LE-PROFILE | ver.3 | rev.5.2 | 10-Oct-2011<br />

LINDENBERG-EMIRATES LLC


Company Profile 3~16<br />

• About <strong>Lindenberg</strong> Emirates 3<br />

• Scope of Activities 4<br />

• Completed <strong>Projects</strong> 5<br />

• Ongoing <strong>Projects</strong> 6<br />

• Representation of <strong>Lindenberg</strong> Anlagen 7<br />

• Company Organization Chart 8<br />

• Company Manpower Chart 9<br />

• Company Reg., PQ & Classification 10~13<br />

• Project References 14~15<br />

<strong>Lindenberg</strong> Power Division 16~30<br />

• Division Profile 16~17<br />

• Scope of Activities 18<br />

• Typical Power Project Organization Chart 19<br />

• <strong>Featured</strong> <strong>Projects</strong> 20~29<br />

• Power Stations 30<br />

<strong>Lindenberg</strong> Water & Drainage Division 31~42<br />

• Division Profile 31~32<br />

• Scope of Activities 32<br />

• Typical Water Project Organization Chart 33<br />

• <strong>Featured</strong> <strong>Projects</strong> 34~42<br />

Quality, Health & Safety & Environment 43~44<br />

Company Recourses 45~52<br />

• Workforce & Labour Camp 45<br />

• Store Facilities 46<br />

• Plant, Machinery, Vehicles & Equipments 47~52<br />

Contact Information 53


About <strong>Lindenberg</strong>-Emirates<br />

Located in the United Arab Emirates, with<br />

its center of operation and main office in<br />

Abu Dhabi, <strong>Lindenberg</strong>-Emirates LLC<br />

specializes in Engineering, Procurement,<br />

and Construction (EPC) mode of project<br />

delivery.<br />

<strong>Lindenberg</strong>-Emirates LLC employs manpower expertise in all aspects of contracting including civil<br />

engineering, pipeline construction, turn-key industrial plants, substations, mechanical and electrical<br />

installations, and services to the electromechanical industry including testing, commissioning,<br />

maintenance and operational activities.<br />

Company Details<br />

• Date Established: 20.11.2001<br />

• Ownership: UAE Partner 51%, <strong>Lindenberg</strong> Anlagen (Germany) 49%<br />

• Incorporated in:<br />

Abu Dhabi, United Arab Emirates<br />

• Principal Bankers: Arab Bank for Investment Foreign Trade Mashreqbank<br />

National Bank of Abu Dhabi<br />

HSBC Bank<br />

National Bank of Fujairah<br />

3


Scope of Activities<br />

Power Related Activities<br />

• Construction & Installation of Power Transmission and Distribution Networks<br />

• Installation of High Voltage Cables<br />

• Substation Turnkey Low, Medium and High Voltage & Package Substation Installation<br />

• High & Medium Voltage Switchgear & Transformer Installation<br />

• Submarine Cable Installation<br />

Civil & Electro-mechanical General Contracting<br />

• Water Transmission & Distribution, Storm Water, Drainage & Irrigation Networks<br />

• EPC <strong>Projects</strong> of Water & Sewerage including Pumping Stations<br />

• Submarine Pipe Laying<br />

Oil & Gas Related Activities<br />

• On Shore and Off Shore Oil and Gas Field Services<br />

• Maintenance Services for Oil/Gas Production Utilities<br />

• Technical Maintenance for Equipment, Industrial and Petroleum Plant<br />

Repair & Maintenance Works<br />

4<br />

• Repair and Maintenance of Pumping Stations, Sewerage Networks & Water Drainage Lines


5<br />

<strong>Projects</strong> Successfully Completed in U.A.E.<br />

• Power Supply for Presidential Palaces and Hospitals<br />

• Construction of Water Supply Network to Sadiyat Island<br />

• Power Supply for Presidential Palaces and Hospitals<br />

• Construction of Water Transmission Pipeline in Baniyas<br />

• Construction of Water Transmission Pipeline in Dubai<br />

• Water Transmission Lines inside Al Reem Island<br />

• Security & Upgrading of 11kV Electrical Networks<br />

• Supply of LV Panels Switchgear for Ruwais Housing Complex<br />

• Power Supply for Palaces and Hospitals Stage3<br />

• Construction of Water Transmission Line from Sweihan to Remah<br />

• Modification of Switching Stations in Abu Dhabi<br />

• Construction of Water Networks at Al Qadra Village<br />

Project Value (AED)<br />

177 Million<br />

108 Million<br />

103 Million<br />

94 Million<br />

84 Million<br />

56 Million<br />

40 Million<br />

29 Million<br />

26 Million<br />

26 Million<br />

17 Million<br />

16 Million


Ongoing Power & Civil <strong>Projects</strong> in Abu Dhabi, U.A.E.<br />

• Electrical & Civil Engineering Works for Battery Energy Storage<br />

• Replacement of 11 KV Switchgears and Substations<br />

• Transfer of Load to New 132/11 kV W24 and E01 Primary Substations<br />

• Civil Works for Shuweihat-3 Independent Power Plant<br />

• Transfer of 11kV Load & Primary Substation in Abu Dhabi<br />

• Supply and Installation of 11kV Package Unit Substation for Braka<br />

Nuclear Power Plant<br />

• Installation of 22 kV Cables to Masdar City<br />

Project Value (AED)<br />

142 Million<br />

82 Million<br />

34 Million<br />

29.8 Million<br />

19.7 Million<br />

16.8 Million<br />

2.1 Million<br />

Ongoing Water & Drainage <strong>Projects</strong> in Abu Dhabi, U.A.E.<br />

• Water Transmission Scheme inside Sadiyat Island<br />

• EPC for 2 Nos. 25 MiG Steel Tanks, associated Civil & Pipeline Works.<br />

• Replacement of Existing Sewer Networks Inside Abu Dhabi Island<br />

577 Million<br />

174.5 Million<br />

116 Million<br />

6


Representation of <strong>Lindenberg</strong> Anlagen<br />

<strong>Lindenberg</strong> Emirates represents <strong>Lindenberg</strong> Anlagen GmbH Germany for its products and services in<br />

the United Arab Emirates.<br />

<strong>Lindenberg</strong> Anlagen GmbH Germany is a world class leader in the design and manufacturing of Power<br />

Generation System and has international presence in more than 72 countries.<br />

For more information about <strong>Lindenberg</strong> Anlagen GmbH, please visit www.lindenberg-anlagen.de.<br />

7


Company Organization Chart<br />

CHAIRMAN<br />

Exec. Sec / DC - 1<br />

GENERAL<br />

MANAGER<br />

Senior Business<br />

Associate<br />

Office Manager – 1<br />

Exec. Sec / DC - 1<br />

HR/ADMIN<br />

DEPARTMENT<br />

RECRUITMENT<br />

DEPARTMENT<br />

BUSINESS<br />

DEVELOPMENT<br />

DEPARTMENT<br />

OPERATIONS<br />

DEPARTMENT<br />

LEGAL<br />

DEPARTMENT<br />

HSE DEPARTMENT<br />

QA/QC<br />

DEPARTMENT<br />

HR/Admin<br />

Manager<br />

Recruitment<br />

Manager<br />

Business Dev’t.<br />

Director<br />

Operations<br />

Manager<br />

Head of Legal<br />

Department<br />

HSE Manager<br />

QA/QC Manager<br />

Sr. HR/A Officer – 1<br />

Personnel Officer – 1<br />

Asst. P.O. - 1<br />

Admin Coordinator – 1<br />

PR Coordinator - 1<br />

PRO – 2<br />

Admin. Clerk – 1<br />

Doc. Controller – 1<br />

Camp Boss – 1<br />

Asst. Camp Boss – 2<br />

Secretary - 1 Business Development<br />

Associate - 1<br />

Sales Engineer - 1<br />

Legal Secretary – 1<br />

Legal Advisor<br />

Sr. HSE Engineer – 1<br />

HSE Engineers – 9<br />

Safety Officers – 11<br />

Safety Asst. – 1<br />

Male Nurse – 2<br />

Sr. Administrator - 1<br />

QA/QC Engineers – 3<br />

QA/QC Inspectors – 2<br />

ESTIMATION &<br />

TENDERING<br />

DEPARTMENT<br />

CONTRACTS<br />

DEPARTMENT<br />

PLANNING<br />

DEPARTMENT<br />

PURCHASING<br />

DEPARTMENT<br />

PLANT /<br />

WORKSHOP<br />

DEPARTMENT<br />

POWER DIVISION<br />

WATER &<br />

DRAINAGE<br />

DIVISION<br />

CIVIL<br />

DEPARTMENT<br />

COST CONTROL<br />

DEPARTMENT<br />

FINANCE &<br />

ACCOUNTS<br />

DEPARTMENT<br />

INFORMATION<br />

TECHNOLOGY<br />

DEPARTMENT<br />

DOCUMENT<br />

CONTROL<br />

DEPARTMENT<br />

Estimation<br />

Manager<br />

Contracts<br />

Manager<br />

Planning Dept.<br />

Manager<br />

Purchase<br />

Manager<br />

Plant Manager<br />

Head of Power<br />

Division<br />

Division Manager -<br />

LWD<br />

Civil Department<br />

Manager<br />

Cost Control<br />

Manager<br />

Corporate Finance<br />

Manager<br />

Senior IT<br />

Administrator<br />

Senior Document<br />

Controller<br />

8<br />

Sr. Est. Eng’rs – 2<br />

Estimation Eng’rs – 2<br />

Secretary –1<br />

Doc. Controller –1<br />

Secretary – 1<br />

Sr. Planning Eng’rs – 2<br />

Planning Engineers – 5<br />

Proc’t Eng’rs – 2<br />

Asst. Proc. Eng’r – 1<br />

Purchase Officer– 1<br />

Secretary – 1<br />

Workshop Engineer –1<br />

WS Superintendent –1<br />

F/men Mechanics – 3<br />

Mechanics – 9<br />

WS Administrator – 1<br />

Storekeeper – 1<br />

Purchaser/Coord’r – 1<br />

Design Engineers – 6<br />

Exec. Secretary – 1<br />

Secretary - 1<br />

Doc. Controller – 1<br />

Project Managers – 3<br />

Quantity Surveyor – 1<br />

Project Engineer – 1<br />

Project Support Team<br />

Foremen<br />

Work Crew<br />

Design Engineer – 1<br />

Exec. Secretary – 1<br />

Secretary – 1<br />

Doc. Controller – 1<br />

Project Managers – 3<br />

Sr. Qty. Surveyor - 2<br />

Quantity Surveyor – 3<br />

Const’n Managers – 3<br />

Project Engineers – 2<br />

Project Support Team<br />

Foremen<br />

Work Crew<br />

Project Manager – 1<br />

Quantity Surveyor – 1<br />

Const’n Manager – 1<br />

Project Engineer – 1<br />

Project Support Team<br />

Foremen<br />

Work Crew<br />

Lead C.C. Engr – 1<br />

Cost Control Engr – 2<br />

Tech’l. Secretary - 1<br />

Accounts Manager – 1<br />

Treasury Manager – 1<br />

Bus. Sys Analyst – 1<br />

Sr. Accountants – 6<br />

Accountants – 3<br />

Network Engineer – 1<br />

Asst. Network Eng. - 1<br />

Asst. IT Coord’r – 1<br />

Desktop Support – 1


Manpower Information<br />

<strong>Lindenberg</strong> has got sufficient manpower, including Chartered Engineers, Certified Accountants,<br />

Certified Electrical and Civil Discipline Technicians to participate and execute Mega <strong>Projects</strong> with<br />

utmost professionalism and to the satisfaction of our Clients.<br />

Staff Category (Total: 252) Skilled & Unskilled Workers (Total: 801)<br />

Foreman &<br />

Supervisors, 45<br />

Project Managers /<br />

Dept. Heads, 30<br />

Reception & Office<br />

Assistants, 17<br />

Secretaries, 14<br />

Carpenters, 119<br />

Masons, 68<br />

Engineers - All<br />

Discipline, 59<br />

Laborers, 293<br />

Electrician, 66<br />

Steel Fixers, 59<br />

Land<br />

Surveyors, 13<br />

9<br />

QA/QC<br />

Engineers, 4<br />

Planning & Cost<br />

Control, 4<br />

Coordinators, 6<br />

Administrators, 6<br />

Document<br />

Controllers, 7<br />

Officers & Legal<br />

Advisors, 6<br />

Draftsman - All<br />

Discipline, 9<br />

Accountants, 11<br />

Safety -<br />

Officers/Inspectors,<br />

11<br />

Storekeepers /<br />

Timekeepers, 10<br />

Painters, 6<br />

Mechanics, 9<br />

Welders, 12<br />

Pipe Fitters, 19<br />

Operators, 46<br />

Cleaners / Office<br />

Boy, 30<br />

Charged Hands, 27<br />

Drivers - All<br />

Discipline, 47<br />

Data as of 10-Oct-2011


10<br />

Registration / Clients List<br />

<strong>Lindenberg</strong> is registered / pre-qualified or have submitted tender with the following companies /<br />

government agencies:<br />

1. Abu Dhabi Distribution Company (ADDC)<br />

2. Abu Dhabi Future Energy Company<br />

(MASDAR)<br />

3. Abu Dhabi Gas Industries Ltd. (GASCO)<br />

4. Abu Dhabi Health Services Co. PJSC (SEHA)<br />

5. Abu Dhabi Marine Operating Company<br />

(ADMA-OPCO)<br />

6. Abu Dhabi Ministry of Defense – Military<br />

Works Department<br />

7. Abu Dhabi National Oil Company (ADNOC)<br />

8. Abu Dhabi Oil Refining Company (TAKREER)<br />

9. Abu Dhabi Police General Head Quarters<br />

10. Abu Dhabi Polymers Co. Ltd. (Borouge)<br />

11. Abu Dhabi Sewerage Services Company<br />

(ADSSC)<br />

12. Abu Dhabi Transmission & Despatch<br />

Company (TRANSCO)<br />

13. Abu Dhabi Water & Electricity Authority<br />

(ADWEA)<br />

14. Al Ain Distribution Company (AADC)<br />

1 2 3 4 5 6<br />

7 8 9 10 11 12<br />

13 14 15 16 17 18<br />

19 20 21 22 23 24<br />

15. ALDAR Properties PJSC 20. Municipality of Abu Dhabi<br />

16. Dubai Electricity & Water Authority (DEWA) 21. National Central Cooling Co. PJSC (TABREED)<br />

17. Federal Electricity & Water Authority (FEWA) 22. Sultanate of Oman – Public Authority for Electricity and Water<br />

18. International Petroleum Investment Co. (IPIC) 23. Tourism Development & Investment Company (TDIC)<br />

19. Mubadala Development Company 24. UAE Armed Forces – Special Operations Command


Registration / Clients List<br />

<strong>Lindenberg</strong> is highly experienced working with the following Project Consultants:<br />

1. Deutsche Energie Consult GmbH (DECON)<br />

1 2 3 4<br />

2. Dorsch Consult<br />

3. Dr. M. H. Ali El-Saie Consulting Engineers<br />

4. Hyder Consulting Middle East Limited<br />

5. ILF Consulting Engineers<br />

5 6 7 8<br />

6. Italconsult<br />

7. Lahmeyer International GmbH<br />

8. Mott Macdonald<br />

9. Ozen Levent Power Engineering<br />

Consultancy LLC<br />

9 10 11 12<br />

10. Parsons Brinckerhoff Power<br />

11. Parsons International Ltd.<br />

12. Tebodin Consultants & Engineers<br />

11


<strong>Lindenberg</strong> was Prequalified & Tendered for ADSSC’s STEP Project:<br />

1. <strong>Lindenberg</strong> Emirates was one of the 5<br />

prequalified companies for the Sewerage<br />

Tunnel Enhancement Project “STEP Project”<br />

comprising of a 45 km tunnel of 5-meter<br />

diameter at a depth of 40-45 meters which is<br />

expected to be worth of AED 3 Billion. For<br />

this tender, <strong>Lindenberg</strong> formed a consortium<br />

with Major Korean Construction Companies.<br />

2. Tender No. O-1506, STEP Deep Tunnel Sewer<br />

Contract T-02.<br />

12<br />

3. Tender No. O-1578, STEP Deep Tunnel Sewer<br />

Contract T-03.


Company Classification at Abu Dhabi Department of Planning & Economy<br />

SN Field Scope of Works Category<br />

1. WATER PROJECTS<br />

1. Water Transport Plants & Networks<br />

2. Water Distribution Plants & Networks<br />

1 st<br />

1 st<br />

2. ELECTRICAL PROJECTS<br />

1. Power Distribution Networks & Plants<br />

2. Communications Networks<br />

2 nd<br />

5 th<br />

3. SEWERAGE PROJECTS<br />

1. Main Sewerage Networks<br />

2. Sewerage Sub-Networks & House Connections<br />

5 th<br />

5 th<br />

4.<br />

MECHANICAL & ELECTRICAL<br />

WORKS PROJECTS 1. Mechanical and Electrical Works 5 th<br />

5. BUILDING PROJECTS<br />

1. All types of Buildings<br />

2. Metallic Constructions<br />

5 th<br />

5 th<br />

13


Selected Power & Civil <strong>Projects</strong><br />

SN Contract No. Contract Name Client Contract Value Award Date Consultant Status<br />

1 R-99-0157<br />

2 G-6334<br />

3 G-1882<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals<br />

Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery<br />

Energy Storage (42MW)<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals (Stage-III Phase-III)<br />

ADWEA AED 176,957,025 08.02.2000 Mott MacDonald Completed<br />

ADWEA AED 142,271,120 23.11.2009 DECON Ongoing<br />

ADWEA AED 103,122,825 07.08.2005<br />

Lahmeyer<br />

International GmbH<br />

4 D-6990 Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations ADDC AED 81,991,962 03.01.2010 Parsons Brinckerhoff Ongoing<br />

Completed<br />

5 D-7150<br />

6 D-10624<br />

7 115979C13E<br />

Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace<br />

in Abu Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace<br />

Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu<br />

Dhabi Island<br />

Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical<br />

Equipment – Low Voltage (LV) Panels Switchgear<br />

8 - Shuweihat S3 IPP Civil Work Package 3<br />

9 G-1494<br />

10 D-10599<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals, Stage-III Phase-III, Lot-1<br />

Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi<br />

Island & Eastern Region<br />

ADDC AED 40,667,381 05.05.2008<br />

Ozen Levent<br />

Power Engineering<br />

Consultancy LLC<br />

Completed<br />

ADDC AED 34,028,598 25.05.2010 DECON Ongoing<br />

ADNOC AED 29,675,361 23.04.2009 - Completed<br />

Daewoo<br />

E&C<br />

AED 29,191,474 27.07.2011<br />

ADWEA AED 25,914,216 05.02.2003<br />

Fichtner Consulting<br />

Engineers<br />

Lahmeyer<br />

International GmbH<br />

Ongoing<br />

Completed<br />

ADDC AED 19,683,403 10.02.2010 DECON Ongoing<br />

11 D-7720 Modification of Switching Stations in Abu Dhabi Island ADDC AED 16,999,999 06.10.2008 - Completed<br />

12 4600037153<br />

Supply and Installation of 11kV Package Unit Substation for Braka Nuclear Power<br />

Plant<br />

Hyundai E&C AED 16,865,843 27.07.2011 - Ongoing<br />

14


Selected Water & Drainage <strong>Projects</strong><br />

SN Contract No. Contract Name Client Contract Value Award Date Consultant Status<br />

1 N-5807<br />

2 N-6821<br />

3 O-1463<br />

Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat /<br />

Abu Dhabi Island<br />

EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa Floating<br />

Reservoir Station – Lot D<br />

Works Associated with the Replacement of Existing Sewer Networks at Some<br />

Sectors Inside Abu Dhabi Island - Category A<br />

TRANSCO AED 569,594,995 20.01.2008<br />

TRANSCO AED 174,524,364 07.03.2010<br />

Tebodin Consultants<br />

and Engineers<br />

ILF Consulting<br />

Engineers<br />

Ongoing<br />

Ongoing<br />

ADSSC AED 116,026,699 13.06.2010 Dorsch Gruppe Ongoing<br />

4 N-2622.1 Water Supply to Sadiyat Island and Adjacent Areas – Lot A,B, & C TRANSCO AED 108,118,493 22.07.2007<br />

Tebodin Consultants &<br />

Engineers<br />

Completed<br />

5 D-7310.1 Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway ADDC AED 94,037,448 22.05.2008 Italconsult Completed<br />

6<br />

CW/119C/<br />

2007<br />

Supply, Installation, Testing and Commissioning of Fiber Cement / Glass<br />

Reinforced Epoxy / Ductile Iron Water Transmission Pipelines and Associated<br />

Works at Various Locations in Emirates of Dubai (1200 mm Dia Pipeline Along<br />

Emirates Road)<br />

DEWA AED 73,794,659 08-Jul-2007<br />

7 N-5386 Water Transmission Lines Inside Al Reem Island – Lot A TRANSCO AED 56,455,067 03.02.2008<br />

NJS Consultants<br />

Co. Ltd.<br />

Tebodin Consultants<br />

and Engineers<br />

Completed<br />

Completed<br />

8 N-4604 DN 1000mm Transmission Pipeline from Sweihan to Remah TRANSCO AED 25,889,764 23.07.2007 Mott Mac Donald Completed<br />

9 D-5630<br />

Urgent Works at Al Qadra Village Owned by<br />

HH Sheikh Mansour Bin Zayed<br />

ADWEA AED 16,877,777 15.04.2006 Italconsult Completed<br />

10 O-1047 Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib) ADSSC AED 10,400,000 30.01.2008 Parsons Intl Ltd Completed<br />

11 D-6972<br />

Linking of Delma Two (2) MGD RO Plant to Main Delma Reservoirs Construction<br />

of 119 Water House Connections<br />

ADDC AED 4,633,941 06.08.2007<br />

Dr. MH Ali El-Saie<br />

Consulting Engineers<br />

Completed<br />

15


Division Profile<br />

<strong>Lindenberg</strong> Power Division provides expertise in implementing Electromechanical and<br />

Instrumentation projects on turnkey basis, starting from the design stage to construction, testing and<br />

commissioning and maintenance services for diverse industrial projects.<br />

Having the expertise in turnkey contracting on many projects, the Power Division is very familiar<br />

with all criteria necessary for the successful execution of Electromechanical projects. The Power<br />

Division builds these mandatory requirements into all projects:<br />

• Reliable and efficient performance<br />

• Single-point responsibility<br />

• ISO-certified quality control procedures<br />

• Proven safety programs<br />

• Cost controls and reductions<br />

• Productive and on-time scheduling<br />

16


Division Profile<br />

The Power Division provides a dedicated technical and managerial team necessary to design and<br />

construct new facilities or upgrades. By bringing together every aspect of a power project under a<br />

single management team, the division provides economical and efficient solutions to meet the needs<br />

of a diverse industry base.<br />

The project management team comprised of specialists in the design, construction and operation of<br />

complex type of projects. From concept through acceptance, the division provides the optimal<br />

resources, equipment and services to meet all contractual requirements. The EPC team is<br />

accountable for the following critical functions:<br />

• Planning, organizing and procedures<br />

• Scheduling and tracking<br />

• Cost control<br />

• Document control<br />

• Single-point customer contact<br />

• Progress reporting<br />

17


Scope of Activities<br />

• Contracting works for Power Networks and Distribution Systems<br />

• Underground cable network including jointing, termination, testing and commissioning<br />

• Complete electrical and instrumentation works for Power Plants, Refineries, Power Stations,<br />

Desalination Plants and Sewerage Treatment Plants<br />

• Turnkey contracting works for LV / MV / HV Substations<br />

• EPC works for electric generators<br />

• Installation and commissioning of auxiliary powers, package substation, control panels and<br />

transmission lines<br />

• Contracting works for plant fire fighting and safety alarm systems, remote monitors, and fire<br />

suppression systems.<br />

• Control / MCC room fire suppression systems installation<br />

• Submarine Cable Installation<br />

• Industrial Building Construction<br />

• HVAC Works<br />

• LV / MV / HV Switchgear and Transformer Installation<br />

• Installation and Commissioning of Auxiliary Power Supplies<br />

18


Typical Power Project Organization Chart<br />

HEAD OF POWER DIVISION<br />

PROJECT MANAGER<br />

ENGINEERING<br />

PLANNING & QS<br />

CONSTRUCTION<br />

HSE & QA/QC<br />

OFFICE SUPPORT<br />

Civil Engineer<br />

Electrical Engineer<br />

Planning Engineer<br />

Quantity Surveyor<br />

Construction Manager /<br />

Project Engineer<br />

HSE Engineer<br />

QA/QC Engineer<br />

Coordinator<br />

Secretary<br />

Doc. Controller<br />

Storekeeper<br />

Timekeeper<br />

Watchman<br />

Mechanical Engineer<br />

Site Civil Engineer<br />

Site Electrical Engineer<br />

Testing & Comm. Eng.<br />

Design Coordinator<br />

Mechanical Foreman<br />

Civil Foreman Electrical Foreman Draftsmen<br />

19


<strong>Featured</strong> <strong>Projects</strong><br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals<br />

Contract No.<br />

Client<br />

R-99-0157<br />

Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Value AED 176,957,025<br />

Award Date 08.02.2000<br />

Description<br />

Supply, Installation, Testing & Commissioning Works<br />

Project was completed.<br />

20


<strong>Featured</strong> <strong>Projects</strong><br />

Supply and Installation of 8 Nos. 415 Volts Diesel Generators<br />

Contract No. G-1206<br />

Client<br />

Value AED 13,039,984<br />

Award Date 10.04.2002<br />

Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Description Design, Supply, Installation, Testing and Commissioning of 8 Nos. 415<br />

Volts Diesel Generators<br />

Project was completed.<br />

21


<strong>Featured</strong> <strong>Projects</strong><br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals Stage-III Phase-III. Lot-1<br />

Contract No. G-1494<br />

Client<br />

Value AED 25,914,216<br />

Award Date 05.02.2003<br />

Description<br />

Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Design, Supply, Installation Testing and Commissioning Works<br />

Project was completed.<br />

22


<strong>Featured</strong> <strong>Projects</strong><br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces & Hospitals (Stage-III Phase-III)<br />

Contract No. G-1882<br />

Client<br />

Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Value AED 103,122,825<br />

Award Date 07.08.2005<br />

Description<br />

Design, Supply, Installation Testing and Commissioning including remote<br />

control monitoring system, ISMS, and Medium Voltage Panels.<br />

Project was completed in May 2010.<br />

23


<strong>Featured</strong> <strong>Projects</strong><br />

Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace in Abu<br />

Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace<br />

Contract No. D-7150<br />

Client<br />

Value AED 40,667,381<br />

Award Date 05.05.2008<br />

Description<br />

Abu Dhabi Distribution Company (ADDC)<br />

Design, Supply, Installation Testing and Commissioning of 11KV<br />

Switching Station & replacement of Switchgears, Control Panels, DC<br />

system in Beach Palace Stations B4, B5 Stations & Standby power plant<br />

in H.H.Shk Khalifa Switching station. Completed in July 2010.<br />

24


<strong>Featured</strong> <strong>Projects</strong><br />

Modification of Switching Stations in Abu Dhabi Island<br />

Contract No. D-7720<br />

Client<br />

Value AED 16,999,999<br />

Award Date 06.08.2008<br />

Description<br />

Abu Dhabi Distribution Company (ADDC)<br />

Supply, Installation & Commissioning of RMU’s and Modification<br />

of Transformer Panel to Feeder Panel in Switching Stations.<br />

The Project was completed in Oct 2009.<br />

Long Term Rate Agreement for Installation of Underground Cables, Electrical Distribution Equipment, OHL and allied works in Abu<br />

Dhabi Eastern Region<br />

Contract No.<br />

Client<br />

Value<br />

D-9710/C<br />

Award Date 16.04.2009<br />

Description<br />

Abu Dhabi Distribution Company (ADDC)<br />

AED 10,000,000 per year<br />

Installation of Underground Cables, Electrical Distribution Equipments, OHL and Allied Works as per Work Order<br />

Basis.<br />

25


<strong>Featured</strong> <strong>Projects</strong><br />

Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery<br />

Energy Storage (42MW)<br />

Contract No. G-6334<br />

Client<br />

Abu Dhabi Water and Electricity Authority (ADWEA)<br />

Value AED 142,271,120<br />

Award Date 23.11.2009<br />

Description<br />

Design & Construction of 10 Nos. BESS Substation & Installation Testing<br />

Commissioning of NGK Batteries & Supply of Auxiliary Items.<br />

26


<strong>Featured</strong> <strong>Projects</strong><br />

Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical Equipment – Low Voltage (LV) Panels Switchgear<br />

Contract No.<br />

Client<br />

115979C13E<br />

Value AED 29,675,361<br />

Award Date 23.04.2009<br />

Description<br />

Abu Dhabi National Oil Company (ADNOC)<br />

Supply & Delivery of Low Voltage Panels Switchgear.<br />

The project was completed .<br />

Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations<br />

Contract No. D-6990<br />

Client<br />

Value AED 81,991,962<br />

Award Date 03.01.2010<br />

Abu Dhabi Distribution Company (ADDC)<br />

Description Design & Construction of 1 New 132/11 kV Substation & Modification of 11 kV Network and Replacement with new 11<br />

kV Switchgear @ 2 nos. Substation.<br />

27


<strong>Featured</strong> <strong>Projects</strong><br />

Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi<br />

Island & Eastern Region (2010)<br />

Contract No. D-10599<br />

Client<br />

Value AED 19,683,403<br />

Award Date 10.02.2010<br />

Description<br />

Abu Dhabi Distribution Company (ADDC)<br />

Installation of Underground 11 kV Cables of 112 km & FO Cables<br />

of 20 km.<br />

Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu Dhabi Island<br />

Contract No. D-10624<br />

Client<br />

Value AED 34,028,598<br />

Award Date 25.05.2010<br />

Description<br />

Abu Dhabi Distribution Company (ADDC)<br />

Supply of 11kV Switchgear, DC System, LVAC, DMS System, Auxiliary Transformer and Joints & Terminations.<br />

Installation of Power Cables, 11/0.415kV Package S/S and Civil Works i.e. Building, Trenching, etc.<br />

28


<strong>Featured</strong> <strong>Projects</strong><br />

Shuweihat S3 IPP Civil Work Package 3<br />

Client<br />

Value AED 29,191,475<br />

Award Date 20.07.2011<br />

Description<br />

Daewoo E&C-Siemens (Consortium)<br />

Civil works which includes excavation, filling, concreting, finishing, waterproofing, structural steel works, etc. for<br />

fuel gas pipelines with sleeper foundations & trenches, storm drain works and site roads with asphalt.<br />

Supply and Installation of 11kV Package Unit Substation for Braka Nuclear Power Plant<br />

Contract No. 4600037153<br />

Client<br />

Hyundai Engineering & Construction<br />

Value AED 16,865,843<br />

Award Date 27.07.2011<br />

Description Commissioning of 18 Nos. 11 kV Package Substations.<br />

29


Power Stations<br />

Power Station with Diesel Engine for operation<br />

on Diesel, Crude Oil and HFO<br />

Turnkey Power Stations up to 12 MW<br />

Powered with Diesel, Gas and Dual Fuel Engines<br />

30<br />

Power Station with Gas Engines<br />

Power Station with Dual Fuel Engines


Division Profile<br />

In order to accommodate the brisk developments of UAE’s industry, <strong>Lindenberg</strong> Water and Drainage<br />

Division was established to provide water and drainage solutions.<br />

The Division has up-to-date working knowledge of and is very well conversant with the requirements<br />

in water supply and water distribution network. The necessary infrastructure, including manpower,<br />

reliable sources of suppliers, equipment are readily available at our disposal.<br />

31


Division Profile<br />

The Water & Drainage Division is acknowledged as the premier provider of the highest quality<br />

professional service in the field of water and drainage facilities; insuring absolute client satisfaction<br />

through the expertise and experience of its people. The division aims to provide new technologies,<br />

processes, and materials to build and deliver water and drainage facilities that are best suitable for<br />

their class & area of usage.<br />

Scope of Activities<br />

• Water Pipeline Networks<br />

• Water & Irrigation Reservoirs<br />

• Water & Sewerage Pumping Stations<br />

• Sewage Treatment Plants<br />

• Operation & Maintenance of Sewerage<br />

Networks and Pumping Stations<br />

32


Typical Water & Drainage Project Organization Chart<br />

DIVISION MANAGER<br />

PROJECT MANAGER<br />

ENGINEERING<br />

PLANNING & QS<br />

CONSTRUCTION<br />

HSE & QA/QC<br />

OFFICE SUPPORT<br />

Civil Engineer<br />

Electromech’l Engineer<br />

Inst & Ctrl. Engineer<br />

Planning Engineer<br />

Quantity Surveyor<br />

Construction Manager /<br />

Project Engineer<br />

HSE Engineer<br />

QA/QC Engineer<br />

Coordinator<br />

Secretary<br />

Doc. Controller<br />

Draftsman<br />

Storekeeper<br />

Timekeeper<br />

Site Engineer Site Engineer Site Engineer<br />

Water Tank Works<br />

(Concrete Construction)<br />

Civil Works Pipeline Works Chamber Works Electromechanical Works Inst’n & Control Works<br />

Foreman Civil Foreman Pipeline Foreman Chamber Foreman E/M Foreman I & C Foreman<br />

Work Crew Land Surveyor Land Surveyor Land Surveyor E/W Work Crew I & C Work Crew<br />

Civil Work Crew Pipeline Crew Chamber Crew<br />

33


<strong>Featured</strong> <strong>Projects</strong><br />

Urgent Works at Al Qadra Village Owned by HH Sheikh Mansour Bin Zayed<br />

Contract No. D-5630<br />

Client Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Value AED 16,877,777<br />

Award Date 15.04.2006<br />

Description Supply, Construction & Maintain Water Supply Network<br />

The Project was completed in July 2008<br />

34


<strong>Featured</strong> <strong>Projects</strong><br />

DN 1000mm Transmission Pipeline from Sweihan to Remah<br />

Contract No. N-4604<br />

Client Abu Dhabi Transmission & Despatch Company (TRANSCO)<br />

Value AED 25,889,764<br />

Award Date 23.07.2007<br />

Description Supply, Construction, and Installation of Water Transmission Pipelines<br />

The Project was completed in June 2009<br />

35


<strong>Featured</strong> <strong>Projects</strong><br />

Water Supply to Sadiyat Island and Adjacent Areas – Lots A, B, & C<br />

Contract No. N-2622.1<br />

Client Abu Dhabi Transmission & Despatch Company (TRANSCO)<br />

Value AED 108,118,493<br />

Award Date 22.07.2007<br />

Description Supply, Construction, & Installation of Water Supply Network<br />

The Project was completed in June 2009<br />

36


<strong>Featured</strong> <strong>Projects</strong><br />

Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat / Abu Dhabi<br />

Island<br />

Contract No. N-5807<br />

Client<br />

Abu Dhabi Transmission & Despatch Company (TRANSCO)<br />

Value AED 569,594,995<br />

Award Date 20.01.2008<br />

Description<br />

Construction of DI/CS Pipelines<br />

37


<strong>Featured</strong> <strong>Projects</strong><br />

Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib)<br />

Contract No. O-1047<br />

Client<br />

Value AED 10,400,000<br />

Award Date 30.01.2008<br />

Description<br />

Abu Dhabi Sewerage Services Company (ADSSC)<br />

Miscellaneous Sewerage and Drainage Works at Sas Al Nakheel & Sash<br />

Shuhaib<br />

The Project was completed in July 2009<br />

38


<strong>Featured</strong> <strong>Projects</strong><br />

Water Transmission Lines Inside Al Reem Island – Lot A<br />

Contract No. N-5386<br />

Client Abu Dhabi Transmission & Despatch Company (TRANSCO)<br />

Value AED 56,455,067<br />

Award Date 03.02.2008<br />

Description Installation of DI/CS Pipelines<br />

The Project was completed in January 2010<br />

39


<strong>Featured</strong> <strong>Projects</strong><br />

Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway<br />

Contract No. D-7310.1<br />

Client Abu Dhabi Distribution Company (ADDC)<br />

Value AED 94,037,448<br />

Award Date 22.05.2008<br />

Description Supply and Replacement of Water Transmission Pipelines<br />

The Project was completed in November 2010<br />

40


<strong>Featured</strong> <strong>Projects</strong><br />

EPC Works for Al Ain Distribution Network - Pipelines Umn Ghaffa Floating Reservoir<br />

Station - Lot D<br />

Contract No. N-6821<br />

Client<br />

Abu Dhabi Transmission & Despatch Company (TRANSCO)<br />

Value AED 174,524,364<br />

Award Date 07.03.2010<br />

Description<br />

EPC for 2 Nos. 25 Million Gallons Steel Tanks and associated Civil and<br />

Pipeline Works.<br />

41


<strong>Featured</strong> <strong>Projects</strong><br />

Works Associated with the Replacement of Existing Sewer Networks at Some Sectors<br />

Inside Abu Dhabi Island - Category A<br />

Contract No. O-1463<br />

Client<br />

Abu Dhabi Sewerage Services Company (ADSSC)<br />

Value AED 116,026,699<br />

Award Date 13.06.2010<br />

Description<br />

Construction, Replacement & Rehabilitation of Existing Sewer Lines and<br />

Manholes Inside Abu Dhabi Island.<br />

42


QHSE Policy<br />

LINDENBERG implements and maintains an effective QHSE Management System in line with the<br />

requirements of ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007.<br />

It is our policy to<br />

• Meet or exceed our clients' expectations, the first time and every time, through the application of<br />

proven quality principles at all levels of our business;<br />

• Minimize the generation of hazardous & toxic waste, preventing the release of harmful substances<br />

into the environment, while encouraging the reduction, recycling and re-use of materials;<br />

• Instilling and promoting safety consciousness to prevent ill health, injury and incidents; and provide a<br />

safe and healthy working environment for our employees, clients, and subcontractors.<br />

We are committed to<br />

• Ensuring that adequate resources are made available for QHSE purposes.<br />

• Ensuring that QHSE is accepted as a core management activity, given equal priority as other<br />

objectives and management functions, and included in the company business plan.<br />

• Promoting a positive QHSE culture within the top management and encouraging active employee<br />

participation in QHSE throughout all levels of the company.<br />

43<br />

LE-IMS-Pol | rev. 1<br />

AHMAD ZAABRI<br />

General Manager


QHSE Certificates & Membership<br />

<strong>Lindenberg</strong> Emirates is an Integrated Management System (IMS) certified company and has<br />

established, implemented and maintained an effective Quality, Occupational Health & Safety and<br />

Environmental Management System, in line with the requirements of ISO 9001:2008, ISO 14001: 2004<br />

and OHSAS 18001:2007 to ensure that customer satisfaction and requirements are being met.<br />

ISO 9001:2008<br />

ISO 14001:2004<br />

OHSAS 18001:2007<br />

British Safety Council<br />

44


Workforce and Labour Camp<br />

<strong>Lindenberg</strong>-Emirates LLC employs almost 800 Skilled and Unskilled Labors. Labor Camps with all<br />

modern facilities are established in Al Faya, Mussafah and Al Ain to accommodate the requirements of<br />

the health & safety of the workforce.<br />

Camp Location Size No. of Rooms<br />

Current No. of<br />

Occupants<br />

Al Faya 1,300 m 2 96 600<br />

Magenta Camp (rented) 46 264<br />

Al Ain 400 m 2 28 45<br />

45<br />

Data as of 10-Oct-2011


Store Facilities<br />

Aside from <strong>Projects</strong> Sites Stores and Yards, two Main Stores of 30x20 m 2 are operational at Mussafah to<br />

help in storing & preserving the materials received for different projects, also used for storage of our<br />

standard erection tools required during installation/ commissioning activities.<br />

46


Plant, Machineries, Vehicles and Equipment<br />

<strong>Lindenberg</strong> Emirates’ policy in Vehicles, Equipment and Machinery is to:<br />

• purchase and own all equipment to cover the project needs.<br />

• self-maintain these vehicles, equipment and machinery.<br />

• hire vehicles, equipment and machinery to prevent delays in the project execution.<br />

47


List of Major Vehicles and Machineries<br />

48<br />

SN PLANT / EQUIPMENT DESC. CAPACITY / MODEL QUANTITY YEAR MANUFACTURED<br />

1 BACKHOE LOADER CATERPILLAR 422E 4 2007 / 2010<br />

2 BACKHOE LOADER J.C.B CX3 2 2008<br />

3 EXCAVATOR CATERPILLAR 320CL - 20 TONS 1 2006<br />

4 EXCAVATOR KOMATSU PC 220 - 20 TONS 2 2009<br />

5 EXCAVATOR CATERPILLAR 330D - 30 TONS 1 2007<br />

6 EXCAVATOR KOMATSU PC 300 7 - 30 TONS 4 2005 - 2009<br />

7 EXCAVATOR KOMATSU PC 400 7 - 40 TONS 6 2008 - 2009<br />

8 WHEEL LOADER CATERPILLAR 950H 4 2009<br />

9 WHEEL LOADER CATERPILLAR 962H 5 2008<br />

10 WHEEL LOADER CATERPILLAR 966H 2 2009<br />

11 WHEEL EXCAVATOR CATERPILLAR M316D 16 TONS 1 2008<br />

12 SKID STEER BOBCAT 630KG 1 2007<br />

13 RAM PILING MACHINE 16M VIBRATOR MRZV925VS IC AUGER DRIVE 1 2001<br />

14 MOBILE CRANE TADANO RT 70T 1 2008<br />

15 MOBILE CRANE TADANO RT 55T 1 2008<br />

16 PIPE LAYER KOMATSU 355C 2 2009<br />

17 TRACTOR HEAD VOLVO FH440 2 2008<br />

18 TRACTOR HEAD SCANIA JA 1 2008<br />

Data as of 26-Jan-2011


List of Major Vehicles and Machineries<br />

49<br />

SN PLANT / EQUIPMENT DESC. CAPACITY / MODEL QUANTITY YEAR MANUFACTURED<br />

19 DIESEL TANKER TRUCK SCANIA 1 1992<br />

20 FLAT BED TRAILER MAMUTH 12 X 2.5 - 12 METERS 2 2008<br />

21 FLAT BED TRAILER 18 METERS 2 2009<br />

22 LOW BED MAMMUTH 6 X 4 1 2008<br />

23 PASSENGER BUS TATA - 64 SEATER 1 2006<br />

24 PASSENGER BUS DAEWOO - 64 SEATER 1 2008<br />

25 WATER TANKER 6 X 4 WHEEL DRIVE - 3500 GL 3 2008<br />

26 DIESEL TIPPER TRUCK VOLVO FM 400 (6X4) 2 2008<br />

27 HIAB CRANE - DIESEL TRUCK NISSAN HIAP/320PS MTS60ADT/M 3 2008<br />

28 MOBILE WORKSHOP (TRUCK) NISSAN 1 2007<br />

29 4 WHEEL CAR TOYOTA FORTUNER 2 2008<br />

30 4 WHEEL CAR RANGE ROVER 1 2009<br />

31 4 WHEEL CAR FORD EXPLORER XLT 4 2007<br />

32 PICK UP TOYOTA - DOUBLE CABIN 1 2006<br />

33 SALOON CAR TOYOTA COROLLA 1.6 X LI 16 2010<br />

34 MOTOR CYCLE SUZUKI EN125-2A 1 2009<br />

35 OFFSHORE FLEET FAST BOAT 38" 1 2008<br />

36 OFFSHORE FLEET FAST BOAT 34" 1 2008<br />

Data as of 26-Jan-2011


List of Other Machines and Equipment<br />

50<br />

SN PLANT / EQUIPMENT DESC. CAPACITY / MODEL QUANTITY YEAR MANUFACTURED<br />

1 GENERATOR DIESEL, 30 KVA 3 2008<br />

2 GENERATOR DIESEL, 28 KVA 1 2008<br />

3 GENERATOR SET F. G. WILSON P27P1 - 27 KVA 3 2010<br />

4 GENERATOR DIESEL, 80 KVA 1 2008<br />

5 GENERATOR DIESEL, 100 KVA 3 2008<br />

6 GENERATOR DIESEL, 135 KVA 6 2008<br />

7 GENERATOR YANMAR (JAPAN) 5 KVA 2 2009<br />

8 GENERATOR SET F. G. WILSON P150P1 - 150 KVA 1 2010<br />

9 GENERATOR SET PRIMAC S-6500 7 2006 / 2008<br />

10 GENERATOR HONDA 1 2007<br />

11 GENERATOR PETROL, 5 KVA 4 2008<br />

12 GENERATOR PETROL, 12 KVA 1 2008<br />

13 DEWATERING PUMP GEOVAC / SKYES 6" 45 2008 -2010<br />

14 AIR COMPRESSOR DIESEL, IRMAIR RM AIR 8.0 6 2008<br />

15 AIR COMPRESSOR ELECTRICAL, 270 LTR 1 2008<br />

16 AIR COMPRESSOR ELECTRICAL, 150 LTR 1 2007<br />

17 BAR BENDING MACHINE SILLA / ICARO / SILMPEDIL 6 2008<br />

18 PIPE MULLING MACHINE PIPE MULLING MACHINE 2 2008<br />

Data as of 26-Jan-2011


List of Other Machines and Equipment<br />

51<br />

SN PLANT / EQUIPMENT DESC. CAPACITY / MODEL QUANTITY YEAR MANUFACTURED<br />

19 BAR CUTTING MACHINE SILLA / ICARO / SILMPEDIL 6 2007 - 2008<br />

20 CONCRETE VIBRATOR MACHINE ROBIN, 1C 17 2006 / 2008<br />

21 CONCRETE VIBRATOR MACHINE DIESEL, FARYMANN, 1C 4 2010<br />

22 ASPHALT CUTTER FLOOR SAW, FS410D 2 2010<br />

23 CONCRETE MIXER SILLA, 350 L 2 2008<br />

24 CONCRETE MIXER LOMBARDIN, 750 L 1 2008<br />

25 TABLE SAW BENCH CIRCULAR POWER CUTTER 9 2008 / 2010<br />

26 FLOOR SAW YANMAR 1 2008<br />

27 JETTING PUMP GEOVAC / SKYES 6" 4 2007 / 2008<br />

28 PRESSURE WATER PUMP HONDA, 35 MM BAR 7 2006 / 2008 / 2009<br />

29 PRESSURE WATER PUMP GCAAK 1/2 2 2008<br />

30 PRESSURE WATER PUMP HONDA GX-160B TYPE 2 2010<br />

31 PRESSURE WATER PUMP ROBIN 3" 5 2008<br />

32 PRESSURE WATER PUMP BOOSTER PUMP, LUCKY PRO, 1.5 HP 1 2010<br />

33 PRESSURE WATER PUMP LUCKY PRO, 1 HP 3 2010<br />

34 PRESSURE WATER PUMP DIESEL WATER PUMP 3" YANMAR, 3" 3 2010<br />

35 PIPE WRAPPING MACHINE PIPE WRAPPING MACHINE 2 2008 / 2009<br />

36 TANK FOR STORING DIESEL 4,000 GL ~ 12,000 GL 12 2008<br />

Data as of 26-Jan-2011


List of Other Machines and Equipment<br />

52<br />

SN PLANT / EQUIPMENT DESC. CAPACITY / MODEL QUANTITY YEAR MANUFACTURED<br />

37 WATER BOOSTER PUMP SAER, ITALY 2 2009<br />

38 WATER BOOSTER PUMP LUCKY PRO, 1.5 HP 1 2010<br />

39 SUBMURSIBLE SEWERAGE PUMP ABS MODEL, 3" 5 2010<br />

40 SUBMURSIBLE SEWERAGE PUMP ABS MODEL, 4" 2 2010<br />

41 DIESEL SEWERAGE PUMP SYKES, WITH ECLOSURE, 6" & 12" 7 2010<br />

42 SEWERAGE OVER PUMPING STEEL PIPE 1,000 M LENGTH, 16" 1 2010<br />

43 SEWERAGE OVER PUMPING STEEL PIPE 500 M LENGTH, 10" 1 2010<br />

44 TOWER LIGHTS 4 X 1,000 WATT, METAL HIGHLIGHT 6 2010<br />

45 SUBMURSIBLE PUMP KTZ 35.5 TSURIMI, JAPAN, 2" 1 2008<br />

46 SUBMURSIBLE PUMP KTZ 35.5 TSURIMI, JAPAN, 3" 2 2010<br />

47 SUBMURSIBLE PUMP KTZ 35.5 TSURIMI, JAPAN, 4" 2 2010<br />

48 DOUBLE DRUM ROLLER COMPACTOR WACKER RD 7H, 1.1T 9 2006 - 2008<br />

49 PLATE COMPACTOR WACKER, DPS 1850 H 11 2008<br />

50 PLATE COMPACTOR EY 20 ENGINE, 132 KG 4 2009<br />

51 WELDING MACHINE DIESEL, 400 AMP 6 2008<br />

52 WELDING MACHINE ELECTRICAL, 225 AMP 3 2008<br />

53 WELDING MACHINE SINGLE PHASE STICK, CSE BUTT, PT250 4 2008<br />

54 WELDING MACHINE ELECTRICAL, 400 AMP 2 2007<br />

Data as of 26-Jan-2011


Contact Information<br />

We hope that the information given and detailed in this Company Profile is sufficient to illustrate the<br />

potential and capabilities of <strong>Lindenberg</strong>. We will be pleased to provide further information on your<br />

request. Kindly contact us.<br />

<strong>Lindenberg</strong> Emirates LLC<br />

<strong>Lindenberg</strong> Water & Drainage Division<br />

Villa 101, Al Nahyan Camp Area,<br />

(A Division of <strong>Lindenberg</strong> Emirates LLC)<br />

Muroor Road, P.O. Box 42630, Tel: +971 2 642 2576<br />

Abu Dhabi, United Arab Emirates Fax: +971 2 642 2579<br />

Tel: +971 2 642 2576 E-mail: lwd@lindenberg.ae<br />

Fax: +971 2 642 2591<br />

E-mail: info@lindenberg.ae<br />

<strong>Lindenberg</strong> Power Division<br />

Website: www.lindenberg.ae<br />

(A Division of <strong>Lindenberg</strong> Emirates LLC)<br />

Tel: +971 2 642 2576<br />

Fax: +971 2 642 2571<br />

E-mail: lpd@lindenberg.ae<br />

53


P.O. Box 42630, Abu Dhabi, United Arab Emirates<br />

Tel: +971 2 6811061, Fax: +971 2 6813655<br />

E-mail: info@lindenberg.ae<br />

Website: www.lindenberg.ae

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!