKARO.<br />
Repairing <strong>of</strong> crowd system <strong>of</strong> 10CUM Marion Shovel Exc1851 <strong>of</strong> <strong>the</strong> Kathara Colliery.<br />
SL. TECHNICAL MATERIALS Qty COST (A + B + C)<br />
NO. DETAIS OF THE<br />
PROCESS OF<br />
REQ-UIED MATERIA<br />
LS<br />
MANPOW<br />
ER<br />
OPERATIONAL<br />
COST<br />
REPAIRING<br />
( A ) ( B ) ( C )