Annex 5: Matrix presenting recommendations and follow-up action.<br />
Recommendation Reference Action Actors responsible Deadline<br />
To ensure obtaining duly licensed<br />
software with maintenance support<br />
and, if available in <strong>Sri</strong> <strong>Lanka</strong>, technical<br />
support for the software acquired<br />
under this activity.<br />
To assess the understanding of the<br />
hydro models by PEU.<br />
Increase the quality level of the wind<br />
energy training and the level of<br />
understanding of course participants.<br />
Prepare pre-investment packages for<br />
interested private sector in wind<br />
development.<br />
Get private sector investors more<br />
prominently involved in improved<br />
direct biomass combustion.<br />
Improve information availability and<br />
awareness on biomass fuel use.<br />
Initiate work on biomass gasification<br />
based on a turn-key gasification<br />
package.<br />
Contact the international wind and hydro energy<br />
consultants and raise the issue and initiate a<br />
process that results in acquiring a license and<br />
possible technical back-up.<br />
To organise a training seminar under supervision<br />
of hydro international consultants.<br />
To organise a training seminar by international<br />
wind consultants at a level satisfactory to PEU.<br />
Undertake a thorough data analysis, based on data<br />
collected and prepare pre -investment documents;<br />
Continue activities as they are planned for direct<br />
biomass combustion and prepare pre-investment<br />
level documents for investors from the three<br />
selected sectors.<br />
Properly document activities and disseminate<br />
information through appropriate channels directly<br />
targeting potential investors in three selected<br />
sectors.<br />
To prepare detailed specifications of the<br />
gasfication turn-key package. To prepare a<br />
gasification programme.<br />
CEB/PEU to be assisted by<br />
UNDP and UNIDO.<br />
1 August 2001.<br />
CEB/PEU jointly with<br />
international hydro<br />
consultants.<br />
CEB/PEU jointly with<br />
international wind<br />
consultants.<br />
CEB/PEU jointly with 1 March 2002.<br />
international wind<br />
consultants.<br />
NERDC. 1 October 2001.<br />
End of July 2001, fully<br />
implemented.<br />
1 November 2001, fully<br />
implemented.<br />
NERDC. 1 December 2001.<br />
NERDC assisted by<br />
UNIDO.<br />
1 July 2001.<br />
Commercialise biomass gasification<br />
activities<br />
Design and implement the planned<br />
study tour.<br />
To undertake biomass gasification activities in a<br />
commercial environment to demonstrate<br />
technology and commercial attractiveness<br />
simultaneously.<br />
Finalise the TOR for the study tour, including the<br />
selection of participants and the international<br />
assistance required.<br />
Implement the study tour.<br />
NERDC, UNIDO and local<br />
manufacturing associations.<br />
ITDG, UNIDO.<br />
ITDG, international expert.<br />
1 January 2002.<br />
1 June 2001.<br />
1 October 2001.<br />
Final report, 4 May 2001<br />
<strong>Mid</strong>-<strong>term</strong> evaluation report: 'Renewable energy and energy capacity building'