12.09.2014 Views

Swipe me! - Taxi Talk Magazine

Swipe me! - Taxi Talk Magazine

Swipe me! - Taxi Talk Magazine

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

mcc_0210<br />

Stormy Weather<br />

Contemporary Landscape Photography<br />

24 September 2010 – 20 March 2011 at The Ian Potter Centre: NGV Australia<br />

Drawn entirely from the NGV Collection,<br />

Stormy Weather will feature<br />

24 photographs by 11 renowned<br />

Australian photographers including<br />

Rosemary Laing, Harry Nankin,<br />

David Stephenson and Richard<br />

Woldendorp<br />

Frances Lindsay, Deputy Director,<br />

NGV said: “The works show how<br />

contemporary artists engage with<br />

landscape art, particularly focusing<br />

on their dynamic relationship to the<br />

environ<strong>me</strong>nt. These inspired photographs<br />

are almost as diverse as the<br />

land itself. D<br />

RIGHT: Harry Nankin<br />

born Australia 1953 - Of Great Western tears / Duet<br />

2 2006 - from The rain series 2006–07 - gelatin silver<br />

photographs - (a-b) 107.1 x 214.3 cm (overall) -<br />

National Gallery of Victoria, Melbourne - Purchased<br />

NGV Foundation, 2007 © Harry Nankin<br />

UNBEATABLE VALUE<br />

TAXI YELLOW RESPRAY<br />

Macarthur Wind Farm<br />

largest in the southern hemisphere<br />

For all your spray<br />

painting and panel<br />

beating needs<br />

Quality smash repairs<br />

from$1200<br />

incl GST<br />

Quality equip<strong>me</strong>nt<br />

and premium<br />

paints<br />

Professional staff<br />

MELBOURNE CITY CABS<br />

14 TRADE PLACE - COBURG<br />

9077 3550 0433 413 628<br />

*<br />

*CONDITIONS APPLY<br />

The largest wind farm in the<br />

southern hemisphere worth $1<br />

billion will be built in Victoria’s<br />

west over the next three years.<br />

It will be developed between the<br />

towns of Macarthur, Hawkesdale<br />

and Penshurst within the Shire of<br />

Moyne and is due for completion<br />

in 2013. The wind farm will have<br />

140 turbines with a total capacity<br />

of 420MW. D<br />

SEPTEMBER 2010 <strong>Taxi</strong> <strong>Talk</strong> - voice of the taxi industry<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!