<strong>City</strong> <strong>of</strong> <strong>St</strong>. <strong>Petersburg</strong><br />

<strong>Disaster</strong> <strong>Cost</strong><br />

<strong>Reimbursement</strong> <strong>Manual</strong><br />

Updated: January 2013<br />

Prepared by: Audit Services Department<br />

<strong>City</strong> Auditor: Bradley H. Scott, CPA, CIA, CFE<br />

Contact: Melinda Jenzarli, CPA, CIA, CFE, CFST


USING THIS ONLINE VERSION:<br />

THROUGHOUT THIS MANUAL, YOU WILL<br />

SEE THE HAND TOOL ICON BELOW AS<br />

YOU SCROLL THROUGH THE PAGES.<br />

CLICKING ON ANY LINE IN THE TABLE OF<br />

CONTENTS WILL TAKE YOU TO YOUR<br />

SELECTED PAGES. WHEN YOU SEE THE<br />

HAND SYMBOL AGAIN IN YOUR PAGE, YOU<br />

MAY CLICK AND WILL BE RETURNED TO<br />

THE TABLE OF CONTENTS


TABLE OF CONTENTS<br />

INTRODUCTION & DISASTER COST REIMBURSEMENT OVERVIEW ............................................................. 1<br />

I. FEMA PUBLIC ASSISTANCE PROGRAM<br />

I.A FEMA – Eligibility ........................................................................................................................................ 5<br />

1. Applicant ................................................................................................................................................... 6<br />

2. Facility ....................................................................................................................................................... 6<br />

A. Documenting Pre-<strong>Disaster</strong> Condition ......................................................................................... 6<br />

3. Work .......................................................................................................................................................... 7<br />

A. Eligible Work Criteria ................................................................................................................. 7<br />

B. Eligible Categories ...................................................................................................................... 7<br />

C. <strong>Disaster</strong> Related Work Documentation ....................................................................................... 9<br />

4. <strong>Cost</strong> .......................................................................................................................................................... 10<br />

A. Force Account Labor ................................................................................................................ 10<br />

B. Force Account Materials ........................................................................................................... 11<br />

C. Force Account Equipment ......................................................................................................... 12<br />

D. Equipment & Supplies Purchased for <strong>Disaster</strong> use ................................................................... 12<br />

E. Contracts .................................................................................................................................... 13<br />

F. Donated Resources .................................................................................................................... 14<br />

G. Project Supervision & Grant Management <strong>Cost</strong>s ...................................................................... 15<br />

I.B FEMA – Project Formulation ................................................................................................................... 16<br />

A. Types <strong>of</strong> Projects ....................................................................................................................... 16<br />

B. The Project Worksheet .............................................................................................................. 16<br />

C. Combining Work & Creating Projects ...................................................................................... 17<br />

D. Identifying the Damaged Facility .............................................................................................. 17<br />

E. Project Location ........................................................................................................................ 18<br />

F. Damage Description & Dimensions .......................................................................................... 18<br />

G. Scope <strong>of</strong> Work .......................................................................................................................... 18<br />

H. <strong>Cost</strong> Estimate ............................................................................................................................ 19<br />

II. FHWA: FEDERAL HIGHWAY ADMINISTRATION ER PROGRAM ..................................................... 20<br />

III. SMAA: STATEWIDE MUTUAL AID AGREEMENT .................................................................................. 21<br />

IV. FEMA – APPENDIX<br />

A. FEMA Schedule <strong>of</strong> Equipment Rates ........................................................FEMA – A – 1<br />

B. Force Account Equipment Summary Record ...................................................... FEMA – B – 1<br />

C. Material Summary Record ................................................................................... FEMA – C – 1<br />

D. Rented Equipment Summary Record ................................................................... FEMA – D – 1<br />

E. Project Worksheet .................................................................................................FEMA – E – 1<br />

F. Special Considerations Questions ......................................................................... FEMA – F – 1<br />

G. Force Account Labor Timesheet .......................................................................... FEMA – G – 1<br />

V. FHWA – APPENDIX<br />

A. List <strong>of</strong> FHWA ER Roadways in <strong>City</strong> ................................................................. FHWA – A – 1<br />

B. FHWA ER Road Map .......................................................................................... FHWA – B – 1<br />

C. Detailed Damage Inspection Report .................................................................... FHWA – C – 1<br />

VI.<br />

SMAA – APPENDIX<br />

A. Timesheet ............................................................................................................. SMAA – A – 1


INTRODUCTION<br />

This manual is for use in preparing for cost recoveries related to all natural disasters and emergencies<br />

including, but not limited to hurricanes, tropical storms, tornadoes and flooding. The information contained<br />

is applicable to all federally declared disasters and emergencies. Most <strong>of</strong> the information included in this<br />

manual was taken from the Public Assistance Guide FEMA 322/May 2007.<br />

The purpose <strong>of</strong> this manual is to assist <strong>City</strong> departments to be able to adequately document the <strong>City</strong>’s disaster<br />

related costs and expenses and to help prepare the required forms for reimbursement. Depending on the<br />

nature and location <strong>of</strong> the disaster, the <strong>City</strong> will submit reimbursement documentation to one or all <strong>of</strong> the<br />

following: the Federal Emergency Management Agency, U.S. Department <strong>of</strong> Homeland Security (FEMA);<br />

the Federal Highway Administration (FHWA); the <strong>St</strong>ate under the <strong>St</strong>atewide Mutual Aid Agreement<br />

(SMAA); or any other Federal and <strong>St</strong>ate agencies providing assistance.<br />

DISASTER COST REIMBURSEMENT PROCESS OVERVIEW<br />

STORM EVENT IS APPROACHING PINELLAS COUNTY AND CITY<br />

1. Prior to declaration and coinciding with EOC activation: The Audit Services Department (ASD) will<br />

send an e-mail to all <strong>City</strong> employees advising them and their respective departments <strong>of</strong> the following:<br />

A. All disaster related labor must be recorded in Kronos using the following coding:<br />

Kronos paycode 007-<strong>Disaster</strong> Regular Time or 111- <strong>Disaster</strong> Overtime<br />

B. The <strong>City</strong>’s equipment list is available on the intranet under <strong>Disaster</strong> Information Pages/FEMA<br />

Assistance Recovery Forms & Information/FEMA <strong>Disaster</strong> Equipment rates and should be used to<br />

identify equipment used for disaster related activities. (This list is maintained, updated and matched<br />

up with the appropriate FEMA equipment codes by the Fleet Management Department in the M5<br />

system. Fleet will advise Budget <strong>of</strong> the appropriate FEMA code to be added to the equipment list in<br />

Oracle projects.)<br />

C. The FEMA forms for labor and equipment usage (see FEMA-G-1 and FEMA-B-1 in this manual)<br />

must be completed, signed by the employee and approved by a supervisor/manager. Be very specific<br />

in your description <strong>of</strong> the work performed on the FEMA labor & equipment forms. Document what<br />

was done, by who, when and where. For the equipment used, include Make, Model, Year, Horse<br />

Power, Size and Capacity (this information will be included in the <strong>City</strong> equipment list available on<br />

the intranet).<br />

1


D. The equipment forms must be compiled into a spreadsheet (AUDIT SERVICES WILL PROVIDE A<br />

TEMPLATE SPREADSHEET) including the following fields:<br />

• Equipment Description including the Make, Model, Year, Horse Power, Size and Capacity<br />

• FEMA equipment code<br />

• Operator name and employee number<br />

• Date and number <strong>of</strong> hours equipment was used for disaster related activities<br />

• Equipment rate & total cost<br />

• Location/Site and description <strong>of</strong> work performed<br />

E. Assign one representative per department to coordinate the disaster documentation process.<br />

(Each department should immediately notify ASD <strong>of</strong> the name and contact information for the<br />

department representative responsible for providing reimbursement documentation for that respective<br />

department.) Each department representative must verify the following before forwarding<br />

documentation to the Audit Services Department (ASD).<br />

• The spreadsheet compiled for equipment usage is complete and in agreement with what was<br />

reported on the FEMA equipment forms (Once completed this spreadsheet is to be sent to the<br />

ASD)<br />

• Number <strong>of</strong> hours reported on the employee’s timesheet is equal to or greater than the hours they<br />

report using a piece <strong>of</strong> equipment.<br />

• Overtime is reported only for hours worked over 40 “sweat” hours/week.<br />

• Equipment rates are correct per the FEMA <strong>Disaster</strong> Equipment rates Schedule<br />

• Forms are signed and dated by both employee and supervisor<br />

• Time entered in Kronos and the equipment spreadsheet agrees with the labor and equipment<br />

usage on the FEMA forms, including number <strong>of</strong> hours and pay/equipment rates.<br />

Remember that “overtime” for FEMA purposes is only “sweat hours” over<br />

40hrs/week. For example:<br />

Scenario 1: if you worked 24 hrs regular shift, you were out sick or on annual leave<br />

for 16 hrs (“non-sweat time”) and also performed storm related work for 5 hours,<br />

then the five hours will be coded 007 (regular time) in Kronos and on the labor<br />

FEMA form.<br />

Scenario 2: if you worked 24 hrs regular shift, you were out sick or on annual leave<br />

for 16 hrs (“non-sweat time”) and also performed storm related work for 20 hours,<br />

then 16 hours will be coded to 007 (regular time) and 4 hours would be coded to<br />

111(overtime) in Kronos and on the labor FEMA form.<br />

F. After the verification and reconciliations outlined in E. above are complete, each department<br />

representative should e-mail the reconciled equipment spreadsheet to ASD. A binder should be<br />

created (do not staple documentation) with the following supporting documentation and sent to<br />

the ASD department:<br />

• Copy <strong>of</strong> the reconciled equipment spreadsheet (previously e-mailed to ASD)<br />

• Completed and signed FEMA equipment forms (originals)<br />

• Completed and signed FEMA timesheet (labor) forms (originals)<br />

• KRONOS punch detail report and statement <strong>of</strong> earnings from Oracle for each employee<br />

(include the punch detail report and statements <strong>of</strong> earnings behind the employee timesheet)<br />

2


Take as many pictures as possible <strong>of</strong> buildings, facilities, equipment etc. before and after the<br />

storm. Pictures must also be taken <strong>of</strong> debris including all tree stumps that are in the right <strong>of</strong> way.<br />

Any preventative measures to mitigate damages to <strong>City</strong> facilities and equipment should be taken<br />

prior to the storm.<br />

2. EOC Activation: ASD attends first EOC meeting and reminds departments to document all expenditures<br />

related to event. ASD provides copies <strong>of</strong> the time and equipment sheets as needed. (These forms will also<br />

be made available in electronic format.)<br />

STORM EVENT OCCURS<br />

3. Immediately after the <strong>St</strong>orm Event: ASD re-establishes contact with departments reinforcing the use<br />

<strong>of</strong> disaster payroll codes, completion <strong>of</strong> timesheets etc.<br />

4. Preliminary Damage Assessment: <strong>City</strong> Engineering Department prepares a Preliminary Damage<br />

Assessment and sends to the County. ASD also receives a copy.<br />

5. Declaration: At the request <strong>of</strong> the <strong>St</strong>ate, the President declares Pinellas County a disaster area. ASD<br />

obtains the <strong>Disaster</strong> Declaration Number from the FEMA website.<br />

6. Applicant Briefing: ASD attends the FEMA/<strong>St</strong>ate “Applicant Briefing” and makes contact with the<br />

<strong>St</strong>ate Public Assistance Representative (PA) and FEMA Public Assistance Coordinator (PAC) assigned<br />

to the <strong>City</strong>. An initial “Kick Off” meeting is scheduled with the <strong>St</strong>ate PA, FEMA PAC and ASD.<br />

7. RPA: ASD files a Request for Public Assistance (RPA) within 30 days <strong>of</strong> the declaration.<br />

8. Funding Agreement: ASD requests a Funding Agreement from the FEMA PAC following the<br />

Applicant Briefing. This agreement requires <strong>City</strong> Council approval.<br />

9. Kick <strong>of</strong>f Meeting: An initial “Kick Off” meeting is held with ASD, <strong>St</strong>ate PA and FEMA PAC. (Reps<br />

from other <strong>City</strong> Departments responsible for managing <strong>City</strong> recovery projects may also be invited. The<br />

<strong>City</strong>’s documentation process, preliminary damage estimates, SOW’s, etc. are discussed.<br />

10. Project Formulation/Preparation:<br />

ASD will coordinate with departments reporting category C-G damages to set-up site visits where the<br />

FEMA PAC and <strong>St</strong>ate PA will inspect the damages. Note the emergency work (Category A&B) should<br />

be completed within 6 months and permanent work (Category C-G) within 18 months <strong>of</strong> the declaration.<br />

(See section 1.3.b for descriptions <strong>of</strong> each category)<br />

3


Reconciled time and equipment sheets are sent to ASD. ASD consolidates the sheets submitted for<br />

project formulation i.e. by category/site/department etc.<br />

ASD calculates the benefit rates for Police, Fire and Other Depts. to apply to the total labor costs<br />

documented.<br />

ASD compiles project cost estimates and documentation. Project Worksheets are completed by the<br />

FEMA PAC for large projects and may be completed by ASD or the FEMA PAC for small projects.<br />

Small projects are sampled at 20% if submitted within 60 days <strong>of</strong> the kick-<strong>of</strong>f. Large projects are<br />

verified at 100%.<br />

11. Project Worksheets:<br />

After project worksheets are completed, the final Project Worksheets are signed on behalf <strong>of</strong> the <strong>City</strong><br />

by ASD and submitted for reimbursement.<br />

FEMA obligates funds for the projects to the <strong>St</strong>ate. ASD works with <strong>St</strong>ate on obtaining funds.<br />

12. Project Close Outs:<br />

The PA Program is closed when all <strong>of</strong> the grants awarded under a given disaster have met the statutory<br />

and regulatory requirements and all funds have been obligated.<br />

Records must be kept for 5 years after the closeout letter from FEMA is received. (Note: FEMA only<br />

requires records to be kept for 3 years, however, the <strong>St</strong>ate requires 5 years)<br />

13. Other Federal agencies that <strong>of</strong>ten have authority to provide disaster assistance include:<br />

• Federal Highway Administration (FHWA)<br />

The FHWA Administers the Emergency Relief Program to assist <strong>St</strong>ate and local governments with<br />

the repair <strong>of</strong> Federal Aid roads and bridges damaged during disasters. Funds are primarily used for<br />

permanent work and are granted on the basis <strong>of</strong> inspections performed by FHWA and <strong>St</strong>ate highway<br />

personnel.<br />

o Shortly after the FEMA “Kick Off” meeting, ASD establishes contact with the FDOT to begin<br />

FHWA reimbursement process.<br />

o ASD completes a Detailed Damage Inspection Report (DDIR) and notifies FDOT that the<br />

DDIR is ready for review. After FDOT review, the DDIR is finalized, signed and submitted to<br />

FHWA for reimbursement. The documentation process for FHWA reimbursement if very similar<br />

to the FEMA requirements above.<br />

• U.S. Army Corps <strong>of</strong> Engineers (USACE)<br />

Has the continuing authority to conduct emergency repair and permanent restoration <strong>of</strong> damaged<br />

flood control works including levees, floodwalls, flood control channels and dams designed for flood<br />

control. The USACE also has the authority to construct and repair facilities that protect the shorelines<br />

<strong>of</strong> the United <strong>St</strong>ates. Only locally owned shoreline works are eligible under the PA Program. All<br />

other federally constructed facilities are eligible under USACE.<br />

• Department <strong>of</strong> Agriculture-Natural Resources Conservation Service (NRCS)<br />

Under the emergency Watershed Program, the NRCS has the authority for the repair <strong>of</strong> flood control<br />

works with drainage basins <strong>of</strong> 400 square miles or less. The USACE is responsible for flood works<br />

within a larger drainage basin. The NRCS also has the authority to remove debris from stream<br />

channels, road culverts and bridges.<br />

4


SECTION I – FEMA PUBLIC ASSISTANCE PROGRAM<br />

The Public Assistance Program is administered by the Federal Emergency Management Agency (FEMA), a<br />

component <strong>of</strong> the Department <strong>of</strong> Homeland Security. Under the PA program, FEMA awards grants to assist<br />

<strong>St</strong>ate and local governments and certain Private Nonpr<strong>of</strong>it entities with the response to and recovery from<br />

disasters. FEMA will generally reimburse the <strong>City</strong> for 75% <strong>of</strong> the eligible costs. However, FEMA has the<br />

option <strong>of</strong> providing up to 100% reimbursement <strong>of</strong> eligible cost for certain disasters. The <strong>St</strong>ate generally will<br />

reimburse the <strong>City</strong> for one half <strong>of</strong> the remaining balance <strong>of</strong> the eligible cost that was not reimbursed by<br />

FEMA or 12.5% <strong>of</strong> eligible cost.<br />

The PA program is based on a partnership between FEMA, <strong>St</strong>ate and local <strong>of</strong>ficials:<br />

FEMA is responsible for managing the program, approving grants, and providing technical assistance to the<br />

<strong>St</strong>ate and applicants.<br />

The <strong>St</strong>ate acts as the grantee for the PA Program. The <strong>St</strong>ate also educates potential applicants, works with<br />

FEMA to manage the program and is responsible for implementing and monitoring the grants awarded under<br />

the program.<br />

The applicant (the <strong>City</strong>), also referred to as the subgrantee, is responsible for identifying damage, providing<br />

sufficient data for FEMA to develop an accurate scope and cost estimate for doing the work and approving<br />

grants, and managing the projects funded under the PA Program.<br />

Section I.A – FEMA: Eligibility<br />

The Public Assistance (PA) Program is based on statutes, regulations and policies. The Robert T. <strong>St</strong>afford<br />

<strong>Disaster</strong> Relief and Emergency Assistance Act (<strong>St</strong>afford Act) is the underlying document that authorizes the<br />

program. Regulations published in Title 44 <strong>of</strong> the Code <strong>of</strong> Federal Regulations (44 CFR) Part 206 implement<br />

the statute. Policies are written to apply the statute and regulations to specific situations and provide<br />

clarification on a range <strong>of</strong> issues. These authorities govern the eligibility criteria through which FEMA<br />

provides funds for public assistance. These criteria have the following four components:<br />

5


1. APPLICANT<br />

FEMA provides supplementary Federal assistance to <strong>St</strong>ate, local, and tribal governments, and certain<br />

private nonpr<strong>of</strong>it organizations. The <strong>City</strong> is considered to be the applicant.<br />

2. FACILITY<br />

An eligible facility is any building, works, system, or equipment that is built or manufactured, or any<br />

improved and maintained natural feature that is owned by an eligible public or private nonpr<strong>of</strong>it (PNP)<br />

applicant with certain exceptions.<br />

To be eligible a facility must:<br />

• Be the responsibility <strong>of</strong> an eligible applicant.<br />

• Be located in a designated disaster area.<br />

• Not be under the specific authority <strong>of</strong> another Federal agency.<br />

• Be in active use at the time <strong>of</strong> the disaster.<br />

Examples <strong>of</strong> eligible public facilities include:<br />

• Roads (non-Federal aid)<br />

• Sewage Treatment Plants<br />

• Airports<br />

• Irrigation Channels<br />

• Schools<br />

• Buildings<br />

• Bridges and Culverts<br />

• Utilities<br />

A. Documenting Pre-<strong>Disaster</strong> Condition <strong>of</strong> <strong>City</strong> facilities<br />

Risk Management currently has contracted with an outside vendor for appraisal services. As part <strong>of</strong><br />

their appraisal services, this vendor may have already photographed some <strong>of</strong> your facilities and their<br />

contents. The department should contact Risk Management to see which, if any, <strong>of</strong> their facilities this<br />

vendor has already provided Risk Management with photographs.<br />

Each department has a number <strong>of</strong> options available to them to record the pre-disaster condition<br />

<strong>of</strong> their facilities. Some <strong>of</strong> the options available are:<br />

• The department has their own equipment (digital camera, for example) and could photograph or<br />

videotape their facilities without any cost to them except for the price <strong>of</strong> film or tape.<br />

• The department may borrow a camera or video recorder from another city department.<br />

• The department could have Channel 35 videotape the facilities for them. The cost would depend<br />

upon the amount <strong>of</strong> time it takes.<br />

• The department could contract with the same vendor Risk Management uses to come out and<br />

photograph their facilities. If enough departments show interest and the cost is reasonable, the<br />

<strong>City</strong> may elect to have this work done on a regular basis.<br />

6


3. WORK<br />

• Maintenance records <strong>of</strong> all facilities and <strong>City</strong> equipment must be maintained. This can include<br />

routine maintenance logs and/or maintaining a file <strong>of</strong> all invoices for repairs and regular<br />

maintenance performed.<br />

PHOTOGRAPHS AND VIDEOTAPES MUST BE STORED IN A SECURE LOCATION.<br />

There are three general types <strong>of</strong> work that may be authorized eligible with different criteria for each:<br />

• Debris Removal<br />

• Emergency protective measures; and<br />

• Permanent restoration<br />

Debris removal and emergency protective measures are considered “emergency work”. Permanent work<br />

includes restoring the facility back to its pre-disaster design, function, and capacity.<br />

A. Eligible work criteria-the following three criteria apply to all types <strong>of</strong> work.<br />

• Direct Result-Work must be required as a direct result <strong>of</strong> the declared major disaster or<br />

emergency. FEMA establishes an incident period which is the time span that the disaster causing<br />

incident occurs. Damage that is a direct result <strong>of</strong> events that occur during the incident period is<br />

eligible. Protective measures performed within a reasonable and justified time in advance <strong>of</strong> the<br />

event may be eligible. Damage that occurs after the close <strong>of</strong> the incident period that can be tied<br />

directly to the declared event also may be eligible.<br />

• Designated <strong>Disaster</strong> Area-Eligible work must be located within a designated disaster area.<br />

• Legal Responsibility-The work must be the legal responsibility <strong>of</strong> the <strong>City</strong> at the time <strong>of</strong> the<br />

disaster to be eligible. Ownership <strong>of</strong> the facility is generally sufficient to establish the<br />

responsibility for work to repair the facility.<br />

B. Eligible Categories-To be eligible for public assistance funding, the damages must fall into one <strong>of</strong><br />

the following seven categories:<br />

• Category A – Debris Removal - This category includes the clearance <strong>of</strong> trees and woody<br />

debris; certain building wreckage; damaged/destroyed building contents; sand, mud, silt, and<br />

gravel; vehicles; and other disaster related material deposited on public property. For debris<br />

removal to be eligible, the work must be necessary to:<br />

o Eliminate immediate threats to lives, public health and safety<br />

o Eliminate immediate threats <strong>of</strong> significant damage to improved public or private property<br />

when the measures are cost effective.<br />

o Ensure economic recovery <strong>of</strong> the affected community to the benefit <strong>of</strong> the community-atlarge.<br />

Removal <strong>of</strong> debris from private property is generally ineligible however if debris on private<br />

business and residential property is so widespread that public health, safety, or the economic<br />

recovery <strong>of</strong> the community is threatened, the actual removal <strong>of</strong> debris from the private property<br />

may be eligible. FEMA must approve removal <strong>of</strong> debris from private property before the work<br />

begins for that work to be eligible.<br />

7


It should be noted that the <strong>City</strong> has a contract in place with a debris removal company (currently<br />

Crowder-Gulf). In the event <strong>of</strong> a major storm and at the discretion <strong>of</strong> the Mayor, it may be<br />

decided to utilize the contractor to remove most or all <strong>of</strong> the storm debris with <strong>City</strong> forces<br />

supplementing the effort. <strong>City</strong> forces will use this manual to document their debris removal<br />

activities. The contractor will produce FEMA acceptable documentation which will be reviewed<br />

by Audit Services prior to project formulation. The <strong>City</strong> may also utilize a monitoring firm to<br />

accumulate and collate documentation developed by the debris contractor.<br />

• Category B – Emergency Protective Measures - This category addresses the need to provide<br />

appropriate emergency measures designed to protect life, safety, property and health (i.e.<br />

barricades, sandbags, police, and fire personnel). It is important that Police and Fire Department<br />

Personnel specifically indicate on their timesheets the disaster activity they are engaged in and<br />

in the case <strong>of</strong> a police cruiser specify whether the activity is patrolling as compared to being<br />

stopped and posted at a barricade. FEMA requires that mileage be recorded to obtain protective<br />

measures reimbursement for patrolling whereas the hours are recorded for a police cruiser<br />

stopped with lights on.<br />

• Category C – Road System Repairs - This category addresses damage to non-federal roads,<br />

bridges, streets, culverts and traffic control devices.<br />

• Category D – Water Control Facilities - Eligible damages under this category include costs<br />

to repair irrigation systems, drainage channels, and pumping facilities. Repair <strong>of</strong> levees, dams,<br />

and flood control channels is restricted to debris removal, flood fighting, and emergency repairs,<br />

if constructed for the purpose <strong>of</strong> eliminating or reducing the threat <strong>of</strong> flooding.<br />

• Category E – Buildings and Equipment - Eligible damage under this category includes costs<br />

to repair public buildings and equipment, supplies/inventories that were damaged and<br />

transportation systems such as public transit systems. Vehicles are also included under this<br />

category.<br />

• Category F – Public Utility Systems - Under this category, assistance is available for<br />

damaged water systems, landfills, sanitary sewer systems, storm drainage systems and<br />

light/power facilities.<br />

• Category G – Other (Parks, Recreational Facilities, etc.) - The “Other” category includes<br />

park and recreational facilities, or other public facilities damages that do not reasonably fit in one<br />

<strong>of</strong> the other six categories.<br />

• For Categories A and B, only overtime wages, the related fringe benefits for permanent<br />

employees and all labor costs <strong>of</strong> extra hires are normally eligible. However, FEMA may<br />

elect to include regular time as an eligible cost. For this reason and that FEMA does reimburse<br />

the <strong>City</strong> for any equipment used during Category A and B activities, the department must keep<br />

track <strong>of</strong> both regular and overtime hours worked and reconcile the hours worked with the<br />

equipment reported on the FEMA Force Equipment Summary Sheet and the electronic Excel<br />

spreadsheet created by each department coordinator.<br />

• For Categories C through G, gross salaries or wages, which include regular, overtime<br />

and fringe benefits, are eligible for FEMA reimbursement. In order for the <strong>City</strong> to be<br />

reimbursed for wages, the department is required to keep track <strong>of</strong> all hours worked on disaster<br />

related activities and must reconcile the hours worked with the equipment used.<br />

8


C. <strong>Disaster</strong> Related Work Documentation<br />

It is critical to establish and maintain accurate records <strong>of</strong> events and expenditures related to disaster<br />

recovery work. The information required for documentation describes the “who, what, when, where,<br />

why, and how much,” for each item <strong>of</strong> disaster recovery work.<br />

This information should include estimated and actual costs; force account labor; force account<br />

equipment, materials, and purchases; photographs <strong>of</strong> damage, work underway, and work completed;<br />

insurance information; environmental and/or historic alternatives and hazard mitigation<br />

opportunities considered; environmental review documents; receipt and disbursement documents;<br />

and records <strong>of</strong> donated goods and services, if any.<br />

The importance <strong>of</strong> maintaining a complete and accurate set <strong>of</strong> records for each project cannot be<br />

over-emphasized. Good documentation facilitates the project formulation, validation, approval, and<br />

funding processes.<br />

All structure and facility damage has to be documented with numerous pictures, preferably in digital<br />

format such as JPEG. All digital pictures should be labeled to identify, at a minimum, the physical<br />

location (address and/or intersection cross streets), GPS Location (if available), date taken, building<br />

name (if applicable) and any other relative descriptive information. FEMA relies heavily on<br />

photographs as part <strong>of</strong> their project formulation. The damage must be described in terms <strong>of</strong> facility,<br />

features, or items requiring repair. These digital pictures should be sent to the ASD either via e-mail<br />

or inter<strong>of</strong>fice mail on a CD including all the information referenced above. Each department should<br />

also keep a copy on file for future reference.<br />

Each department is required to provide Audit Services with the following information in<br />

relation to ALL damages caused by a disaster:<br />

• Individual responsible for overseeing the repair and associated department.<br />

• Determination as to whether the damage will be repaired or not.<br />

• Authorizations to perform the work either by department head or Mayor.<br />

• A complete and detailed description <strong>of</strong> the damages and detailed scope <strong>of</strong> work needed to<br />

repair the damage.<br />

• Who will perform the repair (city forces or contractor)<br />

• If a contractor is performing the repair --a detailed <strong>of</strong>ficial cost estimate on their letterhead.<br />

• Explanation <strong>of</strong> how the contract was procured and what procurement method was used. If<br />

price was not competitively determined; explain why not.<br />

• Explanation <strong>of</strong> any change orders, how it relates to eligible scope <strong>of</strong> work and how the cost<br />

was determined.<br />

• If <strong>City</strong> forces are performing the repair—a work order with a detailed description <strong>of</strong> the<br />

repair including labor hours and materials. The FEMA timesheets and equipment forms will<br />

also have to be completed and signed.<br />

• If the repair has already been made--all documentation related to the cost <strong>of</strong> the repair.<br />

• Whether Insurance will cover some or all <strong>of</strong> the cost <strong>of</strong> the repair.<br />

• Physical address <strong>of</strong> the location <strong>of</strong> each repair.<br />

• Photographs <strong>of</strong> the site/equipment before work started, work underway, and work completed.<br />

(digital format is preferred)<br />

• Any other documentation available including but not limited to: purchase orders, invoices,<br />

maintenance logs, payments, site maps, sketches, calculations, measures, hazard mitigation<br />

proposals, and for large buildings/projects, a set <strong>of</strong> plans.<br />

9


In the description <strong>of</strong> damages, the description should include dimensions and quantities in<br />

order that proper estimates <strong>of</strong> material quantities and costs can be developed. Below are<br />

examples <strong>of</strong> incomplete and complete damage descriptions:<br />

o Example 1<br />

Incomplete: Municipal Marina <strong>of</strong>fice sustained water damage.<br />

Complete: Floodwater inundated Municipal Marina <strong>of</strong>fice to a depth <strong>of</strong> four feet, damaging<br />

drywall, carpeting and <strong>of</strong>fice equipment in 4 <strong>of</strong>fices and reception area.<br />

o Example 2<br />

Incomplete: Floodwater caused damage to the parking lot.<br />

Complete: Floodwater undermined the northwest corner <strong>of</strong> the parking lot. The parking lot<br />

has a total capacity <strong>of</strong> 100 vehicles. This caused the asphalt surface and gravel sub-base to<br />

settle over a 1,000 square foot area, affecting 15 parking spaces, resulting in broken asphalt<br />

and compromised sub-base requiring complete replacement.<br />

4. COST<br />

Audit Services will submit worksheets and documentation to FEMA on the <strong>City</strong>’s behalf. With the<br />

department providing this information, Audit Services will be able to maintain a complete and<br />

accurate set <strong>of</strong> records for each project. For multiple declared disasters, the cost for each disaster<br />

must be segregated and accounted for separately.<br />

Generally, costs that can be directly tied to the performance <strong>of</strong> eligible work are eligible. Such costs must<br />

be:<br />

• Reasonable and necessary to accomplish the work.<br />

• Compliant with Federal, <strong>St</strong>ate and local requirements for competitive procurement.<br />

• Reduced by all applicable credits, such as anticipated insurance proceeds and salvage values.<br />

A cost is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a<br />

prudent person under the circumstances prevailing at the time the decision was made to incur the cost.<br />

Reasonable costs can be established through:<br />

• The use <strong>of</strong> historical documentation for similar work<br />

• Average cost <strong>of</strong> similar work in the area<br />

• Published unit costs from national cost estimating databases<br />

• FEMA cost codes, equipment rates, and engineering and design services curves<br />

A. Force Account Labor<br />

Force account labor is a term used to indentify labor provided by the <strong>City</strong>’s employees, rather than<br />

by a contractor. Labor rates include actual wages plus fringe benefits paid or credited to personnel.<br />

The FEMA forms for force account labor (see FEMA-G-1 in this manual) must be completed and<br />

approved by a supervisor/manager. Be very specific in your description <strong>of</strong> the work performed on<br />

the FEMA – <strong>Disaster</strong> Related Work forms.<br />

Different eligibility criteria apply to labor rate for different types <strong>of</strong> employees and work as<br />

follows:<br />

10


• Permanent Employees- For debris removal and emergency protective measures (Category A &<br />

B), only overtime labor is eligible. For permanent work (Category C-G), both regular time and<br />

overtime are eligible. Overtime or Comp time for exempt employees is not eligible except where<br />

written policies allow for it, and cannot be contingent upon federal funding. The costs <strong>of</strong> salaries<br />

and benefits for employees sent home or told not to report due to emergency conditions are not<br />

eligible for reimbursement. Administrative Policy #080300 allows exempt employees to<br />

receive payment on an hour-for-hour basis for overtime worked during emergency<br />

conditions when authorized by an Executive Order by the Mayor. For this reason, all hours<br />

over 40 in the course <strong>of</strong> a week worked by exempt personnel during an emergency should<br />

be tracked.<br />

• Seasonal Employees - When covered under existing budgets and used for a disaster during the<br />

normal season <strong>of</strong> employment are considered permanent employees for the purpose <strong>of</strong> cost<br />

eligibility.<br />

• Backfill Employees - If the backfill employee is an extra hire, the cost <strong>of</strong> this person represents<br />

an extra cost to the <strong>City</strong> therefore straight time, overtime and benefits are eligible. If the backfill<br />

employee is a regular employee there is no extra cost therefore only the overtime cost is eligible.<br />

The key is if the backfill employee results in an extra cost to the <strong>City</strong>.<br />

• Temporary Employees - Are extra personnel hired as a direct result <strong>of</strong> the disaster. Regular<br />

and overtime costs are eligible for both emergency and permanent eligible work.<br />

• Foremen and Supervisors - Generally only the first line supervisors for permanent work are<br />

eligible. Labor costs <strong>of</strong> second level supervisors (and above) are ineligible unless the <strong>City</strong> can<br />

account for specific time spent on eligible permanent projects. Direct management costs <strong>of</strong><br />

eligible projects from the design phase to the completion <strong>of</strong> work are eligible. The salaries <strong>of</strong><br />

commissioners, mayors, department directors, police and fire chiefs, and other administrators are<br />

usually not eligible.<br />

• Regular Time and Overtime - For debris removal and emergency protective measures, only<br />

overtime labor is eligible for permanent employees. For permanent work, both regular time and<br />

overtime are eligible for all employees. All disaster related labor must be recorded in Kronos<br />

using the following coding: Kronos paycode 007-<strong>Disaster</strong> Regular Time or 111- <strong>Disaster</strong><br />

Overtime. Be sure that 40 regular time sweat hours have been worked before coding time to<br />

111 <strong>Disaster</strong> Overtime. There are also payroll codes for adjusting disaster regular time and<br />

overtime. Code 807 is used to adjust disaster regular time and code 811 is used to adjust the<br />

overtime.<br />

• Fringe Benefits - Fringe benefits actually paid or credited as part <strong>of</strong> an established policy are<br />

eligible. Audit Services will determine the fringe benefit rate for each department. In<br />

determining the fringe benefit rate for regular time; Audit Services will take into consideration<br />

the following: paid holidays, vacation, sick leave, administrative leave, retirement, health<br />

benefits, workers’ compensation, life insurance benefits, FICA and Medicare. As for overtime,<br />

Audit Services will only take into consideration FICA, Medicare, and Workers’ Compensation to<br />

determine the fringe benefit rate.<br />

B. Force Account Materials<br />

The cost <strong>of</strong> supplies that were purchased or taken from <strong>City</strong> stock and used during the performance<br />

<strong>of</strong> eligible work is eligible.<br />

11


C. Force Account Equipment<br />

Force account equipment is a term used to identify <strong>City</strong> owned equipment used to perform eligible<br />

work related to a disaster. Use <strong>of</strong> pick-up trucks and automobiles may be reimbursed on the basis <strong>of</strong><br />

mileage if less costly than hourly rates. For all other types <strong>of</strong> equipment, costs are reimbursed using<br />

the FEMA hourly rates included in this manual. The <strong>City</strong>’s equipment list is maintained, updated<br />

and matched up with the appropriate FEMA equipment code by the Fleet Management<br />

Department through the M5 system. Fleet will advise Budget <strong>of</strong> the appropriate FEMA code to be<br />

added to the equipment list in Oracle projects. This list is available on the intranet under <strong>Disaster</strong><br />

Information Pages/FEMA Assistance Recovery Forms & Information/FEMA <strong>Disaster</strong> Equipment<br />

Rates and should be used to identify equipment used for disaster related activities.<br />

If the <strong>City</strong> uses its own equipment, the following should be noted to ensure all required<br />

information is documented properly for reimbursement:<br />

• The Force Account Equipment Summary Record sheet included in this manual (FEMA-B-1)<br />

must be completed. Be very specific in your description <strong>of</strong> the work performed and document<br />

what was done, when and where. For the equipment used, include Make, Model, Year, Horse<br />

Power, Size and Capacity.<br />

• The equipment forms must be compiled into a spreadsheet (AUDIT SERVICES WILL<br />

PROVIDE A TEMPLATE SPREADSHEET) including the following fields:<br />

o Equipment Description including the Make, Model, Year, Horse Power, Size and Capacity<br />

o FEMA equipment code<br />

o Operator name and employee number<br />

o Date and number <strong>of</strong> hours equipment was used for disaster related activities<br />

o Equipment rate & total cost<br />

o Location/Site and description <strong>of</strong> work performed<br />

• Ensure the equipment usage can be reconciled to the timesheets for the individual assigned to the<br />

equipment (idle time is not allowable).<br />

• <strong>St</strong>andby time is generally unallowable.<br />

• Mobilization and demobilization cost should be considered.<br />

• Throughout the year, departments should advise the Budget Department <strong>of</strong> newly acquired or<br />

disposed equipment. The Budget Department is responsible for maintaining a current list <strong>of</strong> all<br />

relevant <strong>City</strong> equipment in Oracle. (This listing is to be used to complete the Force Account<br />

Equipment Summary Record and to populate the Excel spreadsheet referenced above).<br />

Fleet Management and Budget will work together to maintain a current and accurate listing <strong>of</strong><br />

equipment with proper FEMA codes for reimbursement purposes in both the M5 and Oracle<br />

systems.<br />

D. Equipment and Supplies Purchased for <strong>Disaster</strong> Use<br />

In the event the <strong>City</strong> does not have sufficient equipment and supplies to respond to a disaster, FEMA<br />

may assist the <strong>City</strong> in purchasing the needed equipment and supplies. If the individual items <strong>of</strong><br />

equipment and/or the aggregate total <strong>of</strong> supplies have a fair market value greater than $5,000 when they<br />

are no longer needed for the PA program the <strong>City</strong> will be required to compensate FEMA for its share <strong>of</strong><br />

the current market value. Equipment with a per unit value less than $5,000 may be retained or sold by<br />

the <strong>City</strong> with no further obligation to FEMA.<br />

12


E. Contracts<br />

Contracts must be <strong>of</strong> reasonable cost, generally must be competitively bid, and must comply with<br />

Federal, <strong>St</strong>ate, and local procurement standards. FEMA regulations at 44 CFR Part 13 – Uniform<br />

Administrative Requirements For Grants And Cooperative Agreements To <strong>St</strong>ate And Local Governments<br />

provide specific guidance on contracts. FEMA finds four methods <strong>of</strong> procurement acceptable. Each is<br />

described below in general terms.<br />

• Small Purchase Procedures - Small purchase procurement is an informal method for securing<br />

services or supplies that do not cost more than $100,000 by obtaining several price quotes from<br />

different sources.<br />

• Sealed Bids - Sealed bid procurement is a formal method where bids are publicly advertised and<br />

solicited, and the contract is awarded to the bidder whose proposal is the lowest in price (this method<br />

is the preferred method for procuring construction contracts).<br />

• Competitive Proposals - Competitive procurement is a method similar to sealed bid procurement in<br />

which contracts are awarded on the basis <strong>of</strong> contractor qualifications instead <strong>of</strong> solely on price (this<br />

method is <strong>of</strong>ten used for procuring architectural or engineering pr<strong>of</strong>essional services).<br />

• Noncompetitive Proposals - Noncompetitive procurement is a method whereby a proposal is<br />

received from only one source. Noncompetitive proposals should be used only when the award <strong>of</strong> a<br />

contract is not feasible under small purchase procedures, sealed bids, or competitive proposals, and<br />

one <strong>of</strong> the following circumstances applies:<br />

o the item is available only from a single source;<br />

o there is an emergency requirement that will not permit a delay for<br />

o competition;<br />

o FEMA authorizes a noncompetitive proposal; or<br />

o solicitation from a number <strong>of</strong> sources has been attempted, and<br />

o Competition is determined to be inadequate.<br />

FEMA provides reimbursement for three types <strong>of</strong> contracts. They are:<br />

o Lump sum contracts for work within a prescribed boundary with a clearly defined scope and a<br />

total price;<br />

o Unit price contracts for work done on an item-by-item basis with cost determined per unit; and<br />

o <strong>Cost</strong> plus fixed fee contracts, which are either lump sum or unit price contracts with a fixed<br />

contractor fee added into the price.<br />

o Time and materials contracts should be avoided. FEMA may provide assistance for work<br />

completed for a limited period (generally not more than 70 hours) for work that is necessary<br />

immediately after the disaster has occurred when a clear scope <strong>of</strong> work cannot be developed.<br />

Monitoring is critical and a competitive process still should be used to include labor and<br />

equipment rates.<br />

13


• Pre-disaster Planning for Contract Services - Consider the following for incorporation into<br />

emergency procurement procedures:<br />

o What kinds <strong>of</strong> work will need immediate contract services?<br />

Examples:<br />

‣ Debris clearance<br />

‣ Repair <strong>of</strong> utilities<br />

‣ Shoring and bracing <strong>of</strong> damaged structures<br />

‣ Repairs to doors, windows, interior areas<br />

‣ Pumping <strong>of</strong> flooded structures<br />

o Which contractors in the area have the abilities and equipment to perform the work? This could<br />

come from a pre-qualified list <strong>of</strong> contractors who can perform various tasks effectively and<br />

efficiently.<br />

o Which contractors are willing to respond in an emergency? Determine which contractor can<br />

respond to immediate needs.<br />

o In the event <strong>of</strong> a widespread disaster, there will be competition between various local<br />

governments and citizens for services.<br />

o A “Hold Harmless” statement is required by FEMA and should be obtained from all landowners<br />

where storm debris and mulch are deposited. Environmental permits are also required for all<br />

sites where debris is staged and/or processed. Soil and composition samples should also be<br />

obtained from all debris processing sites. A copy <strong>of</strong> this documentation should be sent to the<br />

ASD. Each respective department should also maintain this information for future reference.<br />

F. Donated Resources<br />

Third party donated resources (volunteer labor, donated equipment, and donated materials) are eligible to<br />

<strong>of</strong>fset the non-Federal portion <strong>of</strong> the cost for emergency work (category A & B). The amount <strong>of</strong> credit<br />

that can be applied to a project is capped at the non-Federal share or 12.5%. Any excess credit can be<br />

applied to other emergency work projects <strong>of</strong> the same applicant. Donated resources must apply to actual<br />

eligible emergency work, such as debris removal or the filling and placing <strong>of</strong> sandbags. An example <strong>of</strong><br />

ineligible donated resources is volunteers helping individuals applying for assistance. The donated<br />

services must be documented and must include a record <strong>of</strong> hours worked, number <strong>of</strong> workers at the work<br />

site, and a description <strong>of</strong> work.<br />

In order to qualify, donated services must be documented in the same manner as force account labor. As<br />

part <strong>of</strong> the support documentation, the department should include, if possible, the social security number<br />

<strong>of</strong> the person donating their services.<br />

Donated services will be valued at rates consistent with those ordinarily paid for similar work in the<br />

<strong>City</strong>’s organization. If the <strong>City</strong> does not have employees performing similar work, the rates will be<br />

consistent with those ordinarily paid by other employers for similar work in the same labor market.<br />

Examples include but are not limited to:<br />

• Removing eligible debris<br />

• Filling and placing sandbags<br />

• Donating equipment to raise or reinforce a levee<br />

• Donating materials, such as rocks or sand<br />

• Search and rescue when part <strong>of</strong> an organized search and rescue operation<br />

• Pr<strong>of</strong>essional safety inspections<br />

• Mass food and shelter for victims, when not the mission <strong>of</strong> the organization<br />

14


G. Project Supervision and Grant Management <strong>Cost</strong>s<br />

The <strong>City</strong> has several types <strong>of</strong> eligible supervisory and management costs available that serve different<br />

purposes and need to be identified and claimed separately.<br />

The following items may be eligible project supervision and management costs:<br />

• Supervision and Management by Force Account - Only the overtime costs for permanent<br />

employees who supervise or manage emergency work (category A & B) are eligible. Labor costs <strong>of</strong><br />

second level supervisors (and above) are ineligible unless the <strong>City</strong> can account for specific time spent<br />

on eligible permanent projects. Generally, the labor costs <strong>of</strong> only first line supervisors <strong>of</strong> permanent<br />

work are eligible.<br />

• Project Management Activities - Eligible project management activities are those activities that<br />

the <strong>City</strong> would have performed in the absence <strong>of</strong> Federal funding, such as: direct management <strong>of</strong><br />

projects in the concept and design stages that are being designed by the <strong>City</strong>’s in-house staff, or by an<br />

architectural/engineering firm retained to analyze and design the repair or replacement <strong>of</strong> damaged<br />

facilities; procurement activities for architectural/engineering services and performance <strong>of</strong> work;<br />

review and approval <strong>of</strong> the project design regardless <strong>of</strong> who performs the design work; and<br />

management <strong>of</strong> construction work by contractors.<br />

• Master Service Agreement - A MSA includes various tasking for architectural/engineering<br />

services, construction and construction management services, procurement assistance (bid document<br />

preparation, bid analysis and review, etc.), and other technical services (environmental and historic<br />

consulting etc.). The eligibility <strong>of</strong> specific costs payable under an MSA depends upon the nature <strong>of</strong><br />

the work. If a task under the MSA meets FEMA eligibility criteria, complies with 44 CFR Part 13,<br />

does not duplicate other work funded by FEMA, and is directly related to a specific, FEMA approved<br />

project, the cost may be incorporated into the PW for the project it is supporting. Any general MSA<br />

costs not directly related to the performance <strong>of</strong> a specific eligible project are not eligible for<br />

reimbursement. Some <strong>of</strong> these costs may be covered by the Administrative Allowance (e.g.,<br />

preparing the grant application). A separate PW just for MSA activities may not be prepared.<br />

Grantees employing similar services may request coverage <strong>of</strong> these expenses on a <strong>St</strong>ate Management<br />

PW.<br />

• Administrative Allowance - For the PA Program, the <strong>St</strong>afford Act stipulates that each grant<br />

recipient be provided an allowance to meet the cost <strong>of</strong> administering the grant. The Administrative<br />

Allowance for the <strong>City</strong> covers direct and indirect costs incurred in requesting, obtaining, and<br />

administering Public Assistance, i.e., grant management. No other administrative or indirect costs<br />

incurred by the <strong>City</strong> are eligible. Examples <strong>of</strong> the activities that this allowance is intended to cover<br />

include: identifying damage (to include photographs and flyovers <strong>of</strong> damaged areas); attending the<br />

Applicants’ Briefing; completing forms necessary to request assistance; preparing PWs for small<br />

projects or assisting the Project Specialist (Project Officer) in completing PWs for large projects;<br />

establishing files, and providing copies and documentation; assessing damage, collecting cost data,<br />

and developing cost estimates; working with the <strong>St</strong>ate during project monitoring, final inspection,<br />

and audits; and preparing for audits.<br />

15


Section I.B – FEMA: Project Formulation<br />

Project formulation is the process <strong>of</strong> identifying the eligible scope <strong>of</strong> work and estimating the costs <strong>of</strong> each<br />

project.<br />

A. Types <strong>of</strong> projects - Formulated projects will result in one <strong>of</strong> four types <strong>of</strong> projects with different<br />

funding restrictions. The four types <strong>of</strong> projects are:<br />

• Small Project – A small project is any project which has a cost estimate less than the current<br />

threshold for large/small projects. This threshold changes every October 1 st based on the consumer<br />

price index. For federal fiscal year 2012, the threshold is $66,400. Funding for small projects is based<br />

on the approved estimate to complete the scope <strong>of</strong> work. If the applicant discovers a significant cost<br />

overrun related to actual cost to complete all estimated small projects, then an appeal may be<br />

submitted for the additional funds within 60 days <strong>of</strong> completing the last small project.<br />

• Large Project – A large project is any project which has a cost estimate greater than the threshold<br />

for large/small projects. As mentioned above, for federal fiscal year 2012, the threshold is $66,400.<br />

All large projects are funded based on actual cost to complete the eligible scope <strong>of</strong> work. The<br />

funding for each large project will be adjusted after all work is complete.<br />

• Improved Project – An improved project is any project (large or small) where the applicant<br />

chooses to make improvements (not required by any applicable code, standard, or hazard mitigation<br />

measure) to the facility while making disaster repairs. Funding for improved projects is limited to the<br />

approved federal estimate to complete the eligible scope <strong>of</strong> work. The <strong>St</strong>ate may approve an<br />

improved project. However, FEMA must review the project for compliance with environmental and<br />

historic statutes and other special considerations that apply. If improvements are required (e.g., ADA<br />

ramp) the project is not considered an improved project, but an environmental review may still be<br />

required.<br />

An example <strong>of</strong> an improved project would be if a two-lane bridge was destroyed by a flood and the<br />

<strong>City</strong> decided to build a four-lane bridge in its place. In this example, FEMA funding would be<br />

limited to costs associated with building a two-lane bridge.<br />

• Alternate Project – An alternate project is any permanent restoration project (large or small) where<br />

the applicant chooses to abandon the facility rather than make disaster repairs. The applicant may use<br />

any federal share funds, limited to the approved federal estimate to complete the eligible scope <strong>of</strong><br />

work, at another facility. There is a 10% reduction in the FEMA funds for all alternate projects.<br />

FEMA must perform an environmental review and approve all alternate projects.<br />

An example <strong>of</strong> an alternate project would be if the <strong>City</strong> decides not to rebuild a destroyed recreation<br />

center and builds a new library instead.<br />

B. The Project Worksheet<br />

The <strong>City</strong> has 60 days following the Kick<strong>of</strong>f Meeting to identify and report damaged facilities to FEMA.<br />

The project worksheet is the primary form used to document the location, damage description and<br />

dimensions, scope <strong>of</strong> work, and cost estimate for each project.<br />

If the <strong>City</strong> chooses to prepare PWs for small projects they must be submitted to the FEMA PAC Crew<br />

Leader within 60 days <strong>of</strong> the Kick<strong>of</strong>f Meeting to go through the validation process, although FEMA or<br />

the <strong>St</strong>ate may set an earlier deadline.<br />

16


For large projects, a Project Specialist will be assigned and is responsible for working with the <strong>City</strong> to<br />

prepare the PW’s. The Project Specialist may lead a team that includes a representative <strong>of</strong> the <strong>St</strong>ate and<br />

one or more Technical Specialists, depending on the type and complexity <strong>of</strong> the project. The <strong>City</strong> is<br />

responsible for requesting inspections and changes in PWs at any point in the grant process when<br />

changes in the project or its costs are identified. The <strong>St</strong>ate and FEMA will evaluate the information and,<br />

if significant, take appropriate action.<br />

C. Combining Work and Creating Projects<br />

The <strong>City</strong>, in coordination with the FEMA PAC Crew Leader, may combine work items into projects. In<br />

this manner, the projects may be organized around the <strong>City</strong>’s needs. A project may consist <strong>of</strong> one item <strong>of</strong><br />

work, such as repairs to a single structure, or work that occurs at multiple sites, such as repairs to several<br />

washouts along a road. The table below describes generally accepted methods <strong>of</strong> combining projects. It is<br />

the responsibility <strong>of</strong> the FEMA PAC Crew Leader to ensure that the resulting project is logical and<br />

consistent with other criteria described below.<br />

Method<br />

Type <strong>of</strong> Facility<br />

System<br />

Boundaries<br />

Method <strong>of</strong> Work<br />

Explanation<br />

The <strong>City</strong> could combine all sewer pump stations or gravel roads together.<br />

The <strong>City</strong> could combine repair <strong>of</strong> several breaks in a water distribution system<br />

together.<br />

The <strong>City</strong> may have divided power lines into sectors or a road department into<br />

divisions for ease <strong>of</strong> operations.<br />

One contract could be a project or a group <strong>of</strong> contracts let to one contractor<br />

could be a project.<br />

Emergency and permanent work may be combined into one project only when the emergency work is<br />

incidental to the permanent work. For example, if storm-generated debris must be removed from a<br />

building before the building can be repaired, the project could include both the debris removal and the<br />

repair work. If multiple sites are combined into one project with a total estimated cost above the large<br />

project threshold, that project will be considered a large project. Categories <strong>of</strong> permanent work may not<br />

be combined.<br />

FEMA regulations state that individual projects <strong>of</strong> less than $1,000 in estimated costs are not eligible.<br />

However, it is acceptable to combine sites less than $1,000 in estimated costs into one PW when the<br />

work meets the conditions shown above for combining sites. Separate less than $1,000 in estimated costs<br />

without a reasonable relationship to other sites may not be combined; they are ineligible.<br />

D. Identifying the Damaged Facility<br />

If a project is a single site, record the name <strong>of</strong> the facility and its basic function (if necessary), e.g., <strong>City</strong><br />

Library or Friendship Park. If the project is comprised <strong>of</strong> multiple sites, and possibly a combination <strong>of</strong><br />

emergency work and a category <strong>of</strong> permanent work, the damaged facility title may be more general. For<br />

instance: Hill’s County Sector A Debris Removal or Chester Elementary School Campus. For these<br />

cases, more specific names and location information should be provided for each site within the<br />

Damaged Description and Dimensions area <strong>of</strong> the PW. Detailed maps and sketches may be necessary to<br />

identify each location.<br />

17


E. Project Location<br />

The exact location <strong>of</strong> the damaged facility or area where the disaster costs covered by the project were or<br />

will be incurred must be identified. This information should be specific enough to enable other field<br />

personnel to locate the facility easily if a site visit is necessary. If possible, the precise latitude and<br />

longitude <strong>of</strong> the damaged site should be included.<br />

Location examples are:<br />

o Latitude: 25.69387 / Longitude: -80.16359<br />

o 5520 Harrison Ave N.W., Springdale, Minnesota 55309<br />

o 0.20 mile west <strong>of</strong> intersection <strong>of</strong> County Rd. 22 and County Rd. L<br />

o Northwest sector bound by King <strong>St</strong>reet, Main <strong>St</strong>reet, and Shady Canal<br />

F. Damage Description and Dimensions<br />

All damage must be documented. Damage sustained as a direct result <strong>of</strong> the disaster event should be<br />

differentiated from pre-existing or non-disaster related damage. The specific cause <strong>of</strong> damage must relate<br />

to the incident for which the disaster was declared. It is important to completely describe the cause <strong>of</strong><br />

damage because it can affect eligibility determinations.<br />

The damage must be described in terms <strong>of</strong> the facility, features, or items requiring repair. All damaged<br />

elements must be clearly defined in quantitative terms with physical dimensions (such as length, width,<br />

depth, and capacity). Without appropriate dimensions <strong>of</strong> the damaged elements, proper estimates <strong>of</strong><br />

material quantities cannot be developed.<br />

G. Scope <strong>of</strong> Work<br />

The scope <strong>of</strong> eligible work necessary to repair the damage must be completely described and correspond<br />

directly to the cause <strong>of</strong> damage. The work should be specified as an action with quantifiable (length,<br />

width, depth, capacity) and descriptive (brick, wood, asphalt, timber deck bridge) terms. The scope <strong>of</strong><br />

work should not be described only as “restore to pre-disaster design” If part <strong>of</strong> the work is completed<br />

prior to project approval, the work that has been completed should be distinguished from the work<br />

remaining.<br />

Example:<br />

o Damage Description and Dimensions:<br />

Floodwaters and debris damaged several facilities within Riverside Park in the Town <strong>of</strong><br />

Springville. Six toilets and four sinks in the public restroom became clogged and rendered<br />

unusable. Nine 4x8-foot, redwood picnic tables and four heavy metal barbecue grills with 1x2-<br />

foot cooking surfaces were washed away. Floodwaters and floating debris demolished 300 LF <strong>of</strong><br />

8-ft high chain link fence. 100 CY <strong>of</strong> sediment and other debris were scattered over the 125,000<br />

SF area <strong>of</strong> the park.<br />

o Scope <strong>of</strong> Work:<br />

Repair (unclog and clean) six public restroom toilets and four sinks using 40 hours <strong>of</strong> force<br />

account labor. Replace nine redwood picnic tables and four barbecue grills. Repair and reinstall<br />

300 LF <strong>of</strong> existing chain link fence. Remove and dispose <strong>of</strong> 100 CY <strong>of</strong> debris.<br />

18


H. <strong>Cost</strong> Estimate<br />

FEMA may grant funds on the basis <strong>of</strong> actual costs or on estimates <strong>of</strong> work to be completed. The three<br />

primary methods for determining costs are time and materials, unit cost, and contracts. If work is<br />

completed at the time <strong>of</strong> the site visit, actual costs should be used.<br />

Work to be completed: If the work has not been initiated, the unit cost method should be used whenever<br />

possible.<br />

Work complete: If the work was completed by force account labor, actual personnel, materials, and<br />

equipment costs are used (time and materials method.) If a contractor performed the work, reasonable<br />

actual contract costs are used.<br />

• Time and Materials - The time and materials method is used to summarize actual costs <strong>of</strong> force<br />

account labor, equipment, and materials. <strong>Cost</strong>s must be documented by payroll information,<br />

equipment logs or usage records, and other records, such as invoices, receipts, or work orders<br />

prepared by the applicant. This method also may be used for work to be completed, if appropriate.<br />

• Unit <strong>Cost</strong> - The unit cost method is usually used to develop PWs for work to be completed. Under<br />

this method, unit costs are applied to specific elements <strong>of</strong> the scope <strong>of</strong> work. Typically unit prices are<br />

based on in-place costs, incorporating site preparation, materials, labor, equipment, insurance,<br />

overhead, and pr<strong>of</strong>it (if by contract) for all activities needed to complete that item <strong>of</strong> work.<br />

For example:<br />

The $14 per linear foot unit cost to replace concrete curb and gutter includes all costs for setting up<br />

and breaking down the forms and buying, pouring, and finishing the concrete. In other words, the<br />

$14 includes the cost <strong>of</strong> labor, equipment, and materials. Removal <strong>of</strong> the damaged old material may<br />

be included as a separate work item with its own unit price.<br />

• Contracts - Contract pricing is used to determine the cost <strong>of</strong> work for which the applicant has used<br />

labor, equipment, and material from an outside source. In general, and assuming that the contract was<br />

awarded following Federal procurement guidelines, contract costs are used for work already<br />

complete. In some cases, contract information may be used to estimate costs for work that is just<br />

beginning or still underway. If work has not yet begun on a project, but a contract has been bid or let,<br />

the contract price can be used.<br />

19


Section II – FHWA: FEDERAL HIGHWAY ADMINISTRATION ER PROGRAM<br />

The Emergency Relief (ER) Program is administered by the Federal Highway Administration (FHWA).<br />

Under a Federally declared disaster the Florida Department <strong>of</strong> Transportation becomes the grantee and the<br />

<strong>City</strong> becomes the sub grantee. ER was authorized by Congress in Title 23, United <strong>St</strong>ates Code, Section 125<br />

as a special program under the Highway Trust Fund.<br />

The ER Program provides funds for:<br />

• <strong>Disaster</strong> related repair or reconstruction <strong>of</strong> Federal-aid highways and roads within the <strong>City</strong>.<br />

Approximately 16% <strong>of</strong> the <strong>City</strong>’s roads are Federal-aid roads.<br />

• Debris removal for the first push and pass (Within a reasonable time after the disaster), only in an<br />

event not declared a major disaster or emergency by the President or an event declared a<br />

major disaster by the President where debris removal is not eligible under the declaration. For<br />

all disasters declared by the President where debris removal is eligible, The FEMA PA funding<br />

program will cover eligible debris removal costs on federally funded roads.<br />

Departments involved in eligible ER debris removal (see above) and/or road repair work on federal-aid roads<br />

must use the FHWA log (FHWA-D-1-Appendix) to document the date, employee, equipment, hours and<br />

specific Federal-aid road location All other FEMA forms (materials, rented equipment, contracts, etc.) can be<br />

used to document FHWA work.<br />

In order to receive reimbursement, FHWA requires that we complete a Detailed Damage Inspection Report<br />

(DDIR, Form FHWA-1547). This form (Appendix FHWA-C-1) summarizes equipment, labor and material<br />

for emergency repair and permanent restoration on Federal-aid roads. FEMA equipment, labor and materials<br />

forms and FEMA equipment rates can be used to document activities that are summarized on the DDIR;<br />

however, a detailed log must be maintained documenting emergency and repair activities on Federal-aid<br />

roads. Also included is a list <strong>of</strong> Federal-aid roads (Appendix FHWA-A-1) and a map <strong>of</strong> these roads<br />

(Appendix FHWA-B-1). This data will be used by Audit Services to prepare the DDIR.<br />

20


Section III – STATEWIDE MUTUAL AID AGREEMENT<br />

Annex “S” <strong>of</strong> the <strong>City</strong>’s <strong>Disaster</strong> Operations Plan (DOP) explains in more detail the <strong>City</strong>’s involvement and<br />

obligations under the <strong>St</strong>atewide Mutual Aid Agreement.<br />

The <strong>City</strong> <strong>of</strong> <strong>St</strong>. <strong>Petersburg</strong> is a signatory to the <strong>St</strong>ate <strong>of</strong> Florida <strong>St</strong>atewide Mutual Aid Agreement. In the<br />

event <strong>of</strong> a disaster within the state, the <strong>City</strong> <strong>of</strong> <strong>St</strong>. <strong>Petersburg</strong> may be requested to provide mutual aid to the<br />

affected jurisdiction(s). <strong>St</strong>atewide mutual aid typically consists <strong>of</strong> law enforcement, fire, emergency medical<br />

services, public works and building inspection personnel and equipment. Individual specialty and technically<br />

skilled personnel may also be requested.<br />

Mutual Aid Agreement (SMAA), requests for assistance should be through the <strong>St</strong>ate Emergency Operations<br />

Center (SEOC) by mission assignment (i.e. SEOC Mission Number/Task Number). Requests from the <strong>St</strong>ate<br />

should be through channels to the Pinellas County Emergency Management Office (Pinellas County EOC, if<br />

activated) then to the <strong>City</strong> Emergency Management Office. The <strong>City</strong> Emergency Management Office has<br />

been identified by the <strong>St</strong>ate and the County as the SMAA Authorized Representative for mutual aid<br />

assistance to be provided by the <strong>City</strong>. <strong>City</strong> departments or agencies which receive requests to provide mutual<br />

aid must notify the <strong>City</strong> Emergency Management Office, Fire Administration and Audit Services (for<br />

tracking purposes) <strong>of</strong> the request.<br />

Commitment <strong>of</strong> mutual aid resources will typically be for seven (7) day increments for each deployed<br />

element and subject to 24-hour per day operational schedules. Deployed personnel must be prepared to be<br />

self-sufficient for seven (7) days.<br />

Attachment 1 to Annex “S” provides a mutual aid pre-deployment checklist <strong>of</strong> essential elements <strong>of</strong><br />

information that should be obtained prior to deployment to the impact area. Pay particular attention to the<br />

“<strong>St</strong>ate Mission #.” Any deployment <strong>of</strong> mutual aid assets without having first obtained the “<strong>St</strong>ate Mission #”<br />

will jeopardize cost reimbursement for assistance rendered to the requesting jurisdiction(s).<br />

For all <strong>City</strong> departments, staff agencies and <strong>of</strong>fices that provide mutual aid assistance, the <strong>City</strong> is eligible for<br />

financial reimbursement from the requesting jurisdiction(s) to which mutual aid was provided. The Fire<br />

Department and the Police Department are the responsible agents to file all claims for reimbursement<br />

from the requesting jurisdiction(s) for Fire, EMS and Police mutual aide respectively. All other<br />

departments are responsible to file all claims for reimbursement for their respective departments.<br />

(The Audit Services Department will be responsible for providing employee fringe benefit rate<br />

calculations, which will be included in claims for reimbursement. Audit Services will also perform a<br />

review <strong>of</strong> each reimbursement claim package prior to submittal by the departments and provide<br />

appropriate feedback to the submitting departments). It is incumbent upon departments, staff agencies,<br />

and <strong>of</strong>fices to produce complete and accurate documentation for all costs and expenses incurred to provide<br />

the requested mutual aid. As a mutual aid provider, regular and overtime hours are eligible for<br />

reimbursement. Employee’s fringe benefits are also eligible; i.e. FICA, Medicare, retirement contributions,<br />

workers’ compensations, insurance cost, etc. Receipts for reimbursable out-<strong>of</strong>-pocket expenses are required<br />

to substantiate claims.<br />

Questions concerning the financial reimbursement process and documentation requirements should be<br />

referred to the Audit Services Department.<br />

A separate SMAA timesheet (page SMAA-A-1) is to be used for mutual aid deployments. Completed<br />

and signed timesheets are to be submitted to Audit Services. The timesheet is to be signed by the<br />

employee and supervisor.<br />

The timesheet documents the daily activities by hours and pay codes for deployed personnel. Emergency in-<br />

<strong>St</strong>ate pay codes are to be utilized.<br />

21


Hours should be entered into KRONOS on a daily basis rather than making a cumulative entry on one day.<br />

Personnel on 24 hour shifts should enter time into KRONOS on the actual day that was worked. Individual<br />

timesheets should also be used for backfill personnel since we are also reimbursed for this under the mutual<br />

aid agreement.<br />

All travel, meals, lodging and materials expenses should be documented on FEMA forms. Equipment (i.e.<br />

police cars, fire & emergency vehicles, etc.) used should be recorded on the FEMA Force Equipment<br />

Summary and be submitted to Audit Services.<br />

22


DEPARTMENT OF HOMELAND SECURITY<br />

FEDERAL EMERGENCY MANAGEMENT AGENCY<br />

DISASTER ASSISTANCE DIRECTORATE<br />

PUBLIC ASSISTANCE DIVISION<br />

WASHINGTON, D.C. 20472<br />

The rates on this Schedule <strong>of</strong> Equipment Rates are for applicant-owned equipment in good mechanical condition, complete with all required<br />

attachments. Each rate covers all costs eligible under the Robert T. <strong>St</strong>afford <strong>Disaster</strong> Relief and Emergency Assistance Act, 42 U.S.C. § 5121, et seq.,<br />

for ownership and operation <strong>of</strong> equipment, including depreciation, overhead, all maintenance, field repairs, fuel, lubricants, tires, OSHA equipment<br />

and other costs incidental to operation. <strong>St</strong>andby equipment costs are not eligible.<br />

Equipment must be in actual operation performing eligible work in order for reimbursement to be eligible. LABOR COSTS OF OPERATOR ARE<br />

NOT INCLUDED in the rates and should be approved separately from equipment costs.<br />

Information regarding the use <strong>of</strong> the Schedule is contained in 44 CFR § 206.228 Allowable <strong>Cost</strong>s. Rates for equipment not listed will be furnished by<br />

FEMA upon request. Any appeals shall be in accordance with 44 CFR § 206.206 Appeals.<br />

THESE RATES ARE APPLICABLE TO MAJOR DISASTERS AND EMERGENCIES DECLARED BY THE PRESIDENT ON OR AFTER<br />

SEPTEMBER 15, 2010.<br />

<strong>Cost</strong><br />

Code<br />

Equipment Specs Size HP Notes Unit Rate<br />

8490 Aerial Lift, Self-Propelled<br />

8491 Aerial Lift, Self-Propelled<br />

8492 Aerial Lift, Self-Propelled<br />

8493 Aerial Lift, Self-Propelled<br />

8494 Aerial Lift, Self-Propelled<br />

8486 Aerial Lift, Truck Mntd<br />

Max. Platform<br />

Height<br />

Max. Platform<br />

Height<br />

Max. Platform<br />

Height<br />

Max. Platform<br />

Height<br />

Max. Platform<br />

Height<br />

Max. Platform<br />

Height<br />

37 ft to 15 Articulated, Telescoping, Scissor. hour $8.25<br />

60 ft to 30 Articulated, Telescoping, Scissor. hour $12.25<br />

70 ft to 50 Articulated, Telescoping, Scissor. hour $21.00<br />

125 ft to 85 Articulated and Telescoping. hour $55.00<br />

150 ft to 130 Articulated and Telescoping. hour $67.00<br />

40 ft<br />

FEMA – A - 1<br />

Articulated and Telescoping. Add to Truck rate for total<br />

rate.<br />

hour $6.75<br />

8487 Aerial Lift, Truck Mntd Max. Platform 61 ft Articulated and Telescoping. Add to Truck rate for total hour $12.25


8488 Aerial Lift, Truck Mntd<br />

8489 Aerial Lift, Truck Mntd<br />

Height<br />

Max. Platform<br />

Height<br />

Max. Platform<br />

Height<br />

80 ft<br />

100 ft<br />

rate.<br />

FEMA – A - 2<br />

Articulated and Telescoping. Add to Truck rate for total<br />

rate.<br />

Articulated and Telescoping. Add to Truck rate for total<br />

rate.<br />

hour $23.50<br />

hour $34.00<br />

8010 Air Compressor Air Delivery 41 cfm to 10 Hoses included. hour $1.50<br />

8011 Air Compressor Air Delivery 103 cfm to 30 Hoses included. hour $7.00<br />

8012 Air Compressor Air Delivery 130 cfm to 50 Hoses included. hour $9.25<br />

8013 Air Compressor Air Delivery 175 cfm to 90 Hoses included. hour $20.00<br />

8014 Air Compressor Air Delivery 400 cfm to 145 Hoses included. hour $27.50<br />

8015 Air Compressor Air Delivery 575 cfm to 230 Hoses included. hour $45.50<br />

8016 Air Compressor Air Delivery 1100 cfm to 355 Hoses included. hour $51.00<br />

8017 Air Compressor Air Delivery 1600 cfm to 500 Hoses included. hour $80.00<br />

8040 Ambulance to 150 hour $25.50<br />

8041 Ambulance to 210 hour $32.50<br />

8060 Auger, Portable Hole Diameter 16 in to 6 hour $1.30<br />

8061 Auger, Portable Hole Diameter 18 in to 13 hour $3.50<br />

8062 Auger, Tractor Mntd<br />

Max. Auger<br />

Diameter<br />

36 in to 13<br />

8063 Auger, Truck Mntd Max. Auger Size 24 in to 100<br />

Includes digger, boom and mounting hardware. Add to<br />

Tractor rate for total rate.<br />

Includes digger, boom and mounting hardware. Add to<br />

Truck rate for total rate.<br />

hour $1.30<br />

hour $29.00<br />

8070 Automobile to 130 Transporting people. mile $0.50<br />

8071 Automobile to 130 Transporting cargo. hour $13.00<br />

8072 Automobile, Police to 250 Patrolling. mile $0.60<br />

8073 Automobile, Police to 250 <strong>St</strong>ationary with engine running. hour $16.25<br />

8110 Barge, Deck Size 50'x35'x7.25' hour $34.00<br />

8111 Barge, Deck Size 50'x35'x9' hour $49.00<br />

8112 Barge, Deck Size 120'x45'x10' hour $60.00<br />

8113 Barge, Deck Size 160'x45'x11' hour $75.00<br />

8050 Board, Arrow to 8 Trailer Mounted. hour $3.15


8051 Board, Message to 5 Trailer Mounted. hour $8.50<br />

8133 Boat, Push Size 45'x21'x6' to 435 Flat hull. hour $150.00<br />

8134 Boat, Push Size 54'x21'x6' to 525 Flat hull. hour $200.00<br />

8135 Boat, Push Size 58'x24'x7.5' to 705 Flat hull. hour $250.00<br />

8136 Boat, Push Size 64'x25'x8' to 870 Flat hull. hour $300.00<br />

8130 Boat, Row Heavy duty. hour $0.85<br />

8131 Boat, Runabout Size 13'x5' to 50 Outboard. hour $14.00<br />

8132 Boat, Tender Size 14'x7' to 100 Inboard with 360 degree drive. hour $26.00<br />

8120 Boat, Tow Size 55'x20'x5' to 870 <strong>St</strong>eel. hour $250.00<br />

8121 Boat, Tow Size 60'x21'x5'<br />

8122 Boat, Tow Size 70'x30'x7.5'<br />

8123 Boat, Tow Size 120'x34'x8'<br />

to<br />

1050<br />

to<br />

1350<br />

to<br />

2000<br />

FEMA – A - 3<br />

<strong>St</strong>eel. hour $300.00<br />

<strong>St</strong>eel. hour $450.00<br />

<strong>St</strong>eel. hour $830.00<br />

8140 Boat, Tug Length 16 ft to 100 hour $33.50<br />

8141 Boat, Tug Length 18 ft to 175 hour $53.00<br />

8142 Boat, Tug Length 26 ft to 250 hour $65.00<br />

8143 Boat, Tug Length 40 ft to 380 hour $150.00<br />

8144 Boat, Tug Length 51 ft to 700 hour $225.00<br />

8419<br />

Breaker, Pavement, Hand-<br />

Held<br />

Weight 25-90 lb hour $0.65<br />

8420 Breaker, Pavement to 70 hour $31.25<br />

8150 Broom, Pavement Broom Length 72 in to 35 hour $12.30<br />

8151 Broom, Pavement Broom Length 96 in to 100 hour $19.75<br />

8153 Broom, Pavement, Mntd Broom Length 72 in to 18 Add to Prime Mover rate for total rate. hour $6.00<br />

8154 Broom, Pavement, Pull Broom Length 84 in to 20 Add to Prime Mover rate for total rate. hour $10.25<br />

8270 Bucket, Clamshell Capacity 1.0 cy Includes teeth. Does not include Clamshell & Dragline. hour $3.60<br />

8271 Bucket, Clamshell Capacity 2.5 cy Includes teeth. Does not include Clamshell & Dragline. hour $6.75<br />

8272 Bucket, Clamshell Capacity 5.0 cy Includes teeth. Does not include Clamshell & Dragline. hour $11.25


8273 Bucket, Clamshell Capacity 7.5 cy Includes teeth. Does not include Clamshell & Dragline. hour $14.50<br />

8275 Bucket, Dragline Capacity 2.0 cy Does not include Clamshell & Dragline. hour $2.90<br />

8276 Bucket, Dragline Capacity 5.0 cy Does not include Clamshell & Dragline. hour $6.50<br />

8277 Bucket, Dragline Capacity 10 cy Does not include Clamshell & Dragline. hour $10.50<br />

8278 Bucket, Dragline Capacity 14 cy Does not include Clamshell & Dragline. hour $13.50<br />

8180 Bus to 150 hour $20.00<br />

8181 Bus to 210 hour $23.00<br />

8182 Bus to 300 hour $27.00<br />

8190 Chain Saw Bar Length 16 in hour $1.75<br />

8191 Chain Saw Bar Length 25 in hour $3.20<br />

8192 Chain Saw, Pole Bar Size 18 in hour $1.60<br />

8200 Chipper, Brush<br />

8201 Chipper, Brush<br />

8202 Chipper, Brush<br />

8203 Chipper, Brush<br />

8204 Chipper, Brush<br />

8210<br />

8211<br />

8212<br />

8712<br />

8713<br />

Clamshell & Dragline,<br />

Crawler<br />

Clamshell & Dragline,<br />

Crawler<br />

Clamshell & Dragline,<br />

Truck<br />

Cleaner, Sewer/Catch<br />

Basin<br />

Cleaner, Sewer/Catch<br />

Basin<br />

Chipping<br />

Capacity<br />

Chipping<br />

Capacity<br />

Chipping<br />

Capacity<br />

Chipping<br />

Capacity<br />

Chipping<br />

Capacity<br />

6 in to 35 Trailer Mounted. hour $7.50<br />

9 in to 65 Trailer Mounted. hour $16.00<br />

12 in to 100 Trailer Mounted. hour $21.75<br />

15 in to 125 Trailer Mounted. hour $30.75<br />

18 in to 200 Trailer Mounted. hour $45.50<br />

149,999 lb to 235 Bucket not included in rate. hour $86.00<br />

250,000 lb to 520 Bucket not included in rate. hour $121.00<br />

to 240 Bucket not included in rate. hour $130.00<br />

Hopper Capacity 5 cy Truck Mounted. Add to Truck rate for total rate. hour $16.00<br />

Hopper Capacity 14 cy Truck Mounted. Add to Truck rate for total rate. hour $21.50<br />

8220 Compactor to 10 hour $11.00<br />

FEMA – A - 4


8221<br />

8222<br />

8223<br />

Compactor, Towed,<br />

Vibratory Drum<br />

Compactor, Vibratory,<br />

Drum<br />

Compactor, Pneumatic,<br />

Wheel<br />

to 45 hour $17.50<br />

to 75 hour $25.00<br />

to 100 hour $29.00<br />

8225 Compactor, Sanitation to 300 hour $96.00<br />

8226 Compactor, Sanitation to 400 hour $163.00<br />

8227 Compactor, Sanitation to 535 hour $225.00<br />

8228<br />

8229<br />

8500 Crane<br />

8501 Crane<br />

8502 Crane<br />

8503 Crane<br />

8504 Crane<br />

Compactor, Towed,<br />

Pneumatic, Wheel<br />

Compactor, Towed, Drum<br />

<strong>St</strong>atic<br />

8496 Crane, Truck Mntd<br />

8497 Crane, Truck Mntd<br />

8498 Crane, Truck Mntd<br />

Max. Lift<br />

Capacity<br />

Max. Lift<br />

Capacity<br />

Max. Lift<br />

Capacity<br />

Max. Lift<br />

Capacity<br />

Max. Lift<br />

Capacity<br />

Max. Lift<br />

Capacity<br />

Max. Lift<br />

Capacity<br />

Max. Lift<br />

Capacity<br />

10000 lb Add to Prime Mover rate for total rate. hour $7.50<br />

20000 lb Add to Prime Mover rate for total rate. hour $12.25<br />

8 MT to 80 hour $27.00<br />

15 MT to 150 hour $55.00<br />

50 MT to 200 hour $95.00<br />

70 MT to 300 hour $155.00<br />

110 MT to 350 hour $220.00<br />

24000 lb Add to Truck rate for total rate. hour $10.00<br />

36000 lb Add to Truck rate for total rate. hour $16.00<br />

60000 lb Add to Truck rate for total rate. hour $30.00<br />

8195 Cutter, Brush Cutter Size 8 ft to 150 hour $90.00<br />

8196 Cutter, Brush Cutter Size 8 ft to 190 hour $100.00<br />

8197 Cutter, Brush Cutter Size 10 ft to 245 hour $120.00<br />

FEMA – A - 5


8670 Derrick, Hydraulic Digger<br />

8671 Derrick, Hydraulic Digger<br />

Max. Boom<br />

Length<br />

Max. Boom<br />

Length<br />

60 ft<br />

90 ft<br />

8580 Distributor, Asphalt Tank Capacity 500 gal<br />

8581 Distributor, Asphalt Tank Capacity 1000 gal<br />

8582 Distributor, Asphalt Tank Capacity 4000 gal<br />

FEMA – A - 6<br />

Includes hydraulic pole alignment attachment. Add to<br />

Truck rate.<br />

Includes hydraulic pole alignment attachment. Add to<br />

Truck rate.<br />

Trailer Mounted. Includes burners, insulated tank, and<br />

circulating spray bar.<br />

Truck Mounted. Includes burners, insulated tank, and<br />

circulating spray bar. Add to Truck rate.<br />

Truck Mounted. Includes burners, insulated tank, and<br />

circulating spray bar. Add to Truck rate.<br />

hour $21.00<br />

hour $39.00<br />

hour $12.00<br />

hour $13.00<br />

hour $25.00<br />

8250 Dozer, Crawler to 75 hour $31.00<br />

8251 Dozer, Crawler to 105 hour $40.00<br />

8252 Dozer, Crawler to 160 hour $65.00<br />

8253 Dozer, Crawler to 250 hour $80.00<br />

8254 Dozer, Crawler to 360 hour $135.00<br />

8255 Dozer, Crawler to 565 hour $250.00<br />

8256 Dozer, Crawler to 850 hour $340.00<br />

8260 Dozer, Wheel to 300 hour $55.00<br />

8261 Dozer, Wheel to 400 hour $110.00<br />

8262 Dozer, Wheel to 500 hour $150.00<br />

8263 Dozer, Wheel to 625 hour $200.00<br />

8280 Excavator, Hydraulic Bucket Capacity 0.5 cy to 45 Crawler, Truck & Wheel. Includes bucket. hour $18.00<br />

8281 Excavator, Hydraulic Bucket Capacity 1.0 cy to 90 Crawler, Truck & Wheel. Includes bucket. hour $39.00<br />

8282 Excavator, Hydraulic Bucket Capacity 1.5 cy to 160 Crawler, Truck & Wheel. Includes bucket. hour $65.00<br />

8283 Excavator, Hydraulic Bucket Capacity 2.5 cy to 265 Crawler, Truck & Wheel. Includes bucket. hour $120.00<br />

8284 Excavator, Hydraulic Bucket Capacity 4.5 cy to 420 Crawler, Truck & Wheel. Includes bucket. hour $200.00<br />

8285 Excavator, Hydraulic Bucket Capacity 7.5 cy to 650 Crawler, Truck & Wheel. Includes bucket. hour $240.00<br />

8286 Excavator, Hydraulic Bucket Capacity 12 cy<br />

to<br />

1000<br />

Crawler, Truck & Wheel. Includes bucket. hour $400.00<br />

8240 Feeder, Grizzly to 35 hour $17.00<br />

8241 Feeder, Grizzly to 55 hour $30.00


8242 Feeder, Grizzly to 75 hour $44.00<br />

8300 Fork Lift Capacity 6000 lb to 60 hour 11,75<br />

8301 Fork Lift Capacity 12000 lb to 90 hour $17.00<br />

8302 Fork Lift Capacity 18000 lb to 140 hour $23.00<br />

8303 Fork Lift Capacity 50000 lb to 215 hour $50.00<br />

8310 Generator Prime Output 5.5 kW to 10 hour $3.25<br />

8311 Generator Prime Output 16 kW to 25 hour $8.00<br />

8312 Generator Prime Output 43 kW to 65 hour $17.00<br />

8313 Generator Prime Output 100 kW to 125 hour $34.00<br />

8314 Generator Prime Output 150 kW to 240 hour $50.00<br />

8315 Generator Prime Output 210 kW to 300 hour $60.00<br />

8316 Generator Prime Output 280 kW to 400 hour $85.00<br />

8317 Generator Prime Output 350 kW to 500 hour $95.00<br />

8318 Generator Prime Output 530 kW to 750 hour $150.00<br />

8319 Generator Prime Output 710 kW<br />

8320 Generator Prime Output 1100 kW<br />

8321 Generator Prime Output 2500 kW<br />

to<br />

1000<br />

to<br />

1500<br />

to<br />

3000<br />

FEMA – A - 7<br />

hour $200.00<br />

hour $375.00<br />

hour $500.00<br />

8755 Golf Cart Capacity 2 person hour $3.20<br />

8330 Graders Moldboard Size 10 ft to 110 Includes Rigid and Articulate equipment. hour $34.50<br />

8331 Graders Moldboard Size 12 ft to 150 Includes Rigid and Articulate equipment. hour $58.00<br />

8332 Graders Moldboard Size 14 ft to 225 Includes Rigid and Articulate equipment. hour $70.00<br />

8350 Hose, Discharge Diameter 3 in Per 25 foot length. Includes couplings. hour $0.13<br />

8351 Hose, Discharge Diameter 4 in Per 25 foot length. Includes couplings. hour $0.19<br />

8352 Hose, Discharge Diameter 6 in Per 25 foot length. Includes couplings. hour $0.50<br />

8353 Hose, Discharge Diameter 8 in Per 25 foot length. Includes couplings. hour $0.75<br />

8354 Hose, Discharge Diameter 12 in Per 25 foot length. Includes couplings. hour $1.35<br />

8355 Hose, Discharge Diameter 16 in Per 25 foot length. Includes couplings. hour $2.20


8356 Hose, Suction Diameter 3 in Per 25 foot length. Includes couplings. hour $0.23<br />

8357 Hose, Suction Diameter 4 in Per 25 foot length. Includes couplings. hour $0.43<br />

8358 Hose, Suction Diameter 6 in Per 25 foot length. Includes couplings. hour $0.90<br />

8359 Hose, Suction Diameter 8 in Per 25 foot length. Includes couplings. hour $1.35<br />

8360 Hose, Suction Diameter 12 in Per 25 foot length. Includes couplings. hour $2.45<br />

8361 Hose, Suction Diameter 16 in Per 25 foot length. Includes couplings. hour $3.90<br />

8517 Jackhammer (Dry) Weight Class 25-45 lb hour $1.00<br />

8518 Jackhammer (Wet) Weight Class 30-55 lb hour $1.15<br />

8380 Loader, Crawler Bucket Capacity 0.5 cy to 32 Includes bucket. hour $11.50<br />

8381 Loader, Crawler Bucket Capacity 1 cy to 60 Includes bucket. hour $19.00<br />

8382 Loader, Crawler Bucket Capacity 2 cy to 118 Includes bucket. hour $42.00<br />

8383 Loader, Crawler Bucket Capacity 3 cy to 178 Includes bucket. hour $76.00<br />

8384 Loader, Crawler Bucket Capacity 4 cy to 238 Includes bucket. hour $115.00<br />

8540 Loader, Skid-<strong>St</strong>eer<br />

8541 Loader, Skid-<strong>St</strong>eer<br />

8542 Loader, Skid-<strong>St</strong>eer<br />

Operating<br />

Capacity<br />

Operating<br />

Capacity<br />

Operating<br />

Capacity<br />

1000 lb to 35 hour $11.00<br />

2000 lb to 65 hour $18.00<br />

3000 lb to 85 hour $22.00<br />

8401 Loader, Tractor, Wheel to 81 hour $25.00<br />

8390 Loader, Wheel Bucket Capacity 0.5 cy to 38 hour $15.50<br />

8391 Loader, Wheel Bucket Capacity 1 cy to 60 hour $21.50<br />

8392 Loader, Wheel Bucket Capacity 2 cy to 105 hour $28.75<br />

8393 Loader, Wheel Bucket Capacity 3 cy to 152 hour $40.00<br />

8394 Loader, Wheel Bucket Capacity 4 cy to 200 hour $52.00<br />

8395 Loader, Wheel Bucket Capacity 5 cy to 250 hour $66.00<br />

8396 Loader, Wheel Bucket Capacity 6 cy to 305 hour $82.00<br />

8397 Loader, Wheel Bucket Capacity 7 cy to 360 hour $95.00<br />

8398 Loader, Wheel Bucket Capacity 8 cy to 530 hour $140.00<br />

8570 Loader-Backhoe, Wheel Loader Bucket 0.5 cy to 40 Loader and Backhoe Buckets included. hour $14.75<br />

FEMA – A - 8


8571 Loader-Backhoe, Wheel<br />

8572 Loader-Backhoe, Wheel<br />

8573 Loader-Backhoe, Wheel<br />

8410 Mixer, Concrete Portable<br />

8411 Mixer, Concrete Portable<br />

8412<br />

8413<br />

Mixer, Concrete, Trailer<br />

Mntd<br />

Mixer, Concrete, Trailer<br />

Mntd<br />

Capacity<br />

Loader Bucket<br />

Capacity<br />

Loader Bucket<br />

Capacity<br />

Loader Bucket<br />

Capacity<br />

Batching<br />

Capacity<br />

Batching<br />

Capacity<br />

Batching<br />

Capacity<br />

Batching<br />

Capacity<br />

1 cy to 70 Loader and Backhoe Buckets included. hour $23.50<br />

1.5 cy to 95 Loader and Backhoe Buckets included. hour $33.00<br />

1.75 cy to 115 Loader and Backhoe Buckets included. hour $38.00<br />

10 cft hour $3.25<br />

12 cft hour $4.25<br />

11 cft to 10 hour $8.75<br />

16 cft to 25 hour $15.25<br />

8075 Motorcycle, Police mile $0.35<br />

8633 Mulcher, Trailer Mntd<br />

8634 Mulcher, Trailer Mntd<br />

8635 Mulcher, Trailer Mntd<br />

Working<br />

Capacity<br />

Working<br />

Capacity<br />

Working<br />

Capacity<br />

7 tph to 35 hour $10.25<br />

10 tph to 55 hour $15.75<br />

20 tph to 120 hour $24.75<br />

8430 Paver, Asphalt, Towed Does not include Prime Mover. hour $7.00<br />

8431 Paver, Asphalt to 50 Includes wheel and crawler equipment. hour $65.00<br />

8432 Paver, Asphalt to 125 Includes wheel and crawler equipment. hour $115.00<br />

8433 Paver, Asphalt to 175 Includes wheel and crawler equipment. hour $125.00<br />

8434 Paver, Asphalt to 250 Includes wheel and crawler equipment. hour $140.00<br />

8436 Pick-up, Asphalt to 110 hour $55.00<br />

8437 Pick-up, Asphalt to 150 hour $83.00<br />

8438 Pick-up, Asphalt to 200 hour $110.00<br />

8439 Pick-up, Asphalt to 275 hour $140.00<br />

8660 Plow, Cable Plow Depth 24 in to 30 hour $10.25<br />

FEMA – A - 9


8661 Plow, Cable Plow Depth 36 in to 65 hour $27.75<br />

8662 Plow, Cable Plow Depth 48 in to 110 hour $31.75<br />

8450 Plow, Snow, Grader Mntd Width to 10 ft Add to Grader for total rate. hour $16.00<br />

8451 Plow, Snow, Grader Mntd Width to 14 ft Add to Grader for total rate. hour $24.00<br />

8452 Plow, Snow, Truck Mntd Width to 15 ft Add to Truck rate for total rate. hour $10.75<br />

8453 Plow, Snow, Truck Mntd Width to 15 ft With leveling wing. Add to Truck rate for total rate. hour $18.50<br />

8470 Pump to 4 Does not include Hoses. hour $2.15<br />

8471 Pump to 6 Does not include Hoses. hour $3.20<br />

8472 Pump to 10 Does not include Hoses. hour $4.10<br />

8473 Pump to 15 Does not include Hoses. hour $7.75<br />

8474 Pump to 25 Does not include Hoses. hour $9.25<br />

8475 Pump to 40 Does not include Hoses. hour $16.00<br />

8476 Pump to 60 Does not include Hoses. hour $18.75<br />

8477 Pump to 95 Does not include Hoses. hour $26.50<br />

8478 Pump to 140 Does not include Hoses. hour $31.00<br />

8479 Pump to 200 Does not include Hoses. hour $36.00<br />

8480 Pump to 275 Does not include Hoses. hour $80.00<br />

8481 Pump to 350 Does not include Hoses. hour $95.00<br />

8482 Pump to 425 Does not include Hoses. hour $120.00<br />

8483 Pump to 500 Does not include Hoses. hour $135.00<br />

8484 Pump to 575 Does not include Hoses. hour $155.00<br />

8485 Pump to 650 Does not include Hoses. hour $180.00<br />

8510 Saw, Concrete Blade Diameter 14 in to 14 hour $6.00<br />

8511 Saw, Concrete Blade Diameter 26 in to 35 hour $13.50<br />

8512 Saw, Concrete Blade Diameter 48 in to 65 hour $23.00<br />

8513 Saw, Rock to 100 hour $30.00<br />

8514 Saw, Rock to 200 hour $60.00<br />

8521 Scraper Scraper Capacity 16 cy to 250 hour $90.00<br />

8522 Scraper Scraper Capacity 23 cy to 365 hour $130.00<br />

FEMA – A - 10


8523 Scraper Scraper Capacity 34 cy to 475 hour $200.00<br />

8524 Scraper Scraper Capacity 44 cy to 600 hour $240.00<br />

8560 Snow Blower Capacity 2,000 tph to 400 hour $140.00<br />

8561 Snow Blower Capacity 2,500 tph to 500 hour $160.00<br />

8562 Snow Blower Capacity 3,500 tph to 600 hour $180.00<br />

8550<br />

8551<br />

8552<br />

8553<br />

8558<br />

8559<br />

Snow Blower, Truck<br />

Mntd<br />

Snow Blower, Truck<br />

Mntd<br />

Snow Blower, Truck<br />

Mntd<br />

Snow Blower, Truck<br />

Mntd<br />

Snow Thrower, Walk<br />

Behind<br />

Snow Thrower, Walk<br />

Behind<br />

8630 Sprayer, Seed<br />

8631 Sprayer, Seed<br />

8632 Sprayer, Seed<br />

Capacity 600 tph to 75 Does not include Truck. hour $37.50<br />

Capacity 1400 tph to 200 Does not include Truck. hour $70.00<br />

Capacity 2000 tph to 340 Does not include Truck. hour $110.00<br />

Capacity 2500 tph to 400 Does not include Truck. hour $120.00<br />

Cutting Width 25 in to 5 hour $3.25<br />

Cutting Width 60 in to 15 hour $7.00<br />

Working<br />

Capacity<br />

Working<br />

Capacity<br />

Working<br />

Capacity<br />

750 gal to 30<br />

1250 gal to 50<br />

3500 gal to 115<br />

8458 Spreader, Chemical Capacity 5 cy to 4<br />

8423 Spreader, Chip<br />

8424 Spreader, Chip<br />

Spread Hopper<br />

Width<br />

Spread Hopper<br />

Width<br />

FEMA – A - 11<br />

Trailer & Truck mounted. Does not include Prime<br />

Mover.<br />

Trailer & Truck mounted. Does not include Prime<br />

Mover.<br />

Trailer & Truck mounted. Does not include Prime<br />

Mover.<br />

Trailer & Truck mounted. Does not include Prime<br />

Mover.<br />

hour $9.75<br />

hour $15.00<br />

hour $25.75<br />

hour $4.00<br />

12.5 ft to 152 hour $50.00<br />

16.5 ft to 215 hour $80.00<br />

8425 Spreader, Chip, Mntd Hopper Size 8 ft to 8 Trailer & Truck mounted. hour $3.30<br />

8455 Spreader, Sand Mounting<br />

Tailgate,<br />

Chassis<br />

hour $3.30


8456 Spreader, Sand Mounting Dump Body hour $5.50<br />

8457 Spreader, Sand Mounting Truck (10 yd) hour $7.50<br />

8440 <strong>St</strong>riper Paint Capacity 40 gal to 22 hour $8.75<br />

8441 <strong>St</strong>riper Paint Capacity 90 gal to 60 hour $19.00<br />

8442 <strong>St</strong>riper Paint Capacity 120 gal to 122 hour $37.00<br />

8445 <strong>St</strong>riper, Truck Mntd Paint Capacity 120 gal to 460 hour $70.00<br />

8446 <strong>St</strong>riper, Walk-behind Paint Capacity 12 gal hour $3.35<br />

8157 Sweeper, Pavement to 110 hour $59.00<br />

8158 Sweeper, Pavement to 230 hour $74.00<br />

8590 Trailer, Dump Capacity 20 cy Does not include Prime Mover. hour $8.00<br />

8591 Trailer, Dump Capacity 30 cy Does not include Prime Mover. hour $14.00<br />

8600 Trailer, Equipment Capacity 30 ton hour $10.25<br />

8601 Trailer, Equipment Capacity 40 ton hour $12.50<br />

8602 Trailer, Equipment Capacity 60 ton hour $15.00<br />

8603 Trailer, Equipment Capacity 120 ton hour $25.00<br />

8640 Trailer, Office Trailer Size 8' x 24' hour $1.70<br />

8641 Trailer, Office Trailer Size 8' x 32' hour $1.75<br />

8642 Trailer, Office Trailer Size 10' x 32' hour $2.60<br />

8610 Trailer, Water Tank Capacity 4000 gal<br />

8611 Trailer, Water Tank Capacity 6000 gal<br />

8612 Trailer, Water Tank Capacity 10000 gal<br />

8613 Trailer, Water Tank Capacity 14000 gal<br />

8650 Trencher to 40<br />

8651 Trencher to 85<br />

FEMA – A - 12<br />

Includes a centrifugal pump with sump and a rear<br />

spraybar.<br />

Includes a centrifugal pump with sump and a rear<br />

spraybar.<br />

Includes a centrifugal pump with sump and a rear<br />

spraybar.<br />

Includes a centrifugal pump with sump and a rear<br />

spraybar.<br />

Walk-behind, Crawler & Wheel Mounted. Chain and<br />

Wheel.<br />

Walk-behind, Crawler & Wheel Mounted. Chain and<br />

Wheel.<br />

hour $11.00<br />

hour $14.00<br />

hour $16.50<br />

hour $20.50<br />

hour $11.75<br />

hour $25.00<br />

8290 Trowel, Concrete Diameter 48 in to 12 hour $4.50


8680 Truck, Concrete Mixer Mixer Capacity 13 cy to 300 hour $75.00<br />

8720 Truck, Dump <strong>St</strong>ruck Capacity 8 cy to 220 hour $35.00<br />

8721 Truck, Dump <strong>St</strong>ruck Capacity 10 cy to 320 hour $45.00<br />

8722 Truck, Dump <strong>St</strong>ruck Capacity 12 cy to 400 hour $60.00<br />

8723 Truck, Dump <strong>St</strong>ruck Capacity 18 cy to 400 hour $65.00<br />

8724<br />

Truck, Dump, Off<br />

Highway<br />

<strong>St</strong>ruck Capacity 28 cy to 450 hour $105.00<br />

8690 Truck, Fire Pump Capacity 1000 gpm hour $70.00<br />

8691 Truck, Fire Pump Capacity 1250 gpm hour $80.00<br />

8692 Truck, Fire Pump Capacity 1500 gpm hour $85.00<br />

8693 Truck, Fire Pump Capacity 2000 gpm hour $90.00<br />

8694 Truck, Fire Ladder Ladder length 75 ft hour $125.00<br />

8695 Truck, Fire Ladder Ladder length 150 ft hour $150.00<br />

8700 Truck, Flatbed Maximum Gvw 15000 lb to 200 hour $20.00<br />

8701 Truck, Flatbed Maximum Gvw 25000 lb to 275 hour $22.00<br />

8702 Truck, Flatbed Maximum Gvw 30000 lb to 300 hour $25.00<br />

8703 Truck, Flatbed Maximum Gvw 45000 lb to 380 hour $43.00<br />

8730 Truck, Garbage Capacity 25 cy to 255 hour $47.00<br />

8731 Truck, Garbage Capacity 32 cy to 325 hour $55.00<br />

8800 Truck, Pickup Transporting people. mile $0.50<br />

8801 Truck, Pickup ½ ton hour $14.00<br />

8802 Truck, Pickup 1 ton hour $20.00<br />

8803 Truck, Pickup 1¼ ton hour $22.00<br />

8804 Truck, Pickup 1½ ton hour $25.00<br />

8805 Truck, Pickup 1¾ ton hour $30.00<br />

8790 Truck, Tractor 4 x 2 30000 lb to 220 hour $32.00<br />

8791 Truck, Tractor 4 x 2 45000 lb to 310 hour $45.00<br />

8792 Truck, Tractor 6 x 4 50000 lb to 400 hour $55.00<br />

8780 Truck, Water Tank Capacity 2500 gal to 175 Include pump and rear spray system. hour $31.00<br />

8781 Truck, Water Tank Capacity 4000 gal to 250 Include pump and rear spray system. hour $42.00<br />

FEMA – A - 13


8620 Tub Grinder to 440 hour $85.00<br />

8621 Tub Grinder to 630 hour $120.00<br />

8622 Tub Grinder to 760 hour $150.00<br />

8623 Tub Grinder<br />

to<br />

1000<br />

hour $270.00<br />

8753 Vehicle, Recreational to 10 hour $3.00<br />

8750 Vehicle, Small to 30 hour $7.00<br />

8761 Vibrator, Concrete to 4 hour $1.15<br />

8770 Welder, Portable to 16 Includes ground cable and lead cable. hour $5.00<br />

8771 Welder, Portable to 34 Includes ground cable and lead cable. hour $11.50<br />

8772 Welder, Portable to 50 Includes ground cable and lead cable. hour $16.00<br />

8773 Welder, Portable to 80 Includes ground cable and lead cable. hour $22.00<br />

FEMA – A - 14


FEDERAL EMERGENCY MANAGEMENT AGENCY<br />

FORCE ACCOUNT EQUIPMENT SUMMARY RECORD<br />

Page<br />

<strong>of</strong><br />

1. APPLICANT 2. PAID 3. PW # 4. DISASTER NUMBER<br />

5. LOCATION/SITE 6. CATEGORY 7. PERIOD COVERING<br />

to<br />

8. DESCRIPTION OF WORK PERFORMED<br />

TYPE OF EQUIPMENT<br />

OPERATOR'S<br />

NAME<br />

DATES AND HOURS USED EACH DAY<br />

COSTS<br />

INDICATE SIZE, CAPACITY, HORSEPOWER,<br />

MAKE AND MODEL AS APPROPRIATE<br />

EQUIPMENT<br />

CODE NUMBER<br />

DATE<br />

TOTAL<br />

HOURS<br />

EQUIPMENT<br />

RATE<br />

TOTAL<br />

COST<br />

HOURS $ $<br />

HOURS $ $<br />

HOURS $ $<br />

HOURS $ $<br />

HOURS $ $<br />

HOURS $ $<br />

HOURS $ $<br />

GRAND TOTALS $<br />

I CERTIFY THAT THE ABOVE INFORMATION WAS OBTAINED FROM PAYROLL RECORDS, INVOICES, OR OTHER DOCUMENTS THAT ARE AVAILABLE FOR AUDIT.<br />

CERTIFIED TITLE DATE<br />

FEMA Form 90-127, NOV 98<br />

FEMA – B – 1


FORCE ACCOUNT EQUIPMENT SUMMARY RECORD INSTRUCTIONS<br />

Force account is the term to refer to our own personnel and equipment. Keep the following points in mind when<br />

compiling force account labor information:<br />

Complete the Record as Follows<br />

1. Applicant: Enter your organization’s name.<br />

2. PAID: Enter the computer tracking number that FEMA assigns to your organization. Your Public Assistance<br />

Coordinator can tell you what it is if you don’t know it.<br />

3. PW #: Enter the project number that you have assigned to this project. If you know the project number<br />

assigned by FEMA, use that number<br />

4. <strong>Disaster</strong> Number: Enter the declaration number for this disaster here. The Public Assistance Coordinator<br />

can tell you what it is if you don’t know it.<br />

5. Location/Site: Enter physical address or location <strong>of</strong> project.<br />

6. Category: Enter category <strong>of</strong> work, if known.<br />

7. Period Covering: Enter time period referenced for the information contained on this sheet.<br />

8. Description <strong>of</strong> Work Performed: Briefly describe the type <strong>of</strong> work that was performed.<br />

• Type <strong>of</strong> Work Performed: Enter a brief description <strong>of</strong> the equipment, including the rated<br />

horsepower or capacity <strong>of</strong> the equipment. Be sure to include this information if you also use a trade<br />

name or common name to describe the equipment, e.g., Ditch Witch.<br />

• FEMA Code: Enter the FEMA cost code for the equipment.<br />

• Operator’s Name: Enter the equipment operator’s name.<br />

• Date/Hours Used: Enter the dates and hours the equipment was used on the project.<br />

• Total Hours: Enter the total hours equipment was in use.<br />

• Equipment Rate: Enter the hourly cost to use the equipment.<br />

• Total <strong>Cost</strong>: Multiply the number in the Total Hours block by the number in the Equipment Rate<br />

block and enter the results here.<br />

• Grand Totals: Add the numbers in the Total Hours blocks and Total <strong>Cost</strong> blocks enter the results<br />

here.<br />

FEMA – B – 2


FEDERAL EMERGENCY MANAGEMENT AGENCY<br />

MATERIALS SUMMARY RECORD<br />

Page<br />

<strong>of</strong><br />

1. APPLICANT 2. PAID 3. PW # 4. DISASTER NUMBER<br />

5. LOCATION/SITE 6. CATEGORY 7. PERIOD COVERING<br />

8. DESCRIPTION OF WORK PERFORMED<br />

To<br />

VENDOR DESCRIPTION QUAN. UNIT<br />

PRICE<br />

TOTAL<br />

PRICE<br />

DATE<br />

PURCHASED<br />

DATE USED<br />

INFO FROM<br />

(CHECK ONE)<br />

$ $<br />

INVOICE<br />

STOCK<br />

$ $<br />

$ $<br />

$ $<br />

$ $<br />

$ $<br />

$ $<br />

$ $<br />

$ $<br />

$ $<br />

$ $<br />

GRAND TOTAL $<br />

I CERTIFY THAT THE ABOVE INFORMATION WAS OBTAINED FROM PAYROLL RECORDS, INVOICES, OR OTHER DOCUMENTS THAT ARE AVAILABLE FOR AUDIT.<br />

CERTIFIED TITLE DATE<br />

FEMA Form 90-124, NOV 98<br />

FEMA – C – 1


MATERIALS RECORD SUMMARY INSTRUCTIONS<br />

This form is used to record the costs <strong>of</strong> supplies and materials purchased in response to the disaster or used to repair<br />

damages caused by the disaster.<br />

Complete the Record as Follows:<br />

1. Applicant: Enter your organization’s name.<br />

2. PAID: Enter the computer tracking number that FEMA assigns to your organization. Your Public Assistance<br />

Coordinator can tell you what it is if you don’t know it.<br />

3. PW#: Enter the project number that you have assigned to this project. If you know the project number<br />

assigned by FEMA, use that number.<br />

4. <strong>Disaster</strong> Number: Enter the disaster number for this disaster here. The Public Assistance Coordinator can<br />

tell you what it is if you don’t know it.<br />

5. Location/Site: Enter the physical address or location <strong>of</strong> project.<br />

6. Category: Enter category <strong>of</strong> work, if known.<br />

7. Period Covering: Enter time period referenced for the information contained on this sheet.<br />

8. Description <strong>of</strong> Work Performed: Briefly describe the type <strong>of</strong> work that was performed.<br />

• Vendor: Enter the name <strong>of</strong> the supplier if the material was bought specifically as a result <strong>of</strong> the<br />

disaster.<br />

• Quantity: Enter amount <strong>of</strong> material used (e.g., number, tonnage, etc.).<br />

• Date Purchased: Enter the date on the invoice.<br />

• Date Used: Enter date actually used/installed.<br />

• Info From: Check whether information entered on the form was obtained from actual invoice or if<br />

material was taken from stock on hand.<br />

Grand Total: Add the numbers in the Total Priceblocks and enter the results here.<br />

FEMA – C – 2


FEDERAL EMERGENCY MANAGEMENT AGENCY<br />

RENTED EQUIPMENT SUMMARY RECORD<br />

Page<br />

<strong>of</strong><br />

1. APPLICANT<br />

<strong>City</strong> <strong>of</strong> <strong>St</strong>. <strong>Petersburg</strong><br />

2. PAID 3. PW # 4. DISASTER NUMBER<br />

5. LOCATION/SITE 6. CATEGORY 7. PERIOD COVERING<br />

8. DESCRIPTION OF WORK PERFORMED<br />

To<br />

TYPE OF EQUIPMENT<br />

Indicate size, capacity, horsepower, make<br />

and model as appropriate<br />

DATES AND<br />

HOURS USED<br />

RATE PER HOUR TOTAL COST VENDOR INVOICE<br />

NO.<br />

DATE AND<br />

AMOUNT PAID<br />

CHECK NO.<br />

W/OPR<br />

W/OUT OPR<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

$<br />

I CERTIFY THAT THE ABOVE INFORMATION WAS OBTAINED FROM PAYROLL RECORDS, INVOICES, OR OTHER DOCUMENTS THAT ARE AVAILABLE FOR AUDIT.<br />

CERTIFIED TITLE DATE<br />

FEMA Form 90-125, NOV 98<br />

FEMA – D – 1


RENTED EQUIPMENT SUMMARY RECORDS INSTRUCTIONS<br />

This form is used to record the costs <strong>of</strong> equipment that you had to rent or lease to respond to the disaster or to be<br />

used in making repairs to damages caused by the disaster.<br />

Complete the Record as Follows:<br />

1. Applicant: Enter your organization’s name.<br />

2. PAID: Enter the computer tracking number that FEMA assigns to your organization. Your Public Assistance<br />

Coordinator can tell you what it is if you don’t know it.<br />

3. PW#: Enter the project number that you have assigned to this project. If you know the project number<br />

assigned by FEMA, use that number.<br />

4. <strong>Disaster</strong> Number: Enter the disaster number for this disaster here. The Public Assistance Coordinator can<br />

tell you what it is if you don’t know it.<br />

5. Location/Site: Enter the physical address or location <strong>of</strong> project.<br />

6. Category: Enter category <strong>of</strong> work, if known.<br />

7. Period Covering: Enter time period referenced for the information contained on this sheet.<br />

8. Description <strong>of</strong> Work Performed: Briefly describe the type <strong>of</strong> work that was performed.<br />

• Type <strong>of</strong> Equipment: Enter a brief description <strong>of</strong> the equipment that you leased or rented, including<br />

the rated horsepower or capacity <strong>of</strong> the equipment. Be sure to include this information if you also use<br />

a trade name or common name to describe the equipment, e.g., Ditch Witch.<br />

• Date/Hours Used: Enter the dates and hours the equipment was used on the project.<br />

• Rate per Hour: Enter they hourly rental or lease cost <strong>of</strong> the equipment. Indicate if the equipment<br />

was rented on a daily, weekly, or monthly rate, instead <strong>of</strong> an hourly rate. List in appropriate column<br />

if operator costs were included.<br />

• Total <strong>Cost</strong>: Multiply Hours Used by Hourly Rate charged and enter total cost here.<br />

• Vendor: Enter the name <strong>of</strong> the company that rented or leased the equipment to you.<br />

• Invoice Number: Enter billing invoice number.<br />

• Date/Amount Paid: Enter date <strong>of</strong> payment and amount <strong>of</strong> check.<br />

• Check No.: List checks number that was used to pay for equipment rental.<br />

Grand Total: Add the dollar figure from the Amount Paid blocks and enter total here<br />

FEMA – D – 2


FEDERAL EMERGENCY MANAGEMENT AGENCY<br />

PROJECT WORKSHEET<br />

PROJECT<br />

WORKSHEETPROJECT<br />

WORKSHEETPROJECT<br />

WORKSHEETPROJECT<br />

WORKSHEET<br />

O.M.B. No. 3067-0151<br />

Expires April 30, 2001<br />

PAPERWORK BURDEN DISCLOSURE NOTICE<br />

PAPERWORK BURDEN DISCLOSURE NOTICEPAPERWORK BURDEN DISCLOSURE NOTICEPAPERWORK BURDEN DISCLOSURE<br />

NOTICEPAPERWORK BURDEN DISCLOSURE NOTICE<br />

Public reporting burden for this form is estimated to average 30 minutes. The burden estimate includes the time for reviewing instructions, searching<br />

existing data sources, gathering and maintaining the needed data, and completing and submitting the forms. You are not required to respond to this<br />

collection <strong>of</strong> information unless a valid OMB control number is displayed in the upper right corner <strong>of</strong> the forms. Send comments regarding the accuracy<br />

<strong>of</strong> the burden estimate and any suggestions for reducing the burden to: Information Collections Management, Federal Emergency Management Agency,<br />

500 C <strong>St</strong>reet, SW, Washington, DC 20472, Paperwork Reduction Project (3067-0151). NOTE: Do not send your completed form to this address.<br />

DECLARATION NO. PROJECT NO. FIPS NO. DATE CATEGORY<br />

APPLICANT<br />

COUNTY<br />

LOCATION LATITUDE LONGITUDE<br />

DAMAGE DESCRIPTION AND DIMENSIONS<br />

SCOPE OF WORK<br />

Does the Scope <strong>of</strong> Work change the pre-disaster conditions at the site? Yes No<br />

Special Considerations issues included? Yes No Hazard Mitigation proposal included? Yes No<br />

Is there insurance coverage on this facility? Yes No<br />

PROJECT COST<br />

ITEM<br />

CODE<br />

QUANTITY/UNI<br />

UNIT PRICE<br />

COST<br />

PREPARED BY:<br />

FEMA Form 90-91, SEP 98<br />

REPLACES ALL PREVIOUS EDITIONS<br />

TITLE:<br />

FEMA – E – 1


FEDERAL EMERGENCY MANAGEMENT AGENCY<br />

PROJECT WORKSHEET<br />

INSTRUCTIONS<br />

The Project Worksheet must be completed for each identified damaged project. Projects with estimated or actual<br />

cost <strong>of</strong> damage greater than $63,900 (FY11) are large projects. Projects with estimated or actual cost <strong>of</strong> damage<br />

less than $63,900 (FY11) are small projects. After completing Project Worksheets, submit the worksheets to our<br />

Public Assistance Coordinator.<br />

Identifying Information<br />

Declaration No.: Indicate the disaster declaration number as established by FEMA (i.e. FEMA 1136-DR-TN).<br />

Project No.: Indicate the project designation number you establish to track the project in your system (i.e. 1, 2, 3<br />

etc.).<br />

FIPS No.: Indicate your FIPS number within this space. This is optional.<br />

Date: Indicate the date the worksheet was prepared in MM/DD/YYYY format.<br />

Category: Indicate the category <strong>of</strong> the project according to FEMA specified work categories. This is optional.<br />

Applicant: Name <strong>of</strong> the governmental or other legal entity to which the funds will be awarded.<br />

County: Name <strong>of</strong> the county where the damage is located. If located in multiple counties, indicate “Multi-County.”<br />

Damage Facility: Identify the facility and describe the basic function.<br />

Work Complete as <strong>of</strong>: Indicate the date that the work was examined in the format <strong>of</strong> MM/DD/YY and the<br />

percentage <strong>of</strong> work completed to that date.<br />

Location: This item can range anywhere from an “address,” “intersection <strong>of</strong>…” “1 mile south <strong>of</strong>….on...” to<br />

“countywide.” If damages are in different locations or different counties please list each location. Include latitude<br />

and longitude <strong>of</strong> the project if known.<br />

Damage Description and Dimensions: Describe the disaster-related damage to the facility, including the cause <strong>of</strong><br />

the damage and the area <strong>of</strong> components affected.<br />

Scope <strong>of</strong> Work: List work that has been completed, and work to be complete which is necessary to repair disasterrelated<br />

damage. Include items recorded on the preliminary damage assessment.<br />

Does the Scope <strong>of</strong> Work Change the Pre-<strong>Disaster</strong> Conditions <strong>of</strong> the Site: If the work described under the Scope<br />

<strong>of</strong> Work changes the facilities conditions (i.e. increases/decreases the size or function <strong>of</strong> the facility or does not<br />

replace damaged components in kind with like material), check Yes. If the scope <strong>of</strong> work returns the site to its<br />

pre-disaster configuration, capacity and dimensions check No.<br />

Special Considerations: If the project includes insurable work, and/or is affected by environmental (NEPA) or<br />

historic concerns, check either the Yes or No box so that appropriate action can be initiated to avoid delays in<br />

funding. Refer to Applicant Guidelines for further information.<br />

Hazard Mitigation: If the pre-disaster conditions at the site can be changed to prevent the disaster-related damage<br />

check Yes. If no opportunities for hazard mitigation exists, check No. Appropriate action will be initiated and<br />

avoid delays in funding. Refer to Applicant Handbook for further information.<br />

Is There Insurance Coverage on This Facility: Federal law requires that FEMA be notified <strong>of</strong> any entitlement for<br />

proceeds to repair disaster-related damages, from insurance <strong>of</strong> any other source. Check Yes if any funding or<br />

proceeds can be received for the work within the Scope <strong>of</strong> Work from any source besides FEMA<br />

FEMA – E – 2


Project <strong>Cost</strong><br />

Item: Indicate the item number on the column (i.e. 1, 2, 3, etc.). Use additional forms as necessary to include all<br />

items.<br />

Code: If using the FEMA cost codes, place the appropriate number here.<br />

Narrative: Indicate the work, material or service that best describes the work (i.e. “force account labor overtime,”<br />

“42 in. Dia. RCP,” “sheet rock replacement, etc.).<br />

Quantity/Unit: List the amount <strong>of</strong> units and the unit <strong>of</strong> measure (“48/cy,” “32/lf”, “6/ea’” etc.).<br />

Unit Price: Indicate the price per unit.<br />

<strong>Cost</strong>: This item can be developed from cost to date, contracts, bids, applicant’s experience in that particular repair<br />

work, books which lend themselves to work estimates, such as RS Means, or by using cost codes supplied by<br />

FEMA.<br />

Total <strong>Cost</strong>: Record total cost <strong>of</strong> the project.<br />

Prepared By: Record the name and title <strong>of</strong> the person completing the Project Worksheet.<br />

Record Requirements<br />

Please review the Applicant Handbook for detailed instructions and examples.<br />

For all completed work, the applicant must keep the following records:<br />

• Force account labor documentation sheets identifying the employee, hours worked, date and location.<br />

• Force account equipment documentation sheets identifying specific equipment, operator, and usage by<br />

hour/mile and cost used.<br />

• Material documentation sheets identifying the type <strong>of</strong> material, quantity used and cost.<br />

• Copies <strong>of</strong> all contracts for work and any lease/rental equipment costs.<br />

For all estimated work, keep calculations, quantity estimates, pricing information, etc. as part <strong>of</strong> the records to<br />

document the “cost/estimate” for which funding is being requested.<br />

FEMA – E – 3


FEDERAL EMERGENCY MANAGEMENT AGENCY<br />

SPECIAL CONSIDERATIONS QUESTIONS<br />

1. APPLICANT'S NAME 2. FIPS NUMBER 3. DATE<br />

4. PROJECT NAME 5. LOCATION<br />

Form must be filled out for each project.<br />

1. Does the damaged facility or item <strong>of</strong> work have insurance and/or is it an insurable risk? (e.g., buildings, equipment, vehicles, etc.)<br />

Yes No Unsure Comments<br />

2. Is the damaged facility located within a floodplain or coastal high hazard area, or does it have an impact on a floodplain or wetland?<br />

Yes No Unsure Comments<br />

3, Is the damaged facility or item <strong>of</strong> work located within or adjacent to a Coastal Barrier Resource System Unit or an Otherwise Protected Area?<br />

Yes No Unsure Comments<br />

4. Will the proposed facility repairs/reconstruction change the pre-disaster condition? (e.g., footprint, material, location, capacity, use or function)<br />

Yes No Unsure Comments<br />

5. Does the applicant have a hazard mitigation proposal or would the applicant like technical assistance for a hazard mitigation proposal?<br />

Yes No Unsure Comments<br />

Is the damaged facility on the National Register <strong>of</strong> Historic Places or the state historic listing? Is it older than 50 years? Are there more, similar buildings<br />

near the site?<br />

Yes No Unsure Comments<br />

7. Are there any pristine or undisturbed areas on, or near, the project site? Are there large tracts <strong>of</strong> forestland?<br />

Yes No Unsure Comments<br />

8. Are there any hazardous materials at or adjacent to the damaged facility and/or item <strong>of</strong> work?<br />

Yes No Unsure Comments<br />

9. Are there any other environmentally or controversial issues associated with the damaged facility and/or item <strong>of</strong> work?<br />

Yes No Unsure Comments<br />

FEMA Form 90-120, NOV 98<br />

FEMA – F – 1


FEMA – Timesheet - <strong>Disaster</strong> Related Work<br />

Name Employee #<br />

Job Title<br />

Pay Period <strong>St</strong>art Date<br />

Department<br />

Pay Period End Date<br />

This sheet is to be used for disaster regular and overtime hours.<br />

Equipment usage to be reported on FEMA Force Account Equipment Summary Record.<br />

Calendar<br />

Date<br />

<strong>St</strong>art<br />

Time<br />

<strong>St</strong>op<br />

Time<br />

Hours<br />

Kronos<br />

Hrs Code<br />

Complete/detailed description <strong>of</strong> work activity(FEMA requires) & Work location<br />

Total Number <strong>of</strong> Hours for the Pay Period<br />

I certify that the above information is correct and can be validated from payroll records and/or from other documentation that is available for audit.<br />

Employee's Signature<br />

Supervisor's Signature<br />

Date:<br />

Date:<br />

Kronos Hours Codes:<br />

007 <strong>Disaster</strong> Regular Hours<br />

111 <strong>Disaster</strong> Overtime<br />

FEMA – G – 1


FHWA ER ROADWAYS WITHIN CITY LIMITS<br />

Road No. From To Linear Feet Linear Miles<br />

CR 688/Ulmerton Rd <strong>City</strong> Limits I-275 3,167.53 0.60<br />

CR 686/Roosevelt Blvd N <strong>City</strong> Limits CR 687/4th <strong>St</strong> N 12,563.05 2.38<br />

SR 600/Gandy Blvd West <strong>City</strong> Limits East <strong>City</strong> Limits 12,770.93 2.42<br />

CR 823/83rd Ave N CR 803/Dr. MLK, Jr. <strong>St</strong> N San Martin Blvd 5,450.98 1.03<br />

San Martin Blvd CR 823/83rd Ave N <strong>City</strong> Limits 4,783.17 0.91<br />

77th Ave N 16th <strong>St</strong> N 1st <strong>St</strong> N 6,666.06 1.26<br />

CR 216/62nd Ave N I-275 Bayou Grande Blvd 18,497.84 3.50<br />

CR 202/54th Ave N I-275 1st <strong>St</strong> N 9,758.98 1.85<br />

CR 691/Haines Rd I-275 CR 803/Dr. MLK, Jr. <strong>St</strong> N 7,920.95 1.50<br />

CR 184/38th Ave N CR 1/Park <strong>St</strong> N 1st <strong>St</strong> N 39,657.58 7.51<br />

30th Ave N CR 581/58th <strong>St</strong> N CR 687/4th <strong>St</strong> N 23,851.28 4.52<br />

22 Ave N CR 1/Park <strong>St</strong> N C<strong>of</strong>fee Pot Blvd NE 42,166.53 7.99<br />

C<strong>of</strong>fee Pot Blvd NE 22nd Ave N Beach Dr NE 2,180.01 0.41<br />

Snell Isle Blvd C<strong>of</strong>fee Pot Blvd NE Overlook Dr NE 9,683.60 1.83<br />

Overlook Dr NE Snell Isle Blvd Arkansas Ave NE 886.97 0.17<br />

Arkansas Ave NE 40th Ave NE Overlook Dr NE 2,371.93 0.45<br />

40th Ave NE 1st N Arkansas Ave NE 8,375.17 1.59<br />

9th Ave N CR 1/Park <strong>St</strong> N 3rd <strong>St</strong> N 35,987.94 6.82<br />

5th Ave N CR 1/Park <strong>St</strong> N Beach Dr NE 38,247.83 7.24<br />

Pasadena Court CR 693/Pasadena Ave S SR 693/66th <strong>St</strong> N 784.77 0.15<br />

1st Ave N CR 1/Park <strong>St</strong> N Beach Dr NE 30,746.30 5.82<br />

CR 150/Central Ave West <strong>City</strong> Limits Beach Dr NE 38,782.36 7.35<br />

1st Ave S CR693/Pasadena Ave S Bayshore Dr SE 32,322.23 6.12<br />

15th Ave S West <strong>City</strong> Limits 34th <strong>St</strong> S 6,573.06 1.24<br />

18th Ave S West <strong>City</strong> Limits SR 687/4th <strong>St</strong> S 19,797.22 3.75<br />

CR 138/22nd Ave S West <strong>City</strong> Limits 31st <strong>St</strong> S 7,908.26 1.50<br />

26th Ave S 34th <strong>St</strong> S CR 803/Dr. MLK, Jr. <strong>St</strong> S 10,555.05 2.00<br />

36th Terrace S I-275 Fairway Ave S 1,168.07 0.22<br />

Fairway Ave S 36th Terrace S Country Club Way S 5,210.57 0.99<br />

Country Club Way S Fairway Ave S CR 803/Dr. MLK, Jr. <strong>St</strong> S 5,914.11 1.12<br />

SR 682/Pinellas Bayway West <strong>City</strong> Limits I-275 14,249.73 2.70<br />

54th Ave S I-275 SR 687/4th <strong>St</strong> S 13,281.62 2.52<br />

62nd Ave S I-275 SR 687/4th <strong>St</strong> S 14,969.29 2.84<br />

Pinellas Point Dr S 62nd Ave S SR 687/4th <strong>St</strong> S 10,609.74 2.01<br />

Pinellas Bayway Pinellas Bayway South <strong>City</strong> Limits 7,064.08 1.34<br />

CR 1/Park ST North <strong>City</strong> Limits CR 693/Pasadena Ave S 18,609.91 3.52<br />

CR 693/Pasadena Ave S 66th <strong>St</strong> N South <strong>City</strong> Limits 4,747.17 0.90<br />

SR 595/Alt 19/Tyrone Blvd N North <strong>City</strong> Limits 5th Ave N 17,245.17 3.27<br />

SR 693/66th <strong>St</strong> North <strong>City</strong> Limits 1st Ave S 13,906.42 2.63<br />

CR 581/58th <strong>St</strong> N North <strong>City</strong> Limits South <strong>City</strong> Limits 15,857.06 3.00<br />

CR 611/49th <strong>St</strong> North <strong>City</strong> Limits 1st Ave S 13,793.72 2.61<br />

US 19/34th <strong>St</strong> North <strong>City</strong> Limits I-275 32,403.66 6.14<br />

31st <strong>St</strong> 13th Ave N Southern Terminus 28,583.89 5.41<br />

CR 681/28th <strong>St</strong> North <strong>City</strong> Limits CR 138/22nd Ave S. 21,878.89 4.14<br />

CR 681/28th <strong>St</strong> Roosevelt Blvd N SR 600/Gandy Blvd 12,694.67 2.40<br />

16th <strong>St</strong> 77th Ave N 26th Ave S 35,668.74 6.76<br />

CR 803/Dr MLK, Jr. <strong>St</strong> I-275 Pinellas Point Dr S 66,132.01 12.53<br />

SR 687/4th <strong>St</strong> I-275 Pinellas Point Dr S 71,289.55 13.50<br />

3rd <strong>St</strong> 5th Ave N 5th Ave S 4,572.25 0.87<br />

1st <strong>St</strong> 79th Ave NE 8th Ave S 29,638.42 5.61<br />

Beach Dr NE C<strong>of</strong>fee Pot Blvd NE 1st Ave S 7,832.38 1.48<br />

I-275 96,029.00 18.20<br />

I-175 5,319.00 1.01<br />

I-375 6,086.00 1.15<br />

Total Federal-aid Roads 1,007,212.70 190.78<br />

FHWA – A – 1


FHWA – B – 1


FHWA – C – 1


<strong>St</strong>atewide Mutual Aid<br />

Name Employee #<br />

Pay Period <strong>St</strong>art Date<br />

Pay Period End Date<br />

Mission/Task #<br />

Date<br />

<strong>St</strong>art<br />

Time<br />

<strong>St</strong>op<br />

Time<br />

Hours<br />

Kronos<br />

Hrs Code<br />

Description/Location <strong>of</strong> Work<br />

* Backfill Only *<br />

Name <strong>of</strong> Deployed Employee<br />

Total Number <strong>of</strong> Hours for the Pay Period<br />

I certify that the above information is correct and can be validated from payroll records and/or from other documentation that is available for audit.<br />

Employee's Signature<br />

Supervisor's Signature<br />

Kronos Hours Codes:<br />

001EI - Emergency SWMA Deployed - Regular Hours<br />

104EI - Emergency SWMA Deployed - Overtime Hours<br />

Date:<br />

Date:<br />

001BF- Emergency SWMA Backfill – Regular Hours<br />

104BF- Emergency SWMA Backfill – Overtime Hours<br />

SMAA – A - 1