Local Economic<br />
Development Forum<br />
April 8 th 2010<br />
<strong>Tbilisi</strong>, Georgia<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
1
Contents<br />
1. Study background<br />
2. Metro Universetiti extension Design<br />
3. Roadmap: work performed<br />
4. Objectives of the Masterplan<br />
5. Some the <strong>project</strong>s being currently considered<br />
6. Future work<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
2
1<br />
1. Study background<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
3
Study background<br />
1<br />
Context :<br />
- Asian Development Bank (ADB) loan proposed to finance <strong>transport</strong> <strong>project</strong>s in<br />
<strong>Tbilisi</strong><br />
- Consortium including the French company Systra, Georgian company Spectrum<br />
and British company EC Harris was selected to:<br />
- Review the feasibility studies of the <strong>project</strong>s in order to make them compliant<br />
with ADB international standards,<br />
- Include the <strong>project</strong>s into a global and strategic <strong>sustainable</strong> roadmap for short,<br />
medium and long-term solutions.<br />
- Study began in December 2009, due to be completed by the September 2010<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
4
Study background<br />
1<br />
Roadmap content & methodology:<br />
- Rationale for the roadmap: integrate <strong>project</strong>s financed by ADB into a global and<br />
<strong>sustainable</strong> roadmap for the city of <strong>Tbilisi</strong>,<br />
- Assessment of the socio-economical situation,<br />
- Implementation of Origin/Destination surveys in the Metro, in buses and on the road<br />
network to have a strategic overview of passengers flows in <strong>Tbilisi</strong>,<br />
- Additional: help the municipality organizing a full household survey using<br />
international standards in order to have a detailed understanding of <strong>transport</strong>ation<br />
behavior in the city of <strong>Tbilisi</strong>,<br />
- Strategic evaluation of the proposed <strong>project</strong>s,<br />
- Additional: implementation of a full detailed model using an international software to<br />
test all municipality <strong>project</strong>s,<br />
- Cost estimates and cost-benefit analysis.<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
5
Study background<br />
1<br />
Challenges: lack of data<br />
- Almost no data existed about <strong>transport</strong>ation demand in <strong>Tbilisi</strong>,<br />
- Therefore it was decided to perform surveys to understand <strong>Tbilisi</strong> inhabitants’<br />
current and future needs,<br />
- Such surveys were never performed before in <strong>Tbilisi</strong>; Systra implements an<br />
international standard methodology already successfully tested in numerous cities<br />
around the world (Mexico, Rio de Janeiro, Cairo, Sarajevo, Hanoï…) ensuring<br />
quality and statistical significance of the results. This will provide very useful<br />
information to the Municipality of <strong>Tbilisi</strong>.<br />
- Collecting data about <strong>transport</strong>ation demand is essential to understand<br />
<strong>transport</strong>ation-related issues and to propose relevant coordinated and <strong>sustainable</strong><br />
<strong>project</strong>s corresponding to the inhabitants current and future short, medium and<br />
long-term needs.<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
6
2<br />
2. Metro University Extension Design<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
7
Metro extension design<br />
2<br />
Review and update the existing design<br />
- Tunnel and station civil works<br />
- Systems & signaling<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
8
Metro extension design<br />
2<br />
Review and update the existing design<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
9
Metro extension design<br />
2<br />
Propose architectural concepts for the stations<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
10
Metro extension design<br />
2<br />
Propose 3 architectural concepts for the stations<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
11
Metro extension design<br />
2<br />
Prepare the Metro extension tender for the Municipality<br />
- Audit report on the state of the <strong>project</strong>s and actions to be implemented was<br />
delivered 15/03/2010<br />
- Final design Package for the Metro extension to be tendered is expected to be<br />
delivered on 31/05/2010<br />
- Construction is expected to last 30 months and include:<br />
- Construction works<br />
- Installation and testing of equipment<br />
- Finishes<br />
- Cost estimate for the extension: around US $ 30 Millions<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
12
3<br />
3. Roadmap : work performed<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
13
Socio-economical assessment 3<br />
- Specific shape of the city very constraint by natural topography favoring the<br />
existence of bottlenecks in the <strong>transport</strong>ation system,<br />
- Very dense suburbs generating several trips,<br />
- Very attractive center,<br />
- Numerous former industrial areas now unoccupied providing space for new housing<br />
or business development,<br />
- Several ongoing <strong>urban</strong> <strong>project</strong>s, the most important being the removal of the railway<br />
tracks from the city center,<br />
- <strong>Tbilisi</strong> in the regional context: important commuting from Rustavi, main attracting<br />
center in Georgia, important transit (thru) traffic (persons and goods) between<br />
Turkey, Armenia, Azerbaijan and Russia.<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
14
Socio-economic assessment 3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
15
Socio-economic assessment 3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
16
Socio-economic assessment 3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
17
Socio-economic assessment 3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
18
Transportation system assessment 3<br />
Road network:<br />
- Very extensive road network, usually far from capacity,<br />
- Few bottlenecks in the network and some inefficiency in traffic flows management,<br />
- Bad connection between northern and southern part of the city due to the city center<br />
bottleneck,<br />
- Important to be careful about road investment in order to build a <strong>sustainable</strong><br />
roadmap.<br />
Public <strong>transport</strong> network:<br />
- Strong and efficient Metro backbone serving part of the city center and some of the<br />
dense suburbs,<br />
- Bus and Marshrutkas network not optimized: O/D logic on many links while traffic<br />
need to be consolidated on strong corridors to offer better and cheaper service,<br />
- Some areas in the city center and in the dense suburbs are not served by a heavy<br />
<strong>transport</strong> mode (light rail for instance),<br />
- Bad connections between suburbs.<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
19
Transport system assessment 3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
20
Surveys<br />
3<br />
Objective:<br />
- Very few data about <strong>transport</strong>ation demand in <strong>Tbilisi</strong>,<br />
- Only boarding number per station in the Metro and<br />
boarding number per line in the bus system,<br />
- No information about origins, destinations, motives<br />
of the persons,<br />
- Objective 1: building a Origin/Destination matrix for<br />
trips performed during the peak period in <strong>Tbilisi</strong>,<br />
- Objective 2: propose <strong>transport</strong>ation <strong>project</strong>s<br />
corresponding to the current and future demand<br />
corridors (taking into account <strong>urban</strong> developments),<br />
- Additional objective: assist the municipality in the<br />
process of getting a complete overview of the<br />
<strong>transport</strong>ation behavior in <strong>Tbilisi</strong>.<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
21
Surveys<br />
3<br />
In the Metro network:<br />
- Manual counts completed by automatic<br />
counts at the turnstile.<br />
- Over 6300 Origin-Destination surveys<br />
performed at morning peak (8:00 AM –<br />
11:00 PM) at 11 major Metro stations<br />
‣ Age and occupation,<br />
‣ Origin of the trip (usually home<br />
address),<br />
‣ Destination of the trip (usually<br />
business/school address),<br />
‣ Motive of the trip (home-work,<br />
home-study….),<br />
‣ Trip duration, frequency of the trip,<br />
number of transfers.<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
22
Surveys 3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
23
Surveys 3<br />
Metro survey in Akhmateli Teatri station<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
24
Surveys 3<br />
Metro survey in Varketili station<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
25
Surveys<br />
3<br />
On the road network:<br />
- Counts performed at over 20 locations<br />
during morning and evening peak hour at<br />
the <strong>Tbilisi</strong> Patrol Police video center,<br />
- Over 3000 Origin-Destination surveys<br />
performed at evening time (5 PM – 7:30<br />
PM) at 11 locations around and inside<br />
<strong>Tbilisi</strong> with the assistance of the <strong>Tbilisi</strong><br />
Patrol Police<br />
‣ Age and occupation,<br />
‣ Origin of the trip (usually home<br />
address),<br />
‣ Destination of the trip (usually<br />
business/school address),<br />
‣ Motive of the trip (home-work,<br />
home-study….), number of people in<br />
the vehicle.<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
26
Surveys 3<br />
Counts results<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
27
Surveys<br />
3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
28
Surveys<br />
3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
29
Surveys<br />
3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
30
Surveys<br />
3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
31
Surveys<br />
3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
32
Surveys<br />
3<br />
In the bus network:<br />
- Counts are currently being performed by<br />
the <strong>Tbilisi</strong> Bus Company with the<br />
assistance of Systra/Spectrum,<br />
- Around 3000 Origin-Destination surveys<br />
performed at evening time (4:30 PM –<br />
7:30 PM) at 15 major Bus stations<br />
‣ Age and occupation,<br />
‣ Origin of the trip (usually home<br />
address),<br />
‣ Destination of the trip (usually<br />
business/school address),<br />
‣ Motive of the trip (home-work,<br />
home-study….),<br />
‣ List of PT lines used.<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
33
Surveys<br />
3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
34
Surveys<br />
3<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
35
4<br />
4. Objectives of the Masterplan<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
36
Stakes and challenges to <strong>Tbilisi</strong>’s development<br />
4<br />
Main stakes for <strong>Tbilisi</strong>’s <strong>sustainable</strong> development:<br />
- Remove main bottlenecks and improve accessibility to all parts of the city<br />
- Anticipate the growth of the motorization rate due to the economic development<br />
- Anticipate the growth in mobility due to the economic development<br />
- Keep the current modal split by reinforcing quality and attractiveness of public<br />
<strong>transport</strong> and promoting Transit-Oriented Development (TOD) & promote intermodal<br />
passenger <strong>transport</strong><br />
- Anticipate the new <strong>urban</strong> <strong>project</strong>s (housing and business centers) in order to<br />
propose <strong>project</strong>s suitable to future mobility needs.<br />
Total trips<br />
Car trips<br />
Public Transport trips<br />
Today 2025<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
37
Objectives<br />
4<br />
5 identified objectives:<br />
1. Improve efficiency of private <strong>transport</strong> (cars…),<br />
2. Complete the road network,<br />
3. Improve Public Transport quality and level of service,<br />
4. Extent the Public Transport network,<br />
5. Promote a pedestrian friendly strategy and the quality of life in <strong>Tbilisi</strong>.<br />
3 phases:<br />
- “Optimization” (short term)<br />
- “Development” (medium term)<br />
- “Ambitious” (long term)<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
38
Objectives<br />
4<br />
Projects already decided integrated into the Masterplan<br />
1. Vere River highway: rapid highway connection between Gmirta Moedani and<br />
Delisi Metro Station<br />
2. New bridge over the Mtkvari River: connecting Didube and the Right Bank<br />
between Digomi and Saburtalo<br />
3. Universiteti Metro extension: opening of the metro extension between Vaja<br />
Pshavela and Universiteti<br />
4. Gorgasali Tunnel: construction of a tunnel along Gorgasali street<br />
5. Removal of the railway line in the city center of <strong>Tbilisi</strong>: construction of a new<br />
highway/boulevard on the former rail right-of-way.<br />
6. Rike – Shavi Zgvis Kucha link<br />
7. Rustavi Highway <strong>urban</strong> link: new freeway/highway connecting Rustavi and<br />
<strong>Tbilisi</strong>.<br />
8. Traffic light management on Chavchavadze<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
39
Actions<br />
4<br />
Around 30 <strong>project</strong>s or policy proposed:<br />
- 10 <strong>project</strong>s for the Road network<br />
- 10 <strong>project</strong>s for Public <strong>transport</strong> network<br />
- 4-5 new Parking lots proposed<br />
- Intermodality: 3 main transfer stations<br />
- 2 soft modes <strong>project</strong><br />
- 1 <strong>urban</strong> boulevard <strong>project</strong><br />
PROJECTS ARE INTEGRATED AND INTER-RELATED<br />
TO BUILD A LONG TERM SUSTAINABLE MASTERPLAN<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
40
5<br />
5. Some <strong>project</strong>s being currently considered<br />
in the roadmap<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
41
Urban <strong>sustainable</strong> development on removed railway right-of-way 5<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
42
Urban <strong>sustainable</strong> development on removed railway right-of-way 5<br />
Transform the rail right of way into a <strong>urban</strong> boulevard to reduce barriers between<br />
neighborhoods<br />
View of a LRT system<br />
BRT line on an <strong>urban</strong> boulevard. Lyon,<br />
France<br />
Photo Google<br />
The Transmilenio: an <strong>urban</strong> Bus Rapid Transit<br />
system<br />
Bogota, Colombia<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
43
Urban <strong>sustainable</strong> development on removed railway right-of-way<br />
5<br />
Example of an <strong>urban</strong> boulevard with a BRT system: the Busway in Nantes<br />
Nantes, France<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
44
Urban <strong>sustainable</strong> development on removed railway right-of-way<br />
5<br />
Nantes, France<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
45
Urban <strong>sustainable</strong> development on removed railway right-of-way<br />
5<br />
Nantes, France<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
46
Urban <strong>sustainable</strong> development on removed railway<br />
infrastructure<br />
5<br />
Bordeaux, France<br />
Photo LA CUB©<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
47<br />
Barcelona, Spa
Regeneration of a Light Rail Network<br />
5<br />
Need for additional structuring Public <strong>transport</strong> network<br />
- Many areas not served by the Metro or a heavy PT system<br />
- Strong demand on some corridors served by many bus lines<br />
- Rationale for consolidating the demand into a LRT system with a high quality of<br />
service<br />
- Transforming the current “O/D system” into a “corridor system” with feeding lines<br />
- LRT lines are built in all modern cities<br />
- Municipality of <strong>Tbilisi</strong> showed a great interest in the <strong>project</strong><br />
- Complementary with some proposed Metro extension<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
48
Regeneration of a Light Rail Network<br />
5<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
49
Urban organization with LRT<br />
5<br />
Padova, Italy<br />
Source : Lohr Industry ©<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
50
Urban organization with LRT<br />
5<br />
Teda,China<br />
Source : Lohr Industry ©<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
51
Urban organization with LRT<br />
5<br />
Clermont-Ferrand, France<br />
Source : Lohr Industry ©<br />
Montpelier, France<br />
Source : RATP/D.JACKSON ©<br />
Bordeaux, France<br />
Source : La CUB ©<br />
Istanboul, Turkey<br />
Source : Bombardier©<br />
Teda,China<br />
Source : Lohr Industry ©<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
52
An high-tech and highly design solution for cities<br />
5<br />
Marseille, France<br />
Source :<br />
SYSTRA/L.CARDUCCI ©<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
53
An high-tech and highly design solution for cities<br />
5<br />
Orléans, France<br />
Source :<br />
SYSTRA/P.JOURDAIN ©<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
54
An environmentally responsible, modern and comfort way to<br />
travel<br />
5<br />
Clermont-Ferrand, France<br />
Source : SYSTRA<br />
Mulhouse, France<br />
Source : Alstom ©<br />
Grenoble, France<br />
Source : SYSTRA<br />
Dubaï, UAE<br />
Source : SYSTRA ©<br />
Bordeaux, France<br />
Source : La CUB ©<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
55
Public Transport Actions: Metro<br />
5<br />
Metro extensions to Universiteti,<br />
Gldani and Varketili<br />
Green line extension<br />
Red line extension<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
56
Limit local & regional transit traffic in the city center 5<br />
Regional transit traffic<br />
- <strong>Tbilisi</strong> located at the crossroads between several regions & countries: Turkey-<br />
Azerbaijan, Turkey-Armenia, Russia-Armenia<br />
- External ring road is not completed between Rustavi Highway and Marneuli<br />
Highway.<br />
Local transit traffic<br />
- Several bottlenecks in the city center while local thru traffic has to go through the<br />
city center (mainly on the embankments),<br />
- Rationale to propose an inner ring road for traffic between the suburbs.<br />
- Alignment possible along the <strong>Tbilisi</strong> Sea in the context of the <strong>Tbilisi</strong> Sea<br />
Development <strong>project</strong> and the railway bypass <strong>project</strong>.<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
57
Limit local & regional thru traffic in the city center 5<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
58
Other actions 5<br />
Several other actions proposed<br />
- Reorganization and rationalization of the bus network,<br />
- New integrated fare system,<br />
- Road traffic management in the city center,<br />
- New parking lots and new parking policy,<br />
- Reduced speed zone in the old city (long-term).<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
59
6<br />
6. Future work<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
60
Future work for Systra/Spectrum<br />
6<br />
Propose a strategic roadmap on short, medium and long term<br />
- Analysis the results of the surveys,<br />
- Propose a strategic roadmap based on actual and future trends of demand,<br />
- Phase <strong>project</strong>s and investment plan,<br />
- Detail short/medium term <strong>project</strong>s,<br />
- Traffic estimates based on performed surveys.<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
61
Future work for the municipality<br />
6<br />
Implementing of a household survey<br />
- Around 7,000 households (about 18,000<br />
persons) to be surveyed in <strong>Tbilisi</strong><br />
- International standard methodology to<br />
ensure quality monitoring and accuracy of<br />
results<br />
- Never performed before in the Caucasus<br />
Region<br />
- Provide important <strong>transport</strong>ation-related data<br />
such as mobility, motorized mobility<br />
depending on income, age, occupation, trip<br />
motive, motorization…<br />
- Provide information about <strong>Tbilisi</strong> inhabitant’s<br />
opinion on <strong>transport</strong>ation-related subject<br />
- Allow to calibrate a state-of-the art<br />
multimodal detailed <strong>transport</strong>ation model<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
62
Future work for the municipality<br />
6<br />
Building a multimodal model owned by the<br />
municipality<br />
- Based on the household survey and on<br />
counts performed, calibration of a detailed<br />
<strong>transport</strong>ation model (100 – 300 zones) using<br />
internationally recognized software (Cube,<br />
Visum…),<br />
- Socio-economic <strong>project</strong>ion at short, medium<br />
and long term taking into account land-use<br />
<strong>project</strong>s,<br />
- Test of proposed <strong>transport</strong>ation <strong>project</strong>s<br />
(road, LRT <strong>project</strong>s, bus lines<br />
restructuration…) & reliable results,<br />
- Training program for Municipality staff so that<br />
they can use the model and test all their<br />
<strong>project</strong>s on daily basis,<br />
- Update of the model every two years.<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
63
THANK YOU FOR YOUR ATTENTION<br />
Contacts<br />
Jean-Manuel GIELY - Project Manager, Systra: jmgiely@systra.com<br />
Asmat ABESADZE – Deputy Project Manager, Spectrum : info@spectrum.com.ge<br />
Marc-Olivier MAILLEFAUD – Deputy Project Manager, Systra : momaillefaud@systra.com<br />
Stephane COHEN – Transport Engineer and Planner, Systra : scohen@systra.com<br />
<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />
April, the 8th 2010<br />
64