26.10.2014 Views

Williams Gateway Freeway Preferred Alignment Report Final

Williams Gateway Freeway Preferred Alignment Report Final

Williams Gateway Freeway Preferred Alignment Report Final

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Williams</strong> <strong>Gateway</strong> <strong>Freeway</strong> <strong>Alignment</strong><br />

<strong>Preferred</strong> <strong>Alignment</strong> Summary <strong>Report</strong><br />

and Environmental Overview Study March 2006<br />

Table 5.1: <strong>Williams</strong> <strong>Gateway</strong> <strong>Freeway</strong> <strong>Alignment</strong> Study-Tier 3 Matrix<br />

(continued)<br />

Criteria<br />

Alternative<br />

Performance Measures 3 5 7 Measurement Approach<br />

Access<br />

Population within<br />

immediate <strong>Williams</strong><br />

<strong>Gateway</strong> <strong>Freeway</strong> travel<br />

shed (2016)<br />

<br />

3,400<br />

<br />

3,240<br />

<br />

3,850<br />

Projected population per mile<br />

within 2 miles of <strong>Williams</strong><br />

<strong>Gateway</strong> <strong>Freeway</strong><br />

interchanges. Source: MAG<br />

socioeconomic projections.<br />

Greater population served =<br />

better performance.<br />

Population within<br />

immediate <strong>Williams</strong><br />

<strong>Gateway</strong> <strong>Freeway</strong> travel<br />

shed (2026)<br />

Employment within<br />

immediate <strong>Williams</strong><br />

<strong>Gateway</strong> <strong>Freeway</strong> travel<br />

shed (2016)<br />

Employment within<br />

immediate <strong>Williams</strong><br />

<strong>Gateway</strong> <strong>Freeway</strong> travel<br />

shed (2026)<br />

<br />

5,580<br />

<br />

6,135<br />

<br />

10,155<br />

Access to <strong>Williams</strong><br />

<strong>Gateway</strong> Complex 2<br />

(Ellsworth,<br />

<strong>Williams</strong> Field)<br />

<br />

5,965<br />

<br />

5,510<br />

<br />

9,800<br />

3<br />

(Ellsworth,<br />

<strong>Williams</strong> Field,<br />

Crismon)<br />

<br />

7,020<br />

<br />

4,850<br />

<br />

8,815<br />

3<br />

(Ellsworth,<br />

<strong>Williams</strong> Field,<br />

Pecos)<br />

Same as above<br />

Projected employment per<br />

mile within 2 miles of <strong>Williams</strong><br />

<strong>Gateway</strong> <strong>Freeway</strong><br />

interchanges. Source: MAG<br />

socioeconomic projections.<br />

Greater employment served =<br />

better performance.<br />

Same as above<br />

Number of <strong>Williams</strong> <strong>Gateway</strong><br />

<strong>Freeway</strong> interchanges directly<br />

serving the <strong>Williams</strong> <strong>Gateway</strong><br />

Complex. More interchanges<br />

= better access.<br />

Page 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!