03.11.2014 Views

Membrane Pre-treatment Using Plate Settlers - Ohiowater.org

Membrane Pre-treatment Using Plate Settlers - Ohiowater.org

Membrane Pre-treatment Using Plate Settlers - Ohiowater.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Determine the horizontal projected area needed<br />

1. Choose the specific loading rate. For example a standard<br />

loading rate is 0.3 gpm/ft 2 of effective plate area at 90%<br />

efficiency.<br />

Calculations for 10 MGD (6950 GPM) example:<br />

Divide the flow in gpm by the loading rate:<br />

Flow = 6,950 = 23,166 ft 2 = projected area<br />

the Loading rate .3 GPM/ft 2<br />

Apply the efficiency<br />

SIZING CALCULATION EXAMPLE<br />

2. Divide the projected area by the efficiency – 90%<br />

Projected area = 23,166 ft 2<br />

efficiency .9<br />

= 25,740 ft 2 effective area

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!