Parameter<br />

Groundwater levels<br />

Pre-operational<br />

In tidal areas:<br />

Checked at 15-minute intervals over at least one<br />

72-hour period; <strong>and</strong><br />

In tidal <strong>and</strong> non-tidal areas:<br />

Checked at weekly intervals <strong>for</strong> the first month,<br />

then monthly until operation commences.<br />

First season<br />

On initial fi lling following construction,<br />

groundwater levels should be monitored daily <strong>for</strong><br />

the fi rst week, then weekly <strong>for</strong> the fi rst month, then<br />

monthly <strong>for</strong> one year.<br />

Thereafter<br />

Monitoring should be undertaken monthly during<br />

the period that ponds are fi lled, commencing one<br />

month prior to fi lling <strong>and</strong> concluding one month<br />

after the ponds are drained.<br />

Monitoring should be undertaken quarterly during<br />

the period that ponds are not filled.<br />

More frequent monitoring may be required during<br />

construction if dewatering of acid sulfate soils<br />

is required.<br />

Monitoring should commence as early as possible<br />

in the project to obtain the best possible baseline<br />

data on groundwater properties, <strong>and</strong> daily<br />

monitoring should occur following heavy rain, until<br />

such time as the relationship between rainfall <strong>and</strong><br />

groundwater level rise can be determined.<br />

Field parameters (farms<br />

using salt-affected or<br />

saline waters)<br />

Samples should be collected <strong>and</strong> analysed<br />

monthly.<br />

Monitoring of pH <strong>and</strong> EC should be undertaken<br />

monthly <strong>for</strong> 12 months, commencing one month<br />

prior to filling.<br />

Monitoring of pH <strong>and</strong> EC should be undertaken<br />

monthly during the period that ponds are filled,<br />

commencing one month prior to filling <strong>and</strong><br />

concluding one month after the ponds are drained.<br />

Primary parameters Depending on the variation of the aquifer across<br />

the site, suffi cient samples should be collected to<br />

provide a representative ‘baseline’ sample prior<br />

to the commencement of construction works. Sets<br />

of samples should be taken late in each of the dry<br />

<strong>and</strong> wet seasons.<br />

Secondary Parameters Dependent on the variation of the aquifer across<br />

the site, suffi cient samples should be collected to<br />

provide a representative ‘baseline’ sample prior to<br />

the commencement of construction works.<br />

Sets of samples should be taken late in each of the<br />

Dry <strong>and</strong> Wet seasons.<br />

Subject to expert advice should further<br />

investigations be necessary.<br />

Subject to expert advice should further<br />

investigations be necessary.<br />

Monitoring should be undertaken quarterly during<br />

the period that ponds are not filled.<br />

Subject to expert advice should further<br />

investigations be necessary.<br />

Subject to expert advice should further<br />

investigations be necessary.<br />

Please note: these are the minimum recommended monitoring requirements. Additional monitoring is strongly recommended to ensure that the variation in groundwater<br />

characteristics both spatially <strong>and</strong> temporally are fully understood <strong>and</strong> that any changes detected following construction can be appropriately investigated.<br />

38