COST OF FUEL IN TAKA PER KWH AT DIFFERENT MODE OF GENERATION<br />

NAME OF PLANT<br />

EAST ZONE<br />

WEST ZONE<br />

2007-08 <strong>2008</strong>-09 2007-08 <strong>2008</strong>-09<br />

Diesel Station ---- ---- 11.738 12.946<br />

Gas Turbine(Oil Fired) ---- ---- 15.907 18.975<br />

Gas Turbine(Gas Fired) 1.182 1.042 0.929 0.955<br />

Combined Cycle (Gas Fired) 0.796 0.726 ---- ----<br />

Steam Turbine (Oil Fired) ---- ---- 6.479 9.614<br />

Steam Turbine (Gas Fired) 0.094 0.093 ---- ----<br />

Steam Turbine (Coal Fired) ---- ---- 1.625 1.992<br />

Overall Fuel Cost Per Unit 0.83 0.822 3.503 3.868<br />

Of Thermal Generation<br />

4700<br />

DAILY LOAD CURVE<br />

4500<br />

LOAD DURATION CURVE<br />

4400<br />

4162.10 MW<br />

4100<br />

4000<br />

MW<br />

3800<br />

3500<br />

3200<br />

2900<br />

2600<br />

2300<br />

2000<br />

1700<br />

1400<br />

1100<br />

800<br />

500<br />

200<br />

-100<br />

3436 MW<br />

3:00<br />

1:30<br />

0:00<br />

4:30<br />

6:00<br />

7:30<br />

2944 MW<br />

9:00<br />

10:30<br />

12:00<br />

13:30<br />

15:00<br />

16:30<br />

18:00<br />

19:30<br />

21:00<br />

22:30<br />

24:00<br />

Source:Power Grid Company of Bangladesh ( PGCB)<br />

% OF MAXIMUM DEMAND<br />

3500<br />

3000<br />

2500<br />

2000<br />

1500<br />

1000<br />

MAXIMUM DEMAND 4162.10 MW<br />

Hour Inter Connectoe East Grid West Grid System Total<br />

500<br />

0<br />

24:<br />

00<br />

22:<br />

30<br />

21:<br />

00<br />

19:<br />

30<br />

18:<br />

00<br />

16:<br />

30<br />

15:<br />

00<br />

13:<br />

30<br />

12:<br />

00<br />

DURATION IN HOURS<br />

10:<br />

30<br />

9:00<br />

7:30<br />

6:00<br />

4:30<br />

3:00<br />

1:30<br />

0:00<br />

Mr. A.S.M. Alamgir Kabir, Chairman <strong>BPDB</strong> addressing the newly appointed<br />

apprentice Engineers at the Board Room. Later Chairman inaugurated the<br />

Foundation Training Course.<br />