- Page 1 and 2: June 30 2010 FINAL REPORT
- Page 3 and 4: TABLE OF CONTENTS 1.0 PROJECT SCOPE
- Page 5 and 6: 10.3 Town Centre Foreshore Reserve
- Page 7 and 8: APPENDICES Appendix A First Round o
- Page 9 and 10: Issues and opportunities arising fr
- Page 11 and 12: 2.0 STRATEGIC CONTEXT 2.1 Council
- Page 13 and 14: Acquire, utilise and dispose of lan
- Page 15 and 16: Streaky Bay is recognised as a ‚M
- Page 17 and 18: Following the conclusion of the fir
- Page 19 and 20: • a Long Term Zoning Plan for the
- Page 21 and 22: • provide a framework for future
- Page 23: Feedback received from both rounds
- Page 27 and 28: Table 1 above shows that: • the t
- Page 29 and 30: Table 3 above demonstrates that:
- Page 31 and 32: Figure 1 24
- Page 33 and 34: Given the choice which now exists w
- Page 35 and 36: 6.0 HERITAGE 6.1 European Heritage
- Page 37 and 38: St Canute’s Catholic Church The S
- Page 39 and 40: Power Pole In the cutting with a pl
- Page 41 and 42: Further consultation with the indig
- Page 43 and 44: A lane for eastbound cyclists away
- Page 45 and 46: Associated works would include impr
- Page 47 and 48: • Flinders Highway/Bockelberg Str
- Page 49 and 50: 8.2 Goals Management goals for urba
- Page 51 and 52: 9.0 ZONING The community was provid
- Page 53 and 54: That part of the Industry Zone adja
- Page 55 and 56: 10.0 FORESHORE AND TOWN CENTRE The
- Page 57 and 58: • a foreshore boardwalk or shared
- Page 59 and 60: A number of submissions were made d
- Page 61 and 62: As well as any commercial opportuni
- Page 63 and 64: A concept has been prepared which p
- Page 65 and 66: Shelters should accommodate tables,
- Page 67 and 68: 11.11 Pedestrian Lighting Pedestria
- Page 69 and 70: One of the suggestions made at the
- Page 71 and 72: The statistics however are somewhat
- Page 73 and 74: • upgrade Alfred Terrace west of
- Page 75 and 76:
10. Introduce new policies and desi
- Page 77 and 78:
RECOMMENDATION 5: PRIORITY: Local R
- Page 79 and 80:
Construct public toilets at Moore
- Page 81 and 82:
APPENDIX A First Round of Community
- Page 83 and 84:
Streaky Bay Master Plan - Community
- Page 85 and 86:
Streaky Bay Master Plan - Community
- Page 87 and 88:
Streaky Bay Master Plan - Community
- Page 89 and 90:
Streaky Bay Master Plan - Community
- Page 91 and 92:
Streaky Bay Master Plan - Community
- Page 93 and 94:
Streaky Bay Master Plan - Community
- Page 95 and 96:
Streaky Bay Master Plan - Community
- Page 97 and 98:
Streaky Bay Master Plan - Community
- Page 99 and 100:
Streaky Bay Master Plan - Community
- Page 101 and 102:
Streaky Bay Master Plan - Community
- Page 103 and 104:
Streaky Bay Master Plan - Community
- Page 105 and 106:
APPENDIX B Second Round of Communit
- Page 107 and 108:
Streaky Bay Master Plan - Consultat
- Page 109 and 110:
Streaky Bay Master Plan - Consultat
- Page 111 and 112:
Streaky Bay Master Plan - Consultat
- Page 113 and 114:
Streaky Bay Master Plan - Consultat
- Page 115 and 116:
Streaky Bay Master Plan - Consultat
- Page 117 and 118:
Streaky Bay Master Plan - Consultat
- Page 119 and 120:
Streaky Bay Master Plan - Consultat
- Page 121 and 122:
Streaky Bay Master Plan - Consultat
- Page 123:
APPENDIX C Arbortech Tree Services
- Page 146 and 147:
District Council of Streaky Bay Str
- Page 148 and 149:
Document History and Status Rev Des
- Page 150 and 151:
1 Introduction Tonkin Consulting ha
- Page 152 and 153:
Key Result Area : Infrastructure An
- Page 154 and 155:
Bay Road Bike Lanes (Park Avenue -
- Page 156 and 157:
How Often Do You Ride ? Rarely 2 On
- Page 158 and 159:
3 Cycling in Streaky Bay - Opportun
- Page 160 and 161:
• The footpath around Eyre Avenue
- Page 162 and 163:
Further investigation is required t
- Page 164 and 165:
3.7 Supplementary Connections • C
- Page 166 and 167:
4 Summary of Recommendations Moore
- Page 168 and 169:
Fleming Terrace Priority Further In
- Page 170 and 171:
Appendix A Concept Bike Network Dis
- Page 172 and 173:
District Centre Precinct District C
- Page 174 and 175:
District Council of Streaky Bay Str
- Page 176 and 177:
Table of Contents 1 Introduction 1
- Page 178 and 179:
1 Introduction This Stormwater Mana
- Page 180 and 181:
BAY BAY BAY BAY BAY BAY BAY BETTS B
- Page 182 and 183:
Figure 2.2 Future Zoning (Masterpla
- Page 184 and 185:
© TONKIN CONSULTING N BOCKELBERG B
- Page 186 and 187:
provide Council with the required a
- Page 188 and 189:
© TONKIN CONSULTING N BOCKELBERG B
- Page 190 and 191:
2.5 Previous Investigations and Rep
- Page 192 and 193:
3 Stormwater Management Objectives
- Page 194 and 195:
Objective 1.1 Protect all properti
- Page 196 and 197:
Within new developments, encourage
- Page 198 and 199:
5 Stormwater Management Strategies
- Page 200 and 201:
These plans need to be prepared and
- Page 202 and 203:
ALEC BALDOCK ALEC BALDOCK ALEC BALD
- Page 204 and 205:
Medium Priority actions - Complete
- Page 206 and 207:
APPENDIX F Traffic Investigations:
- Page 208 and 209:
District Council of Streaky Bay Tra
- Page 210 and 211:
Table of Contents 1 Introduction 1
- Page 212 and 213:
Site Locations 7 8 6 9 1 2 4 3 5 Di
- Page 214 and 215:
Alfred Tce / Howard St / Mudge Tce
- Page 216 and 217:
Flinders Hwy / Williams Crescent -
- Page 218 and 219:
5 Flinders Drive / Hospital Drive /
- Page 220 and 221:
6 Flinders Highway / Bockelberg Str
- Page 222 and 223:
7 Flinders Highway / Park Avenue /
- Page 224 and 225:
Flinders Highway / Park Avenue / Re
- Page 226 and 227:
8.2 Wells Street - Concept Layout f
- Page 228 and 229:
The bike lane on the northern side
- Page 230 and 231:
8.2.9 Linklater Street to Bay Road
- Page 232 and 233:
Alfred Terrace / Linklater Street /
- Page 234 and 235:
Alfred Terrace (Mudge Terrace - Phi
- Page 236 and 237:
11.3 Flinders Highway / Bockelberg
- Page 238 and 239:
APPENDIX G MasterPlan Drawings 1. O
- Page 240 and 241:
C A P E B A U E R R O A D M A B I E
- Page 242 and 243:
TO CAPE BAUER On-road loop to Cape
- Page 244 and 245:
Retain Jetty’s working / recreati