performance evaluation of technos cleaning balls in rdc msf pilot
performance evaluation of technos cleaning balls in rdc msf pilot
performance evaluation of technos cleaning balls in rdc msf pilot
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 1. Operat<strong>in</strong>g Conditions for Trial Tests <strong>of</strong> Technos Clean<strong>in</strong>g Balls<br />
Test location<br />
M<strong>in</strong>imum<br />
Duration<br />
TBT<br />
Conc. Ratio<br />
(BR)<br />
Type <strong>of</strong><br />
Antiscalant<br />
Dose Rate <strong>of</strong><br />
Antiscalant<br />
Sponge Balls Ball<br />
Clean<strong>in</strong>g<br />
Frequency<br />
No. <strong>of</strong><br />
Balls/Charge<br />
Test #1 :<br />
3 Weeks<br />
110 o C 1.4 DSB (M) 2 ppm Technos 6 cycles/<br />
5<br />
RDC MSF Pilot<br />
Plant<br />
(Nov. 2 to<br />
Nov. 23, 1998)<br />
8 hours<br />
Test #2 :<br />
4 Weeks<br />
107 ∼1.4 DSB (M) 3 ppm Technos 6 cycles/<br />
1600<br />
Jeddah III plant,<br />
(Unit 9)<br />
(Feb.22 to<br />
Mar. 23, 1999)<br />
8 hours<br />
Test #3:<br />
6 Weeks<br />
98 1.4 Belgard<br />
1 ppm Technos 8 cycles/<br />
500<br />
Al-Jubail II Plant,<br />
(Unit 16)<br />
(Sept.1 to<br />
Oct.14, 2001)<br />
EV 2030<br />
8 hours<br />
13