Community Development - City of Stirling
Community Development - City of Stirling
Community Development - City of Stirling
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>City</strong> <strong>of</strong> <strong>Stirling</strong><br />
1999<br />
annual report
Your <strong>City</strong><br />
The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> began in 1871 as the Perth Road Board,<br />
became the Shire <strong>of</strong> Perth in 1961, and gained <strong>City</strong> status in<br />
1971.<br />
In 1871, when the total population <strong>of</strong> Western Australia was<br />
only 25,000, the (<strong>Stirling</strong>) district was five times larger than now,<br />
but the area was either rural or completely undeveloped. It then<br />
included what are now the Cities <strong>of</strong> Wanneroo, Bayswater and<br />
Belmont.<br />
By 1947 <strong>Stirling</strong>’s population was 31,000. It reached 84,000 in<br />
1961 and climbed above 160,000 in 1971 with the development<br />
<strong>of</strong> northern areas. In 1990 it was 180,000.<br />
The <strong>City</strong> now has an area <strong>of</strong> about 100 sq kms, and 30 suburbs<br />
stretching from Railway Parade, Mount Lawley to the<br />
Indian Ocean at Scarborough, Trigg, North Beach<br />
and Waterman.<br />
YOUR CITY’S MAKEUP:<br />
Population: 175,569<br />
Total area: 100 sq km<br />
Area <strong>of</strong> parks/gardens/developed<br />
reserves/natural areas: 977 ha<br />
Length <strong>of</strong> roads: 1,017 km<br />
Length <strong>of</strong> footpaths/dual use paths: 760 km<br />
Number <strong>of</strong> rateable assessments: est 75,505<br />
Number <strong>of</strong> non-rateable assessments: est 1,900<br />
Number <strong>of</strong> Wards: Seven<br />
Distance from Perth <strong>City</strong>: The Administration Centre is 8.5 kms<br />
from Perth GPO<br />
Child Health Centres: 14 - Alexander Park, Balcatta, Balga,<br />
Dianella, Hamersley, Inglewood, Karrinyup, Mirrabooka,<br />
Nollamara, Osborne, Scarborough, Trigg, Wembley Downs,<br />
Yokine.<br />
Senior Citizens/Autumn Centres: Seven - Balga, Dianella,<br />
Inglewood, Nollamara, North Beach, Osborne, Scarborough.<br />
Libraries: Six - Dianella, Inglewood, Karrinyup, Mirrabooka,<br />
Osborne, Scarborough.<br />
Recreation Centres: 10 - Balcatta (WK Moir), Dianella,<br />
Hamersley, Innaloo, Karrinyup, Mirrabooka, (Herb Graham),<br />
Nollamara, Scarborough, Tuart Hill (Grenville), Yokine.<br />
Women’s Refuge: <strong>Stirling</strong> Women’s Refuge.<br />
Swimming Pools: Two - Balga, Inglewood.<br />
Museum: Mount Flora Regional Museum, Flora Terrace, North<br />
Beach.<br />
Golf Courses: Hamersley,<br />
Registered dogs: 18,000 approx.<br />
CITY OF STIRLING<br />
ELECTORS GENERAL MEETING<br />
PURSUANT to S5.27 <strong>of</strong> the Local Government Act 1995 and Local<br />
Government Administration Regulations, Electors are cordially invited to<br />
attend the Electors General Meeting for the 1998-99 Financial Year<br />
which will be held at 7pm on Wednesday, September 29, 1999 in the<br />
Council Reception Hall, Civic Administration Centre, Civic Place, <strong>Stirling</strong>.<br />
The Order <strong>of</strong> Business will be:<br />
(a) Welcome, introduction and apologies;<br />
(b) Contents <strong>of</strong> the Annual Report for the 1998-99 Financial Year;<br />
(c) General Business.<br />
The draft Annual Financial Statements for the 1998-99 Financial Year are<br />
available for perusal at the <strong>City</strong>’s Accounting Services Department at the<br />
Main Administration Office.<br />
M.J. WADSWORTH<br />
Chief Executive Officer
Contents<br />
STIRLING’S VISION, MISSION, 2<br />
MAYOR’S REPORT 3<br />
CHIEF EXECUTIVE’S REPORT 4<br />
YOUR CITY’S MANAGERS 5<br />
YOUR CITY’S COUNCILLORS 6<br />
THE WARDS 7<br />
COMMUNITY DEVELOPMENT 8<br />
8-9 Leisure Services<br />
10 <strong>Community</strong> Services<br />
11-13 Building<br />
13-14 Planning<br />
15-16 Health<br />
WORKS 18<br />
17-18 Engineering Operations<br />
19-20 Engineering Design<br />
20-21 <strong>City</strong> Building<br />
22 Waste Management<br />
Operations<br />
23 Parks and Reserves<br />
HUMAN RESOURCES 24<br />
FINANCE AND CORPORATE SERVICES 25<br />
25 Accounting Services<br />
26 Information Technology<br />
27-28 Administrative Services<br />
29 Library Services<br />
30 Strategic Planning and<br />
Financial Management<br />
THE CITY’S STRATEGIC PLAN 31<br />
FINANCIAL STATEMENTS 35<br />
36 Statement by CEO<br />
37 Audit Statement<br />
38 Operating Statement<br />
39 Financial Position<br />
40 Changes in Equity<br />
41 Statement <strong>of</strong> Cash Flows<br />
42 Schedule 1 - General Purpose Income<br />
43 Schedule 2 - Statement <strong>of</strong> Rating<br />
Information<br />
1
<strong>Stirling</strong>’s Vision and Mission<br />
VISION<br />
Our vision is a description <strong>of</strong> the future<br />
we are aiming to achieve.<br />
STIRLING<br />
The <strong>City</strong> <strong>of</strong> Choice<br />
ACHIEVING THE IDEAL COMMUNITY<br />
MISSION<br />
A mission statement gives an<br />
organisation a sense <strong>of</strong> purpose<br />
and direction. The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>’s<br />
mission statement describes our<br />
primary focus which is...<br />
to provide services and facilities<br />
which enhance the well-being<br />
<strong>of</strong> our community<br />
VALUES<br />
Our values describe the things<br />
which are important to us in<br />
the way we do business.<br />
We strive to display our values in all our<br />
interactions - in Council, through<br />
Councillors and staff, and within our<br />
community. Our values are:<br />
We respect people<br />
We seek involvement from our<br />
community and value their input<br />
We strive for quality<br />
We demonstrate integrity in all we do<br />
We appreciate and recognise<br />
the contribution <strong>of</strong> all who<br />
work for the <strong>City</strong><br />
<strong>City</strong> <strong>of</strong> <strong>Stirling</strong><br />
Administration Offices,<br />
Civic Place, <strong>Stirling</strong>,<br />
Western Australia 6021<br />
Telephone: (08) 9345 8555<br />
Fax: (08) 9345 3073<br />
Web site address: http://www.stirling.wa.gov.au<br />
2
During 1998/99 the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> prepared<br />
the framework for at least two years <strong>of</strong> major<br />
infrastructure improvements, focusing on the<br />
building <strong>of</strong> community facilities, important road<br />
upgradings and the staged development <strong>of</strong> the<br />
<strong>Stirling</strong> Civic Precinct.<br />
This has allowed the <strong>City</strong> to continue <strong>Stirling</strong>’s<br />
strong record <strong>of</strong> sound and successful financial<br />
management.<br />
Additionally, <strong>Stirling</strong> is undoubtedly among the<br />
most stable and cohesive local government<br />
organisations in Western Australia, with an<br />
excellent working rapport between <strong>City</strong><br />
management and your elected representatives.<br />
The local government elections in May, 1999<br />
saw the <strong>City</strong> adopt postal voting – supervised by<br />
the Electoral Commission – for the first time,<br />
resulting in an outstanding fourfold increase in<br />
voter participation, to a 37 per cent valid postal<br />
return.<br />
I congratulate all <strong>of</strong> the candidates for the<br />
integrity <strong>of</strong> their campaigning, and the electors<br />
who showed their liking for the simplicity and<br />
convenience <strong>of</strong> the postal ballot. The results<br />
indicated a preference for experience, with all<br />
sitting or former Councillors who contested<br />
elections being returned.<br />
Following the elections I was deeply honoured<br />
to receive the unanimous support <strong>of</strong> Council in<br />
being returned unopposed for a second, twoyear<br />
term as your Mayor.<br />
<strong>Stirling</strong> is undergoing a period <strong>of</strong> economic<br />
boom, according to the key indicator <strong>of</strong><br />
construction activity. The <strong>City</strong> has recorded its<br />
fifth successive year <strong>of</strong> record building activity –<br />
topping $250 million in building licence<br />
approvals – driven by residential redevelopment<br />
and expansion in the commercial sector,<br />
particularly retail.<br />
The <strong>City</strong>’s own community projects construction<br />
program over the next two years will<br />
complement private sector development.<br />
The redevelopment <strong>of</strong> the Inglewood Swimming<br />
Pool and the new Osborne Library and<br />
<strong>Community</strong> Centre are but just two examples <strong>of</strong><br />
big ticket capital expenditure items which have<br />
been planned with an emphasis on customer<br />
requirements for the coming decades.<br />
An important project which will be completed in<br />
the coming 12 months will be relocation <strong>of</strong><br />
Council’s works depot within industrial land at<br />
Balcatta. The purpose-designed depot will not<br />
only improve the efficiency <strong>of</strong> our workforce, but<br />
also free up valuable land on the existing Cedric<br />
Street site for the development <strong>of</strong> the <strong>Stirling</strong><br />
Civic Precinct.<br />
The long-planned development <strong>of</strong> land nearby<br />
the <strong>Stirling</strong> Interchange will see the Precinct<br />
blend new Civic <strong>of</strong>fices and public facilities with<br />
a mixture <strong>of</strong> quality commercial and residential<br />
development. The conceptual focus for the<br />
Mayor’s Report<br />
<strong>Stirling</strong> Civic Precinct has always been to create<br />
an identifiable heart for the <strong>City</strong>, which can take<br />
advantage <strong>of</strong> the centralised location and the<br />
transport infrastructure <strong>of</strong> the Freeway and Rail<br />
Interchange.<br />
The <strong>City</strong>’s own fragmented administration<br />
buildings are long overdue for replacement, and<br />
the consolidated <strong>of</strong>fices will have far more<br />
efficient – but no greater – space than the<br />
existing premises.<br />
The <strong>City</strong>’s communications with stakeholders on<br />
this and other developments will be ongoing.<br />
In the past financial year we have sharply<br />
increased ratepayer communications, and<br />
introduced regular Ward meetings in addition to<br />
encouraging ratepayer and resident input into a<br />
variety <strong>of</strong> studies.<br />
In the special focus area <strong>of</strong> youth we have<br />
continued our quarterly meetings with school<br />
principals and religious leaders as well as<br />
working closely with State Government<br />
agencies.<br />
The <strong>City</strong> in 1999 also began the <strong>Stirling</strong> Youth<br />
Advisory Council to empower young people to<br />
help us meet their needs and expectations. Their<br />
assistance will see, for example, our first<br />
skateboard facility built at Balga.<br />
Our recognition <strong>of</strong> Scarborough as a key<br />
regional asset is also recognised in the<br />
development <strong>of</strong> a Vision for the<br />
highly popular beach area.<br />
Again we have been<br />
through a period <strong>of</strong> intense<br />
public input from the<br />
$60,000 Scarborough<br />
Ideas Competition.<br />
The commitment <strong>of</strong><br />
<strong>Stirling</strong> employees is<br />
heartily acknowledged, as<br />
is the great contribution <strong>of</strong><br />
our hundreds <strong>of</strong> volunteer<br />
community workers.<br />
Extremely<br />
important at<br />
the same time<br />
is the clear and<br />
dedicated role<br />
<strong>of</strong> my fellow<br />
Councillors who<br />
have set<br />
extremely<br />
high standards<br />
in<br />
carrying out<br />
their<br />
role as public<br />
sector directors<br />
<strong>of</strong> a large and<br />
robust<br />
organisation.<br />
The Mayor<br />
Cr Tony<br />
Vallelonga JP.<br />
3
Chief Executive<br />
Officer M J (Mike)<br />
Wadsworth.<br />
Chief Executive’s Report<br />
T<br />
he <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> consolidated its position<br />
as a West Australian leader in local<br />
government during the 1998/99 financial year.<br />
Takeover bids by two small neighbouring<br />
Councils for several <strong>of</strong> <strong>Stirling</strong>’s southern<br />
suburbs were rejected by Local Government<br />
Minister Paul Omodei early in the financial<br />
year, allowing the <strong>City</strong> to renew its strong<br />
focus on the important business <strong>of</strong> improving<br />
the services and products provided for<br />
ratepayers and residents.<br />
The continuing focus on customers was<br />
emphasised when Mr Omodei launched the<br />
<strong>City</strong>’s inaugural Customer Service Week in<br />
March, 1999.<br />
The week brought to fruition the first stage <strong>of</strong><br />
an 18-month long strategic campaign from the<br />
Mayor, Councillors and Executive management<br />
to improve the way the <strong>City</strong> deals with the<br />
public, including customer service training <strong>of</strong><br />
all 700 employees.<br />
The organisation <strong>of</strong> Customer Service Week<br />
was a joint and cooperative effort between<br />
senior managers and frontline staff.<br />
Activities during the week-long celebration <strong>of</strong><br />
customer service initiatives were: the launch <strong>of</strong><br />
customer service charters by the Minister, the<br />
release <strong>of</strong> public comment and action cards,<br />
small giveaways to customers, all senior<br />
managers and some Councillors attending the<br />
frontline counters, public acknowledgment <strong>of</strong><br />
the 10,000th customer at the Mirrabooka<br />
Service Centre, a <strong>Community</strong> Newspaper<br />
insert to <strong>Stirling</strong> households, customer focus<br />
visits to all the <strong>City</strong>’s external centres, ongoing<br />
service training for high inquiry areas and a<br />
program to address the special needs <strong>of</strong> the<br />
disabled.<br />
A second Customer Service Week is<br />
scheduled for<br />
March, 2000.<br />
The<br />
commitment<br />
to customer<br />
service is<br />
also<br />
enshrined<br />
in <strong>Stirling</strong>’s<br />
new<br />
Strategic<br />
Plan,<br />
4<br />
which gives the <strong>City</strong> an extended “roadmap”<br />
for the next five years.<br />
<strong>Stirling</strong>’s Strategic Plan is a concise and easily<br />
readable document, and is included in this<br />
Annual Report.<br />
The Plan recognises not only the richness <strong>of</strong><br />
the <strong>City</strong>’s diversity, but also the diverse role <strong>of</strong><br />
a large municipal authority.<br />
Other emphasis is put on the maintenance <strong>of</strong><br />
core responsibilities, promotion <strong>of</strong> innovation,<br />
improvement to community lifestyle, better<br />
business processes, leadership in<br />
recruitment and training, open<br />
communication and the optimal<br />
usage <strong>of</strong> assets and revenue.<br />
The Plan specifically endorses the<br />
design and construction <strong>of</strong> a multistage<br />
Civic Centre and Civic<br />
Precinct at <strong>Stirling</strong>, a range <strong>of</strong> large<br />
community facility projects (such<br />
as the Inglewood Aquatic Centre<br />
redevelopment), the regional<br />
significance <strong>of</strong> Scarborough<br />
Beach, the need to be at the<br />
forefront <strong>of</strong> technology, regional<br />
leadership in waste management<br />
and recycling, and the active<br />
promotion <strong>of</strong> achievements.<br />
The <strong>City</strong> has embarked on a<br />
budgetary program for the coming<br />
12 months which is dominated by<br />
capital expenditure on<br />
improvements to community<br />
facilities as well as a significant<br />
increase in road and building<br />
upgrades.<br />
The role and functions <strong>of</strong> local<br />
government continues to expand as we<br />
improve community lifestyle through new<br />
activities such as the successful introduction<br />
<strong>of</strong> 24-hour security patrols.<br />
To meet the needs <strong>of</strong> our ratepayers and<br />
residents the <strong>City</strong> in the coming years will<br />
strive to improve public awareness <strong>of</strong> its<br />
services, and to carefully monitor the utilisation<br />
<strong>of</strong> our facilities so we can keep pace with<br />
changing and new demands.<br />
As we look to the 21st century the major issue<br />
is what should local government be doing<br />
now, especially in the form <strong>of</strong> capital works<br />
infrastructure, so that our successors as<br />
residents will commend us for our foresight.<br />
The organisation has recently undergone a<br />
management restructure to help us achieve<br />
those outcomes and I am delighted to again<br />
report the strong cooperation and support <strong>of</strong><br />
employees for the <strong>City</strong>’s mission and goals.<br />
Likewise, the Executive works well and closely<br />
with the elected Councillors whose role as<br />
directors <strong>of</strong> the organisation guarantees<br />
continuous public-based input to the future <strong>of</strong><br />
the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>.
<strong>City</strong>’s Managers<br />
As at 30 June, 1999<br />
North Beach<br />
Road, Gwelup,<br />
benefited from<br />
<strong>Stirling</strong>’s<br />
commitment to<br />
improving<br />
streetscapes.<br />
Chief Executive Officer<br />
- Mike Wadsworth<br />
Deputy Chief Executive Officer<br />
- Rod Constantine<br />
Executive Manager <strong>Community</strong> <strong>Development</strong><br />
- Stuart Johnson<br />
Executive Manager Works/Business Units<br />
- Ross Moody<br />
Manager Administrative Services<br />
- Craig Watts<br />
Manager Human Resources<br />
- Trevor Holland<br />
Manager <strong>City</strong> Building Operations<br />
- Bruce McGeorge<br />
Manager Parks and Reserves<br />
- Sam Morrison<br />
Principal Environmental Health Officer<br />
- Les Float<br />
Principal Building Surveyor<br />
- Andre Gillot<br />
Manager Planning Services<br />
- Theo van Looji<br />
Manager Leisure Services<br />
- Fiona Strutt<br />
Manager <strong>Community</strong> Services<br />
- Pat Olver<br />
Manager Accounting Services<br />
- Bob Henderson<br />
Manager Strategic Planning and Financial Management - Rod Watts<br />
Manager Libraries, Art and Culture<br />
- Kay Poustie<br />
Manager Information Technology<br />
- Kim Browne<br />
Waste Operations Manager<br />
- Brian Jones<br />
Manager Engineering Design<br />
- Al Valvasori<br />
Manager Engineering Operations<br />
- Ron Spragg<br />
The <strong>City</strong> has<br />
undertaken<br />
many street<br />
beautification<br />
projects in the<br />
past year to<br />
help improve<br />
the overall look<br />
<strong>of</strong> <strong>Stirling</strong>.<br />
5
■<br />
YOUR CITY’S<br />
COUNCILLORS<br />
HAMERSLEY WARD<br />
Cr G Italiano, 6 Widgeon Close, <strong>Stirling</strong> 6021. Telephone: 9446<br />
8897, Fax: 9446 8897, Mob: 0419 240 655. Term ends 2001.<br />
Committees: Technical Services; Town Planning and Statutory<br />
Services.<br />
Cr P L Rose JP, 21 Sunart Close, Hamersley, 6022. Tel: 9247 5235,<br />
Mob: 0417 924 103. Term ends 2003. Committees: Policy,<br />
Corporate Planning, Budget and Finance; House.<br />
■<br />
BALGA WARD<br />
Cr J Copley JP (Deputy Mayor), 249 Mirrabooka Avenue, Balga<br />
6061. Tel: 9342 6690, Fax: 9342 8855, Mob: 0419 247 606. Term<br />
ends 2003. Committees: Technical Services; House.<br />
Cr D Boothman, 20 Garrick Way, Balga 6061. Tel: 9247 2174, Fax:<br />
9247 2174, Mob: 0419 047 224. Term ends 2001. Committees:<br />
Policy, Corporate Planning, Budget and Finance.<br />
■<br />
INGLEWOOD WARD<br />
Cr T J Tyzack, 23 Wordsworth Avenue, Yokine 6060,<br />
Tel: 9444 5381, Fax: 9242 1279, Mob: 0419 045 980.<br />
Term ends: 2001. Committees: Town Planning and<br />
Statutory Services; Policy, Corporate Planning,<br />
Budget and Finance.<br />
Cr R J Daniel, 43 Sexton Road, Inglewood 6052. Tel:<br />
9271 5242, Fax: 9272 7323. Term ends 2003.<br />
Committees: Technical Services; House.<br />
■<br />
LAWLEY WARD<br />
Cr T W Clarey, 38 Melrose Crescent, Mount Lawley<br />
6050, Tel: 9370 2588, Fax: 9370 3896. Term ends<br />
2003. Committees: Town Planning and Statutory<br />
Services; Policy, Corporate Planning, Budget and<br />
Finance.<br />
Cr R M Willox JP, 9 Dene Street, Mount Lawley 6050.<br />
Tel: 9271 7332, Fax: 9370 5671, Mob: 0419 249 288.<br />
Term ends 2001. Committees: Technical Services;<br />
Policy, Corporate Planning, Budget and Finance.<br />
■<br />
OSBORNE WARD<br />
Cr A A Spagnolo JP, 21 Coatelan Drive, <strong>Stirling</strong> 6021,<br />
Tel: 9344 2085, Fax: 9344 2739, Mob: 0419 043 174.<br />
Term ends 2003. Committees: Town Planning and<br />
Statutory Services; House.<br />
Cr D C Vallelonga JP (Mayor), 8 Udall Place, Gwelup<br />
6018. Tel: 9446 9363, Fax: 9445 3132, Mob: 0417 992<br />
272. Term ends 2001. Committees: Technical<br />
Services; Town Planning and Statutory Services;<br />
Policy, Corporate Planning, Budget and Finance; House.<br />
■<br />
SCARBOROUGH WARD<br />
Cr J M Camilleri OAM JP, 21 Birchwood Avenue, Woodlands 6018.<br />
Tel: 9446 3201, Fax: 9445 3406. Term ends 2001. Committees:<br />
Technical Services; House.<br />
Cr B R Ham, 113 Rosewood Avenue, Woodlands 6018.<br />
Tel: 9446 1488, Fax: 9244 7046, Mob: 0417 915 772. Term ends<br />
2003. Committees: Town Planning and Statutory Services; Policy,<br />
Corporate Planning, Budget and Finance.<br />
■<br />
COASTAL WARD<br />
Cr W M Stewart, 60 Elsie Street, Waterman 6020.<br />
Tel: 9448 6080, Fax: 9448 6097. Term ends 2003. Committees:<br />
Technical Services; House.<br />
Cr E Martin, 3a Hale Street, Waterman 6020.<br />
Tel: 9243 1370, Fax: 9243 1370, Mob: 0419 047 126. Term ends<br />
2001. Committees: Town Planning and Statutory Services.<br />
COASTAL<br />
6<br />
Cr Bill<br />
Stewart<br />
Cr Eion<br />
Martin<br />
Cr Peter Rose<br />
Cr Joe Camilleri OAM<br />
HAMERSLEY<br />
SCARBOROUGH<br />
Cr John Italiano<br />
Cr Brian Ham
BALGA<br />
INGLEWOOD<br />
Cr June Copley<br />
Deputy Mayor<br />
Cr David Boothman<br />
Cr Terry Tyzack<br />
Cr Bob Daniel<br />
LAWLEY<br />
Cr Trevor Clarey<br />
OSBORNE<br />
Cr Tony Vallelonga<br />
Mayor<br />
Cr Adam Spagnolo<br />
Cr Rod Willox<br />
7
<strong>Community</strong> <strong>Development</strong><br />
Leisure Services<br />
An ever-popular<br />
favourite,<br />
the Inglewood<br />
Swimming<br />
Pool is to<br />
undergo a $7.5<br />
million refurbishment.<br />
OBJECTIVES OF THE DEPARTMENT:<br />
To plan, manage, coordinate and promote the<br />
provision <strong>of</strong> quality, safe, recreation facilities,<br />
services and resources in the <strong>City</strong> so that<br />
residents and visitors can participate in a range<br />
<strong>of</strong> leisure activities which will enhance their<br />
quality <strong>of</strong> life.<br />
MAJOR HIGHLIGHTS:<br />
• Adoption <strong>of</strong> plans for the<br />
redevelopment <strong>of</strong> Inglewood<br />
Aquatic Centre<br />
• Completion <strong>of</strong> the Regional<br />
Recreation Facilities<br />
Strategy Plan for the<br />
North Metropolitan<br />
Regional Recreation<br />
Advisory Committee<br />
• Completion <strong>of</strong><br />
Business Plans for<br />
<strong>Community</strong> and<br />
Recreation Centre<br />
• Major<br />
improvements in<br />
utilisation <strong>of</strong> Yokine<br />
and Karrinyup<br />
<strong>Community</strong> Centres<br />
• Appointment <strong>of</strong> a<br />
new manager at Herb<br />
Graham Recreation Centre<br />
• Review <strong>of</strong> Child Services to<br />
improve efficiency and<br />
effectiveness<br />
• Highly successful events program<br />
including the Sunset Jazz concerts, with the<br />
Jazz Divas being the undoubted showpiece in<br />
Civic Gardens<br />
The areas <strong>of</strong> <strong>Community</strong> Arts and Festivals<br />
have been expanding over the last few years. It<br />
is an exciting component <strong>of</strong> the <strong>City</strong>’s Leisure<br />
Services Department consisting <strong>of</strong> several<br />
budget areas and subsidiary projects including:<br />
• <strong>Community</strong> arts<br />
• Pageants, fairs and carnivals<br />
• Programs in the park<br />
• Naming reserves (subsidiary project)<br />
• Playgrounds (subsidiary project)<br />
The overall vision <strong>of</strong> Leisure Services Special<br />
Projects is:<br />
“To provide programs, one-<strong>of</strong>f events, financial<br />
assistance and pr<strong>of</strong>essional advice to<br />
community groups, individuals and<br />
organisations to encourage the promotion <strong>of</strong><br />
arts and culture within the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>”<br />
The subsidiary projects aim to provide<br />
excellence, safety and recognition within, and<br />
for, the community.<br />
Income is generated through sponsorship and<br />
grants from Arts funding organisations such as<br />
Healthway, the Lotteries Commission and Arts<br />
WA and local businesses.<br />
COMMUNITY ARTS<br />
The <strong>Community</strong> Arts program <strong>of</strong>fered a range<br />
<strong>of</strong> activities and projects which provided an<br />
opportunity for groups to display their artistic<br />
skills and for the public to view and purchase<br />
them. Activities included:<br />
• Craft Extravaganza – Again a successful<br />
event which secured in-kind sponsorship for<br />
local art and craft outlets. The event also<br />
played host for the 1998 International Scarf<br />
Exchange.<br />
• “You’re Never Too Old To Be Young” Expo –<br />
Coordinated by several departments and<br />
held at Scarborough Civic Centre, this expo<br />
introduced the community to seniors<br />
information and activity-based projects.<br />
• Mural – This project involved the application<br />
<strong>of</strong> a mural on the top level <strong>of</strong> the Mount<br />
Flora Regional Museum by a local artist.<br />
<strong>Community</strong> artist<br />
Richard Fry and<br />
local students<br />
worked together<br />
to create works<br />
<strong>of</strong> art at this<br />
year’s<br />
Multicultural<br />
Family Festival.<br />
8
<strong>Community</strong> <strong>Development</strong><br />
Leisure Services<br />
• <strong>Community</strong> Centre art exhibitions – Jim<br />
Satchell and Yokine <strong>Community</strong> Centres both<br />
held art and craft exhibitions in which the<br />
public was able to purchase and view local<br />
works.<br />
• <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> Art Award – This acquisitive<br />
art award showcased excellence in twodimensional<br />
art at the Karrinyup <strong>Community</strong><br />
Centre.<br />
PAGEANTS, FAIRS AND CARNIVALS<br />
<strong>Community</strong> Fairs – Several community fairs<br />
and festivals were held last year which were<br />
predominantly free events to encourage the<br />
public to participate and generate a sense <strong>of</strong><br />
community. The events included:<br />
• <strong>Stirling</strong> Multicultural Family Festival<br />
• Seniors Music Workshops<br />
• Swingtime in the Park<br />
• Daybreak 6000<br />
• Sunset Jazz Concert Series<br />
• Viva Latina, Scarborough Civic Centre<br />
• Carine <strong>Community</strong> Fair<br />
• Awesome Children’s Festival<br />
• Intergenerational Walks<br />
• Skate Fest<br />
• Balga Pool Open Day<br />
Carols by Candlelight events – Three were held<br />
across the <strong>City</strong> ranging in size and duration.<br />
These included:<br />
• Christmas at Scarborough<br />
• Carols by Candlelight at Scarborough Senior<br />
High School<br />
• Balga Family Celebration<br />
PROGRAMS IN THE PARK<br />
Participark proved successful in 1999, enabling<br />
young people in the <strong>City</strong> to visit their local park<br />
and enjoy free activities and entertainment.<br />
After a review <strong>of</strong> this program it has been<br />
agreed that Participark not be held in future<br />
years and the Budget be deleted.<br />
NAMING OF RESERVES<br />
There were few naming requests this financial<br />
year. Two requests were approved for tree<br />
planting ceremonies in honour <strong>of</strong> local people<br />
at Waterman Beach and Booker/Morley<br />
Reserve, Dianella. The cost <strong>of</strong> these was met<br />
by the family.<br />
PLAYGROUNDS<br />
A number <strong>of</strong> playgrounds were upgraded as<br />
the fifth year <strong>of</strong> the <strong>City</strong>’s upgrading schedule.<br />
This saw the completion <strong>of</strong> all regional<br />
playgrounds and a number <strong>of</strong> major<br />
playgrounds within each Ward. Art will be<br />
incorporated into the regional playgrounds in<br />
the next three to seven years, depending<br />
on budget.<br />
The following systems have been developed<br />
throughout the year to improve procedures:<br />
• Preparation <strong>of</strong> a yearly plan for Arts and<br />
Festivals for 1999/2000 to assist with budget<br />
preparation.<br />
• <strong>Development</strong> <strong>of</strong> an Arts Working Group to<br />
improve coordination between departments,<br />
including a review <strong>of</strong> existing projects.<br />
• Hire <strong>of</strong> Banner Poles Policy, guidelines and<br />
fee schedule.<br />
• Deletion <strong>of</strong> Activity H607 Programs in the<br />
Park. As a result <strong>of</strong> the review <strong>of</strong> Arts and<br />
Festivals by the Arts Working Group it was<br />
agreed that Participark was to be deleted<br />
from the program <strong>of</strong> activities, hence<br />
enabling this activity to be deleted.<br />
• Handing over <strong>of</strong> Youth Activity H609 to the<br />
Youth Officer.<br />
Major projects to be undertaken during the<br />
1999/2000 financial year include:<br />
• Expanding and improving on all events and<br />
projects within the two budget areas;<br />
<strong>Community</strong> Arts and Pageants, Fairs and<br />
Carnivals, based on evaluations and<br />
community/coordinator feedback.<br />
• <strong>Development</strong> <strong>of</strong> sponsorship kits.<br />
• Application for<br />
outside funding<br />
based on a<br />
joint<br />
submission.<br />
The You’re Never<br />
Too Old To Be<br />
Young Seniors<br />
Expo allowed<br />
seniors to discover<br />
new information<br />
and a range <strong>of</strong> pursuits.<br />
A dog wash service<br />
on <strong>Stirling</strong>’s<br />
beaches proved to<br />
be highly popular.<br />
9
<strong>Community</strong> <strong>Development</strong><br />
<strong>Community</strong> Services<br />
High energy<br />
Skate Fests<br />
helped to<br />
bridge the<br />
gap between<br />
young people<br />
and the <strong>City</strong><br />
<strong>of</strong> <strong>Stirling</strong>.<br />
OBJECTIVES OF THE DEPARTMENT<br />
To provide a range <strong>of</strong> community services for<br />
residents <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> and to work in<br />
conjunction with other <strong>City</strong> departments,<br />
Federal, State and non-government<br />
organisations to ensure the most efficient use<br />
<strong>of</strong> resources by:<br />
• Efficient management <strong>of</strong> a range <strong>of</strong><br />
community services for residents <strong>of</strong> the <strong>City</strong><br />
<strong>of</strong> <strong>Stirling</strong>.<br />
• Maintaining buildings under the control <strong>of</strong><br />
the <strong>Community</strong> Services Department in<br />
good repair.<br />
• Maximising Government grant funding for all<br />
departmental programs.<br />
• Undertaking new initiatives to develop the<br />
range <strong>of</strong> community services <strong>of</strong>fered to<br />
residents.<br />
• Recognising the importance <strong>of</strong> our<br />
Personnel.<br />
MAJOR HIGHLIGHTS<br />
• Funding Contracts<br />
specifications have been<br />
met and exceeded for both<br />
output and outcome criteria.<br />
• A grant for $52,054 has<br />
been obtained from the<br />
Lotteries Commission for<br />
equipping the new<br />
Diversional (Day) Centre at<br />
11 Lemana Court,<br />
Nollamara.<br />
• The Osborne <strong>Community</strong><br />
Centre project has been<br />
progressed to the point<br />
where construction will<br />
begin soon.<br />
• A highly successful Seniors<br />
Expo was held over two days which<br />
attracted 8,000 visitors and was<br />
supported by a wide variety <strong>of</strong> service<br />
providers, both public and<br />
private/commercial.<br />
• Staff have been active in significant working<br />
committees developing Home and<br />
<strong>Community</strong> Care Program Policies for the<br />
future.<br />
• The Younger Disabled Clients <strong>of</strong> the<br />
Diversional Services Program held several<br />
concerts for family and friends over the year.<br />
This new initiative was enjoyed by the<br />
participants and very much appreciated by<br />
their audiences.<br />
• The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> Youth Advisory<br />
Committee has been formed which will<br />
provide an effective link between Council<br />
and younger residents <strong>of</strong> the <strong>City</strong>.<br />
MAJOR ITEMS OF EXPENDITURE<br />
AND/OR EXPECTED OUTCOME:<br />
• Building <strong>of</strong> new Diversional (Day) Centre<br />
at 11 Lemana Court, Nollamara. This<br />
project will enable the program to provide<br />
services with easy access for clients <strong>of</strong> the<br />
area. HACC has provided $250,000 towards<br />
building costs and the Lotteries Commission<br />
$52,054 to equip the centre. The <strong>City</strong> has<br />
allocated $70,000 towards the total cost.<br />
• Commencement <strong>of</strong> the building <strong>of</strong> a new<br />
<strong>Community</strong> Centre to replace Osborne<br />
Autumn Centre. This will enable a wider<br />
variety <strong>of</strong> programs to be <strong>of</strong>fered to aged<br />
and general residents <strong>of</strong> the area and is to<br />
be developed in conjunction with the new<br />
Osborne Library. The facility at a total cost<br />
<strong>of</strong> $5.26 million will be substantially<br />
completed this financial year. A grant<br />
application towards the costs <strong>of</strong> the<br />
<strong>Community</strong> Centre component has been<br />
submitted to the Lotteries Commission.<br />
• Provision <strong>of</strong> a Food Services Facility.<br />
Approximately $300,000 will be required to<br />
convert an existing kitchen or other building<br />
to replace the current facility which is to be<br />
demolished.<br />
• New Proposal for Corporate Action Plans.<br />
- Autumn Centre evaluation <strong>of</strong> future trends<br />
and requirements <strong>of</strong> older residents <strong>of</strong> the<br />
<strong>City</strong> <strong>of</strong> <strong>Stirling</strong>.<br />
- Aged and disabled transport review in<br />
conjunction with HACC Pilot Transport<br />
Brokerage project.<br />
- <strong>Development</strong> <strong>of</strong> skateboard facilities at<br />
Balga and Scarborough.<br />
DIFFICULTIES/CHALLENGES AND<br />
PROPOSED SOLUTIONS<br />
Challenges continue to be faced due to the<br />
“commercialisation” <strong>of</strong> many community<br />
services, the competitive tendering<br />
environment and “user pays” pressure from<br />
State and Federal Governments.<br />
Autonomy and the ability to act quickly must<br />
be enabled within the Local Government<br />
system if we are to compete fairly and<br />
favourably in the new environment.<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES<br />
Staff are fully involved in the Local Area<br />
Workplace Agreement training. This will result<br />
in a clearer understanding <strong>of</strong> the scope <strong>of</strong><br />
services and the most efficient and effective<br />
ways to deliver these services.<br />
OTHER INFORMATION<br />
<strong>Community</strong> Services Department staff are<br />
enthusiastic and motivated and are influential<br />
in spheres where future trends are discussed<br />
and directed.<br />
10
<strong>Community</strong> <strong>Development</strong><br />
Building<br />
OBJECTIVES OF THE DEPARTMENT<br />
To provide a Building Control Service for the <strong>City</strong><br />
<strong>of</strong> <strong>Stirling</strong>.<br />
MAJOR HIGHLIGHTS<br />
Record level <strong>of</strong> construction activity in excess <strong>of</strong><br />
$250 million<br />
MAJOR ITEMS OF EXPENDITURE<br />
AND/OR EXPECTED OUTCOME:<br />
Major item <strong>of</strong> expenditure – salaries<br />
DIFFICULTIES/CHALLENGES<br />
ENCOUNTERED - PROPOSED<br />
SOLUTIONS:<br />
High levels <strong>of</strong> building activity resulting in staff<br />
shortages.<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES;<br />
Improved quality control through the<br />
assessment process<br />
SWIMMING POOLS<br />
The State Government promulgated legislation<br />
under Section 245A <strong>of</strong> the Local Government<br />
Act on January 11, 1991 requiring all local<br />
authorities to inspect every private swimming<br />
pool within their municipal district at least once<br />
before July 1, 1992 and then periodically at least<br />
once in every four-year period.<br />
Prior to the introduction <strong>of</strong> the State<br />
Government Legislation in Western Australia 10<br />
deaths occurred in 1988 <strong>of</strong> children aged 0 to 4<br />
years, five deaths in 1989 and eight more deaths<br />
in 1990 prompting the government to amend the<br />
Private Swimming Pool Fencing Legislation.<br />
Statistics indicated that after implementation<br />
and completion <strong>of</strong> the first round <strong>of</strong> private<br />
swimming pool inspections, infant deaths in<br />
private swimming pools reduced to only one in<br />
1993 and three in 1994.<br />
In the year July 1, 1998 to June 30, 1999, two<br />
deaths occurred within the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>, the<br />
first being an elderly gentleman and the second,<br />
a four-year-old boy. Both cases were the subject<br />
<strong>of</strong> a coronial investigation. Pool security was not<br />
considered to be a contributing factor in either<br />
<strong>of</strong> the deaths.<br />
Two rounds <strong>of</strong> the Private Swimming Pool<br />
Inspection Program have been completed with<br />
the third and current round under way. This<br />
round is scheduled to be completed on or<br />
before June 30, 2000 and within statutory<br />
requirements.<br />
The third round <strong>of</strong> the Private Swimming Pool<br />
Inspection program began on July 1, 1997 and<br />
is due for completion by June 30, 2000.<br />
Number <strong>of</strong> pools estimated at<br />
commencement <strong>of</strong> the third round<br />
<strong>of</strong> the Inspection Program 7,771<br />
Number <strong>of</strong> new pool applications<br />
processed 204<br />
Number <strong>of</strong> pools removed or cancelled<br />
(July 1, 1998 to June 30, 1999) 76<br />
Total number <strong>of</strong> pools inspected to<br />
June 30, 1999 5,041<br />
Generally, problems related to the improper<br />
maintenance <strong>of</strong> self-closing gates and difficulty<br />
<strong>of</strong> gaining access to some properties.<br />
A small number <strong>of</strong> owners required repeated<br />
visits to ensure remedial works were undertaken.<br />
For the first time, pool owners received a Pool<br />
Inspection Levy <strong>of</strong> $10 included on their rates<br />
notice. This fee will be charged each year over<br />
the four-year inspection period to cover the full<br />
cost <strong>of</strong> the inspection <strong>of</strong> $40.<br />
This billing method has significantly reduced the<br />
The construction<br />
<strong>of</strong> Innaloo<br />
Central Shopping<br />
Centre saw<br />
shops being<br />
leased in record<br />
time, continuing<br />
<strong>Stirling</strong>’s<br />
phenomenal<br />
growth.<br />
11
<strong>Community</strong> <strong>Development</strong><br />
Building<br />
This represents the highest value <strong>of</strong> construction<br />
in any single year recorded in the <strong>City</strong>’s history.<br />
This year’s construction activity is also greater<br />
than the building booms <strong>of</strong> 1989 and 1994.<br />
Construction values for previous years have<br />
been indexed to represent equivalent<br />
construction values.<br />
The result is even more remarkable given that<br />
construction activity for Maylands was excluded<br />
from this year’s figures.<br />
The total value <strong>of</strong> building construction activity<br />
within the <strong>City</strong> over the past five years has been<br />
in excess <strong>of</strong> $1.1 billion.<br />
More than 450<br />
demolitions<br />
were<br />
approved in<br />
<strong>Stirling</strong> in the<br />
past year.<br />
impact and opposition by pool owners and<br />
allows them to better budget for the reduced<br />
yearly levy rather than pay the full fee <strong>of</strong> $40<br />
upfront as previously required.<br />
The third round <strong>of</strong> the Private Swimming Pool<br />
Inspection Program is presently marginally<br />
ahead <strong>of</strong> target.<br />
A schedule has been implemented and is<br />
monitored regularly to ensure this program will<br />
be effectively completed on or before June 30,<br />
2000 in compliance with Section 245a <strong>of</strong> the<br />
Local Government (Miscellaneous Provisions)<br />
Act.<br />
BUILDING<br />
The <strong>City</strong> issued Building Licence approvals for<br />
construction work with an estimated<br />
construction value <strong>of</strong> $256 million – this is a<br />
14.7% growth on last year and 24.1% on<br />
1996/97.<br />
While the economic climate is strong and<br />
complemented by low interest rates, the<br />
construction industry continues to be buoyant.<br />
Many industry analysts are unsure as to what<br />
impact the GST may have on the industry. Given<br />
the cyclic nature <strong>of</strong> the industry, a downturn is<br />
more likely than not in the medium term.<br />
Construction activity in the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> is<br />
somewhat unique when compared with other<br />
expanding local authorities in WA.<br />
<strong>Stirling</strong>’s close proximity to central Perth and the<br />
average age <strong>of</strong> building stock, makes it ripe for<br />
redevelopment. As a result, demand is high and<br />
any industry downturn in the future is less likely<br />
to have as great an impact on <strong>Stirling</strong>.<br />
The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> issues more demolition<br />
approvals than any other local authority in WA,<br />
which is indicative <strong>of</strong> the standard<br />
redevelopment pr<strong>of</strong>ile. There were 463<br />
demolitions in 1998/99.<br />
SWIMMING POOL INSPECTIONS<br />
6000<br />
5000<br />
4000<br />
3000<br />
2000<br />
1000<br />
0<br />
Sep-97<br />
Oct-97<br />
Nov-97<br />
Dec-97<br />
Jan-98<br />
Feb-98<br />
Mar-98<br />
Apr-98<br />
May-98<br />
Jun-98<br />
Jul-98<br />
Aug-98<br />
Sep-98<br />
Oct-98<br />
Nov-98<br />
Dec-98<br />
Jan-99<br />
Feb-99<br />
Mar-99<br />
Apr-99<br />
May-99<br />
Jun-99<br />
Jul-99<br />
12
<strong>Community</strong> <strong>Development</strong><br />
Building<br />
CONSTRUCTION VALUES 1989 - 1999<br />
300,000,000<br />
250,000,000<br />
Actual<br />
200,000,000<br />
150,000,000<br />
100,000,000<br />
50,000,000<br />
Indexed to<br />
current<br />
building costs<br />
Average<br />
0<br />
89/90 90/91 91/92 92/93 93/94 94/95 95/96 96/97 97/98 98/99<br />
OBJECTIVES OF THE DEPARTMENT:<br />
To plan facilities, regulate land use consistent<br />
with identified needs, community expectations<br />
and environmental considerations.<br />
MAJOR HIGHLIGHTS:<br />
• Ideas Competition for Scarborough Environs<br />
Area Strategy.<br />
• Design Layout Plan and Implementation<br />
Strategy for Main Street Plaza Precinct.<br />
• Partnership development <strong>of</strong> WA-based<br />
computerised development approvals and<br />
workflow system.<br />
• Major progress in the implementation <strong>of</strong><br />
Town Planning Scheme No. 38.<br />
• Production <strong>of</strong> Advertising Signs User<br />
Manual.<br />
• Completion <strong>of</strong> two land use studies<br />
(Scarborough Beach Road and Main Street).<br />
• Facilitation <strong>of</strong> the New North Project.<br />
• Heritage Areas Study and Glendalough<br />
Urban Design Station Study.<br />
MAJOR ITEMS OF EXPENDITURE<br />
AND/OR EXPECTED OUTCOME:<br />
• District Planning Scheme Review.<br />
Outcome: Major rewrite <strong>of</strong> scheme format to<br />
include greater strategic direction.<br />
This project is expected to take<br />
longer than one year.<br />
Planning<br />
13<br />
• Right Of Way Management Strategy<br />
Outcome: Adoption <strong>of</strong> Management<br />
Principles and Implementation<br />
Program.<br />
• Heritage Precincts & Municipal Inventory<br />
Review<br />
Outcome: Provide the <strong>City</strong> with<br />
management tools to protect its<br />
Heritage.<br />
• TP38 Implementation<br />
Outcome: Further progress implementation<br />
(including opening <strong>of</strong> Ellen <strong>Stirling</strong><br />
Boulevard, subdivision <strong>of</strong> Precinct<br />
4).<br />
• Scarborough and Environs Area Strategy<br />
(SEAS) Project<br />
Outcome: Preparation and adoption <strong>of</strong> a<br />
shared vision and Implementation<br />
Strategy for Scarborough Beach<br />
Precinct.<br />
• Glendalough Station Precinct Study<br />
Outcome: Adoption <strong>of</strong> an Urban Design<br />
Study (incorporating development<br />
standards and streetscape<br />
enhancements) and preparation <strong>of</strong><br />
an Implementation Strategy.<br />
• Local Agenda 21<br />
Outcome: Reach agreement on a Local<br />
Agenda 21 for the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>.
<strong>Community</strong> <strong>Development</strong><br />
Planning<br />
Planning<br />
continues<br />
apace for<br />
<strong>Stirling</strong> with<br />
many projects,<br />
studies and<br />
strategies<br />
under way.<br />
• Flora Terrace Precinct Study<br />
Outcome: Implementation <strong>of</strong> Study findings<br />
(potentially including works on<br />
private land).<br />
• Computerised <strong>Development</strong> Approvals<br />
System (APPROVE)<br />
Outcome: Improved accountability/workflow<br />
• Civic Precinct Study<br />
Outcome: Enable redevelopment <strong>of</strong> the<br />
Depot Site, progress relocation <strong>of</strong><br />
the <strong>City</strong>’s Administration Centre.<br />
NEW PROPOSALS FOR<br />
CORPORATE PLAN<br />
ACTION PLANS:<br />
• District Planning Scheme<br />
Review.<br />
• Comprehensive review<br />
development control policies.<br />
• ROW Management Strategy.<br />
• Osborne Park Industrial<br />
Strategy.<br />
• Mirrabooka Regional Centre Strategy.<br />
• Municipal Heritage Inventory Review.<br />
• Local Agenda 21.<br />
• Scarborough Environs Area Strategy.<br />
• Local Commercial Centres Study.<br />
DIFFICULTIES/CHALLENGES<br />
ENCOUNTERED AND PROPOSED<br />
SOLUTIONS:<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES<br />
• In conjunction with the new <strong>Development</strong><br />
Approvals System, develop monitoring<br />
framework for the identified Performance<br />
Indicators.<br />
• Recognise and retain current staffing level<br />
at public counter.<br />
• Review the function and composition <strong>of</strong> the<br />
<strong>Development</strong> Review Group.<br />
• Continued implementation <strong>of</strong> the adopted<br />
Strategic <strong>Development</strong> Assessment Plan.<br />
• Ongoing consultation with Executive<br />
Management and Councillors on major<br />
projects.<br />
• Facilitation <strong>of</strong> community reference groups<br />
for major projects.<br />
• Ongoing training/opportunities for improved<br />
staff skills and multiskilling.<br />
• Increase usage <strong>of</strong> GIS/GeoQ databases<br />
and availability <strong>of</strong> information via the<br />
Internet.<br />
High pressure working environment and the<br />
inability to attract experienced staff have had<br />
a marked impact on staff morale/productivity.<br />
The proposed solutions and initiatives will<br />
require commitment and time to reverse this<br />
impact.<br />
The Takari<br />
Primary School<br />
benefited from a<br />
<strong>Stirling</strong> sponsored<br />
resources kit to<br />
encourage local<br />
learning.<br />
• Increased involvement <strong>of</strong> stakeholder<br />
groups in planning process/projects -<br />
improve consultation processes and<br />
negotiation.<br />
• The consistent application <strong>of</strong> council<br />
discretion relative to variations <strong>of</strong><br />
development standards - review,<br />
simplify and clarify Policies (including<br />
delegation <strong>of</strong> authority).<br />
• High volume <strong>of</strong> Staff changes,<br />
extended periods <strong>of</strong> staff shortages -<br />
review methods <strong>of</strong> attracting and<br />
retaining suitable staff with Human<br />
Resources.<br />
• High volume <strong>of</strong> applications received<br />
and time taken for approvals - monitor<br />
and develop agreed benchmarks and<br />
seek improvements, implement<br />
Approve system as matter <strong>of</strong> urgency.<br />
• Accommodation for staff and<br />
resources/files extremely limited -<br />
review opportunities <strong>of</strong> redesign <strong>of</strong><br />
<strong>of</strong>fice lay-out in consultation with<br />
interior designer.<br />
14
<strong>Community</strong> <strong>Development</strong><br />
Health<br />
OBJECTIVES OF THE DEPARTMENT:<br />
To maintain and improve the health and well<br />
being <strong>of</strong> the community.<br />
MAJOR HIGHLIGHTS:<br />
LOCAL HEALTH LAWS REVIEW<br />
Work has begun on the complete re-write <strong>of</strong><br />
the <strong>City</strong>’s Local Health Laws. The style <strong>of</strong> the<br />
legislation has been changed to a much<br />
simplified plain English format supported by<br />
more detailed policies and standards. It is<br />
expected that the review will be substantially<br />
complete by the conclusion <strong>of</strong> the 1999/2000<br />
year.<br />
ALCOHOL POLICY<br />
The <strong>City</strong>’s Alcohol Policy was published and<br />
launched in November, 1998 and has been<br />
well received both by industry, clubs and<br />
community groups since. The <strong>City</strong> receives<br />
excellent co-operation from the Office <strong>of</strong><br />
Gaming and Liquor Licensing in its<br />
implementation and the document has<br />
generally proved to be very useful to people<br />
making or modifying licensing applications.<br />
CHILD HEALTH SERVICES<br />
A review <strong>of</strong> the <strong>City</strong>’s Child Health Centres and<br />
operating arrangements were undertaken by<br />
Jo Stanton Consultancy during the latter part<br />
<strong>of</strong> 1998. This study was jointly undertaken by<br />
the <strong>City</strong> and the North Metropolitan Health<br />
Service. The report found that the community<br />
placed significant value on this service and<br />
supported its continuation and improvement.<br />
The purpose <strong>of</strong> the study was to determine if<br />
the relationships between bather numbers and<br />
tidal exchange created adverse conditions.<br />
The overall results <strong>of</strong> the study revealed that<br />
water quality standards along this section <strong>of</strong><br />
coast do meet these standards during<br />
summertime conditions.<br />
HEALTH PROMOTION<br />
The Senior’s Expo was one <strong>of</strong> the <strong>City</strong>’s<br />
promotional highlights <strong>of</strong> the year. The Expo<br />
was held at the Scarborough <strong>Community</strong><br />
Centre and focussed on the needs <strong>of</strong> the<br />
elderly in maintaining quality <strong>of</strong> life by exploring<br />
the theme “You’re Never too Old to be Young”.<br />
FOOD HYGIENE AND QUALITY<br />
A total <strong>of</strong> 2,295 inspections were carried out <strong>of</strong><br />
the 680 food premises within the <strong>City</strong>.<br />
Council’s Environmental Health Officers<br />
achieved approximately<br />
97% <strong>of</strong> the scheduled<br />
inspection target during the<br />
year.<br />
The 57 food manufacturing<br />
premises were inspected<br />
regularly throughout the<br />
year and those with<br />
The You’re Never Too Old To<br />
Be Young Seniors Expo saw<br />
many get hooked on the<br />
Internet.<br />
COMMUNITY NOISE CONTROL<br />
The <strong>City</strong>’s Health Department handles up to<br />
200 complaints <strong>of</strong> community noise each year.<br />
In an endeavour to improve customer service<br />
and responsiveness a new system for handling<br />
noise complaints was introduced. The system<br />
was developed from data-base s<strong>of</strong>tware and<br />
incorporates both an action and history trail<br />
together with reporting facilities.<br />
CHALLENGES:<br />
SMOKING LEGISLATION<br />
New legislation was introduced in March to<br />
restrict smoking in enclosed public places.<br />
This involves a wide range <strong>of</strong> public areas<br />
including restaurants, licensed premises,<br />
recreation facilities and shopping centres.<br />
Council’s Environmental Health Officers will be<br />
involved in ensuring that the requirements <strong>of</strong><br />
this legislation are smoothly implemented over<br />
the ensuing 12 months.<br />
COASTAL WATER QUALITY SURVEY<br />
During the period January to April, 1999, a<br />
Water Quality Study was undertaken in the bay<br />
beaches between Trigg Island and Waterman.<br />
One <strong>of</strong> the<br />
expo’s aims<br />
was for<br />
seniors to<br />
take an<br />
active role in<br />
their physical,<br />
mental<br />
and social<br />
well-being.<br />
Expo participants had a<br />
chance to win prizes,<br />
such as a South-West<br />
getaway, encouraging<br />
them to live life to the<br />
full.<br />
15
<strong>Community</strong> <strong>Development</strong><br />
Health<br />
A water quality<br />
study found<br />
national guidelines<br />
were met<br />
for recreational<br />
waters along<br />
<strong>Stirling</strong>’s coast.<br />
established food safety plans were audited.<br />
Twenty-nine <strong>of</strong> the food manufacturers now<br />
have established food safety plans (Quality<br />
Assurance Programs) in place and operating.<br />
A survey was undertaken during the year to<br />
examine pesticide residues in locally-grown<br />
produce. Although there are just 11 growers<br />
left in the district, a wide range <strong>of</strong> produce is<br />
still grown. Of 20 produce samples submitted<br />
for analysis none was shown to exceed the<br />
maximum residue levels permitted under the<br />
current legislation.<br />
CARAVAN PARKS<br />
A full compliance survey was undertaken <strong>of</strong> all<br />
three caravan parks within the <strong>City</strong> to<br />
determine their conformity with the Caravan’s<br />
& Camping Ground Act. This was a complex<br />
and detailed task involving <strong>of</strong>ficers from the<br />
<strong>City</strong>’s Health, Building and Planning<br />
Departments.<br />
AEROBIC TREATMENT UNITS<br />
Aerobic Treatment Units have been utilised for<br />
residential development since 1992. These<br />
systems differ from conventional septic<br />
systems in that they involve mechanical<br />
equipment and the treated effluent is disposed<br />
<strong>of</strong> above-ground on garden areas. This year<br />
the <strong>City</strong> undertook an audit <strong>of</strong> established<br />
systems to determine their continuing<br />
compliance with installation and operating<br />
guidelines.<br />
NEW PROPOSALS:<br />
DISASTER RECOVERY PLAN<br />
It has been recognised that the <strong>City</strong>’s current<br />
Emergency Response Plan does not include<br />
an adequate recovery strategy. An interdepartmental<br />
approach will be taken to<br />
developing an appropriate Recovery Plan and<br />
this will include an environmental health<br />
component.<br />
HEALTH PROMOTION<br />
Childhood drownings continue to be<br />
associated with private pool ownership and<br />
the presence <strong>of</strong> pre-school aged children.<br />
Subject to availability <strong>of</strong> funding, a CPR<br />
Training Program has been proposed for<br />
private pool owners for the coming summer.<br />
The program concept is to deliver CPR<br />
instruction within a domestic environment to<br />
small groups <strong>of</strong> parents and pool owners.<br />
PEST CONTROL<br />
The <strong>City</strong> will continue its program <strong>of</strong> mosquito<br />
monitoring in local wetlands and freshwater<br />
lakes and will also participate in the<br />
development <strong>of</strong> a Local Authorities control<br />
group so as to better integrate monitoring and<br />
control strategies in the northern sububs.<br />
IMMUNISATION<br />
The <strong>City</strong>’s Immunisation Section will undertake<br />
a Customer Survey <strong>of</strong> the 63 primary schools<br />
it services with the objective <strong>of</strong> making its<br />
schools program more efficient and better<br />
focussed.<br />
Opportunistic immunisation has been found to<br />
be an effective way <strong>of</strong> keeping adult<br />
immunisation up-to-date. It is planned to hold<br />
at least one adult immunisation clinic at one <strong>of</strong><br />
the major regional shopping centres in the year<br />
during late night shopping.<br />
FOOD HYGIENE AND SAFETY<br />
Several initiatives are planned for the coming<br />
year, including a survey on bulk food quality<br />
including handling facilities and equipment,<br />
participation in the 1999/2000 Food Monitoring<br />
(Health Department <strong>of</strong> WA), the development<br />
<strong>of</strong> a data-base for food complaints and a<br />
whole <strong>of</strong> centre promotion for the FoodSafe<br />
Food Handler Safety Program.<br />
16
Works<br />
Engineering Operations<br />
OBJECTIVES OF THE DEPARTMENT:<br />
To construct and maintain facilities and<br />
services within the road reserve which<br />
provides safety, ease <strong>of</strong> access and improve<br />
the amenity <strong>of</strong> the locality.<br />
MAJOR HIGHLIGHTS:<br />
Completion <strong>of</strong>:<br />
• Reconstruction <strong>of</strong> Royal Street between<br />
Flinders Street and Wanneroo Road.<br />
• Traffic management projects in the<br />
Inglewood Ward.<br />
• Road upgrading and resurfacing <strong>of</strong>:<br />
- Rosewood Avenue, between Pearson and<br />
Sydenham Streets<br />
- Odin Road, between Scarborough Beach<br />
Road and Cedric Street<br />
• Traffic management projects in the Yokine<br />
Ward.<br />
for 1999/2000 in line with other<br />
departments.<br />
• <strong>Development</strong> <strong>of</strong> strategy for replacing<br />
existing/new bus shelters with a more<br />
modern and aesthetic design is complete.<br />
Contract has been let.<br />
MAJOR ITEMS OF EXPENDITURE<br />
AND/OR EXPECTED OUTCOME:<br />
• Complete $6.7 million worth <strong>of</strong> road<br />
resurfacing works.<br />
• Complete $1.7 million worth <strong>of</strong> path<br />
reconstruction work upgrading from slab<br />
paths to insitu concrete. This should<br />
complete the <strong>City</strong>’s five-year program <strong>of</strong><br />
replacing all slab paths.<br />
• Commencement <strong>of</strong> Precinct work on Main<br />
Street, between Hutton and Eldorado Streets.<br />
Far left: Night<br />
work in<br />
<strong>Stirling</strong> has<br />
helped to<br />
minimise traffic<br />
disruption<br />
and reduce<br />
safety risks.<br />
• Drainage system upgrade in Castle Road.<br />
• Major drainage works in Barnes Road.<br />
• Major drainage works in Dryandra Drive.<br />
• Path reconstruction work upgrading from<br />
slab paths to insitu concrete paths to value<br />
<strong>of</strong> $1.84 million.<br />
• Road resurfacing works to the value <strong>of</strong> $3.7<br />
million.<br />
Substantial completion <strong>of</strong> road upgrading and<br />
resurfacing works in North Beach Road,<br />
Balcatta Road to Marmion Avenue.<br />
CORPORATE PLAN PERFORMANCE:<br />
Progress during the year:<br />
• Slab and bitumen paths to be replaced with<br />
insitu paths or paving bricks by June 30,<br />
2000 is 80% complete.<br />
• Modelling <strong>of</strong> infrastructure assets<br />
maintenance is 65% complete. This has<br />
now been reassigned as a new Action Plan<br />
Left: More<br />
than $1.8 million<br />
was<br />
spent on<br />
upgrading<br />
slab paths to<br />
concrete or<br />
paving brick<br />
paths.<br />
17
Works<br />
Engineering Operations<br />
• Commencement <strong>of</strong> work associated with<br />
retaining walls, on-street parking, dual-use<br />
path and general streetscape on West<br />
Coast Drive, north <strong>of</strong> Bailey Street.<br />
• Complete major drainage system upgrade<br />
in:<br />
- Powell Street (Stage 2).<br />
- Minilya Street.<br />
• Complete construction <strong>of</strong> extension <strong>of</strong><br />
Dolomite Court to Pearson Street.<br />
NEW PROPOSALS FOR CORPORATE<br />
PLAN ACTION PLANS<br />
The development <strong>of</strong> the new Strategic Plan<br />
and consequent Corporate Plan have meant<br />
the assignment <strong>of</strong> the following Action Plans:<br />
• Drainage sumps beautification/upgrade.<br />
• Engineering Operations Asset Management.<br />
The <strong>City</strong>’s<br />
enhancement<br />
<strong>of</strong> streets and<br />
verges has<br />
beautified many<br />
commercial<br />
areas.<br />
• Commencement <strong>of</strong> road upgrading,<br />
resurfacing and car parking for the Main<br />
Street Plaza, between Federal and Cape<br />
Streets.<br />
• Complete drainage works in Powell Street.<br />
• Commence traffic management works in<br />
the West Carine area.<br />
• Complete major intersection modification<br />
work at the corner <strong>of</strong> Hutton and Hector<br />
Streets.<br />
• Complete major road upgrading and<br />
resurfacing <strong>of</strong>:<br />
- Flinders Street from Wiluna to Cape<br />
Street.<br />
- Royal Street from Main Street East.<br />
• Commencement <strong>of</strong> work by Main Roads<br />
Western Australia on the Reid Highway<br />
extension from the Mitchell Freeway to<br />
Marmion Avenue.<br />
DIFFICULTIES/CHALLENGES<br />
ENCOUNTERED AND PROPOSED<br />
SOLUTIONS<br />
Capital Works Program<br />
• Cancellation <strong>of</strong> major works in Hutton<br />
Street ($1 million) and delays to Main<br />
Street Precinct work meant scheduling<br />
difficulties to overcome this work<br />
shortfall.<br />
• Some staff required to take leave to<br />
overcome work shortage.<br />
• <strong>Development</strong> <strong>of</strong> procedures to do work at<br />
night to minimise affect on businesses.<br />
• Design Department will seek tenders from<br />
consultants to assist with their design<br />
program.<br />
Road Rehabilitation Program<br />
• Appointed consultant to provide a<br />
pavement management bureau service.<br />
• Consultant has provided a program for<br />
rehabilitation and maintenance <strong>of</strong> the<br />
road pavement asset over the years 1999<br />
to 2004 enabling the value <strong>of</strong> the asset to<br />
improve by 5% and the network<br />
maintained at 85% <strong>of</strong> its maximum value.<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES<br />
• <strong>Development</strong> <strong>of</strong> Customer Service Works<br />
Request tracking system (Corporate<br />
Projects assistance).<br />
• <strong>Development</strong> <strong>of</strong> procedures,<br />
competitiveness, benchmarks through the<br />
DEBA training process.<br />
Engineering Operations will move into a new<br />
depot in Delawney Street, Balcatta in the<br />
financial year 2000/2001, presently scheduled<br />
for July, 2000.<br />
18
Works<br />
Engineering Design<br />
OBJECTIVES OF THE DEPARTMENT:<br />
• To improve facilities and services within the<br />
road reserve which promotes safety, ease<br />
<strong>of</strong> access and improve the amenity <strong>of</strong> the<br />
locality.<br />
• To carry out engineering design work in a<br />
pr<strong>of</strong>essional, efficient and cost-effective<br />
manner.<br />
MAJOR HIGHLIGHTS:<br />
Design <strong>of</strong> major road<br />
construction/reconstruction projects<br />
including:<br />
• Main Street Precinct, Stage 1 $0.95m.<br />
• Rosewood Avenue, Pearson Street to<br />
Queenscliffe Road $0.48m.<br />
• Odin Road, Cedric Street to Scarborough<br />
Beach Road $0.45m.<br />
• Wiluna Street, Wanneroo Road to Nangar<br />
Street $0.23m.<br />
• Royal Street, Wanneroo Road to Flinders<br />
Street $0.25m.<br />
• North Beach Road, Balcatta Road to<br />
Marmion Ave $0.36m.<br />
• Main Street Plaza, Cape Street to Federal<br />
Street $0.95m.<br />
Design <strong>of</strong> Traffic Management Projects<br />
including:<br />
• Coolbinia Primary School, major<br />
parking/pedestrian and traffic safety<br />
improvements $0.08m.<br />
• Hamer Parade, parking and traffic safety<br />
works $0.12m.<br />
Design <strong>of</strong> Major Regional Drainage<br />
Schemes including:<br />
• Castle Road, Woodlands $0.24m.<br />
• Powell Street, Osborne<br />
Park $0.15m.<br />
Greening initiatives including:<br />
• Dianella Industrial<br />
Precinct Works.<br />
• Street landscaping and roundabout<br />
landscape upgrading.<br />
• <strong>Stirling</strong> Civic Gardens car park.<br />
• Trigg car parks Stage 2.<br />
• Corporate Entry Statements.<br />
• Infrastructure planning for State<br />
Underground Power Project for Woodlands<br />
and Doubleview.<br />
MAJOR ITEMS OF EXPENDITURE<br />
AND/OR EXPECTED OUTCOME:<br />
• Design and implementation <strong>of</strong><br />
Menora/Mount Lawley, West Carine and<br />
Yokine Local Area Traffic Management<br />
studies $0.3m.<br />
• Design for upgrading <strong>of</strong> Flinders Street<br />
between Wiluna Street and Cape Street for<br />
four lanes with median $0.7m.<br />
• Design works for Royal Street, east <strong>of</strong> Main<br />
Street additional lanes for turning<br />
movements $0.3m.<br />
• Stage 4 works for major upgrading for<br />
Coastal Promenade path for West Coast<br />
Drive northwards from Bailey Street<br />
$0.35m.<br />
• Stage 3 Local Bicycle Routes in<br />
conjunction with Bikewest for safe bike<br />
routes away from major roads $0.05m.<br />
• Major drainage design works to overcome<br />
flooding in Minilya Street, Innaloo and<br />
Powell Street, Joondanna $0.4m.<br />
• Urban design and streetscape<br />
enhancement works for commercial centres<br />
as a <strong>City</strong>wide project $0.12m.<br />
• Major refurbishment for Flora Terrace<br />
Shopping Precinct $0.33m.<br />
• Road construction works to link Dolomite<br />
Court, Churchlands with Pearson Street<br />
$0.3m.<br />
Facilities and services<br />
within the road reserve<br />
continue to be improved<br />
by Engineering Design.<br />
19
Engineering Design<br />
Works<br />
<strong>City</strong> Building<br />
NEW PROPOSALS FOR CORPORATE<br />
PLAN ACTION PLANS:<br />
• <strong>Development</strong> <strong>of</strong> Policy on Traffic<br />
Management to identify criteria and<br />
strategies for situations where improvement<br />
measures are warranted.<br />
• <strong>Development</strong> <strong>of</strong> bus shelter installation<br />
guidelines to operate in conjunction with all<br />
new replacement shelter installations to be<br />
undertaken.<br />
DIFFICULTIES/CHALLENGES<br />
ENCOUNTERED AND PROPOSED<br />
SOLUTIONS:<br />
• Striving to maintain the high level <strong>of</strong><br />
commitment for public consultation on all<br />
projects prior to the design and<br />
construction period in accordance with our<br />
Customer Service Charter.<br />
• Successful completion <strong>of</strong> trial closure <strong>of</strong><br />
Everingham Street, Carine as planning for<br />
Reid Highway extension.<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES:<br />
• To review soakwell standards criteria for<br />
unit developments with on site storage and<br />
develop water sensitive design options for<br />
those sites.<br />
• Office-based design target and design<br />
costing system monitors progress on all<br />
projects from time sheet data.<br />
• Comprehensive review <strong>of</strong> corporate<br />
subdivisional design criteria.<br />
• Review to update traffic management plan<br />
undertaken.<br />
• Further enhancement <strong>of</strong> engineering<br />
drawing standards for design and<br />
construction requirements.<br />
• Investigation for Federal Office <strong>of</strong> Road<br />
Safety Black Spot intersection safety<br />
improvements.<br />
• <strong>Development</strong> <strong>of</strong> term consultancy<br />
framework to increase design lead times to<br />
construction and ability to meet<br />
performance demands for additional works.<br />
• Active role in safety audit teams for Stage<br />
three and five audits with Main Roads WA<br />
consultants and other local authorities.<br />
• On-going training for staff for specialised<br />
technical design s<strong>of</strong>tware.<br />
• Improved pavement management data from<br />
computer program “Roman” with input data<br />
from specialist consultants pavement<br />
analysis.<br />
• Further development and tuning <strong>of</strong> asset<br />
management s<strong>of</strong>tware system on behalf <strong>of</strong><br />
the Works Division.<br />
OBJECTIVES OF THE DEPARTMENT<br />
To manage the design, development and<br />
construction <strong>of</strong> the <strong>City</strong>’s Capital Works<br />
Building Program and to maintain the <strong>City</strong>’s<br />
building assets.<br />
MAJOR HIGHLIGHTS<br />
Completion <strong>of</strong> the following:<br />
Construction <strong>of</strong>:<br />
• Dianella Library - Alterations and additions<br />
to existing library.<br />
• Nollamara Autumn Centre - New front entry<br />
porch.<br />
• West <strong>Stirling</strong> Baseball Club - New storage<br />
facility.<br />
• Balga Cricket Club - Alterations and<br />
additions to existing facilities.<br />
• Innaloo Sports Club - Refurbishment <strong>of</strong><br />
existing toilets.<br />
• Scarborough Cricket Club - Alterations and<br />
additions.<br />
• Balcatta Transfer Station - New gate house<br />
and paint collection/ disposal facility.<br />
• Tee Ball Association <strong>of</strong> WA - Alterations and<br />
additions to existing facilities.<br />
Design, <strong>Development</strong> and Documentation:<br />
• Mount Lawley Bowling Club - Refurbishment<br />
and upgrading <strong>of</strong> existing bowling club.<br />
• East <strong>Stirling</strong> Day centre - new centre.<br />
Major Maintenance Works:<br />
• Jim Satchell Recreation Centre - Kitchen<br />
refurbishment.<br />
• Yokine <strong>Community</strong> Recreation Centre -<br />
Replacement <strong>of</strong> kitchen cupboards.<br />
• Scarborough Civic Centre - Repaint covered<br />
walkways.<br />
• Scarborough Surf Life Saving Club -<br />
Refurbishment <strong>of</strong> covered walkway and<br />
replacement <strong>of</strong> aluminium doors/windows.<br />
• Hamersley Public Golf Course - Repainting<br />
<strong>of</strong> main buildings.<br />
• Repainting <strong>of</strong> exteriors <strong>of</strong> major sporting<br />
clubs on reserves.<br />
Re-Ro<strong>of</strong>ing Program:<br />
• Amelia Heights Scout Hall.<br />
• Hancock Street Guide Hall.<br />
• Nollamara Scout Hall.<br />
• Glendale Pre-school.<br />
CORPORATE PLAN PERFORMANCE<br />
Completion <strong>of</strong> the following action plans:<br />
• <strong>City</strong> Buildings Asset Management and<br />
Maintenance Plan.<br />
• Installation <strong>of</strong> Residual Current Devices into<br />
all <strong>City</strong> buildings to comply with Worksafe<br />
regulations.<br />
20
Works<br />
<strong>City</strong> Building<br />
The Inglewood<br />
Swimming<br />
Pool, first built<br />
in 1966, will get<br />
a new lease <strong>of</strong><br />
life, thanks to<br />
the <strong>City</strong> <strong>of</strong><br />
<strong>Stirling</strong> — and<br />
many other<br />
new building<br />
projects have<br />
the green light,<br />
such as the<br />
Osborne Park<br />
Library and<br />
<strong>Community</strong><br />
Centre.<br />
• Replacement <strong>of</strong> majority <strong>of</strong> old gas hot<br />
water systems within buildings with new<br />
systems to comply with Alinta Gas<br />
regulations.<br />
• <strong>City</strong> Buildings re-keying program Stage 5.<br />
MAJOR ITEMS OF EXPENDITURE AND<br />
EXPECTED OUTCOMES<br />
Completion <strong>of</strong> the following:<br />
Construction <strong>of</strong>:<br />
• Mount Lawley Bowling Club.<br />
• East <strong>Stirling</strong> Day Centre.<br />
• Henderson Resource Centre - New<br />
community resource centre.<br />
• Trigg Beach Facility - New<br />
toilets and changerooms.<br />
• North Beach Soccer<br />
Club - toilets and<br />
changerooms.<br />
• Balcatta Cricket<br />
Club - Alterations<br />
and additions to<br />
existing facilities.<br />
Design,<br />
<strong>Development</strong> And<br />
Documentation:<br />
• <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> Works<br />
and Services Depot - New<br />
depot.<br />
• Inglewood Aquatic Centre -<br />
Refurbishment and upgrading <strong>of</strong><br />
existing aquatic centre.<br />
• Osborne Park Library and <strong>Community</strong><br />
Centre - Redevelopment <strong>of</strong> existing Library<br />
and Autumn Centre.<br />
• Dryandra <strong>Community</strong> Centre - Alterations,<br />
additions and upgrading <strong>of</strong> existing<br />
community centre.<br />
Progress <strong>of</strong> the following:<br />
Construction in progress:<br />
• <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> Works and Services Depot.<br />
• Inglewood Aquatic Centre.<br />
• Osborne Park Library and <strong>Community</strong><br />
Centre.<br />
• Dryandra <strong>Community</strong> Centre.<br />
Design, <strong>Development</strong> and Documentation:<br />
• <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> - New Administration and<br />
Civic Centre.<br />
• Wembley Downs Tennis Club -<br />
Refurbishment and upgrading <strong>of</strong> existing<br />
facilities.<br />
• <strong>Stirling</strong> Panthers Soccer Club -<br />
Refurbishment and upgrading <strong>of</strong><br />
existing facilities.<br />
Major <strong>City</strong> Building Maintenance<br />
Works:<br />
• Dianella Library -<br />
Upgrade<br />
airconditioning and<br />
building signage.<br />
• North Beach<br />
Jetty -<br />
Replacement <strong>of</strong><br />
handrails and<br />
decking.<br />
• Coastal toilets and<br />
changerooms -<br />
Refurbish and upgrade<br />
high priority facilities.<br />
• <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> Building and<br />
Health Departments - Upgrade<br />
customer service counters.<br />
• Dianella Autumn Centre House - Refurbish<br />
and upgrade existing facilities.<br />
Re-Ro<strong>of</strong>ing <strong>of</strong> <strong>City</strong> Buildings Program:<br />
• Jim Satchell Recreation Centre<br />
• Nollamara Gym<br />
• Nollamara Scout Hall<br />
• Nollamara Bowling Club<br />
• North Beach Bowling Club<br />
21
Works<br />
Waste Management<br />
OBJECTIVES OF THE DEPARTMENT<br />
• To provide an effective and efficient waste<br />
collection service for residential and<br />
commercial properties. To divert a<br />
significant percentage <strong>of</strong> waste from landfill<br />
subject to financial constraints and to<br />
dispose <strong>of</strong> waste in an environmentally safe<br />
manner.<br />
• To provide a beach and public toilet cleaning<br />
service that maintains the beaches and<br />
toilets in a clean and safe condition and to<br />
provide and service litter bins on roads and<br />
reserves.<br />
MAJOR HIGHLIGHTS<br />
• Scheduled collections undertaken within<br />
specified timeframes 99.9 per cent <strong>of</strong> the<br />
time with missed services collected within<br />
24 hours <strong>of</strong> being notified 99.99 per cent <strong>of</strong><br />
the time.<br />
• Major revision <strong>of</strong> collection rounds following<br />
the transfer <strong>of</strong> Maylands without interruption<br />
in service resulting in a reduction in the<br />
number <strong>of</strong> administrative staff and the<br />
number <strong>of</strong> trucks required to undertake<br />
collections.<br />
• Replacement <strong>of</strong> waste compactors to ensure<br />
improved availability and improved service.<br />
• Implemented seasonal verge pick-up<br />
program with greenwaste collections<br />
scheduled when most required during spring<br />
and autumn.<br />
replacement<br />
program with<br />
additional<br />
front lift truck<br />
and rear<br />
compactors<br />
for verge<br />
collections<br />
replacing<br />
open tippers.<br />
• Stage Two <strong>of</strong><br />
street litter bin<br />
replacement<br />
program (250 street litter bins) and<br />
Stage One reserve litter bins (237 bins)<br />
replacement program.<br />
DIFFICULTIES/CHALLENGES<br />
• The secondary treatment <strong>of</strong> 62,500 tonnes<br />
<strong>of</strong> waste from residential households has<br />
been suspended pending tests being<br />
undertaken to satisfy the Department <strong>of</strong><br />
Environmental Protection’s licence<br />
conditions. Currently all waste is being<br />
taken to landfill putting pressure on the<br />
Mindarie Regional Council site at Tamala<br />
Park and stalling recycling initiatives which<br />
need to be implemented to meet Council’s<br />
diversion <strong>of</strong> waste targets.<br />
• The reduction in the number <strong>of</strong> Class Two<br />
landfill sites in the metropolitan area and<br />
increasing haul distances will result in<br />
substantial cost increases and sustainable<br />
solutions need to be found.<br />
• The greenwaste recycling program has<br />
resulted in more than 20,000 cubic metres <strong>of</strong><br />
mulch being produced and a long-term use<br />
for this material needs to be developed.<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES<br />
• Ongoing analysis <strong>of</strong> existing processes and<br />
procedures is occurring with measures<br />
introduced to improve plant utilisation and<br />
reduce operational costs. Benchmarking<br />
with others in the industry and with the<br />
private sector.<br />
Many <strong>of</strong><br />
<strong>Stirling</strong>’s open<br />
steel bins<br />
were replaced<br />
with moulded<br />
plastic bins,<br />
helping to<br />
improve waste<br />
management.<br />
<strong>Stirling</strong>’s innovative<br />
waste<br />
management<br />
strategy scored<br />
the <strong>City</strong> a top<br />
award.<br />
• Implemented Stage One <strong>of</strong> street litter bin<br />
replacement program with 120 litre lidded<br />
moulded plastic bins replacing the 60 litre<br />
open steel cans.<br />
• Revision <strong>of</strong> toilet cleaning procedures and<br />
cleaning rounds with a substantial<br />
improvement in the overall level <strong>of</strong><br />
cleanliness.<br />
YEAR’S FORECAST<br />
• Expansion <strong>of</strong> bulk bin commercial<br />
collections. Completion <strong>of</strong> waste compactor<br />
NEW PROPOSALS<br />
• Investigation into the costs <strong>of</strong> implementing<br />
two greenwaste collections per year to each<br />
household to reduce the quantity <strong>of</strong><br />
greenwaste being deposited in the domestic<br />
waste bin.<br />
• Investigation into subsidising the cost <strong>of</strong><br />
compost bins for households to enable<br />
household organic waste to be converted<br />
into compost.<br />
• <strong>Development</strong> <strong>of</strong> calendars to advise<br />
residents <strong>of</strong> bulk verge collection dates in<br />
advance <strong>of</strong> pamphlet delivery.<br />
22
Works<br />
Parks and Reserves<br />
OBJECTIVES OF THE DEPARTMENT<br />
To provide with the spatial makeup <strong>of</strong> the <strong>City</strong>’s<br />
Parks and Reserves, services and facilities to<br />
accommodate the open air recreational<br />
expectations <strong>of</strong> all members <strong>of</strong> the community.<br />
To plan, develop and manage parks and<br />
reserves associated with recreation facilities to<br />
a standard and to satisfy individuals need for<br />
recreation and leisure.<br />
MAJOR HIGHLIGHTS<br />
• Redevelopment <strong>of</strong> Copley Park, Mount<br />
Lawley, to include a total revamp <strong>of</strong> the<br />
reserve to include a new playground, seating<br />
areas, paths and ramps and a new irrigation<br />
system. The redesign and construction has<br />
been carried out in-house in conjunction<br />
with the Ward councillors.<br />
• New irrigation system at Balga pool and<br />
surrounds. This 4ha site included installation<br />
<strong>of</strong> a new bore pump and cubicle.<br />
• Ongoing median development including Hale<br />
Road, Mirrabooka Avenue and entry<br />
statements at West Coast Highway (North<br />
and South).<br />
• Ongoing playground development including<br />
complementary landscaping <strong>of</strong> regional<br />
playgrounds at Dianella ROS and Carine<br />
ROS.<br />
• Activity-based costing <strong>of</strong> the Maintenance<br />
Budget, enabling the breakdown <strong>of</strong> budgets<br />
and expenditure to sub-operation code level<br />
to enable true financial and operational<br />
analysis.<br />
• Finalisation <strong>of</strong> the plans and funding<br />
arrangements with the Lotteries Commission<br />
for the construction <strong>of</strong> Henderson Resource<br />
Centre, to be built during the 1999/2000<br />
financial year.<br />
• Completion <strong>of</strong> the firebreaks and track<br />
consolidation at both Memory Place and<br />
Cottonwood Crescent bushlands. The<br />
newest<br />
bushland areas<br />
to be placed<br />
under the<br />
control <strong>of</strong> <strong>City</strong><br />
<strong>of</strong> <strong>Stirling</strong><br />
Parks<br />
Department.<br />
MAJOR ITEMS<br />
OF<br />
EXPENDITURE<br />
AND/OR<br />
EXPECTED<br />
OUTCOME:<br />
• $100,000 Balga<br />
Pool - Irrigation<br />
• $150,000 CIMS<br />
- Irrigation Control System<br />
• $526,499 Playgrounds (14) throughout the<br />
city including three new Regional<br />
Playgrounds at Dianella ROS, Carine ROS<br />
and Brian Burke.<br />
NEW PROPOSALS FOR CORPORATE<br />
PLAN ACTION PLANS:<br />
• Review <strong>of</strong> Ground Usage on Active<br />
Reserves.<br />
DIFFICULTIES/CHALLENGES<br />
ENCOUNTERED AND PROPOSED<br />
SOLUTIONS:<br />
• Ever-increasing ground usage especially on<br />
reserves used by junior sports groups. The<br />
solution to this problem is to be determined<br />
during the next financial year.<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES:<br />
• Review <strong>of</strong> the Parks Maintenance Budget,<br />
which has been based on activity-based,<br />
costings principals and currently consists <strong>of</strong><br />
over 6000 individual accounts. This enables<br />
the department to review processes and<br />
costings for operations section.<br />
• Review and redefining department after<br />
organisational change and amalgamation.<br />
Extensive<br />
street pruning<br />
helped maintain<br />
the overall<br />
look <strong>of</strong><br />
<strong>Stirling</strong>’s<br />
streets and<br />
prevent problems<br />
in stormy<br />
weather.<br />
Ongoing maintenance <strong>of</strong><br />
playgrounds and reserves<br />
has ensured fun and leisure<br />
activities remain at a premium.<br />
23
Human Resources<br />
OBJECTIVES OF THE DEPARTMENT:<br />
To provide efficient and effective human<br />
resource safety and industrial relations support<br />
services in recognition <strong>of</strong> the fact that staff are<br />
our most valuable resource.<br />
MAJOR HIGHLIGHTS:<br />
• 130 permanent new employees recruited.<br />
• Over 100 students <strong>of</strong>fered work experience.<br />
• Customer Service Charters established for<br />
each department and a Customer Service<br />
Week held involving all staff at the <strong>City</strong>.<br />
Customer Service training continued to be<br />
conducted for all new employees.<br />
• The <strong>City</strong> won 24 IFAP safety awards for the<br />
year.<br />
• Conducted a bi-annual job evaluation to<br />
ensure that salaries were commensurate<br />
with the market place.<br />
• Implementation <strong>of</strong> a new HR/Payroll system<br />
which is Year 2000 compliant, replacing a<br />
system that was 18 years old. This included<br />
the implementation <strong>of</strong> the Occupational<br />
Health and Safety component.<br />
• Worker’s Compensation claims reduced by<br />
15% which resulted in the best result ever.<br />
• Lost time injuries were reduced by 20%.<br />
• All worker’s compensation claims prior to<br />
June, 1997 have been finalised.<br />
<strong>Stirling</strong>’s 1999<br />
Employee <strong>of</strong> the<br />
Year, Claire Evans<br />
was recognised for<br />
her commitment to<br />
customer service.<br />
MAJOR ITEMS OF EXPENDITURE<br />
AND/OR EXPECTED INCOME:<br />
• Training this year will concentrate on further<br />
customer service training, safety, team<br />
building, Internet and email training and<br />
conflict resolution.<br />
• In order to facilitate enterprise bargaining<br />
negotiations, training will be provided to staff<br />
to assist in improving the efficiency and<br />
effectiveness <strong>of</strong> each department and<br />
improve the overall competitiveness <strong>of</strong> the<br />
<strong>City</strong>.<br />
DIFFICULTIES/CHALLENGES<br />
ENCOUNTERED AND PROPOSED<br />
SOLUTIONS:<br />
• A difficult challenge encountered was the<br />
ability to identify and measure productivity<br />
savings in order to provide a salary increase<br />
to salaried staff. This year any new<br />
Enterprise Bargaining Agreement must be<br />
introduced with upfront productivity savings.<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES:<br />
• Following the introduction <strong>of</strong> the new<br />
HR/Payroll system the <strong>City</strong> will implement<br />
web kiosks to all managers and nominated<br />
staff to enable restricted access to staff<br />
records. This will considerably reduce the<br />
number <strong>of</strong> queries currently received by<br />
Human Resources and Payroll.<br />
• The <strong>City</strong> will raise the pr<strong>of</strong>ile <strong>of</strong> all safety<br />
representatives throughout the <strong>City</strong> as part<br />
<strong>of</strong> the ongoing reduction <strong>of</strong><br />
accidents/incidents throughout the<br />
organisation. In addition, safety<br />
representatives will be given the opportunity<br />
to be involved in the construction <strong>of</strong> the new<br />
Depot.<br />
• In promoting the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> as the “<strong>City</strong><br />
<strong>of</strong> Choice” initiatives will be<br />
implemented to promote the<br />
<strong>City</strong> as a “preferred<br />
employer”.<br />
24
Finance and Corporate Services<br />
OBJECTIVES OF THE<br />
DEPARTMENT<br />
Administer the provision <strong>of</strong> financial<br />
services and reporting in accordance with<br />
statutory and Council directives for the<br />
benefit <strong>of</strong> the community and the<br />
corporation.<br />
Accounting Services<br />
MAJOR HIGHLIGHTS<br />
• Renumbering <strong>of</strong> approximately 80,000<br />
rate files to match the Valuer-<br />
General’s new Valuation Entity<br />
Number (VEN).<br />
• 97.58% <strong>of</strong> rates collected - only<br />
marginally down on last year’s<br />
97.63% best ever result.<br />
• Three-yearly revaluation <strong>of</strong> the <strong>City</strong>’s<br />
75,500 rateable assessments.<br />
• Interfacing <strong>of</strong> the rates system with<br />
Challenge Bank desk bank system<br />
for greater efficiency in rate<br />
payment processing and<br />
reconciliation.<br />
• Implemented the electronic<br />
payment <strong>of</strong> PAYE and prescribed<br />
tax to the Australian Taxation<br />
Office.<br />
• The stores direct entry processing<br />
system became fully operational.<br />
• The first stage <strong>of</strong> the implementation <strong>of</strong> an<br />
integrated Human Resources and Payroll<br />
System was completed in time to<br />
commence payment <strong>of</strong> staff from July 1.<br />
MAJOR ITEMS OF EXPENDITURE<br />
AND/OR EXPECTED OUTCOME:<br />
• Preparation for the introduction <strong>of</strong> a Goods<br />
and Services Tax.<br />
• Preparation to allocate Fringe Benefits to<br />
employees and include on group certificates.<br />
• Implement a system which permits the direct<br />
entry <strong>of</strong> creditor data.<br />
• Review all land exempt from rates to ensure<br />
that revenue is received when appropriate.<br />
• Review <strong>of</strong> land register to integrate with the<br />
General Accounting System.<br />
NEW PROPOSALS FOR CORPORATE<br />
PLAN ACTION PLANS:<br />
• Goods and Services Tax impact.<br />
• Property system electronically available.<br />
• Relocation <strong>of</strong> purchasing and stores to new<br />
works depot.<br />
Budget and rates highlights<br />
were given in a mail-out from<br />
Mayor Vallelonga, also giving<br />
ratepayers the opportunity to<br />
win prizes.<br />
• Automate the allocation <strong>of</strong> Activity Based<br />
Costing overheads<br />
• Review <strong>of</strong> investment policy<br />
DIFFICULTIES/CHALLENGES<br />
ENCOUNTERED AND PROPOSED<br />
SOLUTIONS:<br />
• The allocation <strong>of</strong> activity-based costing<br />
overheads is completed manually and is very<br />
time consuming. It is proposed to<br />
implement an electronic solution.<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES:<br />
• Data processing reconciliation.<br />
• Creditors direct processing.<br />
• Labour direct processing.<br />
25
Finance and Corporate Services<br />
OBJECTIVES OF THE DEPARTMENT:<br />
To ensure the coordinated introduction and<br />
application <strong>of</strong> Information Technology to<br />
support the corporate objectives <strong>of</strong> the <strong>City</strong>.<br />
MAJOR HIGHLIGHTS:<br />
• Internet and Intranet facilities continue to<br />
expand. Major enhancements included the<br />
addition <strong>of</strong> the Dog Pound and Security<br />
Services pages.<br />
• A new Human Resources and Payroll system<br />
installed.<br />
• Libraries received more than 90 new PC’s<br />
ready for their new system.<br />
• Year 2000 compliance upgrades are well<br />
underway.<br />
• A new payment system was installed to<br />
facilitate the underground power initiative<br />
Information Technology<br />
MAJOR ITEMS OF EXPENDITURE<br />
AND/OR EXPECTED OUTCOME:<br />
• Central Network and Server<br />
Upgrades - $100,000: Analysis and<br />
implementation <strong>of</strong> upgrades to ensure<br />
adequate response times and the<br />
integrity <strong>of</strong> corporate data.<br />
• Central data server - $120,000: To<br />
centralise data storage, improve file<br />
access performance along with<br />
increased backup and disaster<br />
recovery options.<br />
• Server and Desktop Operating<br />
System upgrades - $150,000: To <strong>of</strong>fer<br />
a standard operating environment for<br />
all users while improving security and<br />
user functionality.<br />
• Consultancy contracts - $142,500: To<br />
provide technical expertise on<br />
database administration and<br />
development, Open VMS Operating<br />
System, Internet <strong>Development</strong> and<br />
Network Administration.<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES;<br />
• In order to be competitive and operate with<br />
the minimum number <strong>of</strong> support staff,<br />
Systems Management S<strong>of</strong>tware will be<br />
implemented to simplify the rollout <strong>of</strong> new<br />
s<strong>of</strong>tware and any s<strong>of</strong>tware upgrades also<br />
improving helpdesk activities and hardware<br />
inventory cataloguing.<br />
Mayor Vallelonga and<br />
Energy Minister Colin<br />
Barnett signing an<br />
agreement on the<br />
State Underground<br />
Power Project.<br />
26
Finance and Corporate Services<br />
Administrative Services<br />
OBJECTIVES OF THE DEPARTMENT:<br />
The Administrative Services Department has a<br />
wide variety <strong>of</strong> responsibilities covering many<br />
disciplines making management <strong>of</strong> the roles<br />
and responsibilities a challenge. This can be<br />
demonstrated through the following broad<br />
nature <strong>of</strong> activities.<br />
• Administrative Services - corporate support<br />
and councillor services.<br />
• Catering and functions - hospitality, food and<br />
beverage.<br />
• Cleaning - maintenance <strong>of</strong> clean working<br />
environment on campus.<br />
• Rangers Services - animal control, parking<br />
control, <strong>of</strong>f road vehicles, fire prevention,<br />
litter control.<br />
• Records - maintenance <strong>of</strong> corporate memory<br />
resource.<br />
• Security Services - promote and provide<br />
enhanced community security in conjunction<br />
with WA Police Service.<br />
Each section has key objectives ranging from<br />
statutory obligations to internal servicing <strong>of</strong><br />
corporate needs. Supervisors and staff have<br />
worked diligently throughout the year to<br />
ensure that these key objectives were<br />
achieved successfully. Staff members within<br />
the department recognise the value <strong>of</strong> team<br />
work and the values <strong>of</strong> customer service.<br />
This has contributed to the success <strong>of</strong> the<br />
department in the last financial year<br />
• The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> provided a service to<br />
residents which enabled coatings to be<br />
applied to private fences using resources<br />
from the <strong>Stirling</strong> Area Graffiti Campaign.<br />
• A new format was adopted to provide a<br />
more personalised service to residents.<br />
<strong>Stirling</strong>’s inaugural<br />
Customer Service Week<br />
was a resounding success.<br />
MAJOR HIGHLIGHTS:<br />
• A full complement <strong>of</strong> 18 security patrol<br />
<strong>of</strong>ficers under the supervision <strong>of</strong> the<br />
Security Services Administrator, began full<br />
patrols <strong>of</strong> the <strong>City</strong> in December. As a<br />
result <strong>of</strong> the introduction <strong>of</strong> the service a<br />
number <strong>of</strong> perpetrators <strong>of</strong> petty crimes<br />
have been successfully brought to task for<br />
their actions.<br />
• The <strong>Stirling</strong> Area Graffiti Taskforce began<br />
work in November, 1997 as a joint initiative<br />
with the State Government. In June, 1998,<br />
80% <strong>of</strong> all graffiti had been removed “free <strong>of</strong><br />
charge” for residents and businesses, and by<br />
June, 1999 it was estimated that the <strong>City</strong><br />
was 99% graffiti-free.<br />
• Records Management continued to undergo<br />
a shift to the electronic distribution <strong>of</strong><br />
documentation using state-<strong>of</strong>-the-art imaging<br />
and workflow technology. Coupled with this<br />
the section has had to grapple with the Y2K<br />
issue and evaluate upgraded s<strong>of</strong>tware.<br />
• The <strong>City</strong> launched an initiative to publish the<br />
details <strong>of</strong> the impounding register on the<br />
<strong>City</strong>’s website. This enables the public to<br />
view all dogs held in the pound. This<br />
initiative has led to an increase in the return<br />
and re-homing <strong>of</strong> dogs.<br />
About 1000 people<br />
each year attend<br />
<strong>Stirling</strong>’s citizenship<br />
ceremonies,<br />
reflecting the <strong>City</strong>’s<br />
ethnic diversity.<br />
Eighteen security patrol<br />
<strong>of</strong>ficers continue to keep a<br />
check on crime in <strong>Stirling</strong>.<br />
27
Finance and Corporate Services<br />
Administrative Services<br />
<strong>Stirling</strong>’s top<br />
student<br />
scholarships<br />
rewarded<br />
another 10<br />
students,<br />
recognising<br />
community<br />
involvement<br />
as well as<br />
academic<br />
excellence.<br />
Rangers have been assigned individual<br />
areas and are responsible for day-to-day<br />
duties within the particular area.<br />
• 1300 telephone number initiated.<br />
• The Security Services Section received an<br />
award for “Advancement in Quality<br />
Innovation” from the Western Australian<br />
Municipal Association Awards for Best<br />
Practice in Local Government.<br />
• Scarborough Beach Precinct security audit<br />
conducted.<br />
• Holiday watch service implemented.<br />
• The Security Service began a trial camera<br />
surveillance project in June, 1999 targeting<br />
the area <strong>of</strong> The Esplanade where anti-social<br />
behavior occurs and preliminary results are<br />
positive.<br />
• Increased awareness in the service<br />
promoted through <strong>Community</strong> Newspapers,<br />
Web Page and mobile display.<br />
• Conducted the May, 1999 Biennial Election<br />
by post, using the services <strong>of</strong> the WAEC.<br />
• Completed a review <strong>of</strong> the <strong>City</strong>’s Policy<br />
Manual, Register <strong>of</strong> Delegations <strong>of</strong> Authority<br />
and continued a review <strong>of</strong> the <strong>City</strong>’s Local<br />
Laws.<br />
• Completed upgrade <strong>of</strong> telephone system<br />
adding additional features and ensuring Y2K<br />
compliance.<br />
MAJOR ITEMS OF EXPENDITURE<br />
AND/OR EXPECTED OUTCOME:<br />
• Provision for the installation <strong>of</strong> security<br />
cameras in commercial areas.<br />
• Continued commitment to removal <strong>of</strong> all<br />
graffiti.<br />
• Ongoing development <strong>of</strong> Records Imaging<br />
and Workflow.<br />
• Commitment to continue improving<br />
customer service and marketing <strong>of</strong> the <strong>City</strong>.<br />
• Upgrade security access for staff to the old<br />
and new administration buildings.<br />
• Upgrade <strong>of</strong> the <strong>City</strong>’s voicemail system.<br />
NEW PROPOSALS FOR CORPORATE<br />
PLAN ACTION PLANS:<br />
It is not proposed that any new action plans<br />
be introduced again in the next 12 months.<br />
This decision has been made on the basis that<br />
until a high level <strong>of</strong> satisfaction is obtained in<br />
the areas <strong>of</strong> Imaging/Workflow and Customer<br />
Service. All resources will be required for these<br />
items.<br />
DIFFICULTIES/CHALLENGES<br />
ENCOUNTERED AND PROPOSED<br />
SOLUTIONS:<br />
• Introduction <strong>of</strong> workflow difficult and it is<br />
proposed that a more comprehensive<br />
training session be provided to key users to<br />
overcome these problems.<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES:<br />
• Focus on customer service by all sections.<br />
• Monthly meetings with section supervisors<br />
to identify possible improvement.<br />
• Continued review <strong>of</strong> Ranger/Security Patrol<br />
Officer’s roster hours to ensure maximum<br />
benefit/productivity.<br />
• Address possible improvements to agenda<br />
and minute production and presentation.<br />
• Monitor success <strong>of</strong> Ranger and Security<br />
Patrol Precincts Initiative.<br />
• Consider means by which workflow<br />
applications can be implemented throughout<br />
the organisation<br />
• Conduct internal customer satisfaction<br />
survey for users <strong>of</strong> any service provided<br />
within Administration Services portfolio.<br />
• Use specification training to improve<br />
efficiencies within the department.<br />
• Continuous improvement to agenda and<br />
minute production method, in line with Best<br />
Practice recommended by DLG.<br />
Ratepayers<br />
meetings<br />
helped further<br />
the <strong>City</strong> <strong>of</strong><br />
<strong>Stirling</strong>’s<br />
commitment<br />
to customer<br />
service.<br />
28
Finance and Corporate Services<br />
Library Services<br />
OBJECTIVES OF THE DEPARTMENT:<br />
To provide and actively promote an efficient,<br />
effective and equitable library and information<br />
service to enrich and extend the educational,<br />
cultural, personal development, social and<br />
recreational needs <strong>of</strong> the <strong>Stirling</strong> community.<br />
MAJOR HIGHLIGHTS:<br />
• Increased library usage by 4.859% to<br />
2,198,612 loans per annum despite losing<br />
Maylands Library.<br />
• Prepared detailed specifications for a new<br />
automated library management system.<br />
• Tendered for and evaluated tender responses<br />
for a new automated library management<br />
system with Cities <strong>of</strong> Joondalup and<br />
Wanneroo and the Shire <strong>of</strong> Swan.<br />
• Installed PCs in all libraries to replace the<br />
“dumb” terminals in readiness for the new<br />
system.<br />
• Worked with the architect, Manager Building<br />
Operations and Manager <strong>Community</strong><br />
Services to develop and prepare plans and<br />
specifications for the new Osborne Library<br />
and <strong>Community</strong> Centre.<br />
• Prepared grant application for and received<br />
$28,000 from Lotteries Commission and<br />
Office <strong>of</strong> Multicultural Interests to purchase<br />
English as a Second Language resource for<br />
Dianella, Inglewood, Scarborough and<br />
Mirrabooka and Linguaphone resources for<br />
Karrinyup.<br />
• Prepared grant application and received<br />
$51,000 from the Federal Government<br />
Federation <strong>Community</strong> Grants to scan and<br />
catalogue historic photographs that will be<br />
accessible through the new library<br />
automated system.<br />
• Ran a successful Multicultural Festival.<br />
• Ran the <strong>City</strong>’s Open Art Prize which attracted<br />
243 entries.<br />
• Participated in the Senior’s Expo with Seniors<br />
On The Net programs.<br />
• Trained 455 people at the Internet Training<br />
Centre.<br />
• Ran successful school holiday program in<br />
each library.<br />
• Ran a two-week celebration <strong>of</strong> Children’s<br />
Book Week attended by 4041 students from<br />
schools across the <strong>City</strong>.<br />
• All library staff attended change management<br />
workshops in preparation for the new library<br />
system.<br />
MAJOR ITEMS OF EXPENDITURE<br />
AND/OR EXPECTED OUTCOME:<br />
• Implementation <strong>of</strong> the new automated library<br />
management system strategy, with the end<br />
result <strong>of</strong> Year 2K compliance, access to<br />
library catalogues through the World Wide<br />
Web to enable users to browse catalogues<br />
and place requests from home PCs, search<br />
catalogues <strong>of</strong> neighbouring local authorities,<br />
LISWA and tertiary institutions.<br />
• Move Osborne Library to the Grenville Hall<br />
and relocate again to the completed facility.<br />
• Completion and fit out <strong>of</strong> the new Osborne<br />
Library and <strong>Community</strong> Centre.<br />
• Develop a strategic action plan for Karrinyup<br />
Library and <strong>Community</strong> Centre.<br />
• Update the Library Corporate plan.<br />
• Formation <strong>of</strong> Customer Focus Groups.<br />
• Publication <strong>of</strong> the <strong>City</strong> history.<br />
• Develop and implement Library Web Page.<br />
• Install e-mail kiosks in each library.<br />
• Run a full range <strong>of</strong> festivals and arts events<br />
including Multicultural Festival, Art Award,<br />
Craft Award, Youth Festival, Jazz Concerts,<br />
Scarborough Christmas event and<br />
sandcastle competition.<br />
NEW PROPOSALS FOR CORPORATE<br />
PLAN ACTION PLANS:<br />
• Monitor Karrinyup Library and <strong>Community</strong><br />
Centre development in relation to the<br />
developments at the shopping centre under<br />
new owners.<br />
• Prepare a 5-10 year scenario for the future <strong>of</strong><br />
library services.<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES:<br />
• The implementation <strong>of</strong> the new library<br />
automated management system will enable<br />
staff to serve library clients much more<br />
efficiently and effectively.<br />
• E-mail kiosks will enable the <strong>City</strong> to provide<br />
e-mail facilities for the public at a charge,<br />
leaving Internet terminals available for<br />
information and educational use.<br />
• Library staff at all levels have workshopped<br />
to develop lists <strong>of</strong> tasks that can be dropped<br />
to create better productivity in the library<br />
back room procedures, creating more<br />
customer service time.<br />
• The transfer <strong>of</strong> staff from the Leisure Services<br />
Department to work on the festivals, culture<br />
and events portfolio has ensured that this<br />
area can be provided for more effectively.<br />
Principal<br />
librarian Kay<br />
Poustie and<br />
Member for<br />
<strong>Stirling</strong> Jann<br />
McFarlane<br />
MP examine<br />
historical<br />
photographs<br />
and illustrations<br />
to be<br />
electronically<br />
preserved.<br />
29
Finance and Corporate Services<br />
Strategic Planning and Financial Management<br />
OBJECTIVES OF THE DEPARTMENT:<br />
The branch is responsible for the budget<br />
function in the <strong>City</strong> along with the strategic<br />
planning process.<br />
Specifically, the budgetary process includes<br />
co-ordination <strong>of</strong> the annual budget process,<br />
quarterly budget reviews and budgetary<br />
control measurement.<br />
The strategic planning function includes<br />
preparation <strong>of</strong> the five-year Strategic Plan,<br />
developing corporate intentions for the coming<br />
12 months in consultation with management,<br />
and the documentation <strong>of</strong> corporate intentions<br />
in the Corporate Plan.<br />
Monitoring <strong>of</strong> the Corporate Plan for timeliness<br />
and objectives being met is done quarterly.<br />
Economic evaluation <strong>of</strong> major undertakings is<br />
also undertaken when required.<br />
The branch also provides economic updates in<br />
the form <strong>of</strong> a newsletter ‘Insight’.<br />
MAJOR HIGHLIGHTS:<br />
• The rationale used for Activity Based<br />
Costing has been improved by simplifying<br />
the format and reducing cost driver numbers<br />
significantly.<br />
• A comprehensive computer-based model<br />
has been developed to consolidate financial<br />
data from Activity Position Statements that<br />
will allow for a consistent format for<br />
reporting financial data in budget papers, the<br />
Principal Activity Plan and the Corporate<br />
Plan. The format will also provide for<br />
adherence to recognised accounting<br />
standards and the Local Government Act;<br />
and<br />
• A review <strong>of</strong> budgetary control processes.<br />
CONTINUOUS IMPROVEMENT<br />
INITIATIVES:<br />
• Further evaluation <strong>of</strong> the capital rationing<br />
model developed by Curtin University for<br />
potential use by the <strong>City</strong>.<br />
• A major study <strong>of</strong> management information<br />
systems and information technology<br />
systems in the <strong>City</strong>. The outcome <strong>of</strong> the<br />
study will include a five-year information<br />
technology strategy plan.<br />
• Undertake a study on key performance<br />
indicators, including a joint study with the<br />
Department <strong>of</strong> Local Government.<br />
• A full study on Activity Based Costing (ABC)<br />
in concert with Accounting Branch to further<br />
simplify the process, while at the same time<br />
producing relevant and reasonable cost<br />
allocations.<br />
• Review budgetary control processes and<br />
organisational management accounting.<br />
MAJOR PROJECTS FOR 1999/2000<br />
• <strong>Development</strong> and documentation <strong>of</strong> the<br />
Corporate Plan for 1999/2000, including<br />
major corporate intentions, critical deadlines<br />
and a set <strong>of</strong> financial statements. An<br />
extension to this process will include<br />
quarterly reports on the actual progress <strong>of</strong><br />
corporate initiatives compared to those set<br />
in the Corporate Plan.<br />
• Preparation <strong>of</strong> the Principal Activity Plan<br />
(PAP) for the four-year period 1999/2000 to<br />
2002/2003.<br />
• Completion <strong>of</strong> Activity Position Statements,<br />
which will be used to form the basis for<br />
input to the PAP, Corporate Plan and<br />
forecast financial statements.<br />
• Further evaluation <strong>of</strong> the capital rationing<br />
model developed by Curtin University, for<br />
potential use by the <strong>City</strong>.<br />
• Preparation and documentation <strong>of</strong> the<br />
1999/2000 Budget, including preparation <strong>of</strong><br />
financial statements in accordance with<br />
contemporary reporting practices.<br />
• Preparation <strong>of</strong> Budget Reviews in October,<br />
1999, February, 2000 and May, 2000.<br />
• A major study <strong>of</strong> management information<br />
systems and information technology<br />
systems in the <strong>City</strong>. The outcome <strong>of</strong> the<br />
study will include a five-year information<br />
technology strategy plan.<br />
• Undertake a study on key performance<br />
indicators, including a joint study with the<br />
Department <strong>of</strong> Local Government.<br />
• A full study on Activity Based Costing (ABC)<br />
in concert with Accounting Branch, including<br />
recommendations to simplify cost drivers (in<br />
the longer term) and to include both actual<br />
and budgeted ABCs in the accounting<br />
system (in the shorter term).<br />
• Review budgetary control processes and<br />
organisational management accounting –<br />
preliminary analysis to the Information<br />
Technology Strategy Study.<br />
30
Strategic<br />
Plan<br />
YOUR CITY’S ‘ROADMAP’ FOR<br />
THE NEXT FIVE YEARS<br />
31
Strategic Plan<br />
A MESSAGE FROM THE MAYOR<br />
The strategic plan has been written as a “roadmap” for the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> over the five<br />
year period 1999/2000 to 2003/2004.<br />
Our <strong>City</strong> has enormous potential and we are committed, as your Council, to fulfilling the<br />
goals set out in the strategic plan.<br />
By doing so we will enhance the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> in a variety <strong>of</strong> ways both externally in the<br />
<strong>City</strong>’s environment and resources, and internally with enhanced communication,<br />
streamlined procedures and continued responsible financial management.<br />
Your councillors have great hopes for the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> and, as our Vision indicates, we<br />
are keen to achieve here, the ideal community.<br />
We authorise the Chief Executive Officer to carry out the plan on behalf <strong>of</strong> the Councillors<br />
and, working together, we look forward to an exciting era for the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>.<br />
VISION<br />
Our vision is a description <strong>of</strong> the future<br />
we are aiming to achieve.<br />
STIRLING<br />
The <strong>City</strong> <strong>of</strong> Choice<br />
ACHIEVING THE IDEAL COMMUNITY<br />
MISSION<br />
A mission statement gives an<br />
organisation a sense <strong>of</strong> purpose<br />
and direction. The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>’s<br />
mission statement describes our<br />
primary focus which is...<br />
to provide services and facilities<br />
which enhance the well-being<br />
<strong>of</strong> our community<br />
VALUES<br />
Our values describe the things<br />
which are important to us in<br />
the way we do business.<br />
We strive to display our values in all our<br />
interactions - in Council, through<br />
Councillors and staff, and within our<br />
community. Our values are:<br />
We respect people<br />
We seek involvement from our<br />
community and value their input<br />
We strive for quality<br />
We demonstrate integrity in all we do<br />
We appreciate and recognise<br />
the contribution <strong>of</strong> all who<br />
work for the <strong>City</strong><br />
■ Overview <strong>of</strong> the<br />
strategic plan<br />
The strategic plan has been written to provide a<br />
broad direction for the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> over the<br />
next five years. In developing the plan, four key<br />
aspects <strong>of</strong> our future are embraced. These are:<br />
• Customers<br />
• Internal business processes<br />
• Learning and growth<br />
• Financials<br />
We recognise that each area is inter-related and<br />
that the work we do in one area will necessarily<br />
have an impact on the others.<br />
Within each area, we have defined a strategic<br />
intent (or broad focus) and several specific<br />
strategies which we are committed to achieving<br />
within the time frame. In order to achieve the<br />
goals set out in the following pages we recognise<br />
the need to develop specific action plans which<br />
have clearly articulated steps, time lines and<br />
responsibilities.<br />
■ Customers<br />
STRATEGIC INTENT<br />
The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> is enriched by its diversity.<br />
Within our boundaries we have a variety <strong>of</strong><br />
people at different life stages and an enormous<br />
mix <strong>of</strong> interests including religious, sporting,<br />
cultural, business and a wide tourist/visitor<br />
appeal. We are aware that our customer base has<br />
differing needs and by understanding and<br />
optimising the fulfilment <strong>of</strong> these needs we strive<br />
to make <strong>Stirling</strong> truly the <strong>City</strong> <strong>of</strong> Choice.<br />
STRATEGIES<br />
We recognise our core responsibilities and<br />
commit to continuing to provide traditional local<br />
government services at an optimum level, while<br />
monitoring ratepayers’ changing needs and<br />
preferences.<br />
In doing so we will focus on<br />
• Service quality and quantity<br />
• Cost control – value for money<br />
• <strong>Community</strong> consultation and Communication<br />
Responsibility: Councillors and CEO<br />
To create a significant centre for the <strong>City</strong> which<br />
would provide citizens with a base for social,<br />
cultural, commercial and civic endeavours.<br />
32
Strategic Plan<br />
<strong>Stirling</strong> understands the<br />
differing needs <strong>of</strong> its diverse<br />
customer base.<br />
We endorse the design and<br />
construction <strong>of</strong> a multistage<br />
civic centre and civic<br />
precinct.<br />
Priority will be given to the<br />
community facilities, while<br />
coordinating the<br />
development <strong>of</strong> other<br />
precincts. The project will<br />
include the following<br />
stages:<br />
• Feasibility study<br />
• Design phase –<br />
community input<br />
• Selection <strong>of</strong> appropriate<br />
design<br />
• Project plan<br />
• Staged construction<br />
• Promotion/opening etc<br />
Responsibility: Overseeing by the <strong>Stirling</strong> Civic<br />
Precinct Committee<br />
We promote innovation in the provision <strong>of</strong> new<br />
and existing services<br />
Examples <strong>of</strong> innovative services for investigation<br />
include:<br />
• Easier access to customer services<br />
• Localised services<br />
• Remote access<br />
• Electronic commerce<br />
• Ratepayer credit cards<br />
• Longer hours for Council operation<br />
• Council as agents for collection <strong>of</strong> accounts<br />
including State and Federal<br />
Government collections<br />
(possibly co-located with<br />
library services)<br />
• Other projects as<br />
identified<br />
Responsibility: CEO<br />
Within the normal<br />
constraints <strong>of</strong> budget and<br />
community need, we<br />
actively endorse the<br />
continued improvement <strong>of</strong><br />
our city, the lifestyles <strong>of</strong> its<br />
ratepayers and the<br />
provision <strong>of</strong> community<br />
facilities.<br />
Projects include:<br />
• Completion <strong>of</strong> Inglewood Aquatic Centre<br />
• <strong>Development</strong> <strong>of</strong> Mirrabooka Regional Centre<br />
• Significant upgrading <strong>of</strong> streetscapes<br />
including medians, furniture and parking<br />
• Beautification <strong>of</strong> drainage compensation<br />
basins<br />
• Maintenance <strong>of</strong> security (and modification<br />
where necessary)<br />
Responsibility: CEO<br />
To enhance the natural assets <strong>of</strong> the city we<br />
advocate the development <strong>of</strong> the Scarborough<br />
Beach area. We believe this project should be<br />
viewed as a regional development attracting<br />
Federal and State funding.<br />
To maintain its effectiveness,<br />
<strong>Stirling</strong> constantly revises its<br />
internal processes to deliver<br />
the best service.<br />
Action: Using the outcomes <strong>of</strong> the<br />
Scarborough and Environs Area<br />
Strategy competition, develop a<br />
concept plan for a staged development<br />
<strong>of</strong> the area.<br />
Note: This project should be conducted<br />
in parallel with the Coastal Ocean<br />
Management Plan<br />
Responsibility: CEO<br />
■ Internal Business<br />
Processes<br />
STRATEGIC INTENT<br />
The <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> enjoys a stable,<br />
committed Council, a high level <strong>of</strong><br />
infrastructure and positive relationships<br />
with other levels <strong>of</strong> government. To<br />
ensure that our Council and our<br />
administrative <strong>of</strong>ficers continue to work<br />
effectively it is important to assess and<br />
review the way we do business. We<br />
strive to provide the best and most<br />
efficient service possible.<br />
STRATEGIES<br />
In a climate <strong>of</strong> continuing technological<br />
change, we must ensure that our<br />
information systems will keep us at the<br />
forefront <strong>of</strong> technology (within six<br />
months).<br />
Action: Appoint an independent arbiter<br />
to assess the current situation and<br />
prepare a five-year Information<br />
Technology Strategic Plan for the <strong>City</strong>,<br />
including an evaluation <strong>of</strong> out-sourcing<br />
and in-sourcing opportunities.<br />
Responsibility: CEO<br />
Taking a regional leadership role, we<br />
need to develop and implement a fiveyear<br />
waste management plan<br />
encompassing best practice and<br />
recycling mechanisms, where necessary,<br />
with regional partners.<br />
Responsibility: CEO<br />
We need to ensure that the organisation<br />
structure and design is conducive to<br />
achieving the objectives <strong>of</strong> the Council<br />
and meeting the needs <strong>of</strong> the <strong>City</strong>. It is<br />
assumed that an appropriate structure<br />
will be in place to implement the<br />
strategic plan and that, as a result <strong>of</strong> the<br />
strategic plan outcomes, the structure<br />
will be altered from time to time.<br />
Associated issues for action following<br />
the restructure <strong>of</strong> the organisation<br />
include:<br />
• Review the appropriateness and<br />
number <strong>of</strong> Council policies and<br />
administrative delegations to<br />
streamline decision-making (within six<br />
months).<br />
• Establish project/planning teams to<br />
co-ordinate issues/projects with input<br />
from all affected parties within<br />
<strong>Community</strong><br />
Services<br />
Recreation<br />
& Reserves<br />
Library &<br />
Information<br />
Services<br />
Building<br />
Planning &<br />
Health<br />
Works<br />
33
Strategic Plan<br />
Council at the beginning <strong>of</strong><br />
the process.<br />
• Participate in the<br />
Department <strong>of</strong> Local<br />
Government’s<br />
benchmarking review and<br />
have the results <strong>of</strong> this<br />
review customised for the<br />
<strong>City</strong> <strong>of</strong> <strong>Stirling</strong> by<br />
appropriate experts for use<br />
as internal performance<br />
indicators.<br />
Responsibility: CEO<br />
■ Learning<br />
and growth<br />
STRATEGIC INTENT<br />
To remain at the forefront <strong>of</strong> local government, it<br />
is important for Councillors and Council<br />
Executive and staff to continue to work in a<br />
learning environment where personal growth<br />
and training is encouraged and fostered. We are<br />
committed to continued learning and growth;<br />
recognition and reward for outstanding service<br />
and innovation; and celebrating our successes.<br />
Personal growth and training<br />
are rewarded among<br />
<strong>Stirling</strong>’s staff to create an<br />
innovative local government.<br />
STRATEGIES<br />
We recognise the work done to date in<br />
customer service training. Since customer focus<br />
is the lifeblood <strong>of</strong> good service we endorse the<br />
next stage <strong>of</strong> customer service training for city<br />
staff. (Within six months).<br />
Training issues include:<br />
• One-stop interface for<br />
customers<br />
• <strong>Community</strong> feedback<br />
• Project management for<br />
both employees and<br />
Councillors including<br />
project allocations, value<br />
for money, ability to “spot”<br />
savings in projects etc.<br />
• Integrated projects –<br />
completeness, continuation<br />
etc<br />
Responsibility: CEO<br />
We understand the<br />
importance <strong>of</strong><br />
acknowledging exceptional<br />
work, leadership and innovation and endorse<br />
the development <strong>of</strong> a reward and recognition<br />
scheme.<br />
Examples include:<br />
• Above average performance <strong>of</strong> staff<br />
• Innovation<br />
• Recognition <strong>of</strong> community contribution<br />
• Incentives for volunteer participation<br />
Responsibility: Councillors and CEO<br />
While the <strong>City</strong> has achieved a great deal over<br />
the last few years, little <strong>of</strong> this has been<br />
broadcast to the community. We believe we<br />
should actively enhance the promotion <strong>of</strong> these<br />
achievements through media, static displays,<br />
and ratepayer presentations.<br />
Responsibility: Councillors and CEO<br />
The <strong>City</strong> is committed to<br />
wise use <strong>of</strong> its assets for<br />
financial independence and<br />
security.<br />
■ Financials<br />
STRATEGIC INTENT<br />
Over the years, Councillors and staff<br />
have worked hard to ensure the <strong>City</strong> <strong>of</strong><br />
<strong>Stirling</strong>’s financial independence and<br />
security. In the future, we are<br />
committed to the wise stewardship <strong>of</strong><br />
Council funds and the optimum use <strong>of</strong><br />
our funds and assets.<br />
STRATEGIES<br />
To optimise return on our investments<br />
we approve the development <strong>of</strong> an<br />
asset management plan to be compiled<br />
by a suitably qualified project manager.<br />
This plan should include:<br />
• An evaluation <strong>of</strong> current assets<br />
• An evaluation <strong>of</strong> asset utilisation<br />
• <strong>Development</strong> <strong>of</strong> a program for the<br />
preservation <strong>of</strong> assets<br />
• <strong>Development</strong> <strong>of</strong> an asset disposal<br />
program<br />
• Ability to evaluate lease/ownership<br />
options for future needs<br />
• Examine options to encourage<br />
heavy traffic to use roads designed<br />
for this purpose.<br />
Responsibility: CEO<br />
To enhance the decision-making ability<br />
<strong>of</strong> Councillors<br />
Actions:<br />
• Introduce “user friendly” financial<br />
reports which include economic<br />
evaluation <strong>of</strong> projects and feedback<br />
on project expenditure<br />
• Include executive summaries with all<br />
Council submissions (where<br />
appropriate)<br />
Responsibility: Councillors and CEO<br />
Capital works and other<br />
entrepreneurial activities within the <strong>City</strong><br />
should be considered on merit and<br />
prioritised for approval in terms <strong>of</strong> need<br />
and capacity to produce an income<br />
stream. Where considered appropriate,<br />
funds generated by the sale, lease or<br />
investment <strong>of</strong> Council assets or by<br />
specific borrowings should be used to<br />
fast-forward these projects.<br />
Responsibility: Councillors and<br />
CEO<br />
To assist in the promotion and<br />
expansion <strong>of</strong> the <strong>City</strong> we should<br />
employ (within six months) a<br />
business development <strong>of</strong>ficer to:<br />
• Promote the <strong>City</strong> to the business<br />
community<br />
• Attract business, services and new<br />
residents to the <strong>City</strong><br />
• Develop other entrepreneurial<br />
activities in the <strong>City</strong><br />
• Attract funds for <strong>City</strong> projects<br />
• Be receptive to business<br />
opportunities<br />
Responsibility: CEO<br />
Sanitation<br />
Administrative<br />
Services<br />
Information<br />
Technology<br />
Rates & Accounts<br />
Human Resources<br />
34
Financial<br />
Statements<br />
For the year ended 30 June, 1999<br />
These Financial Statements and specific<br />
disclosures have been derived from the <strong>City</strong> <strong>of</strong><br />
<strong>Stirling</strong>’s Financial Report.<br />
The Concise Financial Report cannot be<br />
expected to provide as full an understanding <strong>of</strong><br />
the financial performance, financial position and<br />
financial and investing activities <strong>of</strong> the <strong>City</strong> <strong>of</strong><br />
<strong>Stirling</strong> as the Financial Report.<br />
Further financial information can be obtained<br />
from the Financial Report which is available,<br />
free <strong>of</strong> charge, on request to the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong>.<br />
■ See Page 44<br />
35
Statement by Chief Executive Officer<br />
For the year ended 30 June 1999<br />
CITY OF STIRLING<br />
STATEMENT BY CHIEF EXECUTIVE OFFICER<br />
The attached financial report <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> being<br />
the annual financial report and supporting notes and<br />
other information for the financial year ended 30 June<br />
1999 are, in my opinion, properly drawn up to present<br />
fairly the financial position <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> at 30<br />
June 1999 and the results <strong>of</strong> the operations for the<br />
financial year then ended in accordance with Australian<br />
Accounting Standards (except to the extent that these<br />
have been varied in the Statement <strong>of</strong> Accounting Policies<br />
required by Australian Accounting Standard AAS 6<br />
“accounting Policies” and the accompanying notes to the<br />
annual financial report) and comply with the provisions <strong>of</strong><br />
the Local Government Act 1995 and the regulations<br />
under the Act.<br />
Signed on the 16th day <strong>of</strong> September 1999<br />
.....................................................<br />
Chief Executive Officer<br />
M J (Mike) WADSWORTH<br />
CHIEF EXECUTIVE OFFICER<br />
36
Annual Audit Statement<br />
For the year ended 30 June 1999<br />
37
Operating Statement (By Program)<br />
For the year ended 30 June 1999<br />
1998/99 1999 1998<br />
BUDGET $ $<br />
EXPENSES<br />
GENERAL PURPOSE FUNDING 1,846,690 1,836,749 1,822,139<br />
GOVERNANCE 2,942,450 1,625,098 2,353,893<br />
LAW, ORDER, PUBLIC SAFETY 4,033,524 3,727,789 2,815,073<br />
HEALTH 1,483,939 1,502,241 1,418,953<br />
EDUCATION & WELFARE 4,752,313 5,021,182 4,912,467<br />
COMMUNITY AMENITIES 11,836,600 12,107,108 11,073,014<br />
RECREATION AND CULTURE 18,672,284 21,991,308 20,160,109<br />
TRANSPORT 7,353,953 21,573,825 23,150,991<br />
ECONOMIC SERVICES 1,542,524 1,206,634 1,259,169<br />
OTHER PROPERTY AND SERVICES 4,338,181 5,660,478 4,370,352<br />
TOTAL EXPENSES 58,802,458<br />
––––––––––––<br />
76,252,413<br />
––––––––––––<br />
73,336,161<br />
––––––––––––<br />
REVENUE<br />
GENERAL PURPOSE FUNDING 52,658,263 51,704,882 52,665,280<br />
GOVERNANCE 251,582 305,410 558,693<br />
LAW, ORDER, PUBLIC SAFETY 1,396,812 1,574,799 326,039<br />
HEALTH 101,471 205,225 130,853<br />
EDUCATION & WELFARE 3,226,740 2,945,989 3,024,596<br />
COMMUNITY AMENITIES 9,557,395 10,480,234 9,643,122<br />
RECREATION AND CULTURE 3,968,239 7,436,457 5,533,602<br />
TRANSPORT 2,543,499 1,868,094 2,273,825<br />
ECONOMIC SERVICES 2,163,031 1,189,458 1,179,522<br />
OTHER PROPERTY AND SERVICES 3,275,216 1,174,766 1,319,472<br />
TOTAL REVENUE 79,142,248<br />
––––––––––––<br />
78,885,314<br />
––––––––––––<br />
76,655,003<br />
––––––––––––<br />
CHANGE IN NET ASSETS<br />
RESULTING FROM OPERATIONS<br />
BEFORE ABNORMAL ITEMS<br />
AND RESTRUCTURING OF LOCAL<br />
GOVERNMENT 20,339,790<br />
––––––––––––<br />
2,632,901<br />
––––––––––––<br />
3,318,843<br />
––––––––––––<br />
ABNORMAL ITEMS 5,000,000 7,277,006 6,173,249<br />
CHANGE IN NET ASSETS<br />
RESULTING FROM OPERATIONS<br />
BEFORE LOSS ON RESTRUCTURING 25,339,790<br />
––––––––––––<br />
9,909,907<br />
––––––––––––<br />
9,492,092<br />
––––––––––––<br />
LOSS ON RESTRUCTURING 756,375 41,562,416<br />
CHANGE IN NET ASSETS RESULTING<br />
FROM OPERATIONS AFTER LOSS<br />
ON RESTRUCTURING 24,583,415 (31,652,509) 9,492,092<br />
–––––––––––– –––––––––––– ––––––––––––<br />
38
Statement <strong>of</strong> Financial Position<br />
As at year ended 30 June 1999<br />
1999 1998<br />
$ $<br />
CURRENT ASSETS<br />
Cash 1,366,269 1,370,914<br />
Investments 36,096,152 43,603,070<br />
Receivables 16,134,302 10,796,497<br />
Prepayments 525,853 35,703<br />
Stock on hand 257,895<br />
–––––––––––––<br />
249,900<br />
–––––––––––––<br />
TOTAL CURRENT ASSETS 54,380,471<br />
–––––––––––––<br />
56,056,084<br />
–––––––––––––<br />
CURRENT LIABILITIES<br />
Borrowings 4,741,977 6,666,370<br />
Creditors and provisions 6,738,384<br />
–––––––––––––<br />
8,775,703<br />
–––––––––––––<br />
TOTAL CURRENT LIABILITIES 11,480,361<br />
–––––––––––––<br />
15,442,073<br />
–––––––––––––<br />
NET CURRENT ASSETS 42,900,110 40,614,011<br />
NON-CURRENT ASSETS<br />
Receivables 2,437,828 2,645,715<br />
Work in Progress 360,762 563,760<br />
Property plant and equipment 662,725,397<br />
–––––––––––––<br />
696,281,340<br />
–––––––––––––<br />
TOTAL NON-CURRENT ASSETS 665,523,987<br />
–––––––––––––<br />
699,490,815<br />
–––––––––––––<br />
NON-CURRENT LIABILITIES<br />
Creditors and provisions 186,107<br />
–––––––––––––<br />
214,327<br />
–––––––––––––<br />
TOTAL NON-CURRENT LIABILITIES 186,107<br />
–––––––––––––<br />
214,327<br />
–––––––––––––<br />
NET NON-CURRENT ASSETS 665,337,879 699,276,487<br />
NET ASSETS 708,237,989 739,890,498<br />
––––––––––––– –––––––––––––<br />
EQUITY<br />
Accumulated Surplus 688,419,064 722,421,601<br />
Reserves 19,818,925<br />
–––––––––––––<br />
17,468,897<br />
–––––––––––––<br />
TOTAL EQUITY 708,237,989 739,890,498<br />
––––––––––––– –––––––––––––<br />
39
Statement <strong>of</strong> Changes in Equity<br />
For the year ended 30 June 1999<br />
1999 1998<br />
$ $<br />
RESERVES - CASH BACKED<br />
Balance at beginning <strong>of</strong> reporting period 17,468,897 19,212,449<br />
Amount transferred from accumulated surplus 4,381,278 2,265,334<br />
Amount transferred to accumulated surplus (2,031,250)<br />
–––––––––––––<br />
(4,008,886)<br />
–––––––––––––<br />
Balance at end <strong>of</strong> reporting period 19,818,925<br />
–––––––––––––<br />
17,468,897<br />
–––––––––––––<br />
ACCUMULATED SURPLUS<br />
Balance at beginning <strong>of</strong> reporting period 722,421,601 675,651,282<br />
Adjustment due to compliance with a new accounting standard 0 35,534,675<br />
Change in net assets resulting from operations (31,652,509) 9,492,092<br />
Transfers to reserves (4,381,278) (2,265,334)<br />
Transfers from reserves 2,031,250<br />
–––––––––––––<br />
4,008,886<br />
–––––––––––––<br />
Balance at end <strong>of</strong> reporting period 688,419,064<br />
–––––––––––––<br />
722,421,601<br />
–––––––––––––<br />
TOTAL EQUITY 708,237,989 739,890,498<br />
––––––––––––– –––––––––––––<br />
40
Statement <strong>of</strong> Cash Flows<br />
For the year ended 30 June 1999<br />
1999 1998<br />
$ $<br />
CASH FLOWS FROM OPERATING ACTIVITIES<br />
Payments<br />
Staff Expenses (23,524,600) (21,663,856)<br />
Accommodation Expenses (2,895,473) (2,909,890)<br />
Office Equipment, Plant & Vehicles (765,297) (619,802)<br />
Sanitation (3,183,992) (4,261,331)<br />
Maintenance <strong>of</strong> Comm. Infrastructure (2,272,782) (4,674,017)<br />
Stock Purchases (1,970,637) (2,076,546)<br />
Activity Functional Operating Expense (25,997,703)<br />
–––––––––––––<br />
(21,405,498)<br />
–––––––––––––<br />
(60,610,483) (57,610,939)<br />
Receipts<br />
Rates 44,571,639 44,604,934<br />
Fees from Regulatory Services 1,478,900 1,455,752<br />
User Charges 16,486,638 15,803,395<br />
Interest Earned 1,542,803 2,816,053<br />
Other Grants & Contrib. 821,844 827,786<br />
Activity Functional Operating Revenue 5,686,296<br />
–––––––––––––<br />
8,723,189<br />
–––––––––––––<br />
70,588,120 74,231,107<br />
NET CASH FROM OPERATING ACTIVITIES 9,977,637 16,620,168<br />
CASH FLOWS USED IN INVESTING ACTIVITIES<br />
New & Redevelopment <strong>of</strong> Comm. Infrastructure (17,008,492) (20,789,315)<br />
Payments for purchase <strong>of</strong> property, plant & equipment (6,742,629) (8,093,107)<br />
Proceeds from sale <strong>of</strong> property, plant & equipment 1,569,643 8,098,562<br />
Transfer to/from trust<br />
–––––––––––––<br />
(7,508,850)<br />
–––––––––––––<br />
NET CASH USED IN INVESTING ACTIVITIES (22,181,478) (28,292,710)<br />
CASH FLOWS FROM GOVERNMENT<br />
Government Grants 4,692,949 5,371,381<br />
Subsidies 2,177,908 2,104,233<br />
Capital Expenditure-Specific Gov't Grants (254,187)<br />
–––––––––––––<br />
(549,140)<br />
–––––––––––––<br />
NET CASH PROVIDED BY GOVERNMENT 6,616,670 6,926,475<br />
NET INCREASE/(DECREASE) IN CASH HELD (5,587,171) (4,746,067)<br />
CASH AT BEGINNING OF REPORTING PERIOD 38,307,615 43,053,682<br />
––––––––––––– –––––––––––––<br />
CASH AT END OF REPORTING PERIOD 32,720,444 38,307,615<br />
––––––––––––– –––––––––––––<br />
41
SCHEDULE 1<br />
General Purpose Revenue<br />
For the year ended 30 June 1999<br />
1999 1998<br />
$ $<br />
General Rate<br />
GRV Rate in $ 35,035,474 34,536,422<br />
Specificed Area Rate<br />
GRV Rate in $1.505 5,380 3,010<br />
Minimum Rate<br />
GRV Number <strong>of</strong> Assessments 24,393 at $368.00 each 8,976,624 9,612,225<br />
Interim Rates<br />
GRV Rate in $ 316,652<br />
–––––––––––––<br />
825,873<br />
–––––––––––––<br />
Total General Rates Levied 44,334,130 44,977,530<br />
Plus - Late Payment Penalties 270,587 218,693<br />
Plus - Installment charges & interest 228,216 231,575<br />
Plus - Arrears Rates 104,580<br />
–––––––––––––<br />
327,155<br />
–––––––––––––<br />
Total Amount made up from Rates 44,937,513 45,754,953<br />
General Purpose Grant 3,750,824 3,861,382<br />
Pensioner Deferred Rates Interest Grant 118,246 152,722<br />
Other General Purpose Revenue 2,898,300<br />
–––––––––––––<br />
2,896,223<br />
–––––––––––––<br />
TOTAL GENERAL PURPOSE REVENUE<br />
SHOWN ON OPERATING STATEMENT 51,704,882 52,665,280<br />
––––––––––––– –––––––––––––<br />
42
SCHEDULE 2<br />
Statement <strong>of</strong> Rating Information<br />
For the year ended 30 June 1999<br />
Rateable Property Rate in $ Minimums<br />
Value Numbers (cents) Rate Yield No. Yield $ TOTAL $<br />
GENERAL<br />
RATE-GRV<br />
Residential 327,442,434 47,537 7.36773 24,125,074 24,119 8,875,792 33,000,866<br />
Commercial 75,299,314 909 6.07590 4,575,111 150 55,200 4,630,311<br />
Industrial 88,416,972 1,971 7.16524 6,335,288 124 45,632 6,380,920<br />
Interim Rates 316,652 316,652<br />
–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––<br />
TOTAL GRV 491,158,720 50,417 35,352,126 24,393 8,976,624 44,328,750<br />
TOTAL SPECIFIED AREA RATE-GRV 5,380<br />
—————<br />
TOTAL RATES LEVIES - as per Schedule 1 44,334,130<br />
—————<br />
43
Concise Financial Report<br />
INFORMATION TO ASSIST IN THE UNDERSTANDING<br />
OF THE CONCISE FINANCIAL REPORT OF THE CITY OF STIRLING.<br />
PROFIT AND LOSS STATEMENT<br />
• Trends over time indicate that revenue from grants is declining slowly, revenue from rates is being<br />
held at or below the Consumer Price Index and other revenue fluctuates according to business<br />
activity in the sector it represents.<br />
• A minor restructuring <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Stirling</strong> resulted in an area approximately represented by the<br />
boundaries <strong>of</strong> the suburb <strong>of</strong> Maylands being transferred to the <strong>City</strong> <strong>of</strong> Bayswater. This was<br />
accompanied by a transfer <strong>of</strong> Property, Plant, Equipment and Cash to the value <strong>of</strong> $41,562,416.<br />
• Cost <strong>of</strong> operations is largely reflective <strong>of</strong> the scope <strong>of</strong> works undertaken. However, performance<br />
measurements have been introduced throughout the organisation to ensure effective control <strong>of</strong><br />
resources.<br />
BALANCE SHEET<br />
• There has been no significant changes in the composition <strong>of</strong> Property, Plant and Equipment.<br />
• The <strong>City</strong> has no long-term debt only that required for efficient control <strong>of</strong> short-term cash flow.<br />
• Debtors have increased substantially this year as a result <strong>of</strong> the issue <strong>of</strong> accounts for<br />
contributions by owners to the <strong>Stirling</strong> Centre Town Planning Scheme No. 38.<br />
CASH FLOWS<br />
For the year ended 30 June 1999<br />
• There has been no significant changes in cash flow terms.<br />
• Capital programs have been financed from revenue sources.<br />
• The <strong>City</strong> has no long-term debt or debt servicing requirements.<br />
SIGNIFICANT FINANCIAL RATIOS ARE AS FOLLOWS.<br />
(a) the current ratio<br />
- to assess ability to meet current commitments<br />
1999 1998 1997 1996 1995<br />
current assets minus restricted assets<br />
current liabilities minus liabilities<br />
associated with restricted assets<br />
3.7723 2.8016 3.3481 3.6013 3.1656<br />
(b) the debt ratio<br />
- to identify the exposure <strong>of</strong> the <strong>City</strong> to debt as an indicator <strong>of</strong> the solvency <strong>of</strong> the <strong>City</strong><br />
total liabilities<br />
total assets<br />
0.0162 0.0207 0.0163 0.0866 0.1044<br />
(c) the rate coverage ratio<br />
- to assess the dependence on non rate revenue sources<br />
net rate revenue<br />
operating revenue<br />
0.5007 0.5307 0.5655 0.5673 0.5744<br />
(d) outstanding rates ratio<br />
-to assess the rate collection performance<br />
rates outstanding<br />
rates collectable<br />
0.0675 0.0681 0.0778 0.0760 0.0769<br />
Designed and produced by Spencer Group Media<br />
Photographs: Motive Audio Visual, RCM Visuals and Bill Davis.<br />
Typesetting, Pre-press and Printing: Vanguard Press<br />
44
Annual Report Cover<br />
<strong>Stirling</strong> has initiated many new<br />
projects including, from top,<br />
Council’s new works depot ($6.5<br />
million); Osborne Library and<br />
<strong>Community</strong> Centre ($5 million); the<br />
Inglewood Swimming Pool<br />
redevelopment ($7.5 million) and the<br />
Henderson Eco-Discovery Centre<br />
($500,000).