Message<br />

Ensuring adequate, reliable and quality power is a major challenge <strong>for</strong> <strong>BPDB</strong>. In<br />

the situation of inadequate generation addition in the last few years with<br />

shortage of gas supply, <strong>BPDB</strong> is passing critical time to meet the electricity<br />

demand, which is increasing fast matching the growth rate of the economy.<br />

Customer satisfaction with reliable power supply and improved service quality is<br />

another major challenge <strong>for</strong> <strong>BPDB</strong>.<br />

During the FY <strong>2008</strong>-09 progress has been made in different areas of <strong>BPDB</strong><br />

specially generation and distribution. Maximum generation 4162 MW was<br />

achieved during this period. Revenue collection has been increased and system<br />

loss has been reduced as compared to the previous years. <strong>BPDB</strong>'s system loss<br />

during <strong>2008</strong>-<strong>2009</strong> was reduced to 6.58 % of net generation from 6.92 % of<br />

previous year. The loss in <strong>BPDB</strong>'s own distribution was also reduced to 13.57 %<br />

in FY <strong>2009</strong> from 14.43 % in FY <strong>2008</strong>. The revenue collection during FY <strong>2009</strong> was<br />

Tk. 58,992 million which was 9 % higher than that of previous year.<br />

During FY <strong>2009</strong>, new generation addition, mostly from small IPP's and rental<br />

power plants of total capacity 414 MW was synchronised to the national grid. Net<br />

energy generation of <strong>BPDB</strong> was 25,622 GWh, which was 5.39% higher than the<br />

previous year. In the constraint of gas supply this growth was satisfactory but<br />

consumers suffered a lot as demand growth of energy was much higher.<br />

Access to electricity was 47% in FY <strong>2009</strong>. Only 2% increase was not satisfactory to<br />

materialize the government vision of 100% access by 2021. To face this challenge<br />

at the end of the FY <strong>2009</strong> government has changed its planning perspective and<br />

<strong>BPDB</strong> has started to revise the generation expansion plan.<br />

The new initiative to the generation expansion plan considered liquid fuel (HFO/<br />

Diesel) based peaking plant in the short term to reduce pressure on natural gas.<br />

For medium and long term generation expansion plan, coal based large steam<br />

power plants and natural gas/dual fuel based combined cycle plants will be the<br />

option. The least cost option is 2000-2600 MW imported coal based power plants<br />

in costal areas.<br />

Measures of power generation through renewable energy like solar, wind etc. are<br />

also going on. Nuclear energy can also be included as alternative source of<br />

energy in future. Steps have also been taken <strong>for</strong> power exchange through<br />

regional co-operation among the neighboring countries to provide reliable<br />

electricity.<br />

To make the power sector effective <strong>BPDB</strong> has also been continuously pursuing<br />

the re<strong>for</strong>m programme <strong>for</strong> the last few years. During the period under report<br />

expansion of Computerized Billing, Renewable Energy Development, Bill-pay<br />

through Mobile Phone, Energy Efficiency Measures and need based training etc.<br />

were also continued.<br />

Government's commitments to remove all barrier <strong>for</strong> implementation of new<br />

generation addition plan and <strong>BPDB</strong>'s consolidated ef<strong>for</strong>ts will ensure no load<br />

shedding and thereby ensure sustained social and economic development of<br />

Bangladesh.<br />

A.S.M. Alamgir Kabir<br />

Chairman<br />

Bangladesh Power Development Board<br />

03 <strong>Annual</strong> <strong>Report</strong> <strong>2008</strong>-09