( A Subsidiary of Coal India Limited ) PURCHASE ... - CCL
( A Subsidiary of Coal India Limited ) PURCHASE ... - CCL
( A Subsidiary of Coal India Limited ) PURCHASE ... - CCL
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CENTRAL COALFIELDS LIMITED<br />
( A <strong>Subsidiary</strong> <strong>of</strong> <strong>Coal</strong> <strong>India</strong> <strong>Limited</strong> )<br />
<strong>PURCHASE</strong> DEPARTMENT<br />
Darbhanga house : Ranchi 834 001 (Jharkhand) <strong>India</strong><br />
(PBX) 2360726, 2360687, Telex: 0625-201<br />
Gram: COLCENT, Fax (91) 0651-2360198, E.Mail # hodmm@ccl.gov.in<br />
FORMAL ORDER<br />
BY REGISTERED POST<br />
No: MM(P)/III/HEMM/U.Carriage/D 155/12-13//218 Dated: 08.03.2013<br />
To<br />
M/s. BEML Ltd.,<br />
Bhagirathi Complex,<br />
206/D1, Rameshwaram Colony,<br />
Bhariatu Road,<br />
Ranchi – 834 009<br />
e-mail: ranchi@rm.beml.co.in.<br />
Dear Sirs,<br />
Sub: Supply <strong>of</strong> Undercarriage Sets for BD155/D155 Dozers<br />
Ref: 1. This <strong>of</strong>fice Tender No. MM(P)/III/ HEMM/ U.Carriage/D155/<br />
12-13 opened on 22.08.2012<br />
2. Your <strong>of</strong>fer No. BEML/MRP/U.C/D155/1132 dt. 21.08.2012<br />
& subsequent confirmations, the last being dt. 21.02.2013.<br />
With reference to the above, please arrange to supply the following material on the terms and conditions<br />
noted hereunder:<br />
1. SCOPE OF SUPPLY:<br />
Sl. Description<br />
No. ( BEML Make)<br />
1 Complete Undercarriage assembly<br />
suitable For fitment on BD155 / D155<br />
Dozer with eleven components as<br />
detailed in Annexure-A<br />
Qty<br />
Unit Basic<br />
Price ( Rs.)<br />
Extended Price<br />
(Rs.)<br />
27sets 12,25,530.00 3,30,89,310.00<br />
2. TOTAL BASIC ORDER VALUE: Rs. 3,30,89,310.00 (Rupees Three Crores Thirty Lakhs Eighty<br />
Nine thousand Three Hundred Ten) only.<br />
(The above price is firm and on FOR Destn. basis till completion <strong>of</strong> supplies in all respect)<br />
3. SALES TAX: JVAT extra as applicable at the time <strong>of</strong> delivery. Present rate <strong>of</strong> JVAT is 14%. You will<br />
submit form 404 as per rules. <strong>CCL</strong> will avail Input Tax Credit.<br />
4. EXCISE DUTY: E.D. will be paid extra as applicable at the time <strong>of</strong> delivery. The present rate <strong>of</strong> ED is<br />
12.36% including Edu. Cess. <strong>CCL</strong> will avail CENVAT Credit. You are requested to submit E.D<br />
Invoice in the name <strong>of</strong> <strong>CCL</strong> contraining all the informations as required under Central Excise Rule.<br />
5. PACKING & FORWARDING : To be borne by you<br />
6. FREIGHT & INSURANCE : To be borne by you<br />
NB: Any increase in taxes & duties beyond the stipulated delivery period will be to your account.<br />
7. DELIVERY PERIOD: To commence within 90 days from the date <strong>of</strong> issue <strong>of</strong> order and<br />
completion within six months in complete sets. However, early supply shall be appreciated &<br />
accepted.<br />
8. CONSIGNEE:<br />
The Dy. General Manaager (S),<br />
Central Stores,Barkakana, P.O. & Rly.Stn.-Barkakana (E.Rly.), Dist:- Hazaribagh (Jharkhand).<br />
9. PAYING AUTHORITY:<br />
The Area Finance Manager,<br />
<strong>CCL</strong> (CS/CRS),Barkakana,<br />
District :- Hazaribagh (Jharkhand).<br />
- Please avail CENVAT credit & Input Tax Credit against the supply as admissible.<br />
10. INSPECTION:<br />
Material under supply shall be <strong>of</strong> the best quality and workmanship and shall be in accordance with the<br />
specification <strong>of</strong> OEM part no. laid down in the supply order. Manufacturer’s Test Certificate &<br />
Guarantee Certificate should be submitted.<br />
However, Final Inspection shall be carried out by the General Manager (Excv)/HOD,<strong>CCL</strong>, Ranchi or<br />
his authorized representative on receipt <strong>of</strong> materials at Consignee’s end. Notice for inspection shall be<br />
given by the Consignee immediately on receipt <strong>of</strong> the material.<br />
Contd…2.
No: MM(P)/III/HEMM/U.Carriage/D 155/12-13/218 Dated: 08.03.2013<br />
11. (A) TERMS OF PAYMENT:<br />
100% payment shall be made within 21 days <strong>of</strong> receipt and acceptance <strong>of</strong> the materials or bills,<br />
whichever is later through e-payment.<br />
(B) SUBMISSION OF BILL(S)/DOCUMENTS:<br />
: 2 :<br />
Following documents duly authenticated by you, wherever required should be submitted to the<br />
consignee:<br />
1. Consignment note.<br />
2. Challan<br />
3. One copy <strong>of</strong> Bill<br />
4. Copy <strong>of</strong> warranty certificate in original as per Terms & Conditions annexed.<br />
5. Any other documents specified in the order.<br />
Bill for 100% value <strong>of</strong> the spares should be submitted to the Paying Authority in triplicate duly<br />
stamped and receipted for arranging payment alongwith the following documents:-<br />
i. Pre-receipted and stamped Invoice (Original Buyer’s copy <strong>of</strong> invoice).<br />
CENVAT credit on admissible inputs and capital goods will be availed by <strong>CCL</strong>, for which Prereceipted<br />
and stamped Excise cum Tax Invoice showing the amount <strong>of</strong> excise duty , education cess<br />
and secondary & higher education cess at applicable rates separately is required to be submitted . The<br />
Excise cum Tax Invoice must contain all the following information as required under rule 11 <strong>of</strong><br />
Central Excise Rule :<br />
a) Registration no. <strong>of</strong> the Supplier.<br />
b) Address <strong>of</strong> the concerned Central Excise Division.<br />
c) Name <strong>of</strong> the consignee.<br />
d) Description <strong>of</strong> goods supplied.<br />
e) Tariff heading and sub headings<br />
f) Time and date <strong>of</strong> removal.<br />
g) Mode <strong>of</strong> Transport.<br />
h) Vehicle Registration number.<br />
i) Rate <strong>of</strong> duty.<br />
j) Quantity and value <strong>of</strong> goods, and duty payable thereon.<br />
ii. Packing list in original giving details <strong>of</strong> bill <strong>of</strong> materials<br />
iii. Consignment note / RR/ PWB in original<br />
iv. Warranty / Guarantee certificate<br />
v. Manfuacturers test certificate.<br />
vi.Certficate from the auditor certifying that excise duty has been paid as per prevailing excise rule,<br />
and Refund / Credit, if any obtained shall be passed on to <strong>CCL</strong>.<br />
The consignee after verification <strong>of</strong> documents and final inspection <strong>of</strong> the materials as per the order<br />
shall forward the DRR to the Paying Authority for arranging payment within the time specified.<br />
Special Instruction: One copy <strong>of</strong> Challan and invoice showing dispatch details and other documents<br />
must be sent to this <strong>of</strong>fice and the Office <strong>of</strong> the GM(Excv)/HOD, <strong>CCL</strong>, to know the dispatch<br />
particulars.<br />
12. PRICE CERTIFICATE :<br />
You will have to certify on the body <strong>of</strong> each & every bill that the prices charged are not more than the<br />
prices applicable to other government deptt/undertakings including CIL and its subsidiaries &<br />
DGS&D.<br />
13. LIQUIDATED DAMAGES CLAUSE: In the event <strong>of</strong> failure to deliver the stores within the<br />
stipulated date/period in accordance with the samples and/or specifications mentioned in the supply<br />
order and in the event <strong>of</strong> breach <strong>of</strong> any <strong>of</strong> the terms and conditions mentioned in the supply order,<br />
Central <strong>Coal</strong>fields Ltd. shall be entitled as its option either to enforce the following:<br />
a) To recover from the successful tenderer as agreed liquidated damages, a sum not less than<br />
0.5% (half percent) <strong>of</strong> the price <strong>of</strong> any stores which the successful tenderer has not been able to<br />
supply as aforesaid for each week or part <strong>of</strong> week during which the delivery <strong>of</strong> such stores may<br />
be in arrears limited to 10%. Where felt necessary the limit <strong>of</strong> 10% can be increased to 15% at<br />
the discretion <strong>of</strong> Head <strong>of</strong> the Materials Management Division.<br />
b) To purchase elsewhere, after due notice to the successful tenderer on the account and at the<br />
risk <strong>of</strong> the defaulting supplier the stores not supplied or others <strong>of</strong> a similar description without<br />
cancelling the supply order in respect <strong>of</strong> the consignment not yet due for supply or<br />
Contd…3.
: 3 :<br />
No: MM(P)/III/HEMM/U.Carriage/D 155/12-13/218 Dated: 08.03.2013<br />
c) To cancel the supply order or a portion there<strong>of</strong>, and if so desired to purchase the stores at the<br />
risk and cost <strong>of</strong> the defaulting supplier and also<br />
d) To extend the period <strong>of</strong> delivery with or without penalty as may be considered fit and proper,<br />
the penalty, if imposed shall not be more than the agreed Liquidated Damages referred to in<br />
clause (a) above.<br />
e) To forfeit the security deposit full or in part.<br />
f) Whenever under this contract a sum <strong>of</strong> money is recoverable from and payable by the supplier,<br />
Central <strong>Coal</strong>fields Ltd. shall be entitled to recover such sum by appropriating, in part or in<br />
whole, by deducting any sum or which at any time thereafter may become due to the successful<br />
tenderer in this or any other contract. Should this sum be not sufficient to cover the full amount<br />
recoverable, the successful tenderer shall pay Central <strong>Coal</strong>fields Ltd. on demand the remaining<br />
balance. The supplier shall not be entitled to any gain on any such purchase.<br />
14. SECURITY DEPOSIT:<br />
Exempted being PSU.<br />
15. ROAD PERMIT:<br />
If required,the road permit may be obtained from the consignee.<br />
16. PRICE FALL CLAUSE:<br />
It will be a condition <strong>of</strong> the order that althrough the currency <strong>of</strong> the prices at which you shall supply the<br />
stores, shall not exceed the lowest price charged by you to any other agency including DGS&D. In the<br />
event <strong>of</strong> price going down, you shall promptly pass on such information to enable this Company to<br />
amend the ordered rate.<br />
17. GUARANTEE/WARRANTY PARAMETER :<br />
You should certify that the Undercarriages supplied are as per OEM Part no. & specification. You are<br />
responsible for manufacturer’s warranty in respect <strong>of</strong> proper design, material, quality, workmanship<br />
and correctness <strong>of</strong> the parts and fitment to the machineand shall function properly on the intended<br />
equipment. The complete Under Carriage set shall have a Guarantee for 2 years/4500 Working hrs.<br />
from the date <strong>of</strong> fitment on the equipment whichever is earlier<br />
18. WARRANTY REPLACEMENT:<br />
You are responsible to replace the defective material/Prematurely failed material free <strong>of</strong> cost within 30<br />
days <strong>of</strong> receipt <strong>of</strong> intimation from the consignee/user subject to the normal joint inspection and on<br />
consignee store basis without any extra charge to <strong>CCL</strong> on account <strong>of</strong> rreight etc.<br />
19. FITMENT GUARANTEE :<br />
The items supplied must confom to respective OEM Part No. and should fit in the respective equipment<br />
without any modification (addition/deletion).<br />
20. IDENTIFICATION MARKS:<br />
The maker’s name, logo etc should be embossed/engraved/punched on each <strong>of</strong> the item at a visible<br />
place which is not subject to normal wear and tear for convenience <strong>of</strong> identification at any time.<br />
21. AFTER SALES SERVICE:<br />
You should provide service support during fitment <strong>of</strong> Under Carriage and periodical inspection should<br />
be carried out during the warranty/guarantee period free <strong>of</strong> cost.<br />
22. FORCE MAJEURE CLAUSE<br />
If the execution <strong>of</strong> the contract/supply order is delayed beyond the period stipulated in the<br />
contract/supply order as a result <strong>of</strong> outbreak or hostilities, declaration <strong>of</strong> an embargo or blockade, or<br />
fire, flood, acts <strong>of</strong> nature or any other contingency beyond the supplier's control due to act <strong>of</strong> God then<br />
Central <strong>Coal</strong>fields <strong>Limited</strong> may allow such additional time by extending the delivery period, as it<br />
considers to be justified by the circumstances <strong>of</strong> the case and its decision shall be final. If and when<br />
additional time is granted by Central <strong>Coal</strong>fields <strong>Limited</strong>, the contract/supply order shall be read and<br />
understood as if it had contained from its inception the delivery date as extended.<br />
a) The successful bidder will advise, in the event <strong>of</strong> his having to resort to this clause by a registered<br />
letter duly certified by the Local chamber <strong>of</strong> Commerce or Statutory authorities, the beginning and end<br />
<strong>of</strong> the causes <strong>of</strong> the delay, within fifteen days <strong>of</strong> the occurrence and cessation <strong>of</strong> such force majeure<br />
conditions. In the event <strong>of</strong> delay lasting out <strong>of</strong> force majeure <strong>CCL</strong> will reserve the right to cancel the<br />
contract and provisions governing termination <strong>of</strong> contract, as stated in the bid documents will apply.<br />
b) For delays arising out <strong>of</strong> force majeure, the bidder will not claim extension in completion date for a<br />
period exceeding the period <strong>of</strong> delay attributable to the causes <strong>of</strong> force majeure and neither <strong>CCL</strong> nor<br />
the bidder shall be liable to pay extra costs provided it is mutually established that force majeure<br />
conditions did actually exist.<br />
23. PERFORMANCE BANK GUARANTEE:<br />
Performance Bank Guarantee valid for 27 months from the date <strong>of</strong> commissioning for Rs. 42,38,430.00<br />
must be submitted before execution <strong>of</strong> supplies or along with supply bills. No payment shall be<br />
released without submission <strong>of</strong> the performance bank guarantee. The Performance Bank Guarantee<br />
Contd…4.
No: MM(P)/III/HEMM/U.Carriage/D 155/12-13/218 Dated: 08.03.2013<br />
shall be released after completion <strong>of</strong> Performance Guarantee period/criteria. On completion <strong>of</strong><br />
Performance Guarantee Period/Criteria, you should submit a written request to the supply order signing<br />
authority for release <strong>of</strong> PBG.<br />
24. SPECIAL INSTRUCTION:<br />
One copy <strong>of</strong> the challan and invoice showing despatch details and other documents must be sent to this<br />
<strong>of</strong>fice and the Office <strong>of</strong> the GM(Excv)/HOD,<strong>CCL</strong>,Ranchi to know the despatch particulars.<br />
25. JURISDICTION:<br />
The Court at Ranchi in Jharkhand State only will have the jurisdiction to deal with and decide any legal<br />
matter or dispute whatsoever arising out <strong>of</strong> our contract.<br />
26. ORDER ACCEPTANCE:<br />
Two copies <strong>of</strong> the order are being enclosed. One copy <strong>of</strong> the order may please be returned duly<br />
stamped and signed within 20 days from the date <strong>of</strong> supply order as a token <strong>of</strong> acknowledgement and<br />
acceptance <strong>of</strong> the contract, otherwise it will be presumed that you have accepted the contract for<br />
execution.<br />
: 4 :<br />
All other terms & conditions will be as per the General terms and Conditions <strong>of</strong> the supply <strong>of</strong><br />
stores <strong>of</strong> Central <strong>Coal</strong>fields <strong>Limited</strong>.<br />
Yours faithfully,<br />
FOR & ON BEHALF OF CENTRAL COALFIELDS LIMITED<br />
( DP Roy) ( A.K. Singh )<br />
MT(MM)<br />
Chief Manager (P)<br />
Copy forwarded to:-<br />
1. The CVO, <strong>CCL</strong>, Ranchi<br />
2. Sri C.S. Samal, IAS (Retd.)<br />
CA-193, Sector-1, Bidhan Nagar, Kolkata-700064<br />
3. Sri N.R. Banerjee, IAS (Retd.),<br />
Flat No. 121, Shriniketan, CGHS Plot No.1, Sector 7, Dwaraka, New Delhi - 110075<br />
M/s. BEML Ltd. have confirmed acceptance <strong>of</strong> the Integrity Pact as per NIT.<br />
4. The GM (MM), <strong>CCL</strong>, Ranchi<br />
5. The General Manager(Excv)/HOD, <strong>CCL</strong>, Ranchi<br />
6. The GM(S&IC),<strong>CCL</strong>,Ranchi.<br />
7. The Dy. GM (S), Central Stores,Barkakana.<br />
8. The Area Finance Manager,<strong>CCL</strong>,(CS/CRS),Barkakana – alongwith copy <strong>of</strong> Bank details furnished by<br />
M/s. BEML for e-Payment. Please avail CENVAT<br />
credit & Input Tax Credit as admissible.<br />
9. The GM (F) (Op), <strong>CCL</strong>, Ranchi<br />
10. MIS Cell,<strong>CCL</strong>, Ranchi.<br />
11. Manager (Secy) to CMD/D(T)(Op), <strong>CCL</strong>, Ranchi<br />
This issues with the approval <strong>of</strong> competent authority, concurrence <strong>of</strong> GM(F)O vide No. 1600 dt.<br />
05.03.2013 & Fund certification vide no.D/O/F/BC/Excavation Spares/SB-12-13/107/30/1631 dt.<br />
07.03.2013 for Rs. 4,23,84,229.54.<br />
MT(MM)<br />
Chief Manager (P)
: 5 :<br />
No: MM(P)/III/HEMM/U.Carriage/D 155/12-13/218 Dated: 08.03.2013<br />
ANNEXURE – A<br />
“ BEML MAKE”<br />
Sl.<br />
No.<br />
Model Description Part No Quantity / Per<br />
Machine / Per<br />
Set<br />
BD<br />
155/D155<br />
DOZER<br />
Complete Under<br />
Carriage Sets consisting<br />
<strong>of</strong> under mentioned 11<br />
items:<br />
1<br />
TRACK SHOE<br />
125CTB0033<br />
2Nos<br />
ASSLY.<br />
2<br />
TRACK ROLLER 125TF00173<br />
4Nos<br />
ASSLY (SF).<br />
3<br />
TRACK ROLLER 125TF00181<br />
10Nos<br />
ASSLY (D/F).<br />
4<br />
CARRIER<br />
125TF00198<br />
4Nos<br />
ROLLER ASSLY.<br />
5 IDLER ASSY. 125TF00213 2Nos<br />
6<br />
TEETH<br />
125FD51927<br />
18Nos<br />
SPROCKET<br />
7 BOLT BFB2412478 54Nos<br />
8<br />
BOLT(TRACK<br />
CFB0222415<br />
56Nos<br />
ROLLER MTG)<br />
9<br />
SPRING<br />
CFW00112472 56Nos<br />
WASHER<br />
BOLT<br />
CFB0122090<br />
8Nos<br />
10<br />
(CARRIER<br />
ROLLER MTG)<br />
11 NUT BFN2612430 54Nos<br />
SPECIAL NOTE<br />
1. Track chain Assy for BD155 / D155 Dozers should be Lubricated type (SALT) with master links.<br />
2. All above assy / sub-assy / components shall fully conform to the OEM part Nos. & specifications and shall<br />
be interchangeable as a set as well as individual item wise with OEM part Nos.<br />
3. All the items are to be supplied in one set.<br />
4. Supply to be made in multiple <strong>of</strong> complete sets consisting <strong>of</strong> all 11 items in a set.<br />
MT (MM)<br />
Chief Manager (P)