- Page 1 and 2: Verulamium Park Management Plan 201
- Page 3 and 4: CONTENTS Vision Statement .........
- Page 5 and 6: Vision Statement VERULAMIUM PARK MA
- Page 7 and 8: Chapter 1 Historical and Geographic
- Page 9: 1.2 The Geographical Context 1.2.1
- Page 13 and 14: Roman Walls and the London Gate. Ac
- Page 15 and 16: Athletics Track and Abbey View 9 Ho
- Page 17 and 18: www.stalbans.gov.uk/parking Appendi
- Page 19 and 20: oth form significant habitats for w
- Page 21 and 22: 1.2.7 Landscape Description The Par
- Page 23 and 24: the Park as a key viewpoint locatio
- Page 25 and 26: Cricket Pavilion Thames Water Pumpi
- Page 27 and 28: • Fitness Groups The Council has
- Page 29 and 30: 2.2.1 The Corporate Plan, the Local
- Page 31 and 32: the contractor, which formed part o
- Page 33 and 34: Chapter 3 The Organisational Contex
- Page 35 and 36: • Staff support for special event
- Page 37 and 38: 4.2 Verulamium Park Consultative Fo
- Page 39 and 40: Park Leaflet 4.5 Council Web Site T
- Page 41 and 42: 4.8 Verulamium Park Facebook Page I
- Page 43 and 44: 5.2.6 Cycle Paths Historically cycl
- Page 45 and 46: that runs past the lakes is very sl
- Page 47 and 48: Middlesex Wildlife Trust, the plan
- Page 49 and 50: 5.2.21 Cricket Squares and Pavilion
- Page 51 and 52: A2 A3 Conserve the landscape charac
- Page 53 and 54: • Feedback from the park users. 6
- Page 55 and 56: Date: 18/02/2013 Scale: - 1:8000 ©
- Page 57 and 58: RISK ASSESSMENT FORM Activity / Are
- Page 59 and 60: Ref 6 7 8 9 Hazard Asbestos Toilets
- Page 61 and 62:
Ref 13 14 Hazard Vehicles moving ar
- Page 63 and 64:
RISK ASSESSMENT GUIDANCE 1. Methodo
- Page 65 and 66:
APPENDIX 3 - Grounds Maintenance Pl
- Page 67 and 68:
APPENDIX 4 Grounds Maintenance Stan
- Page 69 and 70:
Regime Shrub borders Standard requi
- Page 71 and 72:
Regime Children’s play area and a
- Page 73 and 74:
Regime Spring Meadow Standard requi
- Page 75 and 76:
Regime Pavilions Standard required
- Page 77 and 78:
Park Buildings Maintenance Programm
- Page 79 and 80:
season maintenance Daily routine ma
- Page 81 and 82:
Verulamium Park Access and Interpre
- Page 83 and 84:
1 INTRODUCTION SITE DESCRIPTION Ver
- Page 85 and 86:
2 DESIGN GUIDELINES The following s
- Page 87 and 88:
We would like the contractor to com
- Page 89 and 90:
FINGERPOSTS No: 6 Directional arms:
- Page 91 and 92:
4 CONDITIONS AND PROCEDURES PRELIMI
- Page 93 and 94:
5 BILL OF QUANTITIES 1a Description
- Page 95 and 96:
ST ALBANS CITY AND DISTRICT COUNCIL
- Page 98 and 99:
Document 5 Visual Aids 8 12 14 1 16
- Page 100 and 101:
Document 5 Visual Aids 4. The Lake
- Page 102 and 103:
Document 5 Visual Aids 9. RSPB ‘A
- Page 104 and 105:
Document 5 Visual Aids 17. Entrance
- Page 106 and 107:
YEAR 1 Action Plan 2012 ‐ 2013 Ob
- Page 108 and 109:
Increase existing areas of meadow g
- Page 110 and 111:
C4 C5 C6 D1 D2 D3 D4 E2 Manage wood
- Page 112 and 113:
YEAR 3 Action Plan 2014 ‐ 2015 Ob
- Page 114 and 115:
Plant new hedgerow along the remain
- Page 116 and 117:
%U VERULAMIUM PARK Action Plan Year
- Page 118: