The steps in this process may be combined to the following final equation:<br />
T = 1000 x 2 / 3 k L<br />
(assumes porosity of 33 per cent)<br />
where the parameters <strong>and</strong> units of measurement are:<br />
T<br />
x<br />
k<br />
L<br />
is the time to pass through liner (days)<br />
is the depth of the impermeable layer (m)<br />
is the predicted saturated hydraulic conductivity (mm/day)<br />
is the distance between the level of the pond surface <strong>and</strong> the level of the base of the <br />
impermeable layer (m) i.e. depth of water + depth of impermeable layer<br />
The volume leaked during the period of ponding may be calculated using the following equation:<br />
V = Q t a<br />
86.4<br />
Where V is the volume leaked during the period the pond is filled (ML/ha),<br />
Q is the flow (m 3 /s),<br />
t a<br />
is the number of days that leakage may occur (the maximum likely filled period of the <br />
containment structure (days) minus the time to pass through the liner (T)),<br />
<strong>and</strong> 86.4 is a unit conversion factor from m 3 /s to ML/day.<br />
36