Structure 54<br />
Location (44.75760°N, 63.67664°W)<br />
No structure was installed here. Our environmental consultant is waiting to see if the hydrology<br />
of the river will change once machine work is performed at the s‐turn site.<br />
Structure 55<br />
Location (44.75744°N, 63.67635°W)<br />
No structure was installed here. Our environmental consultant is waiting to see if the hydrology<br />
of the river will change once machine work is performed at the s‐turn site.<br />
Structure 56<br />
Location (44.75746°N, 63.67600°W)<br />
No structure was installed here. Our environmental consultant is waiting to see if the hydrology<br />
of the river will change once machine work is performed at the s‐turn site.<br />
Structure 57<br />
Location (44.75766°N, 65.67590°W)<br />
No structure was installed here. <strong>The</strong>re are various concerns at the s‐turn. <strong>The</strong> site will be reassessed<br />
after machine work is performed later in <strong>2009</strong>.<br />
Structure 58<br />
Location (44.75764°N, 63.67563°W)<br />
A right log was installed here. A large deflector was built where the log ended. A log may need<br />
to be added to the end of the log if the deflector doesn’t hold through the year. A large pool<br />
was filled in to become the existing ramp. Upon completion the pool was 39cm deep and the<br />
wetted width was 4.90m.<br />
13 | D igger <strong>Log</strong> <strong>Installation</strong> <strong>2009</strong>