Description template for a BHLS
Description template for a BHLS
Description template for a BHLS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Bus with High Level of Service<br />
1 – The urban and governance context<br />
The main data of the urban area context<br />
Answer<br />
If needed: some comments or<br />
explaination<br />
Number of communities 1<br />
Number of inhabitant of this urban area 365’000<br />
Total surface of this urban area 92 Km 2<br />
Density Inhabitants per Km 2 (and if possible density of the<br />
downtown)<br />
http://www.demographia.com/db-zurward.htm<br />
PT market split rate (Zurich)<br />
4’100 entire city<br />
3’100 downtown<br />
50% <strong>for</strong> all PT<br />
modes<br />
VBZ operates in the city of<br />
Zurich, but the operation is<br />
integrated at a regional level<br />
with the Zurich Public<br />
Transport Authority (ZVV)<br />
Zurich city, not including<br />
agglomeration<br />
Downtown refers to Kreis 1<br />
Slow modes not included.<br />
Commuter trip data from 2000<br />
(source: strasse und verkehr 12/05)<br />
Trips / inhabitant / day 3.3 All modes (MZ 2005)<br />
Average of Km / inhabitant / year (all of Switzerland):<br />
- All modes<br />
- Buses & Trams<br />
- Other main mode (Private cars)<br />
13’932<br />
547<br />
9’324<br />
Source: MZ 2005<br />
Operating cost coverage rate (all transport modes) 64 % Source: ZVV financial report (2007)<br />
The background: context of the project implementation<br />
and decision process.<br />
What was the basis <strong>for</strong> the stimulus of the project?<br />
- Is it a part of a mobility master plan?<br />
- Is it an upgrading existing bus line?<br />
What are the main objectives at the level of the whole<br />
urban area?<br />
Who was the promoter/initiator of introducing the <strong>BHLS</strong><br />
project?<br />
Main dates of the project<br />
- creation of the mobility master :<br />
- feasibility studies:<br />
- decision to proceed:<br />
- start construction:<br />
- end construction:<br />
- opening year:<br />
Answer<br />
<br />
No<br />
If needed: some comments or explaination<br />
Mobility makes part of a citywide (and<br />
regional) master development plan <strong>for</strong> 2025.<br />
Bus lines complement the tram and S-Bahn<br />
network in the city<br />
-Improve quality of life<br />
-Efficiency, culture innovation, security (PT)<br />
-Increase attractiveness and expand network<br />
<strong>for</strong> PT and Slow modes<br />
-Highest possible quality in the service<br />
(certified)<br />
(Kantonsrat) (Regierungsrat)<br />
(Verkehrsverbund)<br />
(Verkehrsunernehmen)<br />
The bus line 31 is not con<strong>template</strong>d as a<br />
separate element in the PT strategy.<br />
2