03.10.2014 Views

Community Development - City of Stirling

Community Development - City of Stirling

Community Development - City of Stirling

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>City</strong> <strong>of</strong> <strong>Stirling</strong><br />

1999<br />

annual report


Your <strong>City</strong><br />

The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> began in 1871 as the Perth Road Board,<br />

became the Shire <strong>of</strong> Perth in 1961, and gained <strong>City</strong> status in<br />

1971.<br />

In 1871, when the total population <strong>of</strong> Western Australia was<br />

only 25,000, the (<strong>Stirling</strong>) district was five times larger than now,<br />

but the area was either rural or completely undeveloped. It then<br />

included what are now the Cities <strong>of</strong> Wanneroo, Bayswater and<br />

Belmont.<br />

By 1947 <strong>Stirling</strong>’s population was 31,000. It reached 84,000 in<br />

1961 and climbed above 160,000 in 1971 with the development<br />

<strong>of</strong> northern areas. In 1990 it was 180,000.<br />

The <strong>City</strong> now has an area <strong>of</strong> about 100 sq kms, and 30 suburbs<br />

stretching from Railway Parade, Mount Lawley to the<br />

Indian Ocean at Scarborough, Trigg, North Beach<br />

and Waterman.<br />

YOUR CITY’S MAKEUP:<br />

Population: 175,569<br />

Total area: 100 sq km<br />

Area <strong>of</strong> parks/gardens/developed<br />

reserves/natural areas: 977 ha<br />

Length <strong>of</strong> roads: 1,017 km<br />

Length <strong>of</strong> footpaths/dual use paths: 760 km<br />

Number <strong>of</strong> rateable assessments: est 75,505<br />

Number <strong>of</strong> non-rateable assessments: est 1,900<br />

Number <strong>of</strong> Wards: Seven<br />

Distance from Perth <strong>City</strong>: The Administration Centre is 8.5 kms<br />

from Perth GPO<br />

Child Health Centres: 14 - Alexander Park, Balcatta, Balga,<br />

Dianella, Hamersley, Inglewood, Karrinyup, Mirrabooka,<br />

Nollamara, Osborne, Scarborough, Trigg, Wembley Downs,<br />

Yokine.<br />

Senior Citizens/Autumn Centres: Seven - Balga, Dianella,<br />

Inglewood, Nollamara, North Beach, Osborne, Scarborough.<br />

Libraries: Six - Dianella, Inglewood, Karrinyup, Mirrabooka,<br />

Osborne, Scarborough.<br />

Recreation Centres: 10 - Balcatta (WK Moir), Dianella,<br />

Hamersley, Innaloo, Karrinyup, Mirrabooka, (Herb Graham),<br />

Nollamara, Scarborough, Tuart Hill (Grenville), Yokine.<br />

Women’s Refuge: <strong>Stirling</strong> Women’s Refuge.<br />

Swimming Pools: Two - Balga, Inglewood.<br />

Museum: Mount Flora Regional Museum, Flora Terrace, North<br />

Beach.<br />

Golf Courses: Hamersley,<br />

Registered dogs: 18,000 approx.<br />

CITY OF STIRLING<br />

ELECTORS GENERAL MEETING<br />

PURSUANT to S5.27 <strong>of</strong> the Local Government Act 1995 and Local<br />

Government Administration Regulations, Electors are cordially invited to<br />

attend the Electors General Meeting for the 1998-99 Financial Year<br />

which will be held at 7pm on Wednesday, September 29, 1999 in the<br />

Council Reception Hall, Civic Administration Centre, Civic Place, <strong>Stirling</strong>.<br />

The Order <strong>of</strong> Business will be:<br />

(a) Welcome, introduction and apologies;<br />

(b) Contents <strong>of</strong> the Annual Report for the 1998-99 Financial Year;<br />

(c) General Business.<br />

The draft Annual Financial Statements for the 1998-99 Financial Year are<br />

available for perusal at the <strong>City</strong>’s Accounting Services Department at the<br />

Main Administration Office.<br />

M.J. WADSWORTH<br />

Chief Executive Officer


Contents<br />

STIRLING’S VISION, MISSION, 2<br />

MAYOR’S REPORT 3<br />

CHIEF EXECUTIVE’S REPORT 4<br />

YOUR CITY’S MANAGERS 5<br />

YOUR CITY’S COUNCILLORS 6<br />

THE WARDS 7<br />

COMMUNITY DEVELOPMENT 8<br />

8-9 Leisure Services<br />

10 <strong>Community</strong> Services<br />

11-13 Building<br />

13-14 Planning<br />

15-16 Health<br />

WORKS 18<br />

17-18 Engineering Operations<br />

19-20 Engineering Design<br />

20-21 <strong>City</strong> Building<br />

22 Waste Management<br />

Operations<br />

23 Parks and Reserves<br />

HUMAN RESOURCES 24<br />

FINANCE AND CORPORATE SERVICES 25<br />

25 Accounting Services<br />

26 Information Technology<br />

27-28 Administrative Services<br />

29 Library Services<br />

30 Strategic Planning and<br />

Financial Management<br />

THE CITY’S STRATEGIC PLAN 31<br />

FINANCIAL STATEMENTS 35<br />

36 Statement by CEO<br />

37 Audit Statement<br />

38 Operating Statement<br />

39 Financial Position<br />

40 Changes in Equity<br />

41 Statement <strong>of</strong> Cash Flows<br />

42 Schedule 1 - General Purpose Income<br />

43 Schedule 2 - Statement <strong>of</strong> Rating<br />

Information<br />

1


<strong>Stirling</strong>’s Vision and Mission<br />

VISION<br />

Our vision is a description <strong>of</strong> the future<br />

we are aiming to achieve.<br />

STIRLING<br />

The <strong>City</strong> <strong>of</strong> Choice<br />

ACHIEVING THE IDEAL COMMUNITY<br />

MISSION<br />

A mission statement gives an<br />

organisation a sense <strong>of</strong> purpose<br />

and direction. The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>’s<br />

mission statement describes our<br />

primary focus which is...<br />

to provide services and facilities<br />

which enhance the well-being<br />

<strong>of</strong> our community<br />

VALUES<br />

Our values describe the things<br />

which are important to us in<br />

the way we do business.<br />

We strive to display our values in all our<br />

interactions - in Council, through<br />

Councillors and staff, and within our<br />

community. Our values are:<br />

We respect people<br />

We seek involvement from our<br />

community and value their input<br />

We strive for quality<br />

We demonstrate integrity in all we do<br />

We appreciate and recognise<br />

the contribution <strong>of</strong> all who<br />

work for the <strong>City</strong><br />

<strong>City</strong> <strong>of</strong> <strong>Stirling</strong><br />

Administration Offices,<br />

Civic Place, <strong>Stirling</strong>,<br />

Western Australia 6021<br />

Telephone: (08) 9345 8555<br />

Fax: (08) 9345 3073<br />

Web site address: http://www.stirling.wa.gov.au<br />

2


During 1998/99 the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> prepared<br />

the framework for at least two years <strong>of</strong> major<br />

infrastructure improvements, focusing on the<br />

building <strong>of</strong> community facilities, important road<br />

upgradings and the staged development <strong>of</strong> the<br />

<strong>Stirling</strong> Civic Precinct.<br />

This has allowed the <strong>City</strong> to continue <strong>Stirling</strong>’s<br />

strong record <strong>of</strong> sound and successful financial<br />

management.<br />

Additionally, <strong>Stirling</strong> is undoubtedly among the<br />

most stable and cohesive local government<br />

organisations in Western Australia, with an<br />

excellent working rapport between <strong>City</strong><br />

management and your elected representatives.<br />

The local government elections in May, 1999<br />

saw the <strong>City</strong> adopt postal voting – supervised by<br />

the Electoral Commission – for the first time,<br />

resulting in an outstanding fourfold increase in<br />

voter participation, to a 37 per cent valid postal<br />

return.<br />

I congratulate all <strong>of</strong> the candidates for the<br />

integrity <strong>of</strong> their campaigning, and the electors<br />

who showed their liking for the simplicity and<br />

convenience <strong>of</strong> the postal ballot. The results<br />

indicated a preference for experience, with all<br />

sitting or former Councillors who contested<br />

elections being returned.<br />

Following the elections I was deeply honoured<br />

to receive the unanimous support <strong>of</strong> Council in<br />

being returned unopposed for a second, twoyear<br />

term as your Mayor.<br />

<strong>Stirling</strong> is undergoing a period <strong>of</strong> economic<br />

boom, according to the key indicator <strong>of</strong><br />

construction activity. The <strong>City</strong> has recorded its<br />

fifth successive year <strong>of</strong> record building activity –<br />

topping $250 million in building licence<br />

approvals – driven by residential redevelopment<br />

and expansion in the commercial sector,<br />

particularly retail.<br />

The <strong>City</strong>’s own community projects construction<br />

program over the next two years will<br />

complement private sector development.<br />

The redevelopment <strong>of</strong> the Inglewood Swimming<br />

Pool and the new Osborne Library and<br />

<strong>Community</strong> Centre are but just two examples <strong>of</strong><br />

big ticket capital expenditure items which have<br />

been planned with an emphasis on customer<br />

requirements for the coming decades.<br />

An important project which will be completed in<br />

the coming 12 months will be relocation <strong>of</strong><br />

Council’s works depot within industrial land at<br />

Balcatta. The purpose-designed depot will not<br />

only improve the efficiency <strong>of</strong> our workforce, but<br />

also free up valuable land on the existing Cedric<br />

Street site for the development <strong>of</strong> the <strong>Stirling</strong><br />

Civic Precinct.<br />

The long-planned development <strong>of</strong> land nearby<br />

the <strong>Stirling</strong> Interchange will see the Precinct<br />

blend new Civic <strong>of</strong>fices and public facilities with<br />

a mixture <strong>of</strong> quality commercial and residential<br />

development. The conceptual focus for the<br />

Mayor’s Report<br />

<strong>Stirling</strong> Civic Precinct has always been to create<br />

an identifiable heart for the <strong>City</strong>, which can take<br />

advantage <strong>of</strong> the centralised location and the<br />

transport infrastructure <strong>of</strong> the Freeway and Rail<br />

Interchange.<br />

The <strong>City</strong>’s own fragmented administration<br />

buildings are long overdue for replacement, and<br />

the consolidated <strong>of</strong>fices will have far more<br />

efficient – but no greater – space than the<br />

existing premises.<br />

The <strong>City</strong>’s communications with stakeholders on<br />

this and other developments will be ongoing.<br />

In the past financial year we have sharply<br />

increased ratepayer communications, and<br />

introduced regular Ward meetings in addition to<br />

encouraging ratepayer and resident input into a<br />

variety <strong>of</strong> studies.<br />

In the special focus area <strong>of</strong> youth we have<br />

continued our quarterly meetings with school<br />

principals and religious leaders as well as<br />

working closely with State Government<br />

agencies.<br />

The <strong>City</strong> in 1999 also began the <strong>Stirling</strong> Youth<br />

Advisory Council to empower young people to<br />

help us meet their needs and expectations. Their<br />

assistance will see, for example, our first<br />

skateboard facility built at Balga.<br />

Our recognition <strong>of</strong> Scarborough as a key<br />

regional asset is also recognised in the<br />

development <strong>of</strong> a Vision for the<br />

highly popular beach area.<br />

Again we have been<br />

through a period <strong>of</strong> intense<br />

public input from the<br />

$60,000 Scarborough<br />

Ideas Competition.<br />

The commitment <strong>of</strong><br />

<strong>Stirling</strong> employees is<br />

heartily acknowledged, as<br />

is the great contribution <strong>of</strong><br />

our hundreds <strong>of</strong> volunteer<br />

community workers.<br />

Extremely<br />

important at<br />

the same time<br />

is the clear and<br />

dedicated role<br />

<strong>of</strong> my fellow<br />

Councillors who<br />

have set<br />

extremely<br />

high standards<br />

in<br />

carrying out<br />

their<br />

role as public<br />

sector directors<br />

<strong>of</strong> a large and<br />

robust<br />

organisation.<br />

The Mayor<br />

Cr Tony<br />

Vallelonga JP.<br />

3


Chief Executive<br />

Officer M J (Mike)<br />

Wadsworth.<br />

Chief Executive’s Report<br />

T<br />

he <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> consolidated its position<br />

as a West Australian leader in local<br />

government during the 1998/99 financial year.<br />

Takeover bids by two small neighbouring<br />

Councils for several <strong>of</strong> <strong>Stirling</strong>’s southern<br />

suburbs were rejected by Local Government<br />

Minister Paul Omodei early in the financial<br />

year, allowing the <strong>City</strong> to renew its strong<br />

focus on the important business <strong>of</strong> improving<br />

the services and products provided for<br />

ratepayers and residents.<br />

The continuing focus on customers was<br />

emphasised when Mr Omodei launched the<br />

<strong>City</strong>’s inaugural Customer Service Week in<br />

March, 1999.<br />

The week brought to fruition the first stage <strong>of</strong><br />

an 18-month long strategic campaign from the<br />

Mayor, Councillors and Executive management<br />

to improve the way the <strong>City</strong> deals with the<br />

public, including customer service training <strong>of</strong><br />

all 700 employees.<br />

The organisation <strong>of</strong> Customer Service Week<br />

was a joint and cooperative effort between<br />

senior managers and frontline staff.<br />

Activities during the week-long celebration <strong>of</strong><br />

customer service initiatives were: the launch <strong>of</strong><br />

customer service charters by the Minister, the<br />

release <strong>of</strong> public comment and action cards,<br />

small giveaways to customers, all senior<br />

managers and some Councillors attending the<br />

frontline counters, public acknowledgment <strong>of</strong><br />

the 10,000th customer at the Mirrabooka<br />

Service Centre, a <strong>Community</strong> Newspaper<br />

insert to <strong>Stirling</strong> households, customer focus<br />

visits to all the <strong>City</strong>’s external centres, ongoing<br />

service training for high inquiry areas and a<br />

program to address the special needs <strong>of</strong> the<br />

disabled.<br />

A second Customer Service Week is<br />

scheduled for<br />

March, 2000.<br />

The<br />

commitment<br />

to customer<br />

service is<br />

also<br />

enshrined<br />

in <strong>Stirling</strong>’s<br />

new<br />

Strategic<br />

Plan,<br />

4<br />

which gives the <strong>City</strong> an extended “roadmap”<br />

for the next five years.<br />

<strong>Stirling</strong>’s Strategic Plan is a concise and easily<br />

readable document, and is included in this<br />

Annual Report.<br />

The Plan recognises not only the richness <strong>of</strong><br />

the <strong>City</strong>’s diversity, but also the diverse role <strong>of</strong><br />

a large municipal authority.<br />

Other emphasis is put on the maintenance <strong>of</strong><br />

core responsibilities, promotion <strong>of</strong> innovation,<br />

improvement to community lifestyle, better<br />

business processes, leadership in<br />

recruitment and training, open<br />

communication and the optimal<br />

usage <strong>of</strong> assets and revenue.<br />

The Plan specifically endorses the<br />

design and construction <strong>of</strong> a multistage<br />

Civic Centre and Civic<br />

Precinct at <strong>Stirling</strong>, a range <strong>of</strong> large<br />

community facility projects (such<br />

as the Inglewood Aquatic Centre<br />

redevelopment), the regional<br />

significance <strong>of</strong> Scarborough<br />

Beach, the need to be at the<br />

forefront <strong>of</strong> technology, regional<br />

leadership in waste management<br />

and recycling, and the active<br />

promotion <strong>of</strong> achievements.<br />

The <strong>City</strong> has embarked on a<br />

budgetary program for the coming<br />

12 months which is dominated by<br />

capital expenditure on<br />

improvements to community<br />

facilities as well as a significant<br />

increase in road and building<br />

upgrades.<br />

The role and functions <strong>of</strong> local<br />

government continues to expand as we<br />

improve community lifestyle through new<br />

activities such as the successful introduction<br />

<strong>of</strong> 24-hour security patrols.<br />

To meet the needs <strong>of</strong> our ratepayers and<br />

residents the <strong>City</strong> in the coming years will<br />

strive to improve public awareness <strong>of</strong> its<br />

services, and to carefully monitor the utilisation<br />

<strong>of</strong> our facilities so we can keep pace with<br />

changing and new demands.<br />

As we look to the 21st century the major issue<br />

is what should local government be doing<br />

now, especially in the form <strong>of</strong> capital works<br />

infrastructure, so that our successors as<br />

residents will commend us for our foresight.<br />

The organisation has recently undergone a<br />

management restructure to help us achieve<br />

those outcomes and I am delighted to again<br />

report the strong cooperation and support <strong>of</strong><br />

employees for the <strong>City</strong>’s mission and goals.<br />

Likewise, the Executive works well and closely<br />

with the elected Councillors whose role as<br />

directors <strong>of</strong> the organisation guarantees<br />

continuous public-based input to the future <strong>of</strong><br />

the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>.


<strong>City</strong>’s Managers<br />

As at 30 June, 1999<br />

North Beach<br />

Road, Gwelup,<br />

benefited from<br />

<strong>Stirling</strong>’s<br />

commitment to<br />

improving<br />

streetscapes.<br />

Chief Executive Officer<br />

- Mike Wadsworth<br />

Deputy Chief Executive Officer<br />

- Rod Constantine<br />

Executive Manager <strong>Community</strong> <strong>Development</strong><br />

- Stuart Johnson<br />

Executive Manager Works/Business Units<br />

- Ross Moody<br />

Manager Administrative Services<br />

- Craig Watts<br />

Manager Human Resources<br />

- Trevor Holland<br />

Manager <strong>City</strong> Building Operations<br />

- Bruce McGeorge<br />

Manager Parks and Reserves<br />

- Sam Morrison<br />

Principal Environmental Health Officer<br />

- Les Float<br />

Principal Building Surveyor<br />

- Andre Gillot<br />

Manager Planning Services<br />

- Theo van Looji<br />

Manager Leisure Services<br />

- Fiona Strutt<br />

Manager <strong>Community</strong> Services<br />

- Pat Olver<br />

Manager Accounting Services<br />

- Bob Henderson<br />

Manager Strategic Planning and Financial Management - Rod Watts<br />

Manager Libraries, Art and Culture<br />

- Kay Poustie<br />

Manager Information Technology<br />

- Kim Browne<br />

Waste Operations Manager<br />

- Brian Jones<br />

Manager Engineering Design<br />

- Al Valvasori<br />

Manager Engineering Operations<br />

- Ron Spragg<br />

The <strong>City</strong> has<br />

undertaken<br />

many street<br />

beautification<br />

projects in the<br />

past year to<br />

help improve<br />

the overall look<br />

<strong>of</strong> <strong>Stirling</strong>.<br />

5


■<br />

YOUR CITY’S<br />

COUNCILLORS<br />

HAMERSLEY WARD<br />

Cr G Italiano, 6 Widgeon Close, <strong>Stirling</strong> 6021. Telephone: 9446<br />

8897, Fax: 9446 8897, Mob: 0419 240 655. Term ends 2001.<br />

Committees: Technical Services; Town Planning and Statutory<br />

Services.<br />

Cr P L Rose JP, 21 Sunart Close, Hamersley, 6022. Tel: 9247 5235,<br />

Mob: 0417 924 103. Term ends 2003. Committees: Policy,<br />

Corporate Planning, Budget and Finance; House.<br />

■<br />

BALGA WARD<br />

Cr J Copley JP (Deputy Mayor), 249 Mirrabooka Avenue, Balga<br />

6061. Tel: 9342 6690, Fax: 9342 8855, Mob: 0419 247 606. Term<br />

ends 2003. Committees: Technical Services; House.<br />

Cr D Boothman, 20 Garrick Way, Balga 6061. Tel: 9247 2174, Fax:<br />

9247 2174, Mob: 0419 047 224. Term ends 2001. Committees:<br />

Policy, Corporate Planning, Budget and Finance.<br />

■<br />

INGLEWOOD WARD<br />

Cr T J Tyzack, 23 Wordsworth Avenue, Yokine 6060,<br />

Tel: 9444 5381, Fax: 9242 1279, Mob: 0419 045 980.<br />

Term ends: 2001. Committees: Town Planning and<br />

Statutory Services; Policy, Corporate Planning,<br />

Budget and Finance.<br />

Cr R J Daniel, 43 Sexton Road, Inglewood 6052. Tel:<br />

9271 5242, Fax: 9272 7323. Term ends 2003.<br />

Committees: Technical Services; House.<br />

■<br />

LAWLEY WARD<br />

Cr T W Clarey, 38 Melrose Crescent, Mount Lawley<br />

6050, Tel: 9370 2588, Fax: 9370 3896. Term ends<br />

2003. Committees: Town Planning and Statutory<br />

Services; Policy, Corporate Planning, Budget and<br />

Finance.<br />

Cr R M Willox JP, 9 Dene Street, Mount Lawley 6050.<br />

Tel: 9271 7332, Fax: 9370 5671, Mob: 0419 249 288.<br />

Term ends 2001. Committees: Technical Services;<br />

Policy, Corporate Planning, Budget and Finance.<br />

■<br />

OSBORNE WARD<br />

Cr A A Spagnolo JP, 21 Coatelan Drive, <strong>Stirling</strong> 6021,<br />

Tel: 9344 2085, Fax: 9344 2739, Mob: 0419 043 174.<br />

Term ends 2003. Committees: Town Planning and<br />

Statutory Services; House.<br />

Cr D C Vallelonga JP (Mayor), 8 Udall Place, Gwelup<br />

6018. Tel: 9446 9363, Fax: 9445 3132, Mob: 0417 992<br />

272. Term ends 2001. Committees: Technical<br />

Services; Town Planning and Statutory Services;<br />

Policy, Corporate Planning, Budget and Finance; House.<br />

■<br />

SCARBOROUGH WARD<br />

Cr J M Camilleri OAM JP, 21 Birchwood Avenue, Woodlands 6018.<br />

Tel: 9446 3201, Fax: 9445 3406. Term ends 2001. Committees:<br />

Technical Services; House.<br />

Cr B R Ham, 113 Rosewood Avenue, Woodlands 6018.<br />

Tel: 9446 1488, Fax: 9244 7046, Mob: 0417 915 772. Term ends<br />

2003. Committees: Town Planning and Statutory Services; Policy,<br />

Corporate Planning, Budget and Finance.<br />

■<br />

COASTAL WARD<br />

Cr W M Stewart, 60 Elsie Street, Waterman 6020.<br />

Tel: 9448 6080, Fax: 9448 6097. Term ends 2003. Committees:<br />

Technical Services; House.<br />

Cr E Martin, 3a Hale Street, Waterman 6020.<br />

Tel: 9243 1370, Fax: 9243 1370, Mob: 0419 047 126. Term ends<br />

2001. Committees: Town Planning and Statutory Services.<br />

COASTAL<br />

6<br />

Cr Bill<br />

Stewart<br />

Cr Eion<br />

Martin<br />

Cr Peter Rose<br />

Cr Joe Camilleri OAM<br />

HAMERSLEY<br />

SCARBOROUGH<br />

Cr John Italiano<br />

Cr Brian Ham


BALGA<br />

INGLEWOOD<br />

Cr June Copley<br />

Deputy Mayor<br />

Cr David Boothman<br />

Cr Terry Tyzack<br />

Cr Bob Daniel<br />

LAWLEY<br />

Cr Trevor Clarey<br />

OSBORNE<br />

Cr Tony Vallelonga<br />

Mayor<br />

Cr Adam Spagnolo<br />

Cr Rod Willox<br />

7


<strong>Community</strong> <strong>Development</strong><br />

Leisure Services<br />

An ever-popular<br />

favourite,<br />

the Inglewood<br />

Swimming<br />

Pool is to<br />

undergo a $7.5<br />

million refurbishment.<br />

OBJECTIVES OF THE DEPARTMENT:<br />

To plan, manage, coordinate and promote the<br />

provision <strong>of</strong> quality, safe, recreation facilities,<br />

services and resources in the <strong>City</strong> so that<br />

residents and visitors can participate in a range<br />

<strong>of</strong> leisure activities which will enhance their<br />

quality <strong>of</strong> life.<br />

MAJOR HIGHLIGHTS:<br />

• Adoption <strong>of</strong> plans for the<br />

redevelopment <strong>of</strong> Inglewood<br />

Aquatic Centre<br />

• Completion <strong>of</strong> the Regional<br />

Recreation Facilities<br />

Strategy Plan for the<br />

North Metropolitan<br />

Regional Recreation<br />

Advisory Committee<br />

• Completion <strong>of</strong><br />

Business Plans for<br />

<strong>Community</strong> and<br />

Recreation Centre<br />

• Major<br />

improvements in<br />

utilisation <strong>of</strong> Yokine<br />

and Karrinyup<br />

<strong>Community</strong> Centres<br />

• Appointment <strong>of</strong> a<br />

new manager at Herb<br />

Graham Recreation Centre<br />

• Review <strong>of</strong> Child Services to<br />

improve efficiency and<br />

effectiveness<br />

• Highly successful events program<br />

including the Sunset Jazz concerts, with the<br />

Jazz Divas being the undoubted showpiece in<br />

Civic Gardens<br />

The areas <strong>of</strong> <strong>Community</strong> Arts and Festivals<br />

have been expanding over the last few years. It<br />

is an exciting component <strong>of</strong> the <strong>City</strong>’s Leisure<br />

Services Department consisting <strong>of</strong> several<br />

budget areas and subsidiary projects including:<br />

• <strong>Community</strong> arts<br />

• Pageants, fairs and carnivals<br />

• Programs in the park<br />

• Naming reserves (subsidiary project)<br />

• Playgrounds (subsidiary project)<br />

The overall vision <strong>of</strong> Leisure Services Special<br />

Projects is:<br />

“To provide programs, one-<strong>of</strong>f events, financial<br />

assistance and pr<strong>of</strong>essional advice to<br />

community groups, individuals and<br />

organisations to encourage the promotion <strong>of</strong><br />

arts and culture within the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>”<br />

The subsidiary projects aim to provide<br />

excellence, safety and recognition within, and<br />

for, the community.<br />

Income is generated through sponsorship and<br />

grants from Arts funding organisations such as<br />

Healthway, the Lotteries Commission and Arts<br />

WA and local businesses.<br />

COMMUNITY ARTS<br />

The <strong>Community</strong> Arts program <strong>of</strong>fered a range<br />

<strong>of</strong> activities and projects which provided an<br />

opportunity for groups to display their artistic<br />

skills and for the public to view and purchase<br />

them. Activities included:<br />

• Craft Extravaganza – Again a successful<br />

event which secured in-kind sponsorship for<br />

local art and craft outlets. The event also<br />

played host for the 1998 International Scarf<br />

Exchange.<br />

• “You’re Never Too Old To Be Young” Expo –<br />

Coordinated by several departments and<br />

held at Scarborough Civic Centre, this expo<br />

introduced the community to seniors<br />

information and activity-based projects.<br />

• Mural – This project involved the application<br />

<strong>of</strong> a mural on the top level <strong>of</strong> the Mount<br />

Flora Regional Museum by a local artist.<br />

<strong>Community</strong> artist<br />

Richard Fry and<br />

local students<br />

worked together<br />

to create works<br />

<strong>of</strong> art at this<br />

year’s<br />

Multicultural<br />

Family Festival.<br />

8


<strong>Community</strong> <strong>Development</strong><br />

Leisure Services<br />

• <strong>Community</strong> Centre art exhibitions – Jim<br />

Satchell and Yokine <strong>Community</strong> Centres both<br />

held art and craft exhibitions in which the<br />

public was able to purchase and view local<br />

works.<br />

• <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> Art Award – This acquisitive<br />

art award showcased excellence in twodimensional<br />

art at the Karrinyup <strong>Community</strong><br />

Centre.<br />

PAGEANTS, FAIRS AND CARNIVALS<br />

<strong>Community</strong> Fairs – Several community fairs<br />

and festivals were held last year which were<br />

predominantly free events to encourage the<br />

public to participate and generate a sense <strong>of</strong><br />

community. The events included:<br />

• <strong>Stirling</strong> Multicultural Family Festival<br />

• Seniors Music Workshops<br />

• Swingtime in the Park<br />

• Daybreak 6000<br />

• Sunset Jazz Concert Series<br />

• Viva Latina, Scarborough Civic Centre<br />

• Carine <strong>Community</strong> Fair<br />

• Awesome Children’s Festival<br />

• Intergenerational Walks<br />

• Skate Fest<br />

• Balga Pool Open Day<br />

Carols by Candlelight events – Three were held<br />

across the <strong>City</strong> ranging in size and duration.<br />

These included:<br />

• Christmas at Scarborough<br />

• Carols by Candlelight at Scarborough Senior<br />

High School<br />

• Balga Family Celebration<br />

PROGRAMS IN THE PARK<br />

Participark proved successful in 1999, enabling<br />

young people in the <strong>City</strong> to visit their local park<br />

and enjoy free activities and entertainment.<br />

After a review <strong>of</strong> this program it has been<br />

agreed that Participark not be held in future<br />

years and the Budget be deleted.<br />

NAMING OF RESERVES<br />

There were few naming requests this financial<br />

year. Two requests were approved for tree<br />

planting ceremonies in honour <strong>of</strong> local people<br />

at Waterman Beach and Booker/Morley<br />

Reserve, Dianella. The cost <strong>of</strong> these was met<br />

by the family.<br />

PLAYGROUNDS<br />

A number <strong>of</strong> playgrounds were upgraded as<br />

the fifth year <strong>of</strong> the <strong>City</strong>’s upgrading schedule.<br />

This saw the completion <strong>of</strong> all regional<br />

playgrounds and a number <strong>of</strong> major<br />

playgrounds within each Ward. Art will be<br />

incorporated into the regional playgrounds in<br />

the next three to seven years, depending<br />

on budget.<br />

The following systems have been developed<br />

throughout the year to improve procedures:<br />

• Preparation <strong>of</strong> a yearly plan for Arts and<br />

Festivals for 1999/2000 to assist with budget<br />

preparation.<br />

• <strong>Development</strong> <strong>of</strong> an Arts Working Group to<br />

improve coordination between departments,<br />

including a review <strong>of</strong> existing projects.<br />

• Hire <strong>of</strong> Banner Poles Policy, guidelines and<br />

fee schedule.<br />

• Deletion <strong>of</strong> Activity H607 Programs in the<br />

Park. As a result <strong>of</strong> the review <strong>of</strong> Arts and<br />

Festivals by the Arts Working Group it was<br />

agreed that Participark was to be deleted<br />

from the program <strong>of</strong> activities, hence<br />

enabling this activity to be deleted.<br />

• Handing over <strong>of</strong> Youth Activity H609 to the<br />

Youth Officer.<br />

Major projects to be undertaken during the<br />

1999/2000 financial year include:<br />

• Expanding and improving on all events and<br />

projects within the two budget areas;<br />

<strong>Community</strong> Arts and Pageants, Fairs and<br />

Carnivals, based on evaluations and<br />

community/coordinator feedback.<br />

• <strong>Development</strong> <strong>of</strong> sponsorship kits.<br />

• Application for<br />

outside funding<br />

based on a<br />

joint<br />

submission.<br />

The You’re Never<br />

Too Old To Be<br />

Young Seniors<br />

Expo allowed<br />

seniors to discover<br />

new information<br />

and a range <strong>of</strong> pursuits.<br />

A dog wash service<br />

on <strong>Stirling</strong>’s<br />

beaches proved to<br />

be highly popular.<br />

9


<strong>Community</strong> <strong>Development</strong><br />

<strong>Community</strong> Services<br />

High energy<br />

Skate Fests<br />

helped to<br />

bridge the<br />

gap between<br />

young people<br />

and the <strong>City</strong><br />

<strong>of</strong> <strong>Stirling</strong>.<br />

OBJECTIVES OF THE DEPARTMENT<br />

To provide a range <strong>of</strong> community services for<br />

residents <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> and to work in<br />

conjunction with other <strong>City</strong> departments,<br />

Federal, State and non-government<br />

organisations to ensure the most efficient use<br />

<strong>of</strong> resources by:<br />

• Efficient management <strong>of</strong> a range <strong>of</strong><br />

community services for residents <strong>of</strong> the <strong>City</strong><br />

<strong>of</strong> <strong>Stirling</strong>.<br />

• Maintaining buildings under the control <strong>of</strong><br />

the <strong>Community</strong> Services Department in<br />

good repair.<br />

• Maximising Government grant funding for all<br />

departmental programs.<br />

• Undertaking new initiatives to develop the<br />

range <strong>of</strong> community services <strong>of</strong>fered to<br />

residents.<br />

• Recognising the importance <strong>of</strong> our<br />

Personnel.<br />

MAJOR HIGHLIGHTS<br />

• Funding Contracts<br />

specifications have been<br />

met and exceeded for both<br />

output and outcome criteria.<br />

• A grant for $52,054 has<br />

been obtained from the<br />

Lotteries Commission for<br />

equipping the new<br />

Diversional (Day) Centre at<br />

11 Lemana Court,<br />

Nollamara.<br />

• The Osborne <strong>Community</strong><br />

Centre project has been<br />

progressed to the point<br />

where construction will<br />

begin soon.<br />

• A highly successful Seniors<br />

Expo was held over two days which<br />

attracted 8,000 visitors and was<br />

supported by a wide variety <strong>of</strong> service<br />

providers, both public and<br />

private/commercial.<br />

• Staff have been active in significant working<br />

committees developing Home and<br />

<strong>Community</strong> Care Program Policies for the<br />

future.<br />

• The Younger Disabled Clients <strong>of</strong> the<br />

Diversional Services Program held several<br />

concerts for family and friends over the year.<br />

This new initiative was enjoyed by the<br />

participants and very much appreciated by<br />

their audiences.<br />

• The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> Youth Advisory<br />

Committee has been formed which will<br />

provide an effective link between Council<br />

and younger residents <strong>of</strong> the <strong>City</strong>.<br />

MAJOR ITEMS OF EXPENDITURE<br />

AND/OR EXPECTED OUTCOME:<br />

• Building <strong>of</strong> new Diversional (Day) Centre<br />

at 11 Lemana Court, Nollamara. This<br />

project will enable the program to provide<br />

services with easy access for clients <strong>of</strong> the<br />

area. HACC has provided $250,000 towards<br />

building costs and the Lotteries Commission<br />

$52,054 to equip the centre. The <strong>City</strong> has<br />

allocated $70,000 towards the total cost.<br />

• Commencement <strong>of</strong> the building <strong>of</strong> a new<br />

<strong>Community</strong> Centre to replace Osborne<br />

Autumn Centre. This will enable a wider<br />

variety <strong>of</strong> programs to be <strong>of</strong>fered to aged<br />

and general residents <strong>of</strong> the area and is to<br />

be developed in conjunction with the new<br />

Osborne Library. The facility at a total cost<br />

<strong>of</strong> $5.26 million will be substantially<br />

completed this financial year. A grant<br />

application towards the costs <strong>of</strong> the<br />

<strong>Community</strong> Centre component has been<br />

submitted to the Lotteries Commission.<br />

• Provision <strong>of</strong> a Food Services Facility.<br />

Approximately $300,000 will be required to<br />

convert an existing kitchen or other building<br />

to replace the current facility which is to be<br />

demolished.<br />

• New Proposal for Corporate Action Plans.<br />

- Autumn Centre evaluation <strong>of</strong> future trends<br />

and requirements <strong>of</strong> older residents <strong>of</strong> the<br />

<strong>City</strong> <strong>of</strong> <strong>Stirling</strong>.<br />

- Aged and disabled transport review in<br />

conjunction with HACC Pilot Transport<br />

Brokerage project.<br />

- <strong>Development</strong> <strong>of</strong> skateboard facilities at<br />

Balga and Scarborough.<br />

DIFFICULTIES/CHALLENGES AND<br />

PROPOSED SOLUTIONS<br />

Challenges continue to be faced due to the<br />

“commercialisation” <strong>of</strong> many community<br />

services, the competitive tendering<br />

environment and “user pays” pressure from<br />

State and Federal Governments.<br />

Autonomy and the ability to act quickly must<br />

be enabled within the Local Government<br />

system if we are to compete fairly and<br />

favourably in the new environment.<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES<br />

Staff are fully involved in the Local Area<br />

Workplace Agreement training. This will result<br />

in a clearer understanding <strong>of</strong> the scope <strong>of</strong><br />

services and the most efficient and effective<br />

ways to deliver these services.<br />

OTHER INFORMATION<br />

<strong>Community</strong> Services Department staff are<br />

enthusiastic and motivated and are influential<br />

in spheres where future trends are discussed<br />

and directed.<br />

10


<strong>Community</strong> <strong>Development</strong><br />

Building<br />

OBJECTIVES OF THE DEPARTMENT<br />

To provide a Building Control Service for the <strong>City</strong><br />

<strong>of</strong> <strong>Stirling</strong>.<br />

MAJOR HIGHLIGHTS<br />

Record level <strong>of</strong> construction activity in excess <strong>of</strong><br />

$250 million<br />

MAJOR ITEMS OF EXPENDITURE<br />

AND/OR EXPECTED OUTCOME:<br />

Major item <strong>of</strong> expenditure – salaries<br />

DIFFICULTIES/CHALLENGES<br />

ENCOUNTERED - PROPOSED<br />

SOLUTIONS:<br />

High levels <strong>of</strong> building activity resulting in staff<br />

shortages.<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES;<br />

Improved quality control through the<br />

assessment process<br />

SWIMMING POOLS<br />

The State Government promulgated legislation<br />

under Section 245A <strong>of</strong> the Local Government<br />

Act on January 11, 1991 requiring all local<br />

authorities to inspect every private swimming<br />

pool within their municipal district at least once<br />

before July 1, 1992 and then periodically at least<br />

once in every four-year period.<br />

Prior to the introduction <strong>of</strong> the State<br />

Government Legislation in Western Australia 10<br />

deaths occurred in 1988 <strong>of</strong> children aged 0 to 4<br />

years, five deaths in 1989 and eight more deaths<br />

in 1990 prompting the government to amend the<br />

Private Swimming Pool Fencing Legislation.<br />

Statistics indicated that after implementation<br />

and completion <strong>of</strong> the first round <strong>of</strong> private<br />

swimming pool inspections, infant deaths in<br />

private swimming pools reduced to only one in<br />

1993 and three in 1994.<br />

In the year July 1, 1998 to June 30, 1999, two<br />

deaths occurred within the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>, the<br />

first being an elderly gentleman and the second,<br />

a four-year-old boy. Both cases were the subject<br />

<strong>of</strong> a coronial investigation. Pool security was not<br />

considered to be a contributing factor in either<br />

<strong>of</strong> the deaths.<br />

Two rounds <strong>of</strong> the Private Swimming Pool<br />

Inspection Program have been completed with<br />

the third and current round under way. This<br />

round is scheduled to be completed on or<br />

before June 30, 2000 and within statutory<br />

requirements.<br />

The third round <strong>of</strong> the Private Swimming Pool<br />

Inspection program began on July 1, 1997 and<br />

is due for completion by June 30, 2000.<br />

Number <strong>of</strong> pools estimated at<br />

commencement <strong>of</strong> the third round<br />

<strong>of</strong> the Inspection Program 7,771<br />

Number <strong>of</strong> new pool applications<br />

processed 204<br />

Number <strong>of</strong> pools removed or cancelled<br />

(July 1, 1998 to June 30, 1999) 76<br />

Total number <strong>of</strong> pools inspected to<br />

June 30, 1999 5,041<br />

Generally, problems related to the improper<br />

maintenance <strong>of</strong> self-closing gates and difficulty<br />

<strong>of</strong> gaining access to some properties.<br />

A small number <strong>of</strong> owners required repeated<br />

visits to ensure remedial works were undertaken.<br />

For the first time, pool owners received a Pool<br />

Inspection Levy <strong>of</strong> $10 included on their rates<br />

notice. This fee will be charged each year over<br />

the four-year inspection period to cover the full<br />

cost <strong>of</strong> the inspection <strong>of</strong> $40.<br />

This billing method has significantly reduced the<br />

The construction<br />

<strong>of</strong> Innaloo<br />

Central Shopping<br />

Centre saw<br />

shops being<br />

leased in record<br />

time, continuing<br />

<strong>Stirling</strong>’s<br />

phenomenal<br />

growth.<br />

11


<strong>Community</strong> <strong>Development</strong><br />

Building<br />

This represents the highest value <strong>of</strong> construction<br />

in any single year recorded in the <strong>City</strong>’s history.<br />

This year’s construction activity is also greater<br />

than the building booms <strong>of</strong> 1989 and 1994.<br />

Construction values for previous years have<br />

been indexed to represent equivalent<br />

construction values.<br />

The result is even more remarkable given that<br />

construction activity for Maylands was excluded<br />

from this year’s figures.<br />

The total value <strong>of</strong> building construction activity<br />

within the <strong>City</strong> over the past five years has been<br />

in excess <strong>of</strong> $1.1 billion.<br />

More than 450<br />

demolitions<br />

were<br />

approved in<br />

<strong>Stirling</strong> in the<br />

past year.<br />

impact and opposition by pool owners and<br />

allows them to better budget for the reduced<br />

yearly levy rather than pay the full fee <strong>of</strong> $40<br />

upfront as previously required.<br />

The third round <strong>of</strong> the Private Swimming Pool<br />

Inspection Program is presently marginally<br />

ahead <strong>of</strong> target.<br />

A schedule has been implemented and is<br />

monitored regularly to ensure this program will<br />

be effectively completed on or before June 30,<br />

2000 in compliance with Section 245a <strong>of</strong> the<br />

Local Government (Miscellaneous Provisions)<br />

Act.<br />

BUILDING<br />

The <strong>City</strong> issued Building Licence approvals for<br />

construction work with an estimated<br />

construction value <strong>of</strong> $256 million – this is a<br />

14.7% growth on last year and 24.1% on<br />

1996/97.<br />

While the economic climate is strong and<br />

complemented by low interest rates, the<br />

construction industry continues to be buoyant.<br />

Many industry analysts are unsure as to what<br />

impact the GST may have on the industry. Given<br />

the cyclic nature <strong>of</strong> the industry, a downturn is<br />

more likely than not in the medium term.<br />

Construction activity in the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> is<br />

somewhat unique when compared with other<br />

expanding local authorities in WA.<br />

<strong>Stirling</strong>’s close proximity to central Perth and the<br />

average age <strong>of</strong> building stock, makes it ripe for<br />

redevelopment. As a result, demand is high and<br />

any industry downturn in the future is less likely<br />

to have as great an impact on <strong>Stirling</strong>.<br />

The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> issues more demolition<br />

approvals than any other local authority in WA,<br />

which is indicative <strong>of</strong> the standard<br />

redevelopment pr<strong>of</strong>ile. There were 463<br />

demolitions in 1998/99.<br />

SWIMMING POOL INSPECTIONS<br />

6000<br />

5000<br />

4000<br />

3000<br />

2000<br />

1000<br />

0<br />

Sep-97<br />

Oct-97<br />

Nov-97<br />

Dec-97<br />

Jan-98<br />

Feb-98<br />

Mar-98<br />

Apr-98<br />

May-98<br />

Jun-98<br />

Jul-98<br />

Aug-98<br />

Sep-98<br />

Oct-98<br />

Nov-98<br />

Dec-98<br />

Jan-99<br />

Feb-99<br />

Mar-99<br />

Apr-99<br />

May-99<br />

Jun-99<br />

Jul-99<br />

12


<strong>Community</strong> <strong>Development</strong><br />

Building<br />

CONSTRUCTION VALUES 1989 - 1999<br />

300,000,000<br />

250,000,000<br />

Actual<br />

200,000,000<br />

150,000,000<br />

100,000,000<br />

50,000,000<br />

Indexed to<br />

current<br />

building costs<br />

Average<br />

0<br />

89/90 90/91 91/92 92/93 93/94 94/95 95/96 96/97 97/98 98/99<br />

OBJECTIVES OF THE DEPARTMENT:<br />

To plan facilities, regulate land use consistent<br />

with identified needs, community expectations<br />

and environmental considerations.<br />

MAJOR HIGHLIGHTS:<br />

• Ideas Competition for Scarborough Environs<br />

Area Strategy.<br />

• Design Layout Plan and Implementation<br />

Strategy for Main Street Plaza Precinct.<br />

• Partnership development <strong>of</strong> WA-based<br />

computerised development approvals and<br />

workflow system.<br />

• Major progress in the implementation <strong>of</strong><br />

Town Planning Scheme No. 38.<br />

• Production <strong>of</strong> Advertising Signs User<br />

Manual.<br />

• Completion <strong>of</strong> two land use studies<br />

(Scarborough Beach Road and Main Street).<br />

• Facilitation <strong>of</strong> the New North Project.<br />

• Heritage Areas Study and Glendalough<br />

Urban Design Station Study.<br />

MAJOR ITEMS OF EXPENDITURE<br />

AND/OR EXPECTED OUTCOME:<br />

• District Planning Scheme Review.<br />

Outcome: Major rewrite <strong>of</strong> scheme format to<br />

include greater strategic direction.<br />

This project is expected to take<br />

longer than one year.<br />

Planning<br />

13<br />

• Right Of Way Management Strategy<br />

Outcome: Adoption <strong>of</strong> Management<br />

Principles and Implementation<br />

Program.<br />

• Heritage Precincts & Municipal Inventory<br />

Review<br />

Outcome: Provide the <strong>City</strong> with<br />

management tools to protect its<br />

Heritage.<br />

• TP38 Implementation<br />

Outcome: Further progress implementation<br />

(including opening <strong>of</strong> Ellen <strong>Stirling</strong><br />

Boulevard, subdivision <strong>of</strong> Precinct<br />

4).<br />

• Scarborough and Environs Area Strategy<br />

(SEAS) Project<br />

Outcome: Preparation and adoption <strong>of</strong> a<br />

shared vision and Implementation<br />

Strategy for Scarborough Beach<br />

Precinct.<br />

• Glendalough Station Precinct Study<br />

Outcome: Adoption <strong>of</strong> an Urban Design<br />

Study (incorporating development<br />

standards and streetscape<br />

enhancements) and preparation <strong>of</strong><br />

an Implementation Strategy.<br />

• Local Agenda 21<br />

Outcome: Reach agreement on a Local<br />

Agenda 21 for the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>.


<strong>Community</strong> <strong>Development</strong><br />

Planning<br />

Planning<br />

continues<br />

apace for<br />

<strong>Stirling</strong> with<br />

many projects,<br />

studies and<br />

strategies<br />

under way.<br />

• Flora Terrace Precinct Study<br />

Outcome: Implementation <strong>of</strong> Study findings<br />

(potentially including works on<br />

private land).<br />

• Computerised <strong>Development</strong> Approvals<br />

System (APPROVE)<br />

Outcome: Improved accountability/workflow<br />

• Civic Precinct Study<br />

Outcome: Enable redevelopment <strong>of</strong> the<br />

Depot Site, progress relocation <strong>of</strong><br />

the <strong>City</strong>’s Administration Centre.<br />

NEW PROPOSALS FOR<br />

CORPORATE PLAN<br />

ACTION PLANS:<br />

• District Planning Scheme<br />

Review.<br />

• Comprehensive review<br />

development control policies.<br />

• ROW Management Strategy.<br />

• Osborne Park Industrial<br />

Strategy.<br />

• Mirrabooka Regional Centre Strategy.<br />

• Municipal Heritage Inventory Review.<br />

• Local Agenda 21.<br />

• Scarborough Environs Area Strategy.<br />

• Local Commercial Centres Study.<br />

DIFFICULTIES/CHALLENGES<br />

ENCOUNTERED AND PROPOSED<br />

SOLUTIONS:<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES<br />

• In conjunction with the new <strong>Development</strong><br />

Approvals System, develop monitoring<br />

framework for the identified Performance<br />

Indicators.<br />

• Recognise and retain current staffing level<br />

at public counter.<br />

• Review the function and composition <strong>of</strong> the<br />

<strong>Development</strong> Review Group.<br />

• Continued implementation <strong>of</strong> the adopted<br />

Strategic <strong>Development</strong> Assessment Plan.<br />

• Ongoing consultation with Executive<br />

Management and Councillors on major<br />

projects.<br />

• Facilitation <strong>of</strong> community reference groups<br />

for major projects.<br />

• Ongoing training/opportunities for improved<br />

staff skills and multiskilling.<br />

• Increase usage <strong>of</strong> GIS/GeoQ databases<br />

and availability <strong>of</strong> information via the<br />

Internet.<br />

High pressure working environment and the<br />

inability to attract experienced staff have had<br />

a marked impact on staff morale/productivity.<br />

The proposed solutions and initiatives will<br />

require commitment and time to reverse this<br />

impact.<br />

The Takari<br />

Primary School<br />

benefited from a<br />

<strong>Stirling</strong> sponsored<br />

resources kit to<br />

encourage local<br />

learning.<br />

• Increased involvement <strong>of</strong> stakeholder<br />

groups in planning process/projects -<br />

improve consultation processes and<br />

negotiation.<br />

• The consistent application <strong>of</strong> council<br />

discretion relative to variations <strong>of</strong><br />

development standards - review,<br />

simplify and clarify Policies (including<br />

delegation <strong>of</strong> authority).<br />

• High volume <strong>of</strong> Staff changes,<br />

extended periods <strong>of</strong> staff shortages -<br />

review methods <strong>of</strong> attracting and<br />

retaining suitable staff with Human<br />

Resources.<br />

• High volume <strong>of</strong> applications received<br />

and time taken for approvals - monitor<br />

and develop agreed benchmarks and<br />

seek improvements, implement<br />

Approve system as matter <strong>of</strong> urgency.<br />

• Accommodation for staff and<br />

resources/files extremely limited -<br />

review opportunities <strong>of</strong> redesign <strong>of</strong><br />

<strong>of</strong>fice lay-out in consultation with<br />

interior designer.<br />

14


<strong>Community</strong> <strong>Development</strong><br />

Health<br />

OBJECTIVES OF THE DEPARTMENT:<br />

To maintain and improve the health and well<br />

being <strong>of</strong> the community.<br />

MAJOR HIGHLIGHTS:<br />

LOCAL HEALTH LAWS REVIEW<br />

Work has begun on the complete re-write <strong>of</strong><br />

the <strong>City</strong>’s Local Health Laws. The style <strong>of</strong> the<br />

legislation has been changed to a much<br />

simplified plain English format supported by<br />

more detailed policies and standards. It is<br />

expected that the review will be substantially<br />

complete by the conclusion <strong>of</strong> the 1999/2000<br />

year.<br />

ALCOHOL POLICY<br />

The <strong>City</strong>’s Alcohol Policy was published and<br />

launched in November, 1998 and has been<br />

well received both by industry, clubs and<br />

community groups since. The <strong>City</strong> receives<br />

excellent co-operation from the Office <strong>of</strong><br />

Gaming and Liquor Licensing in its<br />

implementation and the document has<br />

generally proved to be very useful to people<br />

making or modifying licensing applications.<br />

CHILD HEALTH SERVICES<br />

A review <strong>of</strong> the <strong>City</strong>’s Child Health Centres and<br />

operating arrangements were undertaken by<br />

Jo Stanton Consultancy during the latter part<br />

<strong>of</strong> 1998. This study was jointly undertaken by<br />

the <strong>City</strong> and the North Metropolitan Health<br />

Service. The report found that the community<br />

placed significant value on this service and<br />

supported its continuation and improvement.<br />

The purpose <strong>of</strong> the study was to determine if<br />

the relationships between bather numbers and<br />

tidal exchange created adverse conditions.<br />

The overall results <strong>of</strong> the study revealed that<br />

water quality standards along this section <strong>of</strong><br />

coast do meet these standards during<br />

summertime conditions.<br />

HEALTH PROMOTION<br />

The Senior’s Expo was one <strong>of</strong> the <strong>City</strong>’s<br />

promotional highlights <strong>of</strong> the year. The Expo<br />

was held at the Scarborough <strong>Community</strong><br />

Centre and focussed on the needs <strong>of</strong> the<br />

elderly in maintaining quality <strong>of</strong> life by exploring<br />

the theme “You’re Never too Old to be Young”.<br />

FOOD HYGIENE AND QUALITY<br />

A total <strong>of</strong> 2,295 inspections were carried out <strong>of</strong><br />

the 680 food premises within the <strong>City</strong>.<br />

Council’s Environmental Health Officers<br />

achieved approximately<br />

97% <strong>of</strong> the scheduled<br />

inspection target during the<br />

year.<br />

The 57 food manufacturing<br />

premises were inspected<br />

regularly throughout the<br />

year and those with<br />

The You’re Never Too Old To<br />

Be Young Seniors Expo saw<br />

many get hooked on the<br />

Internet.<br />

COMMUNITY NOISE CONTROL<br />

The <strong>City</strong>’s Health Department handles up to<br />

200 complaints <strong>of</strong> community noise each year.<br />

In an endeavour to improve customer service<br />

and responsiveness a new system for handling<br />

noise complaints was introduced. The system<br />

was developed from data-base s<strong>of</strong>tware and<br />

incorporates both an action and history trail<br />

together with reporting facilities.<br />

CHALLENGES:<br />

SMOKING LEGISLATION<br />

New legislation was introduced in March to<br />

restrict smoking in enclosed public places.<br />

This involves a wide range <strong>of</strong> public areas<br />

including restaurants, licensed premises,<br />

recreation facilities and shopping centres.<br />

Council’s Environmental Health Officers will be<br />

involved in ensuring that the requirements <strong>of</strong><br />

this legislation are smoothly implemented over<br />

the ensuing 12 months.<br />

COASTAL WATER QUALITY SURVEY<br />

During the period January to April, 1999, a<br />

Water Quality Study was undertaken in the bay<br />

beaches between Trigg Island and Waterman.<br />

One <strong>of</strong> the<br />

expo’s aims<br />

was for<br />

seniors to<br />

take an<br />

active role in<br />

their physical,<br />

mental<br />

and social<br />

well-being.<br />

Expo participants had a<br />

chance to win prizes,<br />

such as a South-West<br />

getaway, encouraging<br />

them to live life to the<br />

full.<br />

15


<strong>Community</strong> <strong>Development</strong><br />

Health<br />

A water quality<br />

study found<br />

national guidelines<br />

were met<br />

for recreational<br />

waters along<br />

<strong>Stirling</strong>’s coast.<br />

established food safety plans were audited.<br />

Twenty-nine <strong>of</strong> the food manufacturers now<br />

have established food safety plans (Quality<br />

Assurance Programs) in place and operating.<br />

A survey was undertaken during the year to<br />

examine pesticide residues in locally-grown<br />

produce. Although there are just 11 growers<br />

left in the district, a wide range <strong>of</strong> produce is<br />

still grown. Of 20 produce samples submitted<br />

for analysis none was shown to exceed the<br />

maximum residue levels permitted under the<br />

current legislation.<br />

CARAVAN PARKS<br />

A full compliance survey was undertaken <strong>of</strong> all<br />

three caravan parks within the <strong>City</strong> to<br />

determine their conformity with the Caravan’s<br />

& Camping Ground Act. This was a complex<br />

and detailed task involving <strong>of</strong>ficers from the<br />

<strong>City</strong>’s Health, Building and Planning<br />

Departments.<br />

AEROBIC TREATMENT UNITS<br />

Aerobic Treatment Units have been utilised for<br />

residential development since 1992. These<br />

systems differ from conventional septic<br />

systems in that they involve mechanical<br />

equipment and the treated effluent is disposed<br />

<strong>of</strong> above-ground on garden areas. This year<br />

the <strong>City</strong> undertook an audit <strong>of</strong> established<br />

systems to determine their continuing<br />

compliance with installation and operating<br />

guidelines.<br />

NEW PROPOSALS:<br />

DISASTER RECOVERY PLAN<br />

It has been recognised that the <strong>City</strong>’s current<br />

Emergency Response Plan does not include<br />

an adequate recovery strategy. An interdepartmental<br />

approach will be taken to<br />

developing an appropriate Recovery Plan and<br />

this will include an environmental health<br />

component.<br />

HEALTH PROMOTION<br />

Childhood drownings continue to be<br />

associated with private pool ownership and<br />

the presence <strong>of</strong> pre-school aged children.<br />

Subject to availability <strong>of</strong> funding, a CPR<br />

Training Program has been proposed for<br />

private pool owners for the coming summer.<br />

The program concept is to deliver CPR<br />

instruction within a domestic environment to<br />

small groups <strong>of</strong> parents and pool owners.<br />

PEST CONTROL<br />

The <strong>City</strong> will continue its program <strong>of</strong> mosquito<br />

monitoring in local wetlands and freshwater<br />

lakes and will also participate in the<br />

development <strong>of</strong> a Local Authorities control<br />

group so as to better integrate monitoring and<br />

control strategies in the northern sububs.<br />

IMMUNISATION<br />

The <strong>City</strong>’s Immunisation Section will undertake<br />

a Customer Survey <strong>of</strong> the 63 primary schools<br />

it services with the objective <strong>of</strong> making its<br />

schools program more efficient and better<br />

focussed.<br />

Opportunistic immunisation has been found to<br />

be an effective way <strong>of</strong> keeping adult<br />

immunisation up-to-date. It is planned to hold<br />

at least one adult immunisation clinic at one <strong>of</strong><br />

the major regional shopping centres in the year<br />

during late night shopping.<br />

FOOD HYGIENE AND SAFETY<br />

Several initiatives are planned for the coming<br />

year, including a survey on bulk food quality<br />

including handling facilities and equipment,<br />

participation in the 1999/2000 Food Monitoring<br />

(Health Department <strong>of</strong> WA), the development<br />

<strong>of</strong> a data-base for food complaints and a<br />

whole <strong>of</strong> centre promotion for the FoodSafe<br />

Food Handler Safety Program.<br />

16


Works<br />

Engineering Operations<br />

OBJECTIVES OF THE DEPARTMENT:<br />

To construct and maintain facilities and<br />

services within the road reserve which<br />

provides safety, ease <strong>of</strong> access and improve<br />

the amenity <strong>of</strong> the locality.<br />

MAJOR HIGHLIGHTS:<br />

Completion <strong>of</strong>:<br />

• Reconstruction <strong>of</strong> Royal Street between<br />

Flinders Street and Wanneroo Road.<br />

• Traffic management projects in the<br />

Inglewood Ward.<br />

• Road upgrading and resurfacing <strong>of</strong>:<br />

- Rosewood Avenue, between Pearson and<br />

Sydenham Streets<br />

- Odin Road, between Scarborough Beach<br />

Road and Cedric Street<br />

• Traffic management projects in the Yokine<br />

Ward.<br />

for 1999/2000 in line with other<br />

departments.<br />

• <strong>Development</strong> <strong>of</strong> strategy for replacing<br />

existing/new bus shelters with a more<br />

modern and aesthetic design is complete.<br />

Contract has been let.<br />

MAJOR ITEMS OF EXPENDITURE<br />

AND/OR EXPECTED OUTCOME:<br />

• Complete $6.7 million worth <strong>of</strong> road<br />

resurfacing works.<br />

• Complete $1.7 million worth <strong>of</strong> path<br />

reconstruction work upgrading from slab<br />

paths to insitu concrete. This should<br />

complete the <strong>City</strong>’s five-year program <strong>of</strong><br />

replacing all slab paths.<br />

• Commencement <strong>of</strong> Precinct work on Main<br />

Street, between Hutton and Eldorado Streets.<br />

Far left: Night<br />

work in<br />

<strong>Stirling</strong> has<br />

helped to<br />

minimise traffic<br />

disruption<br />

and reduce<br />

safety risks.<br />

• Drainage system upgrade in Castle Road.<br />

• Major drainage works in Barnes Road.<br />

• Major drainage works in Dryandra Drive.<br />

• Path reconstruction work upgrading from<br />

slab paths to insitu concrete paths to value<br />

<strong>of</strong> $1.84 million.<br />

• Road resurfacing works to the value <strong>of</strong> $3.7<br />

million.<br />

Substantial completion <strong>of</strong> road upgrading and<br />

resurfacing works in North Beach Road,<br />

Balcatta Road to Marmion Avenue.<br />

CORPORATE PLAN PERFORMANCE:<br />

Progress during the year:<br />

• Slab and bitumen paths to be replaced with<br />

insitu paths or paving bricks by June 30,<br />

2000 is 80% complete.<br />

• Modelling <strong>of</strong> infrastructure assets<br />

maintenance is 65% complete. This has<br />

now been reassigned as a new Action Plan<br />

Left: More<br />

than $1.8 million<br />

was<br />

spent on<br />

upgrading<br />

slab paths to<br />

concrete or<br />

paving brick<br />

paths.<br />

17


Works<br />

Engineering Operations<br />

• Commencement <strong>of</strong> work associated with<br />

retaining walls, on-street parking, dual-use<br />

path and general streetscape on West<br />

Coast Drive, north <strong>of</strong> Bailey Street.<br />

• Complete major drainage system upgrade<br />

in:<br />

- Powell Street (Stage 2).<br />

- Minilya Street.<br />

• Complete construction <strong>of</strong> extension <strong>of</strong><br />

Dolomite Court to Pearson Street.<br />

NEW PROPOSALS FOR CORPORATE<br />

PLAN ACTION PLANS<br />

The development <strong>of</strong> the new Strategic Plan<br />

and consequent Corporate Plan have meant<br />

the assignment <strong>of</strong> the following Action Plans:<br />

• Drainage sumps beautification/upgrade.<br />

• Engineering Operations Asset Management.<br />

The <strong>City</strong>’s<br />

enhancement<br />

<strong>of</strong> streets and<br />

verges has<br />

beautified many<br />

commercial<br />

areas.<br />

• Commencement <strong>of</strong> road upgrading,<br />

resurfacing and car parking for the Main<br />

Street Plaza, between Federal and Cape<br />

Streets.<br />

• Complete drainage works in Powell Street.<br />

• Commence traffic management works in<br />

the West Carine area.<br />

• Complete major intersection modification<br />

work at the corner <strong>of</strong> Hutton and Hector<br />

Streets.<br />

• Complete major road upgrading and<br />

resurfacing <strong>of</strong>:<br />

- Flinders Street from Wiluna to Cape<br />

Street.<br />

- Royal Street from Main Street East.<br />

• Commencement <strong>of</strong> work by Main Roads<br />

Western Australia on the Reid Highway<br />

extension from the Mitchell Freeway to<br />

Marmion Avenue.<br />

DIFFICULTIES/CHALLENGES<br />

ENCOUNTERED AND PROPOSED<br />

SOLUTIONS<br />

Capital Works Program<br />

• Cancellation <strong>of</strong> major works in Hutton<br />

Street ($1 million) and delays to Main<br />

Street Precinct work meant scheduling<br />

difficulties to overcome this work<br />

shortfall.<br />

• Some staff required to take leave to<br />

overcome work shortage.<br />

• <strong>Development</strong> <strong>of</strong> procedures to do work at<br />

night to minimise affect on businesses.<br />

• Design Department will seek tenders from<br />

consultants to assist with their design<br />

program.<br />

Road Rehabilitation Program<br />

• Appointed consultant to provide a<br />

pavement management bureau service.<br />

• Consultant has provided a program for<br />

rehabilitation and maintenance <strong>of</strong> the<br />

road pavement asset over the years 1999<br />

to 2004 enabling the value <strong>of</strong> the asset to<br />

improve by 5% and the network<br />

maintained at 85% <strong>of</strong> its maximum value.<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES<br />

• <strong>Development</strong> <strong>of</strong> Customer Service Works<br />

Request tracking system (Corporate<br />

Projects assistance).<br />

• <strong>Development</strong> <strong>of</strong> procedures,<br />

competitiveness, benchmarks through the<br />

DEBA training process.<br />

Engineering Operations will move into a new<br />

depot in Delawney Street, Balcatta in the<br />

financial year 2000/2001, presently scheduled<br />

for July, 2000.<br />

18


Works<br />

Engineering Design<br />

OBJECTIVES OF THE DEPARTMENT:<br />

• To improve facilities and services within the<br />

road reserve which promotes safety, ease<br />

<strong>of</strong> access and improve the amenity <strong>of</strong> the<br />

locality.<br />

• To carry out engineering design work in a<br />

pr<strong>of</strong>essional, efficient and cost-effective<br />

manner.<br />

MAJOR HIGHLIGHTS:<br />

Design <strong>of</strong> major road<br />

construction/reconstruction projects<br />

including:<br />

• Main Street Precinct, Stage 1 $0.95m.<br />

• Rosewood Avenue, Pearson Street to<br />

Queenscliffe Road $0.48m.<br />

• Odin Road, Cedric Street to Scarborough<br />

Beach Road $0.45m.<br />

• Wiluna Street, Wanneroo Road to Nangar<br />

Street $0.23m.<br />

• Royal Street, Wanneroo Road to Flinders<br />

Street $0.25m.<br />

• North Beach Road, Balcatta Road to<br />

Marmion Ave $0.36m.<br />

• Main Street Plaza, Cape Street to Federal<br />

Street $0.95m.<br />

Design <strong>of</strong> Traffic Management Projects<br />

including:<br />

• Coolbinia Primary School, major<br />

parking/pedestrian and traffic safety<br />

improvements $0.08m.<br />

• Hamer Parade, parking and traffic safety<br />

works $0.12m.<br />

Design <strong>of</strong> Major Regional Drainage<br />

Schemes including:<br />

• Castle Road, Woodlands $0.24m.<br />

• Powell Street, Osborne<br />

Park $0.15m.<br />

Greening initiatives including:<br />

• Dianella Industrial<br />

Precinct Works.<br />

• Street landscaping and roundabout<br />

landscape upgrading.<br />

• <strong>Stirling</strong> Civic Gardens car park.<br />

• Trigg car parks Stage 2.<br />

• Corporate Entry Statements.<br />

• Infrastructure planning for State<br />

Underground Power Project for Woodlands<br />

and Doubleview.<br />

MAJOR ITEMS OF EXPENDITURE<br />

AND/OR EXPECTED OUTCOME:<br />

• Design and implementation <strong>of</strong><br />

Menora/Mount Lawley, West Carine and<br />

Yokine Local Area Traffic Management<br />

studies $0.3m.<br />

• Design for upgrading <strong>of</strong> Flinders Street<br />

between Wiluna Street and Cape Street for<br />

four lanes with median $0.7m.<br />

• Design works for Royal Street, east <strong>of</strong> Main<br />

Street additional lanes for turning<br />

movements $0.3m.<br />

• Stage 4 works for major upgrading for<br />

Coastal Promenade path for West Coast<br />

Drive northwards from Bailey Street<br />

$0.35m.<br />

• Stage 3 Local Bicycle Routes in<br />

conjunction with Bikewest for safe bike<br />

routes away from major roads $0.05m.<br />

• Major drainage design works to overcome<br />

flooding in Minilya Street, Innaloo and<br />

Powell Street, Joondanna $0.4m.<br />

• Urban design and streetscape<br />

enhancement works for commercial centres<br />

as a <strong>City</strong>wide project $0.12m.<br />

• Major refurbishment for Flora Terrace<br />

Shopping Precinct $0.33m.<br />

• Road construction works to link Dolomite<br />

Court, Churchlands with Pearson Street<br />

$0.3m.<br />

Facilities and services<br />

within the road reserve<br />

continue to be improved<br />

by Engineering Design.<br />

19


Engineering Design<br />

Works<br />

<strong>City</strong> Building<br />

NEW PROPOSALS FOR CORPORATE<br />

PLAN ACTION PLANS:<br />

• <strong>Development</strong> <strong>of</strong> Policy on Traffic<br />

Management to identify criteria and<br />

strategies for situations where improvement<br />

measures are warranted.<br />

• <strong>Development</strong> <strong>of</strong> bus shelter installation<br />

guidelines to operate in conjunction with all<br />

new replacement shelter installations to be<br />

undertaken.<br />

DIFFICULTIES/CHALLENGES<br />

ENCOUNTERED AND PROPOSED<br />

SOLUTIONS:<br />

• Striving to maintain the high level <strong>of</strong><br />

commitment for public consultation on all<br />

projects prior to the design and<br />

construction period in accordance with our<br />

Customer Service Charter.<br />

• Successful completion <strong>of</strong> trial closure <strong>of</strong><br />

Everingham Street, Carine as planning for<br />

Reid Highway extension.<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES:<br />

• To review soakwell standards criteria for<br />

unit developments with on site storage and<br />

develop water sensitive design options for<br />

those sites.<br />

• Office-based design target and design<br />

costing system monitors progress on all<br />

projects from time sheet data.<br />

• Comprehensive review <strong>of</strong> corporate<br />

subdivisional design criteria.<br />

• Review to update traffic management plan<br />

undertaken.<br />

• Further enhancement <strong>of</strong> engineering<br />

drawing standards for design and<br />

construction requirements.<br />

• Investigation for Federal Office <strong>of</strong> Road<br />

Safety Black Spot intersection safety<br />

improvements.<br />

• <strong>Development</strong> <strong>of</strong> term consultancy<br />

framework to increase design lead times to<br />

construction and ability to meet<br />

performance demands for additional works.<br />

• Active role in safety audit teams for Stage<br />

three and five audits with Main Roads WA<br />

consultants and other local authorities.<br />

• On-going training for staff for specialised<br />

technical design s<strong>of</strong>tware.<br />

• Improved pavement management data from<br />

computer program “Roman” with input data<br />

from specialist consultants pavement<br />

analysis.<br />

• Further development and tuning <strong>of</strong> asset<br />

management s<strong>of</strong>tware system on behalf <strong>of</strong><br />

the Works Division.<br />

OBJECTIVES OF THE DEPARTMENT<br />

To manage the design, development and<br />

construction <strong>of</strong> the <strong>City</strong>’s Capital Works<br />

Building Program and to maintain the <strong>City</strong>’s<br />

building assets.<br />

MAJOR HIGHLIGHTS<br />

Completion <strong>of</strong> the following:<br />

Construction <strong>of</strong>:<br />

• Dianella Library - Alterations and additions<br />

to existing library.<br />

• Nollamara Autumn Centre - New front entry<br />

porch.<br />

• West <strong>Stirling</strong> Baseball Club - New storage<br />

facility.<br />

• Balga Cricket Club - Alterations and<br />

additions to existing facilities.<br />

• Innaloo Sports Club - Refurbishment <strong>of</strong><br />

existing toilets.<br />

• Scarborough Cricket Club - Alterations and<br />

additions.<br />

• Balcatta Transfer Station - New gate house<br />

and paint collection/ disposal facility.<br />

• Tee Ball Association <strong>of</strong> WA - Alterations and<br />

additions to existing facilities.<br />

Design, <strong>Development</strong> and Documentation:<br />

• Mount Lawley Bowling Club - Refurbishment<br />

and upgrading <strong>of</strong> existing bowling club.<br />

• East <strong>Stirling</strong> Day centre - new centre.<br />

Major Maintenance Works:<br />

• Jim Satchell Recreation Centre - Kitchen<br />

refurbishment.<br />

• Yokine <strong>Community</strong> Recreation Centre -<br />

Replacement <strong>of</strong> kitchen cupboards.<br />

• Scarborough Civic Centre - Repaint covered<br />

walkways.<br />

• Scarborough Surf Life Saving Club -<br />

Refurbishment <strong>of</strong> covered walkway and<br />

replacement <strong>of</strong> aluminium doors/windows.<br />

• Hamersley Public Golf Course - Repainting<br />

<strong>of</strong> main buildings.<br />

• Repainting <strong>of</strong> exteriors <strong>of</strong> major sporting<br />

clubs on reserves.<br />

Re-Ro<strong>of</strong>ing Program:<br />

• Amelia Heights Scout Hall.<br />

• Hancock Street Guide Hall.<br />

• Nollamara Scout Hall.<br />

• Glendale Pre-school.<br />

CORPORATE PLAN PERFORMANCE<br />

Completion <strong>of</strong> the following action plans:<br />

• <strong>City</strong> Buildings Asset Management and<br />

Maintenance Plan.<br />

• Installation <strong>of</strong> Residual Current Devices into<br />

all <strong>City</strong> buildings to comply with Worksafe<br />

regulations.<br />

20


Works<br />

<strong>City</strong> Building<br />

The Inglewood<br />

Swimming<br />

Pool, first built<br />

in 1966, will get<br />

a new lease <strong>of</strong><br />

life, thanks to<br />

the <strong>City</strong> <strong>of</strong><br />

<strong>Stirling</strong> — and<br />

many other<br />

new building<br />

projects have<br />

the green light,<br />

such as the<br />

Osborne Park<br />

Library and<br />

<strong>Community</strong><br />

Centre.<br />

• Replacement <strong>of</strong> majority <strong>of</strong> old gas hot<br />

water systems within buildings with new<br />

systems to comply with Alinta Gas<br />

regulations.<br />

• <strong>City</strong> Buildings re-keying program Stage 5.<br />

MAJOR ITEMS OF EXPENDITURE AND<br />

EXPECTED OUTCOMES<br />

Completion <strong>of</strong> the following:<br />

Construction <strong>of</strong>:<br />

• Mount Lawley Bowling Club.<br />

• East <strong>Stirling</strong> Day Centre.<br />

• Henderson Resource Centre - New<br />

community resource centre.<br />

• Trigg Beach Facility - New<br />

toilets and changerooms.<br />

• North Beach Soccer<br />

Club - toilets and<br />

changerooms.<br />

• Balcatta Cricket<br />

Club - Alterations<br />

and additions to<br />

existing facilities.<br />

Design,<br />

<strong>Development</strong> And<br />

Documentation:<br />

• <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> Works<br />

and Services Depot - New<br />

depot.<br />

• Inglewood Aquatic Centre -<br />

Refurbishment and upgrading <strong>of</strong><br />

existing aquatic centre.<br />

• Osborne Park Library and <strong>Community</strong><br />

Centre - Redevelopment <strong>of</strong> existing Library<br />

and Autumn Centre.<br />

• Dryandra <strong>Community</strong> Centre - Alterations,<br />

additions and upgrading <strong>of</strong> existing<br />

community centre.<br />

Progress <strong>of</strong> the following:<br />

Construction in progress:<br />

• <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> Works and Services Depot.<br />

• Inglewood Aquatic Centre.<br />

• Osborne Park Library and <strong>Community</strong><br />

Centre.<br />

• Dryandra <strong>Community</strong> Centre.<br />

Design, <strong>Development</strong> and Documentation:<br />

• <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> - New Administration and<br />

Civic Centre.<br />

• Wembley Downs Tennis Club -<br />

Refurbishment and upgrading <strong>of</strong> existing<br />

facilities.<br />

• <strong>Stirling</strong> Panthers Soccer Club -<br />

Refurbishment and upgrading <strong>of</strong><br />

existing facilities.<br />

Major <strong>City</strong> Building Maintenance<br />

Works:<br />

• Dianella Library -<br />

Upgrade<br />

airconditioning and<br />

building signage.<br />

• North Beach<br />

Jetty -<br />

Replacement <strong>of</strong><br />

handrails and<br />

decking.<br />

• Coastal toilets and<br />

changerooms -<br />

Refurbish and upgrade<br />

high priority facilities.<br />

• <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> Building and<br />

Health Departments - Upgrade<br />

customer service counters.<br />

• Dianella Autumn Centre House - Refurbish<br />

and upgrade existing facilities.<br />

Re-Ro<strong>of</strong>ing <strong>of</strong> <strong>City</strong> Buildings Program:<br />

• Jim Satchell Recreation Centre<br />

• Nollamara Gym<br />

• Nollamara Scout Hall<br />

• Nollamara Bowling Club<br />

• North Beach Bowling Club<br />

21


Works<br />

Waste Management<br />

OBJECTIVES OF THE DEPARTMENT<br />

• To provide an effective and efficient waste<br />

collection service for residential and<br />

commercial properties. To divert a<br />

significant percentage <strong>of</strong> waste from landfill<br />

subject to financial constraints and to<br />

dispose <strong>of</strong> waste in an environmentally safe<br />

manner.<br />

• To provide a beach and public toilet cleaning<br />

service that maintains the beaches and<br />

toilets in a clean and safe condition and to<br />

provide and service litter bins on roads and<br />

reserves.<br />

MAJOR HIGHLIGHTS<br />

• Scheduled collections undertaken within<br />

specified timeframes 99.9 per cent <strong>of</strong> the<br />

time with missed services collected within<br />

24 hours <strong>of</strong> being notified 99.99 per cent <strong>of</strong><br />

the time.<br />

• Major revision <strong>of</strong> collection rounds following<br />

the transfer <strong>of</strong> Maylands without interruption<br />

in service resulting in a reduction in the<br />

number <strong>of</strong> administrative staff and the<br />

number <strong>of</strong> trucks required to undertake<br />

collections.<br />

• Replacement <strong>of</strong> waste compactors to ensure<br />

improved availability and improved service.<br />

• Implemented seasonal verge pick-up<br />

program with greenwaste collections<br />

scheduled when most required during spring<br />

and autumn.<br />

replacement<br />

program with<br />

additional<br />

front lift truck<br />

and rear<br />

compactors<br />

for verge<br />

collections<br />

replacing<br />

open tippers.<br />

• Stage Two <strong>of</strong><br />

street litter bin<br />

replacement<br />

program (250 street litter bins) and<br />

Stage One reserve litter bins (237 bins)<br />

replacement program.<br />

DIFFICULTIES/CHALLENGES<br />

• The secondary treatment <strong>of</strong> 62,500 tonnes<br />

<strong>of</strong> waste from residential households has<br />

been suspended pending tests being<br />

undertaken to satisfy the Department <strong>of</strong><br />

Environmental Protection’s licence<br />

conditions. Currently all waste is being<br />

taken to landfill putting pressure on the<br />

Mindarie Regional Council site at Tamala<br />

Park and stalling recycling initiatives which<br />

need to be implemented to meet Council’s<br />

diversion <strong>of</strong> waste targets.<br />

• The reduction in the number <strong>of</strong> Class Two<br />

landfill sites in the metropolitan area and<br />

increasing haul distances will result in<br />

substantial cost increases and sustainable<br />

solutions need to be found.<br />

• The greenwaste recycling program has<br />

resulted in more than 20,000 cubic metres <strong>of</strong><br />

mulch being produced and a long-term use<br />

for this material needs to be developed.<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES<br />

• Ongoing analysis <strong>of</strong> existing processes and<br />

procedures is occurring with measures<br />

introduced to improve plant utilisation and<br />

reduce operational costs. Benchmarking<br />

with others in the industry and with the<br />

private sector.<br />

Many <strong>of</strong><br />

<strong>Stirling</strong>’s open<br />

steel bins<br />

were replaced<br />

with moulded<br />

plastic bins,<br />

helping to<br />

improve waste<br />

management.<br />

<strong>Stirling</strong>’s innovative<br />

waste<br />

management<br />

strategy scored<br />

the <strong>City</strong> a top<br />

award.<br />

• Implemented Stage One <strong>of</strong> street litter bin<br />

replacement program with 120 litre lidded<br />

moulded plastic bins replacing the 60 litre<br />

open steel cans.<br />

• Revision <strong>of</strong> toilet cleaning procedures and<br />

cleaning rounds with a substantial<br />

improvement in the overall level <strong>of</strong><br />

cleanliness.<br />

YEAR’S FORECAST<br />

• Expansion <strong>of</strong> bulk bin commercial<br />

collections. Completion <strong>of</strong> waste compactor<br />

NEW PROPOSALS<br />

• Investigation into the costs <strong>of</strong> implementing<br />

two greenwaste collections per year to each<br />

household to reduce the quantity <strong>of</strong><br />

greenwaste being deposited in the domestic<br />

waste bin.<br />

• Investigation into subsidising the cost <strong>of</strong><br />

compost bins for households to enable<br />

household organic waste to be converted<br />

into compost.<br />

• <strong>Development</strong> <strong>of</strong> calendars to advise<br />

residents <strong>of</strong> bulk verge collection dates in<br />

advance <strong>of</strong> pamphlet delivery.<br />

22


Works<br />

Parks and Reserves<br />

OBJECTIVES OF THE DEPARTMENT<br />

To provide with the spatial makeup <strong>of</strong> the <strong>City</strong>’s<br />

Parks and Reserves, services and facilities to<br />

accommodate the open air recreational<br />

expectations <strong>of</strong> all members <strong>of</strong> the community.<br />

To plan, develop and manage parks and<br />

reserves associated with recreation facilities to<br />

a standard and to satisfy individuals need for<br />

recreation and leisure.<br />

MAJOR HIGHLIGHTS<br />

• Redevelopment <strong>of</strong> Copley Park, Mount<br />

Lawley, to include a total revamp <strong>of</strong> the<br />

reserve to include a new playground, seating<br />

areas, paths and ramps and a new irrigation<br />

system. The redesign and construction has<br />

been carried out in-house in conjunction<br />

with the Ward councillors.<br />

• New irrigation system at Balga pool and<br />

surrounds. This 4ha site included installation<br />

<strong>of</strong> a new bore pump and cubicle.<br />

• Ongoing median development including Hale<br />

Road, Mirrabooka Avenue and entry<br />

statements at West Coast Highway (North<br />

and South).<br />

• Ongoing playground development including<br />

complementary landscaping <strong>of</strong> regional<br />

playgrounds at Dianella ROS and Carine<br />

ROS.<br />

• Activity-based costing <strong>of</strong> the Maintenance<br />

Budget, enabling the breakdown <strong>of</strong> budgets<br />

and expenditure to sub-operation code level<br />

to enable true financial and operational<br />

analysis.<br />

• Finalisation <strong>of</strong> the plans and funding<br />

arrangements with the Lotteries Commission<br />

for the construction <strong>of</strong> Henderson Resource<br />

Centre, to be built during the 1999/2000<br />

financial year.<br />

• Completion <strong>of</strong> the firebreaks and track<br />

consolidation at both Memory Place and<br />

Cottonwood Crescent bushlands. The<br />

newest<br />

bushland areas<br />

to be placed<br />

under the<br />

control <strong>of</strong> <strong>City</strong><br />

<strong>of</strong> <strong>Stirling</strong><br />

Parks<br />

Department.<br />

MAJOR ITEMS<br />

OF<br />

EXPENDITURE<br />

AND/OR<br />

EXPECTED<br />

OUTCOME:<br />

• $100,000 Balga<br />

Pool - Irrigation<br />

• $150,000 CIMS<br />

- Irrigation Control System<br />

• $526,499 Playgrounds (14) throughout the<br />

city including three new Regional<br />

Playgrounds at Dianella ROS, Carine ROS<br />

and Brian Burke.<br />

NEW PROPOSALS FOR CORPORATE<br />

PLAN ACTION PLANS:<br />

• Review <strong>of</strong> Ground Usage on Active<br />

Reserves.<br />

DIFFICULTIES/CHALLENGES<br />

ENCOUNTERED AND PROPOSED<br />

SOLUTIONS:<br />

• Ever-increasing ground usage especially on<br />

reserves used by junior sports groups. The<br />

solution to this problem is to be determined<br />

during the next financial year.<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES:<br />

• Review <strong>of</strong> the Parks Maintenance Budget,<br />

which has been based on activity-based,<br />

costings principals and currently consists <strong>of</strong><br />

over 6000 individual accounts. This enables<br />

the department to review processes and<br />

costings for operations section.<br />

• Review and redefining department after<br />

organisational change and amalgamation.<br />

Extensive<br />

street pruning<br />

helped maintain<br />

the overall<br />

look <strong>of</strong><br />

<strong>Stirling</strong>’s<br />

streets and<br />

prevent problems<br />

in stormy<br />

weather.<br />

Ongoing maintenance <strong>of</strong><br />

playgrounds and reserves<br />

has ensured fun and leisure<br />

activities remain at a premium.<br />

23


Human Resources<br />

OBJECTIVES OF THE DEPARTMENT:<br />

To provide efficient and effective human<br />

resource safety and industrial relations support<br />

services in recognition <strong>of</strong> the fact that staff are<br />

our most valuable resource.<br />

MAJOR HIGHLIGHTS:<br />

• 130 permanent new employees recruited.<br />

• Over 100 students <strong>of</strong>fered work experience.<br />

• Customer Service Charters established for<br />

each department and a Customer Service<br />

Week held involving all staff at the <strong>City</strong>.<br />

Customer Service training continued to be<br />

conducted for all new employees.<br />

• The <strong>City</strong> won 24 IFAP safety awards for the<br />

year.<br />

• Conducted a bi-annual job evaluation to<br />

ensure that salaries were commensurate<br />

with the market place.<br />

• Implementation <strong>of</strong> a new HR/Payroll system<br />

which is Year 2000 compliant, replacing a<br />

system that was 18 years old. This included<br />

the implementation <strong>of</strong> the Occupational<br />

Health and Safety component.<br />

• Worker’s Compensation claims reduced by<br />

15% which resulted in the best result ever.<br />

• Lost time injuries were reduced by 20%.<br />

• All worker’s compensation claims prior to<br />

June, 1997 have been finalised.<br />

<strong>Stirling</strong>’s 1999<br />

Employee <strong>of</strong> the<br />

Year, Claire Evans<br />

was recognised for<br />

her commitment to<br />

customer service.<br />

MAJOR ITEMS OF EXPENDITURE<br />

AND/OR EXPECTED INCOME:<br />

• Training this year will concentrate on further<br />

customer service training, safety, team<br />

building, Internet and email training and<br />

conflict resolution.<br />

• In order to facilitate enterprise bargaining<br />

negotiations, training will be provided to staff<br />

to assist in improving the efficiency and<br />

effectiveness <strong>of</strong> each department and<br />

improve the overall competitiveness <strong>of</strong> the<br />

<strong>City</strong>.<br />

DIFFICULTIES/CHALLENGES<br />

ENCOUNTERED AND PROPOSED<br />

SOLUTIONS:<br />

• A difficult challenge encountered was the<br />

ability to identify and measure productivity<br />

savings in order to provide a salary increase<br />

to salaried staff. This year any new<br />

Enterprise Bargaining Agreement must be<br />

introduced with upfront productivity savings.<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES:<br />

• Following the introduction <strong>of</strong> the new<br />

HR/Payroll system the <strong>City</strong> will implement<br />

web kiosks to all managers and nominated<br />

staff to enable restricted access to staff<br />

records. This will considerably reduce the<br />

number <strong>of</strong> queries currently received by<br />

Human Resources and Payroll.<br />

• The <strong>City</strong> will raise the pr<strong>of</strong>ile <strong>of</strong> all safety<br />

representatives throughout the <strong>City</strong> as part<br />

<strong>of</strong> the ongoing reduction <strong>of</strong><br />

accidents/incidents throughout the<br />

organisation. In addition, safety<br />

representatives will be given the opportunity<br />

to be involved in the construction <strong>of</strong> the new<br />

Depot.<br />

• In promoting the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> as the “<strong>City</strong><br />

<strong>of</strong> Choice” initiatives will be<br />

implemented to promote the<br />

<strong>City</strong> as a “preferred<br />

employer”.<br />

24


Finance and Corporate Services<br />

OBJECTIVES OF THE<br />

DEPARTMENT<br />

Administer the provision <strong>of</strong> financial<br />

services and reporting in accordance with<br />

statutory and Council directives for the<br />

benefit <strong>of</strong> the community and the<br />

corporation.<br />

Accounting Services<br />

MAJOR HIGHLIGHTS<br />

• Renumbering <strong>of</strong> approximately 80,000<br />

rate files to match the Valuer-<br />

General’s new Valuation Entity<br />

Number (VEN).<br />

• 97.58% <strong>of</strong> rates collected - only<br />

marginally down on last year’s<br />

97.63% best ever result.<br />

• Three-yearly revaluation <strong>of</strong> the <strong>City</strong>’s<br />

75,500 rateable assessments.<br />

• Interfacing <strong>of</strong> the rates system with<br />

Challenge Bank desk bank system<br />

for greater efficiency in rate<br />

payment processing and<br />

reconciliation.<br />

• Implemented the electronic<br />

payment <strong>of</strong> PAYE and prescribed<br />

tax to the Australian Taxation<br />

Office.<br />

• The stores direct entry processing<br />

system became fully operational.<br />

• The first stage <strong>of</strong> the implementation <strong>of</strong> an<br />

integrated Human Resources and Payroll<br />

System was completed in time to<br />

commence payment <strong>of</strong> staff from July 1.<br />

MAJOR ITEMS OF EXPENDITURE<br />

AND/OR EXPECTED OUTCOME:<br />

• Preparation for the introduction <strong>of</strong> a Goods<br />

and Services Tax.<br />

• Preparation to allocate Fringe Benefits to<br />

employees and include on group certificates.<br />

• Implement a system which permits the direct<br />

entry <strong>of</strong> creditor data.<br />

• Review all land exempt from rates to ensure<br />

that revenue is received when appropriate.<br />

• Review <strong>of</strong> land register to integrate with the<br />

General Accounting System.<br />

NEW PROPOSALS FOR CORPORATE<br />

PLAN ACTION PLANS:<br />

• Goods and Services Tax impact.<br />

• Property system electronically available.<br />

• Relocation <strong>of</strong> purchasing and stores to new<br />

works depot.<br />

Budget and rates highlights<br />

were given in a mail-out from<br />

Mayor Vallelonga, also giving<br />

ratepayers the opportunity to<br />

win prizes.<br />

• Automate the allocation <strong>of</strong> Activity Based<br />

Costing overheads<br />

• Review <strong>of</strong> investment policy<br />

DIFFICULTIES/CHALLENGES<br />

ENCOUNTERED AND PROPOSED<br />

SOLUTIONS:<br />

• The allocation <strong>of</strong> activity-based costing<br />

overheads is completed manually and is very<br />

time consuming. It is proposed to<br />

implement an electronic solution.<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES:<br />

• Data processing reconciliation.<br />

• Creditors direct processing.<br />

• Labour direct processing.<br />

25


Finance and Corporate Services<br />

OBJECTIVES OF THE DEPARTMENT:<br />

To ensure the coordinated introduction and<br />

application <strong>of</strong> Information Technology to<br />

support the corporate objectives <strong>of</strong> the <strong>City</strong>.<br />

MAJOR HIGHLIGHTS:<br />

• Internet and Intranet facilities continue to<br />

expand. Major enhancements included the<br />

addition <strong>of</strong> the Dog Pound and Security<br />

Services pages.<br />

• A new Human Resources and Payroll system<br />

installed.<br />

• Libraries received more than 90 new PC’s<br />

ready for their new system.<br />

• Year 2000 compliance upgrades are well<br />

underway.<br />

• A new payment system was installed to<br />

facilitate the underground power initiative<br />

Information Technology<br />

MAJOR ITEMS OF EXPENDITURE<br />

AND/OR EXPECTED OUTCOME:<br />

• Central Network and Server<br />

Upgrades - $100,000: Analysis and<br />

implementation <strong>of</strong> upgrades to ensure<br />

adequate response times and the<br />

integrity <strong>of</strong> corporate data.<br />

• Central data server - $120,000: To<br />

centralise data storage, improve file<br />

access performance along with<br />

increased backup and disaster<br />

recovery options.<br />

• Server and Desktop Operating<br />

System upgrades - $150,000: To <strong>of</strong>fer<br />

a standard operating environment for<br />

all users while improving security and<br />

user functionality.<br />

• Consultancy contracts - $142,500: To<br />

provide technical expertise on<br />

database administration and<br />

development, Open VMS Operating<br />

System, Internet <strong>Development</strong> and<br />

Network Administration.<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES;<br />

• In order to be competitive and operate with<br />

the minimum number <strong>of</strong> support staff,<br />

Systems Management S<strong>of</strong>tware will be<br />

implemented to simplify the rollout <strong>of</strong> new<br />

s<strong>of</strong>tware and any s<strong>of</strong>tware upgrades also<br />

improving helpdesk activities and hardware<br />

inventory cataloguing.<br />

Mayor Vallelonga and<br />

Energy Minister Colin<br />

Barnett signing an<br />

agreement on the<br />

State Underground<br />

Power Project.<br />

26


Finance and Corporate Services<br />

Administrative Services<br />

OBJECTIVES OF THE DEPARTMENT:<br />

The Administrative Services Department has a<br />

wide variety <strong>of</strong> responsibilities covering many<br />

disciplines making management <strong>of</strong> the roles<br />

and responsibilities a challenge. This can be<br />

demonstrated through the following broad<br />

nature <strong>of</strong> activities.<br />

• Administrative Services - corporate support<br />

and councillor services.<br />

• Catering and functions - hospitality, food and<br />

beverage.<br />

• Cleaning - maintenance <strong>of</strong> clean working<br />

environment on campus.<br />

• Rangers Services - animal control, parking<br />

control, <strong>of</strong>f road vehicles, fire prevention,<br />

litter control.<br />

• Records - maintenance <strong>of</strong> corporate memory<br />

resource.<br />

• Security Services - promote and provide<br />

enhanced community security in conjunction<br />

with WA Police Service.<br />

Each section has key objectives ranging from<br />

statutory obligations to internal servicing <strong>of</strong><br />

corporate needs. Supervisors and staff have<br />

worked diligently throughout the year to<br />

ensure that these key objectives were<br />

achieved successfully. Staff members within<br />

the department recognise the value <strong>of</strong> team<br />

work and the values <strong>of</strong> customer service.<br />

This has contributed to the success <strong>of</strong> the<br />

department in the last financial year<br />

• The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> provided a service to<br />

residents which enabled coatings to be<br />

applied to private fences using resources<br />

from the <strong>Stirling</strong> Area Graffiti Campaign.<br />

• A new format was adopted to provide a<br />

more personalised service to residents.<br />

<strong>Stirling</strong>’s inaugural<br />

Customer Service Week<br />

was a resounding success.<br />

MAJOR HIGHLIGHTS:<br />

• A full complement <strong>of</strong> 18 security patrol<br />

<strong>of</strong>ficers under the supervision <strong>of</strong> the<br />

Security Services Administrator, began full<br />

patrols <strong>of</strong> the <strong>City</strong> in December. As a<br />

result <strong>of</strong> the introduction <strong>of</strong> the service a<br />

number <strong>of</strong> perpetrators <strong>of</strong> petty crimes<br />

have been successfully brought to task for<br />

their actions.<br />

• The <strong>Stirling</strong> Area Graffiti Taskforce began<br />

work in November, 1997 as a joint initiative<br />

with the State Government. In June, 1998,<br />

80% <strong>of</strong> all graffiti had been removed “free <strong>of</strong><br />

charge” for residents and businesses, and by<br />

June, 1999 it was estimated that the <strong>City</strong><br />

was 99% graffiti-free.<br />

• Records Management continued to undergo<br />

a shift to the electronic distribution <strong>of</strong><br />

documentation using state-<strong>of</strong>-the-art imaging<br />

and workflow technology. Coupled with this<br />

the section has had to grapple with the Y2K<br />

issue and evaluate upgraded s<strong>of</strong>tware.<br />

• The <strong>City</strong> launched an initiative to publish the<br />

details <strong>of</strong> the impounding register on the<br />

<strong>City</strong>’s website. This enables the public to<br />

view all dogs held in the pound. This<br />

initiative has led to an increase in the return<br />

and re-homing <strong>of</strong> dogs.<br />

About 1000 people<br />

each year attend<br />

<strong>Stirling</strong>’s citizenship<br />

ceremonies,<br />

reflecting the <strong>City</strong>’s<br />

ethnic diversity.<br />

Eighteen security patrol<br />

<strong>of</strong>ficers continue to keep a<br />

check on crime in <strong>Stirling</strong>.<br />

27


Finance and Corporate Services<br />

Administrative Services<br />

<strong>Stirling</strong>’s top<br />

student<br />

scholarships<br />

rewarded<br />

another 10<br />

students,<br />

recognising<br />

community<br />

involvement<br />

as well as<br />

academic<br />

excellence.<br />

Rangers have been assigned individual<br />

areas and are responsible for day-to-day<br />

duties within the particular area.<br />

• 1300 telephone number initiated.<br />

• The Security Services Section received an<br />

award for “Advancement in Quality<br />

Innovation” from the Western Australian<br />

Municipal Association Awards for Best<br />

Practice in Local Government.<br />

• Scarborough Beach Precinct security audit<br />

conducted.<br />

• Holiday watch service implemented.<br />

• The Security Service began a trial camera<br />

surveillance project in June, 1999 targeting<br />

the area <strong>of</strong> The Esplanade where anti-social<br />

behavior occurs and preliminary results are<br />

positive.<br />

• Increased awareness in the service<br />

promoted through <strong>Community</strong> Newspapers,<br />

Web Page and mobile display.<br />

• Conducted the May, 1999 Biennial Election<br />

by post, using the services <strong>of</strong> the WAEC.<br />

• Completed a review <strong>of</strong> the <strong>City</strong>’s Policy<br />

Manual, Register <strong>of</strong> Delegations <strong>of</strong> Authority<br />

and continued a review <strong>of</strong> the <strong>City</strong>’s Local<br />

Laws.<br />

• Completed upgrade <strong>of</strong> telephone system<br />

adding additional features and ensuring Y2K<br />

compliance.<br />

MAJOR ITEMS OF EXPENDITURE<br />

AND/OR EXPECTED OUTCOME:<br />

• Provision for the installation <strong>of</strong> security<br />

cameras in commercial areas.<br />

• Continued commitment to removal <strong>of</strong> all<br />

graffiti.<br />

• Ongoing development <strong>of</strong> Records Imaging<br />

and Workflow.<br />

• Commitment to continue improving<br />

customer service and marketing <strong>of</strong> the <strong>City</strong>.<br />

• Upgrade security access for staff to the old<br />

and new administration buildings.<br />

• Upgrade <strong>of</strong> the <strong>City</strong>’s voicemail system.<br />

NEW PROPOSALS FOR CORPORATE<br />

PLAN ACTION PLANS:<br />

It is not proposed that any new action plans<br />

be introduced again in the next 12 months.<br />

This decision has been made on the basis that<br />

until a high level <strong>of</strong> satisfaction is obtained in<br />

the areas <strong>of</strong> Imaging/Workflow and Customer<br />

Service. All resources will be required for these<br />

items.<br />

DIFFICULTIES/CHALLENGES<br />

ENCOUNTERED AND PROPOSED<br />

SOLUTIONS:<br />

• Introduction <strong>of</strong> workflow difficult and it is<br />

proposed that a more comprehensive<br />

training session be provided to key users to<br />

overcome these problems.<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES:<br />

• Focus on customer service by all sections.<br />

• Monthly meetings with section supervisors<br />

to identify possible improvement.<br />

• Continued review <strong>of</strong> Ranger/Security Patrol<br />

Officer’s roster hours to ensure maximum<br />

benefit/productivity.<br />

• Address possible improvements to agenda<br />

and minute production and presentation.<br />

• Monitor success <strong>of</strong> Ranger and Security<br />

Patrol Precincts Initiative.<br />

• Consider means by which workflow<br />

applications can be implemented throughout<br />

the organisation<br />

• Conduct internal customer satisfaction<br />

survey for users <strong>of</strong> any service provided<br />

within Administration Services portfolio.<br />

• Use specification training to improve<br />

efficiencies within the department.<br />

• Continuous improvement to agenda and<br />

minute production method, in line with Best<br />

Practice recommended by DLG.<br />

Ratepayers<br />

meetings<br />

helped further<br />

the <strong>City</strong> <strong>of</strong><br />

<strong>Stirling</strong>’s<br />

commitment<br />

to customer<br />

service.<br />

28


Finance and Corporate Services<br />

Library Services<br />

OBJECTIVES OF THE DEPARTMENT:<br />

To provide and actively promote an efficient,<br />

effective and equitable library and information<br />

service to enrich and extend the educational,<br />

cultural, personal development, social and<br />

recreational needs <strong>of</strong> the <strong>Stirling</strong> community.<br />

MAJOR HIGHLIGHTS:<br />

• Increased library usage by 4.859% to<br />

2,198,612 loans per annum despite losing<br />

Maylands Library.<br />

• Prepared detailed specifications for a new<br />

automated library management system.<br />

• Tendered for and evaluated tender responses<br />

for a new automated library management<br />

system with Cities <strong>of</strong> Joondalup and<br />

Wanneroo and the Shire <strong>of</strong> Swan.<br />

• Installed PCs in all libraries to replace the<br />

“dumb” terminals in readiness for the new<br />

system.<br />

• Worked with the architect, Manager Building<br />

Operations and Manager <strong>Community</strong><br />

Services to develop and prepare plans and<br />

specifications for the new Osborne Library<br />

and <strong>Community</strong> Centre.<br />

• Prepared grant application for and received<br />

$28,000 from Lotteries Commission and<br />

Office <strong>of</strong> Multicultural Interests to purchase<br />

English as a Second Language resource for<br />

Dianella, Inglewood, Scarborough and<br />

Mirrabooka and Linguaphone resources for<br />

Karrinyup.<br />

• Prepared grant application and received<br />

$51,000 from the Federal Government<br />

Federation <strong>Community</strong> Grants to scan and<br />

catalogue historic photographs that will be<br />

accessible through the new library<br />

automated system.<br />

• Ran a successful Multicultural Festival.<br />

• Ran the <strong>City</strong>’s Open Art Prize which attracted<br />

243 entries.<br />

• Participated in the Senior’s Expo with Seniors<br />

On The Net programs.<br />

• Trained 455 people at the Internet Training<br />

Centre.<br />

• Ran successful school holiday program in<br />

each library.<br />

• Ran a two-week celebration <strong>of</strong> Children’s<br />

Book Week attended by 4041 students from<br />

schools across the <strong>City</strong>.<br />

• All library staff attended change management<br />

workshops in preparation for the new library<br />

system.<br />

MAJOR ITEMS OF EXPENDITURE<br />

AND/OR EXPECTED OUTCOME:<br />

• Implementation <strong>of</strong> the new automated library<br />

management system strategy, with the end<br />

result <strong>of</strong> Year 2K compliance, access to<br />

library catalogues through the World Wide<br />

Web to enable users to browse catalogues<br />

and place requests from home PCs, search<br />

catalogues <strong>of</strong> neighbouring local authorities,<br />

LISWA and tertiary institutions.<br />

• Move Osborne Library to the Grenville Hall<br />

and relocate again to the completed facility.<br />

• Completion and fit out <strong>of</strong> the new Osborne<br />

Library and <strong>Community</strong> Centre.<br />

• Develop a strategic action plan for Karrinyup<br />

Library and <strong>Community</strong> Centre.<br />

• Update the Library Corporate plan.<br />

• Formation <strong>of</strong> Customer Focus Groups.<br />

• Publication <strong>of</strong> the <strong>City</strong> history.<br />

• Develop and implement Library Web Page.<br />

• Install e-mail kiosks in each library.<br />

• Run a full range <strong>of</strong> festivals and arts events<br />

including Multicultural Festival, Art Award,<br />

Craft Award, Youth Festival, Jazz Concerts,<br />

Scarborough Christmas event and<br />

sandcastle competition.<br />

NEW PROPOSALS FOR CORPORATE<br />

PLAN ACTION PLANS:<br />

• Monitor Karrinyup Library and <strong>Community</strong><br />

Centre development in relation to the<br />

developments at the shopping centre under<br />

new owners.<br />

• Prepare a 5-10 year scenario for the future <strong>of</strong><br />

library services.<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES:<br />

• The implementation <strong>of</strong> the new library<br />

automated management system will enable<br />

staff to serve library clients much more<br />

efficiently and effectively.<br />

• E-mail kiosks will enable the <strong>City</strong> to provide<br />

e-mail facilities for the public at a charge,<br />

leaving Internet terminals available for<br />

information and educational use.<br />

• Library staff at all levels have workshopped<br />

to develop lists <strong>of</strong> tasks that can be dropped<br />

to create better productivity in the library<br />

back room procedures, creating more<br />

customer service time.<br />

• The transfer <strong>of</strong> staff from the Leisure Services<br />

Department to work on the festivals, culture<br />

and events portfolio has ensured that this<br />

area can be provided for more effectively.<br />

Principal<br />

librarian Kay<br />

Poustie and<br />

Member for<br />

<strong>Stirling</strong> Jann<br />

McFarlane<br />

MP examine<br />

historical<br />

photographs<br />

and illustrations<br />

to be<br />

electronically<br />

preserved.<br />

29


Finance and Corporate Services<br />

Strategic Planning and Financial Management<br />

OBJECTIVES OF THE DEPARTMENT:<br />

The branch is responsible for the budget<br />

function in the <strong>City</strong> along with the strategic<br />

planning process.<br />

Specifically, the budgetary process includes<br />

co-ordination <strong>of</strong> the annual budget process,<br />

quarterly budget reviews and budgetary<br />

control measurement.<br />

The strategic planning function includes<br />

preparation <strong>of</strong> the five-year Strategic Plan,<br />

developing corporate intentions for the coming<br />

12 months in consultation with management,<br />

and the documentation <strong>of</strong> corporate intentions<br />

in the Corporate Plan.<br />

Monitoring <strong>of</strong> the Corporate Plan for timeliness<br />

and objectives being met is done quarterly.<br />

Economic evaluation <strong>of</strong> major undertakings is<br />

also undertaken when required.<br />

The branch also provides economic updates in<br />

the form <strong>of</strong> a newsletter ‘Insight’.<br />

MAJOR HIGHLIGHTS:<br />

• The rationale used for Activity Based<br />

Costing has been improved by simplifying<br />

the format and reducing cost driver numbers<br />

significantly.<br />

• A comprehensive computer-based model<br />

has been developed to consolidate financial<br />

data from Activity Position Statements that<br />

will allow for a consistent format for<br />

reporting financial data in budget papers, the<br />

Principal Activity Plan and the Corporate<br />

Plan. The format will also provide for<br />

adherence to recognised accounting<br />

standards and the Local Government Act;<br />

and<br />

• A review <strong>of</strong> budgetary control processes.<br />

CONTINUOUS IMPROVEMENT<br />

INITIATIVES:<br />

• Further evaluation <strong>of</strong> the capital rationing<br />

model developed by Curtin University for<br />

potential use by the <strong>City</strong>.<br />

• A major study <strong>of</strong> management information<br />

systems and information technology<br />

systems in the <strong>City</strong>. The outcome <strong>of</strong> the<br />

study will include a five-year information<br />

technology strategy plan.<br />

• Undertake a study on key performance<br />

indicators, including a joint study with the<br />

Department <strong>of</strong> Local Government.<br />

• A full study on Activity Based Costing (ABC)<br />

in concert with Accounting Branch to further<br />

simplify the process, while at the same time<br />

producing relevant and reasonable cost<br />

allocations.<br />

• Review budgetary control processes and<br />

organisational management accounting.<br />

MAJOR PROJECTS FOR 1999/2000<br />

• <strong>Development</strong> and documentation <strong>of</strong> the<br />

Corporate Plan for 1999/2000, including<br />

major corporate intentions, critical deadlines<br />

and a set <strong>of</strong> financial statements. An<br />

extension to this process will include<br />

quarterly reports on the actual progress <strong>of</strong><br />

corporate initiatives compared to those set<br />

in the Corporate Plan.<br />

• Preparation <strong>of</strong> the Principal Activity Plan<br />

(PAP) for the four-year period 1999/2000 to<br />

2002/2003.<br />

• Completion <strong>of</strong> Activity Position Statements,<br />

which will be used to form the basis for<br />

input to the PAP, Corporate Plan and<br />

forecast financial statements.<br />

• Further evaluation <strong>of</strong> the capital rationing<br />

model developed by Curtin University, for<br />

potential use by the <strong>City</strong>.<br />

• Preparation and documentation <strong>of</strong> the<br />

1999/2000 Budget, including preparation <strong>of</strong><br />

financial statements in accordance with<br />

contemporary reporting practices.<br />

• Preparation <strong>of</strong> Budget Reviews in October,<br />

1999, February, 2000 and May, 2000.<br />

• A major study <strong>of</strong> management information<br />

systems and information technology<br />

systems in the <strong>City</strong>. The outcome <strong>of</strong> the<br />

study will include a five-year information<br />

technology strategy plan.<br />

• Undertake a study on key performance<br />

indicators, including a joint study with the<br />

Department <strong>of</strong> Local Government.<br />

• A full study on Activity Based Costing (ABC)<br />

in concert with Accounting Branch, including<br />

recommendations to simplify cost drivers (in<br />

the longer term) and to include both actual<br />

and budgeted ABCs in the accounting<br />

system (in the shorter term).<br />

• Review budgetary control processes and<br />

organisational management accounting –<br />

preliminary analysis to the Information<br />

Technology Strategy Study.<br />

30


Strategic<br />

Plan<br />

YOUR CITY’S ‘ROADMAP’ FOR<br />

THE NEXT FIVE YEARS<br />

31


Strategic Plan<br />

A MESSAGE FROM THE MAYOR<br />

The strategic plan has been written as a “roadmap” for the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> over the five<br />

year period 1999/2000 to 2003/2004.<br />

Our <strong>City</strong> has enormous potential and we are committed, as your Council, to fulfilling the<br />

goals set out in the strategic plan.<br />

By doing so we will enhance the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> in a variety <strong>of</strong> ways both externally in the<br />

<strong>City</strong>’s environment and resources, and internally with enhanced communication,<br />

streamlined procedures and continued responsible financial management.<br />

Your councillors have great hopes for the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> and, as our Vision indicates, we<br />

are keen to achieve here, the ideal community.<br />

We authorise the Chief Executive Officer to carry out the plan on behalf <strong>of</strong> the Councillors<br />

and, working together, we look forward to an exciting era for the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>.<br />

VISION<br />

Our vision is a description <strong>of</strong> the future<br />

we are aiming to achieve.<br />

STIRLING<br />

The <strong>City</strong> <strong>of</strong> Choice<br />

ACHIEVING THE IDEAL COMMUNITY<br />

MISSION<br />

A mission statement gives an<br />

organisation a sense <strong>of</strong> purpose<br />

and direction. The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>’s<br />

mission statement describes our<br />

primary focus which is...<br />

to provide services and facilities<br />

which enhance the well-being<br />

<strong>of</strong> our community<br />

VALUES<br />

Our values describe the things<br />

which are important to us in<br />

the way we do business.<br />

We strive to display our values in all our<br />

interactions - in Council, through<br />

Councillors and staff, and within our<br />

community. Our values are:<br />

We respect people<br />

We seek involvement from our<br />

community and value their input<br />

We strive for quality<br />

We demonstrate integrity in all we do<br />

We appreciate and recognise<br />

the contribution <strong>of</strong> all who<br />

work for the <strong>City</strong><br />

■ Overview <strong>of</strong> the<br />

strategic plan<br />

The strategic plan has been written to provide a<br />

broad direction for the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> over the<br />

next five years. In developing the plan, four key<br />

aspects <strong>of</strong> our future are embraced. These are:<br />

• Customers<br />

• Internal business processes<br />

• Learning and growth<br />

• Financials<br />

We recognise that each area is inter-related and<br />

that the work we do in one area will necessarily<br />

have an impact on the others.<br />

Within each area, we have defined a strategic<br />

intent (or broad focus) and several specific<br />

strategies which we are committed to achieving<br />

within the time frame. In order to achieve the<br />

goals set out in the following pages we recognise<br />

the need to develop specific action plans which<br />

have clearly articulated steps, time lines and<br />

responsibilities.<br />

■ Customers<br />

STRATEGIC INTENT<br />

The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> is enriched by its diversity.<br />

Within our boundaries we have a variety <strong>of</strong><br />

people at different life stages and an enormous<br />

mix <strong>of</strong> interests including religious, sporting,<br />

cultural, business and a wide tourist/visitor<br />

appeal. We are aware that our customer base has<br />

differing needs and by understanding and<br />

optimising the fulfilment <strong>of</strong> these needs we strive<br />

to make <strong>Stirling</strong> truly the <strong>City</strong> <strong>of</strong> Choice.<br />

STRATEGIES<br />

We recognise our core responsibilities and<br />

commit to continuing to provide traditional local<br />

government services at an optimum level, while<br />

monitoring ratepayers’ changing needs and<br />

preferences.<br />

In doing so we will focus on<br />

• Service quality and quantity<br />

• Cost control – value for money<br />

• <strong>Community</strong> consultation and Communication<br />

Responsibility: Councillors and CEO<br />

To create a significant centre for the <strong>City</strong> which<br />

would provide citizens with a base for social,<br />

cultural, commercial and civic endeavours.<br />

32


Strategic Plan<br />

<strong>Stirling</strong> understands the<br />

differing needs <strong>of</strong> its diverse<br />

customer base.<br />

We endorse the design and<br />

construction <strong>of</strong> a multistage<br />

civic centre and civic<br />

precinct.<br />

Priority will be given to the<br />

community facilities, while<br />

coordinating the<br />

development <strong>of</strong> other<br />

precincts. The project will<br />

include the following<br />

stages:<br />

• Feasibility study<br />

• Design phase –<br />

community input<br />

• Selection <strong>of</strong> appropriate<br />

design<br />

• Project plan<br />

• Staged construction<br />

• Promotion/opening etc<br />

Responsibility: Overseeing by the <strong>Stirling</strong> Civic<br />

Precinct Committee<br />

We promote innovation in the provision <strong>of</strong> new<br />

and existing services<br />

Examples <strong>of</strong> innovative services for investigation<br />

include:<br />

• Easier access to customer services<br />

• Localised services<br />

• Remote access<br />

• Electronic commerce<br />

• Ratepayer credit cards<br />

• Longer hours for Council operation<br />

• Council as agents for collection <strong>of</strong> accounts<br />

including State and Federal<br />

Government collections<br />

(possibly co-located with<br />

library services)<br />

• Other projects as<br />

identified<br />

Responsibility: CEO<br />

Within the normal<br />

constraints <strong>of</strong> budget and<br />

community need, we<br />

actively endorse the<br />

continued improvement <strong>of</strong><br />

our city, the lifestyles <strong>of</strong> its<br />

ratepayers and the<br />

provision <strong>of</strong> community<br />

facilities.<br />

Projects include:<br />

• Completion <strong>of</strong> Inglewood Aquatic Centre<br />

• <strong>Development</strong> <strong>of</strong> Mirrabooka Regional Centre<br />

• Significant upgrading <strong>of</strong> streetscapes<br />

including medians, furniture and parking<br />

• Beautification <strong>of</strong> drainage compensation<br />

basins<br />

• Maintenance <strong>of</strong> security (and modification<br />

where necessary)<br />

Responsibility: CEO<br />

To enhance the natural assets <strong>of</strong> the city we<br />

advocate the development <strong>of</strong> the Scarborough<br />

Beach area. We believe this project should be<br />

viewed as a regional development attracting<br />

Federal and State funding.<br />

To maintain its effectiveness,<br />

<strong>Stirling</strong> constantly revises its<br />

internal processes to deliver<br />

the best service.<br />

Action: Using the outcomes <strong>of</strong> the<br />

Scarborough and Environs Area<br />

Strategy competition, develop a<br />

concept plan for a staged development<br />

<strong>of</strong> the area.<br />

Note: This project should be conducted<br />

in parallel with the Coastal Ocean<br />

Management Plan<br />

Responsibility: CEO<br />

■ Internal Business<br />

Processes<br />

STRATEGIC INTENT<br />

The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> enjoys a stable,<br />

committed Council, a high level <strong>of</strong><br />

infrastructure and positive relationships<br />

with other levels <strong>of</strong> government. To<br />

ensure that our Council and our<br />

administrative <strong>of</strong>ficers continue to work<br />

effectively it is important to assess and<br />

review the way we do business. We<br />

strive to provide the best and most<br />

efficient service possible.<br />

STRATEGIES<br />

In a climate <strong>of</strong> continuing technological<br />

change, we must ensure that our<br />

information systems will keep us at the<br />

forefront <strong>of</strong> technology (within six<br />

months).<br />

Action: Appoint an independent arbiter<br />

to assess the current situation and<br />

prepare a five-year Information<br />

Technology Strategic Plan for the <strong>City</strong>,<br />

including an evaluation <strong>of</strong> out-sourcing<br />

and in-sourcing opportunities.<br />

Responsibility: CEO<br />

Taking a regional leadership role, we<br />

need to develop and implement a fiveyear<br />

waste management plan<br />

encompassing best practice and<br />

recycling mechanisms, where necessary,<br />

with regional partners.<br />

Responsibility: CEO<br />

We need to ensure that the organisation<br />

structure and design is conducive to<br />

achieving the objectives <strong>of</strong> the Council<br />

and meeting the needs <strong>of</strong> the <strong>City</strong>. It is<br />

assumed that an appropriate structure<br />

will be in place to implement the<br />

strategic plan and that, as a result <strong>of</strong> the<br />

strategic plan outcomes, the structure<br />

will be altered from time to time.<br />

Associated issues for action following<br />

the restructure <strong>of</strong> the organisation<br />

include:<br />

• Review the appropriateness and<br />

number <strong>of</strong> Council policies and<br />

administrative delegations to<br />

streamline decision-making (within six<br />

months).<br />

• Establish project/planning teams to<br />

co-ordinate issues/projects with input<br />

from all affected parties within<br />

<strong>Community</strong><br />

Services<br />

Recreation<br />

& Reserves<br />

Library &<br />

Information<br />

Services<br />

Building<br />

Planning &<br />

Health<br />

Works<br />

33


Strategic Plan<br />

Council at the beginning <strong>of</strong><br />

the process.<br />

• Participate in the<br />

Department <strong>of</strong> Local<br />

Government’s<br />

benchmarking review and<br />

have the results <strong>of</strong> this<br />

review customised for the<br />

<strong>City</strong> <strong>of</strong> <strong>Stirling</strong> by<br />

appropriate experts for use<br />

as internal performance<br />

indicators.<br />

Responsibility: CEO<br />

■ Learning<br />

and growth<br />

STRATEGIC INTENT<br />

To remain at the forefront <strong>of</strong> local government, it<br />

is important for Councillors and Council<br />

Executive and staff to continue to work in a<br />

learning environment where personal growth<br />

and training is encouraged and fostered. We are<br />

committed to continued learning and growth;<br />

recognition and reward for outstanding service<br />

and innovation; and celebrating our successes.<br />

Personal growth and training<br />

are rewarded among<br />

<strong>Stirling</strong>’s staff to create an<br />

innovative local government.<br />

STRATEGIES<br />

We recognise the work done to date in<br />

customer service training. Since customer focus<br />

is the lifeblood <strong>of</strong> good service we endorse the<br />

next stage <strong>of</strong> customer service training for city<br />

staff. (Within six months).<br />

Training issues include:<br />

• One-stop interface for<br />

customers<br />

• <strong>Community</strong> feedback<br />

• Project management for<br />

both employees and<br />

Councillors including<br />

project allocations, value<br />

for money, ability to “spot”<br />

savings in projects etc.<br />

• Integrated projects –<br />

completeness, continuation<br />

etc<br />

Responsibility: CEO<br />

We understand the<br />

importance <strong>of</strong><br />

acknowledging exceptional<br />

work, leadership and innovation and endorse<br />

the development <strong>of</strong> a reward and recognition<br />

scheme.<br />

Examples include:<br />

• Above average performance <strong>of</strong> staff<br />

• Innovation<br />

• Recognition <strong>of</strong> community contribution<br />

• Incentives for volunteer participation<br />

Responsibility: Councillors and CEO<br />

While the <strong>City</strong> has achieved a great deal over<br />

the last few years, little <strong>of</strong> this has been<br />

broadcast to the community. We believe we<br />

should actively enhance the promotion <strong>of</strong> these<br />

achievements through media, static displays,<br />

and ratepayer presentations.<br />

Responsibility: Councillors and CEO<br />

The <strong>City</strong> is committed to<br />

wise use <strong>of</strong> its assets for<br />

financial independence and<br />

security.<br />

■ Financials<br />

STRATEGIC INTENT<br />

Over the years, Councillors and staff<br />

have worked hard to ensure the <strong>City</strong> <strong>of</strong><br />

<strong>Stirling</strong>’s financial independence and<br />

security. In the future, we are<br />

committed to the wise stewardship <strong>of</strong><br />

Council funds and the optimum use <strong>of</strong><br />

our funds and assets.<br />

STRATEGIES<br />

To optimise return on our investments<br />

we approve the development <strong>of</strong> an<br />

asset management plan to be compiled<br />

by a suitably qualified project manager.<br />

This plan should include:<br />

• An evaluation <strong>of</strong> current assets<br />

• An evaluation <strong>of</strong> asset utilisation<br />

• <strong>Development</strong> <strong>of</strong> a program for the<br />

preservation <strong>of</strong> assets<br />

• <strong>Development</strong> <strong>of</strong> an asset disposal<br />

program<br />

• Ability to evaluate lease/ownership<br />

options for future needs<br />

• Examine options to encourage<br />

heavy traffic to use roads designed<br />

for this purpose.<br />

Responsibility: CEO<br />

To enhance the decision-making ability<br />

<strong>of</strong> Councillors<br />

Actions:<br />

• Introduce “user friendly” financial<br />

reports which include economic<br />

evaluation <strong>of</strong> projects and feedback<br />

on project expenditure<br />

• Include executive summaries with all<br />

Council submissions (where<br />

appropriate)<br />

Responsibility: Councillors and CEO<br />

Capital works and other<br />

entrepreneurial activities within the <strong>City</strong><br />

should be considered on merit and<br />

prioritised for approval in terms <strong>of</strong> need<br />

and capacity to produce an income<br />

stream. Where considered appropriate,<br />

funds generated by the sale, lease or<br />

investment <strong>of</strong> Council assets or by<br />

specific borrowings should be used to<br />

fast-forward these projects.<br />

Responsibility: Councillors and<br />

CEO<br />

To assist in the promotion and<br />

expansion <strong>of</strong> the <strong>City</strong> we should<br />

employ (within six months) a<br />

business development <strong>of</strong>ficer to:<br />

• Promote the <strong>City</strong> to the business<br />

community<br />

• Attract business, services and new<br />

residents to the <strong>City</strong><br />

• Develop other entrepreneurial<br />

activities in the <strong>City</strong><br />

• Attract funds for <strong>City</strong> projects<br />

• Be receptive to business<br />

opportunities<br />

Responsibility: CEO<br />

Sanitation<br />

Administrative<br />

Services<br />

Information<br />

Technology<br />

Rates & Accounts<br />

Human Resources<br />

34


Financial<br />

Statements<br />

For the year ended 30 June, 1999<br />

These Financial Statements and specific<br />

disclosures have been derived from the <strong>City</strong> <strong>of</strong><br />

<strong>Stirling</strong>’s Financial Report.<br />

The Concise Financial Report cannot be<br />

expected to provide as full an understanding <strong>of</strong><br />

the financial performance, financial position and<br />

financial and investing activities <strong>of</strong> the <strong>City</strong> <strong>of</strong><br />

<strong>Stirling</strong> as the Financial Report.<br />

Further financial information can be obtained<br />

from the Financial Report which is available,<br />

free <strong>of</strong> charge, on request to the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>.<br />

■ See Page 44<br />

35


Statement by Chief Executive Officer<br />

For the year ended 30 June 1999<br />

CITY OF STIRLING<br />

STATEMENT BY CHIEF EXECUTIVE OFFICER<br />

The attached financial report <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> being<br />

the annual financial report and supporting notes and<br />

other information for the financial year ended 30 June<br />

1999 are, in my opinion, properly drawn up to present<br />

fairly the financial position <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> at 30<br />

June 1999 and the results <strong>of</strong> the operations for the<br />

financial year then ended in accordance with Australian<br />

Accounting Standards (except to the extent that these<br />

have been varied in the Statement <strong>of</strong> Accounting Policies<br />

required by Australian Accounting Standard AAS 6<br />

“accounting Policies” and the accompanying notes to the<br />

annual financial report) and comply with the provisions <strong>of</strong><br />

the Local Government Act 1995 and the regulations<br />

under the Act.<br />

Signed on the 16th day <strong>of</strong> September 1999<br />

.....................................................<br />

Chief Executive Officer<br />

M J (Mike) WADSWORTH<br />

CHIEF EXECUTIVE OFFICER<br />

36


Annual Audit Statement<br />

For the year ended 30 June 1999<br />

37


Operating Statement (By Program)<br />

For the year ended 30 June 1999<br />

1998/99 1999 1998<br />

BUDGET $ $<br />

EXPENSES<br />

GENERAL PURPOSE FUNDING 1,846,690 1,836,749 1,822,139<br />

GOVERNANCE 2,942,450 1,625,098 2,353,893<br />

LAW, ORDER, PUBLIC SAFETY 4,033,524 3,727,789 2,815,073<br />

HEALTH 1,483,939 1,502,241 1,418,953<br />

EDUCATION & WELFARE 4,752,313 5,021,182 4,912,467<br />

COMMUNITY AMENITIES 11,836,600 12,107,108 11,073,014<br />

RECREATION AND CULTURE 18,672,284 21,991,308 20,160,109<br />

TRANSPORT 7,353,953 21,573,825 23,150,991<br />

ECONOMIC SERVICES 1,542,524 1,206,634 1,259,169<br />

OTHER PROPERTY AND SERVICES 4,338,181 5,660,478 4,370,352<br />

TOTAL EXPENSES 58,802,458<br />

––––––––––––<br />

76,252,413<br />

––––––––––––<br />

73,336,161<br />

––––––––––––<br />

REVENUE<br />

GENERAL PURPOSE FUNDING 52,658,263 51,704,882 52,665,280<br />

GOVERNANCE 251,582 305,410 558,693<br />

LAW, ORDER, PUBLIC SAFETY 1,396,812 1,574,799 326,039<br />

HEALTH 101,471 205,225 130,853<br />

EDUCATION & WELFARE 3,226,740 2,945,989 3,024,596<br />

COMMUNITY AMENITIES 9,557,395 10,480,234 9,643,122<br />

RECREATION AND CULTURE 3,968,239 7,436,457 5,533,602<br />

TRANSPORT 2,543,499 1,868,094 2,273,825<br />

ECONOMIC SERVICES 2,163,031 1,189,458 1,179,522<br />

OTHER PROPERTY AND SERVICES 3,275,216 1,174,766 1,319,472<br />

TOTAL REVENUE 79,142,248<br />

––––––––––––<br />

78,885,314<br />

––––––––––––<br />

76,655,003<br />

––––––––––––<br />

CHANGE IN NET ASSETS<br />

RESULTING FROM OPERATIONS<br />

BEFORE ABNORMAL ITEMS<br />

AND RESTRUCTURING OF LOCAL<br />

GOVERNMENT 20,339,790<br />

––––––––––––<br />

2,632,901<br />

––––––––––––<br />

3,318,843<br />

––––––––––––<br />

ABNORMAL ITEMS 5,000,000 7,277,006 6,173,249<br />

CHANGE IN NET ASSETS<br />

RESULTING FROM OPERATIONS<br />

BEFORE LOSS ON RESTRUCTURING 25,339,790<br />

––––––––––––<br />

9,909,907<br />

––––––––––––<br />

9,492,092<br />

––––––––––––<br />

LOSS ON RESTRUCTURING 756,375 41,562,416<br />

CHANGE IN NET ASSETS RESULTING<br />

FROM OPERATIONS AFTER LOSS<br />

ON RESTRUCTURING 24,583,415 (31,652,509) 9,492,092<br />

–––––––––––– –––––––––––– ––––––––––––<br />

38


Statement <strong>of</strong> Financial Position<br />

As at year ended 30 June 1999<br />

1999 1998<br />

$ $<br />

CURRENT ASSETS<br />

Cash 1,366,269 1,370,914<br />

Investments 36,096,152 43,603,070<br />

Receivables 16,134,302 10,796,497<br />

Prepayments 525,853 35,703<br />

Stock on hand 257,895<br />

–––––––––––––<br />

249,900<br />

–––––––––––––<br />

TOTAL CURRENT ASSETS 54,380,471<br />

–––––––––––––<br />

56,056,084<br />

–––––––––––––<br />

CURRENT LIABILITIES<br />

Borrowings 4,741,977 6,666,370<br />

Creditors and provisions 6,738,384<br />

–––––––––––––<br />

8,775,703<br />

–––––––––––––<br />

TOTAL CURRENT LIABILITIES 11,480,361<br />

–––––––––––––<br />

15,442,073<br />

–––––––––––––<br />

NET CURRENT ASSETS 42,900,110 40,614,011<br />

NON-CURRENT ASSETS<br />

Receivables 2,437,828 2,645,715<br />

Work in Progress 360,762 563,760<br />

Property plant and equipment 662,725,397<br />

–––––––––––––<br />

696,281,340<br />

–––––––––––––<br />

TOTAL NON-CURRENT ASSETS 665,523,987<br />

–––––––––––––<br />

699,490,815<br />

–––––––––––––<br />

NON-CURRENT LIABILITIES<br />

Creditors and provisions 186,107<br />

–––––––––––––<br />

214,327<br />

–––––––––––––<br />

TOTAL NON-CURRENT LIABILITIES 186,107<br />

–––––––––––––<br />

214,327<br />

–––––––––––––<br />

NET NON-CURRENT ASSETS 665,337,879 699,276,487<br />

NET ASSETS 708,237,989 739,890,498<br />

––––––––––––– –––––––––––––<br />

EQUITY<br />

Accumulated Surplus 688,419,064 722,421,601<br />

Reserves 19,818,925<br />

–––––––––––––<br />

17,468,897<br />

–––––––––––––<br />

TOTAL EQUITY 708,237,989 739,890,498<br />

––––––––––––– –––––––––––––<br />

39


Statement <strong>of</strong> Changes in Equity<br />

For the year ended 30 June 1999<br />

1999 1998<br />

$ $<br />

RESERVES - CASH BACKED<br />

Balance at beginning <strong>of</strong> reporting period 17,468,897 19,212,449<br />

Amount transferred from accumulated surplus 4,381,278 2,265,334<br />

Amount transferred to accumulated surplus (2,031,250)<br />

–––––––––––––<br />

(4,008,886)<br />

–––––––––––––<br />

Balance at end <strong>of</strong> reporting period 19,818,925<br />

–––––––––––––<br />

17,468,897<br />

–––––––––––––<br />

ACCUMULATED SURPLUS<br />

Balance at beginning <strong>of</strong> reporting period 722,421,601 675,651,282<br />

Adjustment due to compliance with a new accounting standard 0 35,534,675<br />

Change in net assets resulting from operations (31,652,509) 9,492,092<br />

Transfers to reserves (4,381,278) (2,265,334)<br />

Transfers from reserves 2,031,250<br />

–––––––––––––<br />

4,008,886<br />

–––––––––––––<br />

Balance at end <strong>of</strong> reporting period 688,419,064<br />

–––––––––––––<br />

722,421,601<br />

–––––––––––––<br />

TOTAL EQUITY 708,237,989 739,890,498<br />

––––––––––––– –––––––––––––<br />

40


Statement <strong>of</strong> Cash Flows<br />

For the year ended 30 June 1999<br />

1999 1998<br />

$ $<br />

CASH FLOWS FROM OPERATING ACTIVITIES<br />

Payments<br />

Staff Expenses (23,524,600) (21,663,856)<br />

Accommodation Expenses (2,895,473) (2,909,890)<br />

Office Equipment, Plant & Vehicles (765,297) (619,802)<br />

Sanitation (3,183,992) (4,261,331)<br />

Maintenance <strong>of</strong> Comm. Infrastructure (2,272,782) (4,674,017)<br />

Stock Purchases (1,970,637) (2,076,546)<br />

Activity Functional Operating Expense (25,997,703)<br />

–––––––––––––<br />

(21,405,498)<br />

–––––––––––––<br />

(60,610,483) (57,610,939)<br />

Receipts<br />

Rates 44,571,639 44,604,934<br />

Fees from Regulatory Services 1,478,900 1,455,752<br />

User Charges 16,486,638 15,803,395<br />

Interest Earned 1,542,803 2,816,053<br />

Other Grants & Contrib. 821,844 827,786<br />

Activity Functional Operating Revenue 5,686,296<br />

–––––––––––––<br />

8,723,189<br />

–––––––––––––<br />

70,588,120 74,231,107<br />

NET CASH FROM OPERATING ACTIVITIES 9,977,637 16,620,168<br />

CASH FLOWS USED IN INVESTING ACTIVITIES<br />

New & Redevelopment <strong>of</strong> Comm. Infrastructure (17,008,492) (20,789,315)<br />

Payments for purchase <strong>of</strong> property, plant & equipment (6,742,629) (8,093,107)<br />

Proceeds from sale <strong>of</strong> property, plant & equipment 1,569,643 8,098,562<br />

Transfer to/from trust<br />

–––––––––––––<br />

(7,508,850)<br />

–––––––––––––<br />

NET CASH USED IN INVESTING ACTIVITIES (22,181,478) (28,292,710)<br />

CASH FLOWS FROM GOVERNMENT<br />

Government Grants 4,692,949 5,371,381<br />

Subsidies 2,177,908 2,104,233<br />

Capital Expenditure-Specific Gov't Grants (254,187)<br />

–––––––––––––<br />

(549,140)<br />

–––––––––––––<br />

NET CASH PROVIDED BY GOVERNMENT 6,616,670 6,926,475<br />

NET INCREASE/(DECREASE) IN CASH HELD (5,587,171) (4,746,067)<br />

CASH AT BEGINNING OF REPORTING PERIOD 38,307,615 43,053,682<br />

––––––––––––– –––––––––––––<br />

CASH AT END OF REPORTING PERIOD 32,720,444 38,307,615<br />

––––––––––––– –––––––––––––<br />

41


SCHEDULE 1<br />

General Purpose Revenue<br />

For the year ended 30 June 1999<br />

1999 1998<br />

$ $<br />

General Rate<br />

GRV Rate in $ 35,035,474 34,536,422<br />

Specificed Area Rate<br />

GRV Rate in $1.505 5,380 3,010<br />

Minimum Rate<br />

GRV Number <strong>of</strong> Assessments 24,393 at $368.00 each 8,976,624 9,612,225<br />

Interim Rates<br />

GRV Rate in $ 316,652<br />

–––––––––––––<br />

825,873<br />

–––––––––––––<br />

Total General Rates Levied 44,334,130 44,977,530<br />

Plus - Late Payment Penalties 270,587 218,693<br />

Plus - Installment charges & interest 228,216 231,575<br />

Plus - Arrears Rates 104,580<br />

–––––––––––––<br />

327,155<br />

–––––––––––––<br />

Total Amount made up from Rates 44,937,513 45,754,953<br />

General Purpose Grant 3,750,824 3,861,382<br />

Pensioner Deferred Rates Interest Grant 118,246 152,722<br />

Other General Purpose Revenue 2,898,300<br />

–––––––––––––<br />

2,896,223<br />

–––––––––––––<br />

TOTAL GENERAL PURPOSE REVENUE<br />

SHOWN ON OPERATING STATEMENT 51,704,882 52,665,280<br />

––––––––––––– –––––––––––––<br />

42


SCHEDULE 2<br />

Statement <strong>of</strong> Rating Information<br />

For the year ended 30 June 1999<br />

Rateable Property Rate in $ Minimums<br />

Value Numbers (cents) Rate Yield No. Yield $ TOTAL $<br />

GENERAL<br />

RATE-GRV<br />

Residential 327,442,434 47,537 7.36773 24,125,074 24,119 8,875,792 33,000,866<br />

Commercial 75,299,314 909 6.07590 4,575,111 150 55,200 4,630,311<br />

Industrial 88,416,972 1,971 7.16524 6,335,288 124 45,632 6,380,920<br />

Interim Rates 316,652 316,652<br />

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––<br />

TOTAL GRV 491,158,720 50,417 35,352,126 24,393 8,976,624 44,328,750<br />

TOTAL SPECIFIED AREA RATE-GRV 5,380<br />

—————<br />

TOTAL RATES LEVIES - as per Schedule 1 44,334,130<br />

—————<br />

43


Concise Financial Report<br />

INFORMATION TO ASSIST IN THE UNDERSTANDING<br />

OF THE CONCISE FINANCIAL REPORT OF THE CITY OF STIRLING.<br />

PROFIT AND LOSS STATEMENT<br />

• Trends over time indicate that revenue from grants is declining slowly, revenue from rates is being<br />

held at or below the Consumer Price Index and other revenue fluctuates according to business<br />

activity in the sector it represents.<br />

• A minor restructuring <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> resulted in an area approximately represented by the<br />

boundaries <strong>of</strong> the suburb <strong>of</strong> Maylands being transferred to the <strong>City</strong> <strong>of</strong> Bayswater. This was<br />

accompanied by a transfer <strong>of</strong> Property, Plant, Equipment and Cash to the value <strong>of</strong> $41,562,416.<br />

• Cost <strong>of</strong> operations is largely reflective <strong>of</strong> the scope <strong>of</strong> works undertaken. However, performance<br />

measurements have been introduced throughout the organisation to ensure effective control <strong>of</strong><br />

resources.<br />

BALANCE SHEET<br />

• There has been no significant changes in the composition <strong>of</strong> Property, Plant and Equipment.<br />

• The <strong>City</strong> has no long-term debt only that required for efficient control <strong>of</strong> short-term cash flow.<br />

• Debtors have increased substantially this year as a result <strong>of</strong> the issue <strong>of</strong> accounts for<br />

contributions by owners to the <strong>Stirling</strong> Centre Town Planning Scheme No. 38.<br />

CASH FLOWS<br />

For the year ended 30 June 1999<br />

• There has been no significant changes in cash flow terms.<br />

• Capital programs have been financed from revenue sources.<br />

• The <strong>City</strong> has no long-term debt or debt servicing requirements.<br />

SIGNIFICANT FINANCIAL RATIOS ARE AS FOLLOWS.<br />

(a) the current ratio<br />

- to assess ability to meet current commitments<br />

1999 1998 1997 1996 1995<br />

current assets minus restricted assets<br />

current liabilities minus liabilities<br />

associated with restricted assets<br />

3.7723 2.8016 3.3481 3.6013 3.1656<br />

(b) the debt ratio<br />

- to identify the exposure <strong>of</strong> the <strong>City</strong> to debt as an indicator <strong>of</strong> the solvency <strong>of</strong> the <strong>City</strong><br />

total liabilities<br />

total assets<br />

0.0162 0.0207 0.0163 0.0866 0.1044<br />

(c) the rate coverage ratio<br />

- to assess the dependence on non rate revenue sources<br />

net rate revenue<br />

operating revenue<br />

0.5007 0.5307 0.5655 0.5673 0.5744<br />

(d) outstanding rates ratio<br />

-to assess the rate collection performance<br />

rates outstanding<br />

rates collectable<br />

0.0675 0.0681 0.0778 0.0760 0.0769<br />

Designed and produced by Spencer Group Media<br />

Photographs: Motive Audio Visual, RCM Visuals and Bill Davis.<br />

Typesetting, Pre-press and Printing: Vanguard Press<br />

44


Annual Report Cover<br />

<strong>Stirling</strong> has initiated many new<br />

projects including, from top,<br />

Council’s new works depot ($6.5<br />

million); Osborne Library and<br />

<strong>Community</strong> Centre ($5 million); the<br />

Inglewood Swimming Pool<br />

redevelopment ($7.5 million) and the<br />

Henderson Eco-Discovery Centre<br />

($500,000).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!