01.11.2014 Views

Ozonation and PAC addition schemes, results - EU Project Neptune

Ozonation and PAC addition schemes, results - EU Project Neptune

Ozonation and PAC addition schemes, results - EU Project Neptune

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PAC</strong> <strong>addition</strong> to secondary effluent<br />

(SBR, with <strong>and</strong> without <strong>PAC</strong> recycling)<br />

Pilot plant Eawag<br />

SRT ~ 13 d SRT ~ 15 d<br />

<strong>PAC</strong><br />

+Fe(III)<br />

SRT ~ 4 d<br />

Lane A<br />

Denitrification<br />

Nitrification<br />

Secondary clarifier<br />

Storage Buffer tank 11 Ads-SBR Storage Buffer tank 2<br />

Cloth filter<br />

Flow<br />

direction<br />

Effluent<br />

Influent<br />

(mechanical pretreated<br />

wastewater)<br />

Return sludge<br />

Flushing water (optional)<br />

Flushing water<br />

<strong>PAC</strong> excess sludge (optional)<br />

<strong>PAC</strong> excess sludge<br />

Excess<br />

sludge<br />

<strong>PAC</strong> excess<br />

sludge<br />

Flushing water<br />

Nitrification<br />

Lane B<br />

SRT ~ 13 d<br />

Denitrification Nitrification<br />

<strong>PAC</strong>-<br />

Suspension<br />

Secondary<br />

Clarifier<br />

Secondary clarifier<br />

Cloth Filter<br />

<strong>PAC</strong>-SBR<br />

Effluent<br />

Denitrification<br />

Return sludge<br />

Excess<br />

sludge<br />

Storage Tank<br />

sampling point<br />

Storage Tank

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!