ANSALDO ENERGIA FINANCIAL STATEMENTS 2009<br />

37<br />

During 2009 some significant results were<br />

delivered by the process to reorganise and<br />

reinforce these activities, which was launched<br />

following the Company's abandonment of all the<br />

product licences it held in the past, culminating in<br />

late 2008 in the establishment of a Product<br />

Innovation and Development Management Office.<br />

The Office brings together all legacy resources and<br />

development laboratories both in Ansaldo Energia<br />

and in Ansaldo Ricerche, which was incorporated<br />

during the year.<br />

In detail, in the framework of Ansaldo technology<br />

gas turbine development, the programme to evolve<br />

the class F AE94.3A unit received a further boost,<br />

with the aim of optimising and improving<br />

performance in terms of both power and efficiency.<br />

These improvements will also lead to similar<br />

increases in the performance of combined gassteam<br />

cycles.<br />

An important result in 2009 was the completion of<br />

development work on and the commercial release<br />

of the AE94.3A4+, with a further improvement of<br />

the combustion system as a result of VeLoNox<br />

(Very Low Nitrogen Oxide) technology and a further<br />

increase in the turbine inlet temperature.<br />

A new development programme was also launched<br />

for the AE94.2 turbine, with the aim of increasing<br />

power and efficiency performance.<br />

Once again in relation to Ansaldo technology gas<br />

turbines, development programmes have been<br />

launched regarding the flexibility of use of new<br />

fuels (LNG, gases with low calorific power or a high<br />

pollutant content).<br />

The evolution of customer demand for plant<br />

operation in variable conditions, to satisfy the new<br />

requirements of the electric power market, led in<br />

2009 to the expansion of development projects on<br />

the flexibility of both turbines and the entire<br />

combined cycle.<br />

In the Service segment, new programmes have<br />

been launched to extend the range of products for<br />

work on third party technology machinery, with<br />

special reference to Ansaldo Thomassen and<br />

Ansaldo Esg.<br />

Developments mainly refer to the re-engineering of<br />

both combustion systems and gas turbine blades.<br />

Development work on the innovative continuous<br />

electrostatic purification system and on remote<br />

lubrication oil monitoring have been completed.<br />

In connection with the Original Service Provider<br />

(OSP) line, work has begun with Elsag Datamat to<br />

develop a new control system for steam turbines,<br />

gas turbines and control systems.<br />

In the framework of steam turbine development<br />

projects launched in 2008, work continued on the<br />

characterisation and application of special<br />

materials (super high temperature steels and<br />

superalloys) for “ultrasupercritical” turbines.<br />

Significant turbine generator developments are also<br />

in progress, in connection with the extension of the<br />

power range offered by air-cooled machines to 400<br />

MVA, with innovative design methods using finite<br />

element 3D calculations, and with experimentation<br />

on new insulating materials.<br />

The development work in 2009 on molten<br />

carbonate fuel cells at the subsidiary Ansaldo Fuel<br />

Cells was mainly focused on the application of this<br />

technology to separate CO 2<br />

from flue gas in<br />

thermo-electric power stations (CCS - Carbon<br />

Capture and Sequestration).<br />

Research work also continues at the subsidiary<br />

Ansaldo Nucleare, most importantly on 4th<br />

generation fast nuclear reactors.<br />

Nearing completion in this area is the ELSY project,<br />

financed by the European Union in the framework of<br />

the 6th Framework Programme and led by Ansaldo<br />

Energia, to develop the reference configuration of a<br />

molten lead cooled critical reactor for power<br />

generation and to burn minor actinoids.<br />

In 2009 Ansaldo Nucleare was assigned a new<br />

project in the 7th Framework Programme, to begin<br />

detailed planning work on a prototype of this<br />

reactor.<br />

Finally, in parallel with the creation of the<br />

“Renewable and Distributed Energy” business line,<br />

in 2009 work began to analyse existing thermodynamic,<br />

biomass gassification and urban solid<br />

waste technology.<br />

RESEARCH, DEVELOPMENT AND INNOVATION