Annex 5: Matrix presenting recommendations and follow-up action.<br />

Recommendation Reference Action Actors responsible Deadline<br />

To ensure obtaining duly licensed<br />

software with maintenance support<br />

and, if available in <strong>Sri</strong> <strong>Lanka</strong>, technical<br />

support for the software acquired<br />

under this activity.<br />

To assess the understanding of the<br />

hydro models by PEU.<br />

Increase the quality level of the wind<br />

energy training and the level of<br />

understanding of course participants.<br />

Prepare pre-investment packages for<br />

interested private sector in wind<br />

development.<br />

Get private sector investors more<br />

prominently involved in improved<br />

direct biomass combustion.<br />

Improve information availability and<br />

awareness on biomass fuel use.<br />

Initiate work on biomass gasification<br />

based on a turn-key gasification<br />

package.<br />

Contact the international wind and hydro energy<br />

consultants and raise the issue and initiate a<br />

process that results in acquiring a license and<br />

possible technical back-up.<br />

To organise a training seminar under supervision<br />

of hydro international consultants.<br />

To organise a training seminar by international<br />

wind consultants at a level satisfactory to PEU.<br />

Undertake a thorough data analysis, based on data<br />

collected and prepare pre -investment documents;<br />

Continue activities as they are planned for direct<br />

biomass combustion and prepare pre-investment<br />

level documents for investors from the three<br />

selected sectors.<br />

Properly document activities and disseminate<br />

information through appropriate channels directly<br />

targeting potential investors in three selected<br />

sectors.<br />

To prepare detailed specifications of the<br />

gasfication turn-key package. To prepare a<br />

gasification programme.<br />

CEB/PEU to be assisted by<br />

UNDP and UNIDO.<br />

1 August 2001.<br />

CEB/PEU jointly with<br />

international hydro<br />

consultants.<br />

CEB/PEU jointly with<br />

international wind<br />

consultants.<br />

CEB/PEU jointly with 1 March 2002.<br />

international wind<br />

consultants.<br />

NERDC. 1 October 2001.<br />

End of July 2001, fully<br />

implemented.<br />

1 November 2001, fully<br />

implemented.<br />

NERDC. 1 December 2001.<br />

NERDC assisted by<br />

UNIDO.<br />

1 July 2001.<br />

Commercialise biomass gasification<br />

activities<br />

Design and implement the planned<br />

study tour.<br />

To undertake biomass gasification activities in a<br />

commercial environment to demonstrate<br />

technology and commercial attractiveness<br />

simultaneously.<br />

Finalise the TOR for the study tour, including the<br />

selection of participants and the international<br />

assistance required.<br />

Implement the study tour.<br />

NERDC, UNIDO and local<br />

manufacturing associations.<br />

ITDG, UNIDO.<br />

ITDG, international expert.<br />

1 January 2002.<br />

1 June 2001.<br />

1 October 2001.<br />

Final report, 4 May 2001<br />

<strong>Mid</strong>-<strong>term</strong> evaluation report: 'Renewable energy and energy capacity building'

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!