Test Section Layout<br />
Initial Plan<br />
Year Zero – Initial Application<br />
100 200 ft ft 400-ft Transition Transition Transition<br />
Year Two – Second Application<br />
Year Four – Third Application<br />
Outlined areas = application of material that year<br />
Shaded areas = previously treated sections<br />
Material 1 Material 2 Material 3<br />
Additionally, 500-ft section left untreated as control<br />
THE FIELD TEST PLAN<br />
A test plan was laid out to apply test sections of several commercially available<br />
emulsions to a number of different pavement and climate types. The initial<br />
placement included 200-ft sections of the standard fog seal product used in that<br />
state as well as other products suppliers wished to include in the study. Several<br />
companies donated their materials, field support and application. 400-ft sections<br />
were left open between each section for future application, and there was at least<br />
one 500-ft control section left untreated in each project. The plan was to reapply<br />
sections of the same products on previously treated and untreated sections at twoyear<br />
intervals with a variety of performance and material testing on the surface of<br />
and cores from test and control sections. Because of a change in leadership of the<br />
project, the unavailability of some products used for initial trials, and added testing<br />
of the effects on skid resistance of sanding on some of the sections, this plan was<br />
later altered.<br />