17.10.2014 Views

Description template for a BHLS

Description template for a BHLS

Description template for a BHLS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bus with High Level of Service<br />

1 – The urban and governance context<br />

The main data of the urban area context<br />

Answer<br />

If needed: some comments or<br />

explaination<br />

Number of communities 1<br />

Number of inhabitant of this urban area 365’000<br />

Total surface of this urban area 92 Km 2<br />

Density Inhabitants per Km 2 (and if possible density of the<br />

downtown)<br />

http://www.demographia.com/db-zurward.htm<br />

PT market split rate (Zurich)<br />

4’100 entire city<br />

3’100 downtown<br />

50% <strong>for</strong> all PT<br />

modes<br />

VBZ operates in the city of<br />

Zurich, but the operation is<br />

integrated at a regional level<br />

with the Zurich Public<br />

Transport Authority (ZVV)<br />

Zurich city, not including<br />

agglomeration<br />

Downtown refers to Kreis 1<br />

Slow modes not included.<br />

Commuter trip data from 2000<br />

(source: strasse und verkehr 12/05)<br />

Trips / inhabitant / day 3.3 All modes (MZ 2005)<br />

Average of Km / inhabitant / year (all of Switzerland):<br />

- All modes<br />

- Buses & Trams<br />

- Other main mode (Private cars)<br />

13’932<br />

547<br />

9’324<br />

Source: MZ 2005<br />

Operating cost coverage rate (all transport modes) 64 % Source: ZVV financial report (2007)<br />

The background: context of the project implementation<br />

and decision process.<br />

What was the basis <strong>for</strong> the stimulus of the project?<br />

- Is it a part of a mobility master plan?<br />

- Is it an upgrading existing bus line?<br />

What are the main objectives at the level of the whole<br />

urban area?<br />

Who was the promoter/initiator of introducing the <strong>BHLS</strong><br />

project?<br />

Main dates of the project<br />

- creation of the mobility master :<br />

- feasibility studies:<br />

- decision to proceed:<br />

- start construction:<br />

- end construction:<br />

- opening year:<br />

Answer<br />

<br />

No<br />

If needed: some comments or explaination<br />

Mobility makes part of a citywide (and<br />

regional) master development plan <strong>for</strong> 2025.<br />

Bus lines complement the tram and S-Bahn<br />

network in the city<br />

-Improve quality of life<br />

-Efficiency, culture innovation, security (PT)<br />

-Increase attractiveness and expand network<br />

<strong>for</strong> PT and Slow modes<br />

-Highest possible quality in the service<br />

(certified)<br />

(Kantonsrat) (Regierungsrat)<br />

(Verkehrsverbund)<br />

(Verkehrsunernehmen)<br />

The bus line 31 is not con<strong>template</strong>d as a<br />

separate element in the PT strategy.<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!