25.10.2014 Views

SERCOS News - Issue 1 - 2008

SERCOS News - Issue 1 - 2008

SERCOS News - Issue 1 - 2008

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The Real-Time Ethernet Magazine<br />

5<br />

Motion and I/O:<br />

Together with <strong>SERCOS</strong> III<br />

<strong>SERCOS</strong> III coupler for the WAGO-I/O-SYSTEM<br />

• Full support for Sercos III V. 1.20 protocol and<br />

<strong>SERCOS</strong> safety based on CIP safety<br />

• Compatible with the <strong>SERCOS</strong> III I/O profile<br />

• Additional I/O fieldbus no longer required<br />

• I/O nodes synchronous with motion cycle<br />

• Redundancy possible through ring topology<br />

• 100 Mbit/s<br />

• Cross communication<br />

• Additional standard IP channel<br />

www.wago.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!