ALSTOM Transport - Railway Days 2013
ALSTOM Transport - Railway Days 2013
ALSTOM Transport - Railway Days 2013
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>ALSTOM</strong> <strong>Transport</strong><br />
5/10/2011<br />
TRANSPORT
Agenda<br />
1. <strong>ALSTOM</strong> Group Page 4<br />
2. <strong>ALSTOM</strong> <strong>Transport</strong> Page 11<br />
3. Locomotive market overview Page 21<br />
4. <strong>ALSTOM</strong> product range Page 27<br />
5. Environmental impact Page 38<br />
6. LCC concept Page 42<br />
Market Analysis – P&S- 2
Agenda focus<br />
1. <strong>ALSTOM</strong> Group Page 4<br />
2. <strong>ALSTOM</strong> <strong>Transport</strong> Page 11<br />
3. Locomotive market overview Page 21<br />
4. <strong>ALSTOM</strong> product range Page 27<br />
5. Environmental impact Page 38<br />
6. LCC concept Page 42<br />
Market Analysis – P&S- 3
The Group: innovative technologies<br />
Ready for the future<br />
• Significant increase in R&D expenditure in<br />
2007/08 (554 million euros, + 21%)<br />
• Cutting-edge technological programmes<br />
- <strong>Transport</strong>: world speed record in rail,<br />
AGV, ERTMS.<br />
- Power Systems: launch of pilot plants for<br />
CO2 capture.<br />
- Power Service: development of robotics.<br />
Market Analysis – P&S- 4
Agenda focus<br />
1. <strong>ALSTOM</strong> Group Page 4<br />
2. <strong>ALSTOM</strong> <strong>Transport</strong> Page 11<br />
3. Locomotive market overview Page 21<br />
4. <strong>ALSTOM</strong> product range Page 27<br />
5. Environmental impact Page 38<br />
6. LCC concept Page 42<br />
Market Analysis – P&S- 5
<strong>Transport</strong>: extensive range of products and services<br />
Rolling stock: from trams to very high speed trains...<br />
5 product centers of excellence<br />
High Speed Trains >250 kph<br />
La Rochelle (France)<br />
TGV/AGV<br />
Intercity Trains 140-250 kph<br />
Savigliano (Italy)<br />
PENDOLINO/’Minuetto’/X’TRAPOLIS<br />
Regional Trains 100-180 kph<br />
Salzgitter (Germany)<br />
CORADIA<br />
Market Analysis – P&S- 6<br />
Urban Trains<br />
Valencienne (France)<br />
CITADIS/METROPOLIS<br />
Locomotives<br />
Belfort (France)<br />
PRIMA
<strong>Transport</strong>: extensive range of products and services<br />
(cont’d)<br />
… to development of turnkey systems<br />
Infrastructure<br />
Signalling<br />
Service and maintenance<br />
Market Analysis – P&S- 7
<strong>Transport</strong>: technologically leading products<br />
ERTMS<br />
Revolution in « interoperable »drive systems<br />
Integrated control centres<br />
Global monitoring of complex transport systems<br />
APS<br />
Tram powered from ground-level<br />
AGV (350 km/h)<br />
Fourth generation very high speed train<br />
Market Analysis – P&S- 8
Agenda focus<br />
1. <strong>ALSTOM</strong> Group Page 4<br />
2. <strong>ALSTOM</strong> <strong>Transport</strong> Page 11<br />
3. Locomotive market overview Page 21<br />
4. <strong>ALSTOM</strong> product range Page 27<br />
5. Environmental impact Page 38<br />
6. LCC concept Page 42<br />
Market Analysis – P&S- 9
Locomotive market: regional & segment split<br />
• Accessible worldwide market for locomotives is over €4.5 B (2005-2007)<br />
• NAFTA and Western Europe are the key markets<br />
• Strong growth is expected in Asia and Eastern Europe/CIS<br />
Market volume locomotives (M€)*<br />
REGIONS<br />
CIS<br />
10%<br />
Other<br />
12%<br />
NAFTA<br />
31%<br />
SEGMENTS<br />
Shunters<br />
8%<br />
Mainline<br />
locos<br />
27%<br />
Asia/ Pacific<br />
19%<br />
Western<br />
Europe<br />
28%<br />
Freight locos<br />
65%<br />
* Estimation from UNIFE 2005 data<br />
Market Analysis – P&S- 10
Market analysis<br />
Changes in the international market demand<br />
Interoperability<br />
Short delivery time<br />
for homologated<br />
locos<br />
Cross-border<br />
operation<br />
Fast reaction<br />
for new order<br />
placement<br />
Modularity<br />
New clients,<br />
private operators,<br />
and investors in a<br />
constantly changing<br />
market<br />
Growing freight<br />
needs<br />
Competitive market<br />
Increasing<br />
requirements for<br />
profitability and<br />
competitiveness<br />
Mastered Life Cycle<br />
Cost<br />
Reliability,<br />
availability,<br />
performance<br />
Market Analysis – P&S- 11
Market analysis<br />
Changes in the international market demand<br />
Interoperability<br />
ABCD<br />
PRIMA II<br />
Time to<br />
market<br />
Modularity<br />
Cost<br />
Market Analysis – P&S- 12
Agenda focus<br />
1. <strong>ALSTOM</strong> Group Page 4<br />
2. <strong>ALSTOM</strong> <strong>Transport</strong> Page 11<br />
3. Locomotive market overview Page 21<br />
4. <strong>ALSTOM</strong> product range Page 27<br />
5. Environmental impact Page 38<br />
6. LCC concept Page 42<br />
Market Analysis – P&S- 13
PRIMA II: from platform to product variety<br />
ABCD<br />
PRIMA II<br />
BoBo FRET<br />
CoCo FRET<br />
BoBo Passenger<br />
Market Analysis – P&S- 14
PRIMA II<br />
Operating<br />
requirements<br />
Passenger or Dual operation<br />
PRIMA offering<br />
Freight operation<br />
Product Name Prima II-P Prima II-F<br />
Track gauge<br />
Wheel<br />
arrangement<br />
Voltage<br />
configuration<br />
1 435mm<br />
(UIC-Track gauge)<br />
BoBo<br />
1U / 2U / 3U / 4U<br />
1 435mm<br />
(UIC-Track gauge)<br />
BoBo<br />
1U / 2U / 3U / 4U<br />
Power supply AC 25 kV AC 15 kV DC 3 kV DC 1,5 kV AC 25 kV AC 15 kV DC 3 kV DC 1,5 kV<br />
Maximum<br />
Traction power<br />
6 000 kW 6 000 kW 6 000 kW 4200 kW 6 400 kW 6 000 kW 6 000 kW 4200 kW<br />
Maximum<br />
speed<br />
200km/h<br />
140km/h<br />
Market Analysis – P&S- 15
PRIMA II<br />
PRIMA II vs PRIMA I<br />
PRIMA I (1997) PRIMA II (2007)<br />
Fully TSI compliant No Yes<br />
ERTMS No Yes<br />
New design No Yes<br />
Modular design Partially Yes<br />
Universal locomotive freight/passenger No (Freight only) Yes<br />
Power supply 25kV/15kV/1.5 kV 25kV/15kV/1.5<br />
kV/3kV<br />
Max power 4200 kW 6400 kW<br />
Train-Tracer (remote diagnosis &<br />
localization)<br />
No<br />
Yes<br />
Market Analysis – P&S- 16
PRIMA II<br />
New design<br />
Market Analysis – P&S- 17
PRIMA II<br />
First contract : Morocco<br />
20 electric locomotives<br />
Freight and Passenger 160 kph<br />
3kV<br />
Possibility to upgrade for 25 kV<br />
Delivery : July 09<br />
Market Analysis – P&S- 18
PRIMA II modular solution<br />
• Increased competitiveness<br />
• Compliance with EN, UIC and TSI standards<br />
• Obsolescence treatment<br />
• New external design for a better marketing<br />
• Modular locomotive for better flexibility<br />
<br />
<br />
Same roof<br />
Same car-body for 140 kph and 200 kph bogie<br />
Last minute customization for signalling equipment<br />
Same car-body<br />
Same inside implantation<br />
Aux. cubicle<br />
Motor cubicle<br />
Rheos. cubicle<br />
Common cubicle<br />
Pneumatic cubicle<br />
Signalling cabinet<br />
System cabinet<br />
140 kph bogies<br />
200 kph bogies<br />
Market Analysis – P&S- 19
PRIMA II modular solution<br />
Modularity<br />
• Country/corridor customisation<br />
• Four voltage system<br />
• Options<br />
Auxiliary bloc<br />
Motor bloc<br />
Rheostat bloc<br />
Common bloc<br />
Pneumatic bloc<br />
Security cabinet<br />
System cabinet<br />
Reference solution (platform)<br />
Client /country/EU corridor customisation<br />
Options<br />
Presentation title - 01/01/2007 - P 20<br />
Market Analysis – P&S- 20
PRIMA II<br />
DE<br />
CH<br />
RIU<br />
RADIO<br />
FR<br />
CTV<br />
- France box :<br />
ATESS (Tachometer/recorder/BRS/VACMA)<br />
KVB<br />
- Radio box :<br />
Radio GSM-R<br />
- Germany box :<br />
LZB/PZB<br />
- Switzerland box :<br />
ZUB<br />
Integra<br />
- RIU box (Relays Interface Unit)<br />
Relyas for signalling equipment functions<br />
Signalling cubicle<br />
RIU : Relays/switches/ circuit<br />
breakers<br />
RADIO : Data GSM-R<br />
RIU<br />
RADIO DATA<br />
GSM-R<br />
TRU<br />
ERTMS cubicle<br />
TRU : juridical recorder<br />
EVC (or IVC)<br />
EVC<br />
EVC IVC<br />
Or IVC<br />
Market Analysis – P&S- 21
PRIMA II<br />
Passive protection<br />
• Protection for the driver and the locomotive<br />
• Absorption capacity up to 2.25 MJ = collision with a 80-tons wagon or<br />
locomotive at 36 kph or collision with a 15-tons trucks at 65 kph<br />
• Reduced repairing time and cost<br />
• Reduced immobilization time of the locomotive<br />
• Reduced exploitation losses for the customer<br />
Market Analysis – P&S- 22
PRIMA II<br />
Catenary Voltage<br />
Traction block<br />
4 catenary voltage systems<br />
1U<br />
4U<br />
Motor bloc Version 1U Motor bloc Version 4U<br />
80% of common elements<br />
20% of customised elements<br />
Market Analysis – P&S- 23
PRIMA II<br />
Traction converter<br />
Rear side<br />
Phase output connectors<br />
Hydraulic couplers<br />
Front side<br />
DC HV terminals, LV connectors<br />
Volume : 76 litres<br />
Mass : 50 kg<br />
Power : 1600 kW<br />
Traction converter already in service on Pendolino<br />
and EMU<br />
Market Analysis – P&S- 24
PRIMA II<br />
Service proven sub systems<br />
• Passenger bogie : in service in France, Belgium and Luxembourg, over<br />
200 Million kilometers<br />
• Freight bogie : 300 locomotives in service in France, over 155 Million<br />
kilometers<br />
• Traction block : designed for China CoCo electric locomotive<br />
• Traction converter : already in service in Spain, Italy, China<br />
Main critical equipments used on Prima II are already service proven<br />
Market Analysis – P&S- 25
PRIMA II<br />
Homologations schedule<br />
BELGIUM<br />
(April 2011)<br />
NETHERLANDS<br />
(April 2011)<br />
NORWAY<br />
SWEDEN<br />
FINLAND<br />
DENMARK<br />
UK<br />
GERMANY<br />
(April 2011)<br />
POLAND<br />
PORTUGAL<br />
SPAIN<br />
FRANCE<br />
(April 2011)<br />
SWITZERLAND<br />
ITALY<br />
(Dec. 2011)<br />
CZECH<br />
AUSTRIA<br />
SLOVENIA<br />
CROATIA<br />
SLOVAKIA<br />
HUNGARY<br />
BOSNIA<br />
SERBIA<br />
MACEDONIA<br />
ROMANIA<br />
BULGARIA<br />
Greece<br />
Market Analysis – P&S- 26
Differentiation factors<br />
• Flexibility during its life cycle<br />
− Upgrade for new businesses, new countries, new corridors<br />
− Possibility to convert a freight locomotive into a passenger locomotive<br />
− Increase the residual value of the locomotive<br />
• Interoperability<br />
− Strong experience in ETCS level 2, implemented in various locomotives in<br />
Europe<br />
• Availability and reliability<br />
− Use of service-proven sub-systems : traction converters, bogies, which<br />
have run millions of kilometres<br />
− One complete independent traction drive per axle which guarantee 75% of<br />
performance on the locomotive in case of failure on one axle<br />
Market Analysis – P&S- 27
Differentiation factors<br />
• Services<br />
− Ability to propose a complete offer : Rolling Stock, Services, Signalling<br />
equipment<br />
− Complete dedicated services through Hot line 24h/day, 7 days/week,<br />
mobile team<br />
− Management of spares parts<br />
• Driver’s comfort<br />
− Spacious cab, driver’s position on the left or on the right<br />
− Options : bed, toilets, micro wave oven, fridge<br />
• High passive safety level<br />
− The level of security is higher than requested by EN 15227<br />
Market Analysis – P&S- 28
Freight / Passenger modular solution<br />
Passenger<br />
-Max speed : 200km/h<br />
- Starting effort : 320kN<br />
- Brakes disk<br />
- Pneumatic wheel slide prevention<br />
device<br />
- Electro-pneumatic brake wire<br />
connection, passenger UIC 558<br />
connection and HEP connection cable<br />
UIC 552<br />
Market Analysis – P&S- 29
PRIMA platform: in the centre of the product range<br />
PRIMA key features :<br />
−<br />
Wide range of operating solutions: from heavy haul freight to<br />
passenger operations<br />
−<br />
−<br />
−<br />
−<br />
Product platform based on proven sub-systems*<br />
Low cost of maintenance<br />
Unique passive safety level<br />
Remote maintenance system<br />
(Train Tracer concept)<br />
−<br />
High operating availability due to four fully independent traction drives<br />
* Bogies & Motors FRET 2U / 3U - 125Mkm<br />
Traction drive tested during 4 years on PRIMA 6000<br />
Market Analysis – P&S- 31
Agenda focus<br />
1. <strong>ALSTOM</strong> Group Page 4<br />
2. <strong>ALSTOM</strong> <strong>Transport</strong> Page 11<br />
3. Locomotive market overview Page 21<br />
4. <strong>ALSTOM</strong> product range Page 27<br />
5. Environmental impact Page 38<br />
6. LCC concept Page 42<br />
Market Analysis – P&S- 32
Environmental standards applied for PRIMA locomotives<br />
Pollution-free engine<br />
Compliance with noise reduction standards<br />
Eco-design (recyclable solutions)<br />
Responsible approach to operations<br />
(example: installing of collection tanks for fuel and oil in diesel<br />
locomotives)<br />
Market Analysis – P&S- 33
Eco-design<br />
Reduction of the energy consumption<br />
Recyclibility (with analysis of particular<br />
requirements of every country)<br />
Manufacturing<br />
Product<br />
Maintenance<br />
& Repair<br />
Eco-materials<br />
Reduction of internal and external noise<br />
levels<br />
Materials &<br />
Instruments<br />
End of life<br />
cycle &<br />
Recycling<br />
‣Environmental Product Certificate : ISO 14025<br />
Market Analysis – P&S- 34
Agenda focus<br />
1. <strong>ALSTOM</strong> Group Page 4<br />
2. <strong>ALSTOM</strong> <strong>Transport</strong> Page 11<br />
3. Locomotive market overview Page 21<br />
4. <strong>ALSTOM</strong> product range Page 27<br />
5. Environmental impact Page 38<br />
6. LCC concept Page 42<br />
Market Analysis – P&S- 35
LCC: three main cost lines<br />
1. Operational maintenance<br />
2. Maintenance Support<br />
3. Site Management<br />
Market Analysis – P&S- 36
<strong>ALSTOM</strong> Maintenance Contract: competitive advantage<br />
in LCC management<br />
Advantages of <strong>ALSTOM</strong> Maintenance Contract Proposal compared<br />
to LCC<br />
‣Natural optimisation of the maintenance plan<br />
− commitment to adapt Maintenance Plan through continuous<br />
improvements<br />
− Maintenance Contract takes into account logistics constraints as<br />
opposed to sole LCC evaluation<br />
‣Adaptation to local conditions<br />
− climate, infrastructure requirements, operational constraints<br />
− theoretical LCC calculation in ideal conditions<br />
Much stronger commitment than sole LCC evaluation.<br />
Market Analysis – P&S- 37
Thank you!
Market Analysis – P&S- 39<br />
Annex
Passenger & freight electric locomotives<br />
AEM7 - USA<br />
52 units, 1999<br />
France/Italie, Bo’Bo’, 60, 1998<br />
ASTRIDE BB436000<br />
17 PRIMA 4200 EL 3U, E37500 - 2006<br />
France, Bo’Bo’,<br />
180 PRIMA 4200 EL 2U, BB427000 - 2001<br />
60 PRIMA 4200 EL 3U, BB437000 - 2002<br />
France, Bo’Bo’,<br />
65 PRIMA 4200 EL P, BB827300<br />
Chine – Double BoBo<br />
180 PRIMA DJ4 (2x5000) EL 2005<br />
Market Analysis – P&S- 40
Double BoBo Electric Locomotive (DJ4)<br />
8000 tons at 120 kph<br />
10000 tons at 80 kph<br />
Market Analysis – P&S- 41
Double BoBo Electric Locomotive<br />
• Chinese locomotives contract :<br />
− 180 double PRIMA EL 10000 4B locomotives<br />
− Manufacturing in Alstom Belfort and in China with a partner, Datong<br />
Electric locomotives, after a technology transfer<br />
− Based on proven design of the Prima 4200 locomotive (French<br />
railways)<br />
− Adaptations needed to specific Chinese requirements<br />
Market Analysis – P&S- 42
Double BoBo Electric Locomotive<br />
Living area<br />
Washroom<br />
Beds, microwave, fridge<br />
Market Analysis – P&S- 43
CoCo Electric Locomotive<br />
Market Analysis – P&S- 44<br />
5000 tons at 120 kph<br />
7000 tons at 80 kph
CoCo Electric Locomotive<br />
• Chinese locomotives contract<br />
− 500 PRIMA EL 9600 C locomotives<br />
− Manufacturing in Alstom Belfort and in China with a partner, Datong<br />
Electric locomotives, after a technology transfer<br />
− Based on proven design of the PRIMA EL II locomotive (Multi system<br />
locomotive designed for European countries)<br />
− Adaptations needed to specific Chinese requirements<br />
Market Analysis – P&S- 45
CoCo Electric Locomotive<br />
Auxiliary<br />
Block 1<br />
Motor<br />
Block 1<br />
Motor<br />
Block 2<br />
Toilet<br />
room<br />
Brake<br />
Panel<br />
Motor<br />
Block 3<br />
Auxiliary<br />
Block 2<br />
Market Analysis – P&S- 46
Passenger and freight diesel locomotives*<br />
UK, Bo’Bo’, 30 units, 1999<br />
PRIMA DE 32 B DC<br />
United States, Bo’Bo’, 32 units, 2004, PRIMA 42 B<br />
AC<br />
Iran, Co’Co’, 100 units, 2002,<br />
PRIMA DE 43 C AC<br />
France, Bo’Bo’, 400 units, 2006,<br />
<strong>ALSTOM</strong>-SIEMENS DE<br />
Sri Lanka, Syria , Co’Co’,<br />
30 units, 1998<br />
PRIMA DE 32 C DC<br />
France, Bo’Bo’, 160 units, 2005, GA DE 900<br />
* Electric locomotives remain <strong>ALSTOM</strong>’s major focus in R&D<br />
Market Analysis – P&S- 47
High-speed train power cars<br />
French TGV for SNCF …<br />
1990<br />
World record : 515.3<br />
km/h<br />
TGV PSE (1981)<br />
216 power cars<br />
TGV Atlantic (1989)<br />
210 power cars<br />
TGV Network (1993)<br />
160 power cars<br />
Double-deck TGV (1996,<br />
2002)<br />
249 power cars<br />
In work: DASYE (2009) 50 power cars, TGV POS (2006) 38 power cars, RGV 2N2 (2011) 111 power cars<br />
… with references throughout the world …<br />
Thalys (1996)<br />
54 power cars<br />
Eurostar (1994)<br />
76 power cars<br />
AVE - Spain (1992)<br />
48 power cars<br />
KTX - Korea (2004)<br />
92 power cars<br />
Market Analysis – P&S- 48
High-speed train power cars (cont’d)<br />
2007<br />
World record : 574.8 km/h<br />
TGV POS (2007)<br />
38 power cars<br />
Market Analysis – P&S- 49
Train Tracer remote diagnostic system: support for the<br />
operator fleet management & maintenance<br />
Locomotive Operator<br />
Locomotive<br />
Maintainer<br />
Infrastructure<br />
information<br />
Train<br />
Security<br />
Fleet<br />
Management<br />
Operation /<br />
Maintenance<br />
Corrective<br />
Maintenance<br />
anticipation &<br />
ROE<br />
Preventive<br />
Maintenance<br />
management<br />
(ie CBM)<br />
Train Position<br />
(GPS)<br />
Train Context<br />
Train fault codes<br />
http\\:www.<br />
TrainTracer<br />
Market Analysis – P&S- 50
E-Train: new technology allowing precise remote<br />
diagnostics and anticipation of interventions<br />
• Support Preventive Maintenance (scheduled operations to reduce the<br />
probability of defects)<br />
− Carrying out of maintenance visits in accordance with the manufacturer<br />
maintenance documents<br />
− Full range of operations from light revision to overhaul with direct access<br />
to maintenance workshop<br />
− Constant optimisation of maintenance program based on Return of<br />
Experience<br />
• Support Corrective maintenance (non scheduled operations in cases of failure,<br />
accident, vandalism)<br />
− Hot line assistance of the dedicated multilingual expert team 24h/7d<br />
− On-board predictive maintenance tool : remote failure detection,<br />
diagnosis and treatment<br />
− Repair and diagnosis training : special training for drivers<br />
Market Analysis – P&S- 51
Alstom Locomotives Orders<br />
PLATFORM COUNTRY Total<br />
France 736<br />
China 680<br />
Iran 100<br />
Spain 91<br />
PRIMA<br />
Israel 39<br />
USA 33<br />
UK 30<br />
Syria 30<br />
Sri Lanka 10<br />
Other Europe 1<br />
PRIMA Total 1750<br />
France 160<br />
UK 111<br />
USA 67<br />
OTHER<br />
Belgium 60<br />
France, Italy 60<br />
Egypt 30<br />
Luxembourg 20<br />
OTHER Total 508<br />
Grand Total 2245<br />
Source data: Platform Team & P&S Locomotive Black Book, October 2006<br />
Market Analysis – P&S- 52
PRIMA II modular solution<br />
- Traction BoBo, 21,5 T per axle<br />
- Max speed : 140 km/h (freight)<br />
- Substitution brakes<br />
- Catenary tensions : 25 kV 50Hz, 15 kV 16Hz 2 / 3, 3 kV ,1,5 kV<br />
- Power under catenary tension : 4 200 to 6 400 KW<br />
- Starting effort : 320 kN<br />
•<br />
- Central driver desk EU HDD<br />
- IPE country compatibility<br />
- RPS and signalling equipment provision<br />
- Remote maintenance<br />
•<br />
REFERENCE<br />
SOLUTION<br />
4 catenary tension systems<br />
Central driver desk EU HDD<br />
Market Analysis – P&S- 53
1 - Operational Maintenance<br />
• Materials for preventive and corrective operations<br />
• Initial spare parts and capital spares<br />
• Wheels re-profiling / wheels & axles replacement<br />
• Mid-life overhauls<br />
• Preventive and corrective labour<br />
• <strong>Transport</strong>ation of materials<br />
Market Analysis – P&S- 54
2 – Maintenance Support<br />
• Customisation of maintenance documentation<br />
• Training<br />
• Maintenance management information system (Hardware<br />
deployment (Train-Tracer))<br />
• Purchasing management<br />
• Test equipment & specific tools<br />
• Hotline support<br />
Market Analysis – P&S- 55
3 – Site Management<br />
• Staff management<br />
• Uniform & safety clothing (operations team)<br />
• Medical service<br />
• Necessary capital investment (main depot)<br />
• Hardware deployment<br />
• Depot & management vehicles operation (rental, gasoline,<br />
insurance)<br />
Market Analysis – P&S- 56
www.alstom.com
PRIMA EL 4200 B 3U15 - SNCF<br />
Commercial data<br />
Nominal power<br />
350<br />
Operator<br />
SNCF<br />
1.5 kV DC overhead 4,200 kW<br />
Network<br />
France Germany<br />
Switzerland<br />
15 kV AC overhead 4,200 kW<br />
25 kV AC overhead 4,200 kW<br />
300<br />
First Delivery 2003<br />
Traction performances<br />
Number of units 60<br />
Starting effort<br />
320 kN<br />
250<br />
Designation BB 437000<br />
Continuous effort<br />
250 kN<br />
Service type<br />
Basic technical data<br />
Freight<br />
Continuous speed<br />
Maximum speed<br />
57 km/h<br />
140 km/h<br />
200<br />
Arrangement Bo’Bo’<br />
Gauge<br />
1,435 mm<br />
Axle load<br />
22.5 t<br />
Loading gauge UIC 505<br />
Curve negotation 80 m<br />
Electric brake performances<br />
Rheostat power at wheel rim 2,600 kW<br />
Rec. power at wheel rim 2,600 kW -<br />
4,200 kW<br />
Maximum effort 130 kN<br />
Multiple Unit control<br />
Effort at wheel rim (KN)<br />
150<br />
100<br />
50<br />
0<br />
0 20 40 60 80 100 120 140<br />
-50<br />
-100<br />
Market Analysis - P 58<br />
-150<br />
Speed (Km/h)
PRIMA DE 30 B<br />
Commercial data<br />
Operator<br />
SNCF<br />
Network<br />
France<br />
First Delivery 2006<br />
Number of units 200+200<br />
Designation 475000<br />
Service type Freight<br />
Basic technical data<br />
Arrangement Bo’Bo’<br />
Gauge<br />
1 435 mm<br />
Axle load<br />
21 t<br />
Gauge UIC 505<br />
Curve negotation 80 m<br />
Fuel tank capacity 4 000 l<br />
Diesel engine power<br />
UIC power<br />
2,750 hp<br />
At site power<br />
2,750 hp<br />
Traction performances<br />
Starting effort<br />
250 kN<br />
Continuous effort 220 kN<br />
Continuous speed 25 km/h<br />
Power at wheel rim 1600 kW<br />
Maximum speed 120 km/h<br />
Dynamic brake performances<br />
Power at wheel rim 1,000 kW<br />
Maximum effort 120 kN<br />
Multiple Unit control<br />
Effort kN<br />
260<br />
210<br />
160<br />
110<br />
60<br />
10<br />
0 20 40 60 80 100 120<br />
-40<br />
-90<br />
-140<br />
Vitesse km/h<br />
Market Analysis - P 59
GA DE 1000AC<br />
Données commerciales<br />
Puissance du moteur Diesel<br />
200<br />
Opérateur<br />
SNCF<br />
Puissance UIC<br />
1000 kW<br />
Réseau<br />
France<br />
Première livraison 2006<br />
Puissance sur site<br />
Performances de traction<br />
1000 kW<br />
180<br />
Quantité 160<br />
Série<br />
Effort au démarrage<br />
Effort au RC<br />
170 kN<br />
141.5 kN<br />
160<br />
Service<br />
Manœuvre/Ligne<br />
Vitesse correspondante<br />
18 km/h<br />
Données techniques générales<br />
Puissance à la jante<br />
720 kW<br />
140<br />
Disposition<br />
Bo’Bo’<br />
Vitesse maximum<br />
100 km/h<br />
Ecartement<br />
Charge par essieu<br />
Gabarit<br />
Courbe minimum<br />
Soute à gasoil<br />
1 435 mm<br />
18.25 t<br />
UIC<br />
100 m<br />
3 000 l<br />
Pilotage en Unité Multiple: 2 unités<br />
maximum<br />
Effort à la jante (KN)<br />
120<br />
100<br />
80<br />
60<br />
40<br />
20<br />
Market Analysis - P 60<br />
0<br />
0 20 40 60 80 100<br />
Vitesse (Km/h)