26.10.2014 Views

Williams Gateway Freeway Preferred Alignment Report Final

Williams Gateway Freeway Preferred Alignment Report Final

Williams Gateway Freeway Preferred Alignment Report Final

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Williams</strong> <strong>Gateway</strong> <strong>Freeway</strong> <strong>Alignment</strong><br />

<strong>Preferred</strong> <strong>Alignment</strong> Summary <strong>Report</strong><br />

and Environmental Overview Study March 2006<br />

Table 4.1: Tier 2 Corridor Alternatives Evaluation Matrix<br />

Alternatives<br />

Criteria 1<br />

Economic Development Consistency<br />

with Currently<br />

Transportation Service Environmental<br />

Compatibility 2<br />

Sustains Supports longterm<br />

Adopted Mesa Local Compatibility Natural, Physical,<br />

major<br />

growth of and Queen access, with planned Human<br />

existing <strong>Williams</strong> Creek General including arterial system<br />

employers <strong>Gateway</strong> Plans<br />

access to<br />

economic<br />

airport 5<br />

activity center 4<br />

1 Low (requires<br />

R/W from<br />

GM Desert<br />

Proving<br />

Grounds &<br />

removes N/S<br />

test track)<br />

2 Medium<br />

(requires<br />

some R/W<br />

from GM<br />

Desert<br />

Proving<br />

Grounds, but<br />

preserves<br />

N/S test<br />

track)<br />

3 High (no<br />

notable<br />

impacts)<br />

4 Medium<br />

(minor impact<br />

to Fuji Film &<br />

CRMA tire<br />

recycling<br />

plant access)<br />

Medium<br />

(primarily serves<br />

Mesa portion of<br />

<strong>Williams</strong><br />

<strong>Gateway</strong><br />

economic activity<br />

center)<br />

Medium<br />

(primarily serves<br />

Mesa portion of<br />

<strong>Williams</strong><br />

<strong>Gateway</strong><br />

economic activity<br />

center)<br />

High (provides<br />

balanced highcapacity<br />

travel<br />

within <strong>Williams</strong><br />

<strong>Gateway</strong><br />

economic activity<br />

center)<br />

High (provides<br />

balanced highcapacity<br />

travel<br />

within <strong>Williams</strong><br />

<strong>Gateway</strong><br />

economic activity<br />

center)<br />

Medium (less<br />

compatible with<br />

residential than<br />

with employment<br />

land use in Mesa)<br />

High (consistent<br />

with Mesa<br />

General Plan)<br />

High (consistent<br />

with Mesa<br />

General Plan)<br />

High (consistent<br />

with Mesa<br />

General Plan)<br />

Low<br />

Low<br />

Medium<br />

Medium<br />

High<br />

(compatible with<br />

future grid<br />

network)<br />

Low (takes<br />

arterial<br />

alignment:<br />

<strong>Williams</strong> Field<br />

Rd)<br />

High<br />

(compatible with<br />

future grid<br />

network)<br />

Low (takes<br />

arterial<br />

alignment: Pecos<br />

Rd)<br />

Low (impacts 4<br />

domestic water<br />

production wells, 1<br />

stock water production<br />

well & 1 test well;<br />

impacts major wash<br />

feature & 100-year<br />

floodplain east of<br />

county line in study<br />

area)<br />

Low (impacts 4<br />

domestic water<br />

production wells, a<br />

major wash feature, &<br />

a 100-year floodplain<br />

east of county line in<br />

study area; adjacent<br />

hazardous materials)<br />

Medium (impacts 1<br />

domestic water<br />

production well & a<br />

major wash feature in<br />

Maricopa County;<br />

adjacent hazardous<br />

materials)<br />

Medium (impacts 1<br />

monitor well, 1<br />

municipal water<br />

production well & a<br />

major wash feature in<br />

Maricopa County;<br />

adjacent hazardous<br />

materials)<br />

Cost Minimization<br />

Estimated length<br />

(5.5 mi = “Low”)<br />

Pinal<br />

County<br />

Considerations<br />

3<br />

Conclusions<br />

High (4.0 miles) Medium Consultant recommends remove from<br />

further consideration.<br />

Substantial environmental & economic<br />

(GM Desert Proving Grounds) impacts;<br />

relatively little airport access<br />

High (4.25 miles) High Consultant recommends remove from<br />

further consideration.<br />

Incompatible with planned arterial street<br />

system; substantial environmental<br />

impacts<br />

Medium (4.5 miles) High Consultant recommends retain for Tier 3.<br />

Performs generally well at Tier 2 level of<br />

analysis<br />

Medium (5.0 miles) Medium Consultant recommends remove from<br />

further consideration.<br />

Incompatible with planned arterial street<br />

system<br />

Page 22