Make the most of your energy EN
Schneider Electric image- and solution-brochure
Schneider Electric image- and solution-brochure
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
… round <strong>the</strong> world<br />
Holistic solutions from<br />
<strong>energy</strong> generation<br />
through to <strong>energy</strong><br />
distribution reduce<br />
<strong>energy</strong> consumption.<br />
Rheinfelden hydroelectric<br />
power plant<br />
Germany + Switzerland<br />
The hydroelectric plant's reconstruction<br />
led to an increase in capacity from<br />
185 GWh to 600 GWh. Schneider Electric<br />
delivered a completely ready-to-use system<br />
to meet <strong>the</strong> plant's own <strong>energy</strong> needs<br />
on both <strong>the</strong> German and Swiss sides.<br />
ALMA<br />
Sou<strong>the</strong>rn Observatory,<br />
Atacama Desert in Chile<br />
Energy distribution for <strong>the</strong> world's largest observatory.<br />
From <strong>the</strong> power plant to 3,000 meters<br />
above sea level over 30 km <strong>of</strong> medium<br />
voltage cables through <strong>the</strong> desert to <strong>the</strong> antenna<br />
field on <strong>the</strong> 5,100-meter-high Chajnantor<br />
plateau, three transformer stations with<br />
62 WS medium voltage panels, 9 cast-resin<br />
transformers, 4 low voltage main distribution<br />
boards and 4 rotary converters ensure <strong>the</strong><br />
smooth operation <strong>of</strong> 66 radio antennas.<br />
Senftenberg lll<br />
Schneider Electric<br />
<strong>of</strong>fers <strong>the</strong> right protection<br />
and switchgear<br />
equipment for<br />
photovoltaic installations<br />
<strong>of</strong> all sizes.<br />
Senftenberg, Germany<br />
With a 168 MW capacity, <strong>the</strong> Senftenberg<br />
Solarpark is one <strong>of</strong> <strong>the</strong> world's largest<br />
photovoltaic power plants. In <strong>the</strong> third<br />
construction phase (78 MW <strong>of</strong> peak<br />
capacity on 204 hectares), 62 PV boxes<br />
with 109 Xantrex GT630E central inverters<br />
are used to convert <strong>energy</strong>.<br />
Solar <strong>energy</strong> –<br />
Discover our solutions<br />
for solar farms and<br />
ro<strong>of</strong> systems.<br />
The PV box is an all-in-one solution that<br />
contains all <strong>the</strong> components required<br />
for connecting solar installations to <strong>the</strong><br />
medium-voltage grid, <strong>the</strong>reby reducing<br />
<strong>the</strong> time needed for commissioning<br />
solar farms. The plant is connected to <strong>the</strong><br />
110-kilovolt distribution network operated<br />
by supplier Envia via a 63/80 megavolt<br />
ampere medium power transformer as<br />
well as six-span, air-insulated 20-kilovolt<br />
switchgear from Schneider Electric.<br />
Schneider Electric | <strong>Make</strong> <strong>the</strong> <strong>most</strong> <strong>of</strong> <strong>your</strong> <strong>energy</strong> SM | 31