1.0 PROJECT SCOPE<br />

MasterPlan SA Pty Ltd was appointed by the <strong>District</strong> <strong>Council</strong> <strong>of</strong> <strong>Streaky</strong> <strong>Bay</strong> in<br />

August 2009 to prepare a Master Plan for <strong>Streaky</strong> <strong>Bay</strong> township.<br />

The Project Team responsible for the preparation <strong>of</strong> the Master Plan was made<br />

up <strong>of</strong>:<br />

• MasterPlan SA Pty Ltd (project control, town planning, Master Plan<br />

preparation and coordination);<br />

• Tonkin Consulting Engineers (bicycle plan, traffic investigations and<br />

stormwater management plan); and<br />

• Wendy Davidson Enterprises (stakeholder and community consultation).<br />

The primary purpose <strong>of</strong> the Master Plan is to create a cohesive, community<br />

endorsed framework to guide investment and the development <strong>of</strong> public and<br />

privately owned land. The Master Plan will also be used as the basis for capital<br />

works grant funding, and may form the basis <strong>of</strong> amendments to <strong>Council</strong>’s<br />

Development Plan.<br />

1.1 Study Area<br />

The study area is the township <strong>of</strong> <strong>Streaky</strong> <strong>Bay</strong> including the surrounding<br />

hinterland which is visually and/or functionally connected to the town. The<br />

adjacent waters <strong>of</strong> Blanche Port <strong>Bay</strong> which frame the town’s setting are also part<br />

<strong>of</strong> the study area, but noting that most <strong>of</strong> the bay lies outside <strong>of</strong> the local<br />

government area (low water mark is the <strong>Council</strong> boundary). The use <strong>of</strong> Blanche<br />

Port <strong>Bay</strong> for water-related purposes will be investigated as part <strong>of</strong> a district-wide<br />

review which is being conducted for the <strong>Council</strong> as a separate exercise.<br />

The <strong>Council</strong> has deliberately chosen not to define a precise study area boundary.<br />

1.2 Elected Members and Senior Staff Workshop<br />

Prior to formulation <strong>of</strong> the brief, MasterPlan SA Pty Ltd conducted a workshop<br />

session with elected <strong>Council</strong> members and senior staff on Tuesday 21 October<br />

2008. The primary purpose <strong>of</strong> the workshop was:<br />

(i)<br />

(ii)<br />

to gain a better understanding <strong>of</strong> those local issues <strong>of</strong> concern to the<br />

<strong>Council</strong>; and<br />

to provide <strong>Council</strong> members and senior staff with ideas and suggestions<br />

for improvements to the town’s physical appearance and functional<br />

layout.