<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

Local Economic<br />

Development Forum<br />

April 8 th 2010<br />

<strong>Tbilisi</strong>, Georgia<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

1


Contents<br />

1. Study background<br />

2. Metro Universetiti extension Design<br />

3. Roadmap: work performed<br />

4. Objectives of the Masterplan<br />

5. Some the <strong>project</strong>s being currently considered<br />

6. Future work<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

2


1<br />

1. Study background<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

3


Study background<br />

1<br />

Context :<br />

- Asian Development Bank (ADB) loan proposed to finance <strong>transport</strong> <strong>project</strong>s in<br />

<strong>Tbilisi</strong><br />

- Consortium including the French company Systra, Georgian company Spectrum<br />

and British company EC Harris was selected to:<br />

- Review the feasibility studies of the <strong>project</strong>s in order to make them compliant<br />

with ADB international standards,<br />

- Include the <strong>project</strong>s into a global and strategic <strong>sustainable</strong> roadmap for short,<br />

medium and long-term solutions.<br />

- Study began in December 2009, due to be completed by the September 2010<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

4


Study background<br />

1<br />

Roadmap content & methodology:<br />

- Rationale for the roadmap: integrate <strong>project</strong>s financed by ADB into a global and<br />

<strong>sustainable</strong> roadmap for the city of <strong>Tbilisi</strong>,<br />

- Assessment of the socio-economical situation,<br />

- Implementation of Origin/Destination surveys in the Metro, in buses and on the road<br />

network to have a strategic overview of passengers flows in <strong>Tbilisi</strong>,<br />

- Additional: help the municipality organizing a full household survey using<br />

international standards in order to have a detailed understanding of <strong>transport</strong>ation<br />

behavior in the city of <strong>Tbilisi</strong>,<br />

- Strategic evaluation of the proposed <strong>project</strong>s,<br />

- Additional: implementation of a full detailed model using an international software to<br />

test all municipality <strong>project</strong>s,<br />

- Cost estimates and cost-benefit analysis.<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

5


Study background<br />

1<br />

Challenges: lack of data<br />

- Almost no data existed about <strong>transport</strong>ation demand in <strong>Tbilisi</strong>,<br />

- Therefore it was decided to perform surveys to understand <strong>Tbilisi</strong> inhabitants’<br />

current and future needs,<br />

- Such surveys were never performed before in <strong>Tbilisi</strong>; Systra implements an<br />

international standard methodology already successfully tested in numerous cities<br />

around the world (Mexico, Rio de Janeiro, Cairo, Sarajevo, Hanoï…) ensuring<br />

quality and statistical significance of the results. This will provide very useful<br />

information to the Municipality of <strong>Tbilisi</strong>.<br />

- Collecting data about <strong>transport</strong>ation demand is essential to understand<br />

<strong>transport</strong>ation-related issues and to propose relevant coordinated and <strong>sustainable</strong><br />

<strong>project</strong>s corresponding to the inhabitants current and future short, medium and<br />

long-term needs.<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

6


2<br />

2. Metro University Extension Design<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

7


Metro extension design<br />

2<br />

Review and update the existing design<br />

- Tunnel and station civil works<br />

- Systems & signaling<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

8


Metro extension design<br />

2<br />

Review and update the existing design<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

9


Metro extension design<br />

2<br />

Propose architectural concepts for the stations<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

10


Metro extension design<br />

2<br />

Propose 3 architectural concepts for the stations<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

11


Metro extension design<br />

2<br />

Prepare the Metro extension tender for the Municipality<br />

- Audit report on the state of the <strong>project</strong>s and actions to be implemented was<br />

delivered 15/03/2010<br />

- Final design Package for the Metro extension to be tendered is expected to be<br />

delivered on 31/05/2010<br />

- Construction is expected to last 30 months and include:<br />

- Construction works<br />

- Installation and testing of equipment<br />

- Finishes<br />

- Cost estimate for the extension: around US $ 30 Millions<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

12


3<br />

3. Roadmap : work performed<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

13


Socio-economical assessment 3<br />

- Specific shape of the city very constraint by natural topography favoring the<br />

existence of bottlenecks in the <strong>transport</strong>ation system,<br />

- Very dense suburbs generating several trips,<br />

- Very attractive center,<br />

- Numerous former industrial areas now unoccupied providing space for new housing<br />

or business development,<br />

- Several ongoing <strong>urban</strong> <strong>project</strong>s, the most important being the removal of the railway<br />

tracks from the city center,<br />

- <strong>Tbilisi</strong> in the regional context: important commuting from Rustavi, main attracting<br />

center in Georgia, important transit (thru) traffic (persons and goods) between<br />

Turkey, Armenia, Azerbaijan and Russia.<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

14


Socio-economic assessment 3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

15


Socio-economic assessment 3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

16


Socio-economic assessment 3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

17


Socio-economic assessment 3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

18


Transportation system assessment 3<br />

Road network:<br />

- Very extensive road network, usually far from capacity,<br />

- Few bottlenecks in the network and some inefficiency in traffic flows management,<br />

- Bad connection between northern and southern part of the city due to the city center<br />

bottleneck,<br />

- Important to be careful about road investment in order to build a <strong>sustainable</strong><br />

roadmap.<br />

Public <strong>transport</strong> network:<br />

- Strong and efficient Metro backbone serving part of the city center and some of the<br />

dense suburbs,<br />

- Bus and Marshrutkas network not optimized: O/D logic on many links while traffic<br />

need to be consolidated on strong corridors to offer better and cheaper service,<br />

- Some areas in the city center and in the dense suburbs are not served by a heavy<br />

<strong>transport</strong> mode (light rail for instance),<br />

- Bad connections between suburbs.<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

19


Transport system assessment 3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

20


Surveys<br />

3<br />

Objective:<br />

- Very few data about <strong>transport</strong>ation demand in <strong>Tbilisi</strong>,<br />

- Only boarding number per station in the Metro and<br />

boarding number per line in the bus system,<br />

- No information about origins, destinations, motives<br />

of the persons,<br />

- Objective 1: building a Origin/Destination matrix for<br />

trips performed during the peak period in <strong>Tbilisi</strong>,<br />

- Objective 2: propose <strong>transport</strong>ation <strong>project</strong>s<br />

corresponding to the current and future demand<br />

corridors (taking into account <strong>urban</strong> developments),<br />

- Additional objective: assist the municipality in the<br />

process of getting a complete overview of the<br />

<strong>transport</strong>ation behavior in <strong>Tbilisi</strong>.<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

21


Surveys<br />

3<br />

In the Metro network:<br />

- Manual counts completed by automatic<br />

counts at the turnstile.<br />

- Over 6300 Origin-Destination surveys<br />

performed at morning peak (8:00 AM –<br />

11:00 PM) at 11 major Metro stations<br />

‣ Age and occupation,<br />

‣ Origin of the trip (usually home<br />

address),<br />

‣ Destination of the trip (usually<br />

business/school address),<br />

‣ Motive of the trip (home-work,<br />

home-study….),<br />

‣ Trip duration, frequency of the trip,<br />

number of transfers.<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

22


Surveys 3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

23


Surveys 3<br />

Metro survey in Akhmateli Teatri station<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

24


Surveys 3<br />

Metro survey in Varketili station<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

25


Surveys<br />

3<br />

On the road network:<br />

- Counts performed at over 20 locations<br />

during morning and evening peak hour at<br />

the <strong>Tbilisi</strong> Patrol Police video center,<br />

- Over 3000 Origin-Destination surveys<br />

performed at evening time (5 PM – 7:30<br />

PM) at 11 locations around and inside<br />

<strong>Tbilisi</strong> with the assistance of the <strong>Tbilisi</strong><br />

Patrol Police<br />

‣ Age and occupation,<br />

‣ Origin of the trip (usually home<br />

address),<br />

‣ Destination of the trip (usually<br />

business/school address),<br />

‣ Motive of the trip (home-work,<br />

home-study….), number of people in<br />

the vehicle.<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

26


Surveys 3<br />

Counts results<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

27


Surveys<br />

3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

28


Surveys<br />

3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

29


Surveys<br />

3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

30


Surveys<br />

3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

31


Surveys<br />

3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

32


Surveys<br />

3<br />

In the bus network:<br />

- Counts are currently being performed by<br />

the <strong>Tbilisi</strong> Bus Company with the<br />

assistance of Systra/Spectrum,<br />

- Around 3000 Origin-Destination surveys<br />

performed at evening time (4:30 PM –<br />

7:30 PM) at 15 major Bus stations<br />

‣ Age and occupation,<br />

‣ Origin of the trip (usually home<br />

address),<br />

‣ Destination of the trip (usually<br />

business/school address),<br />

‣ Motive of the trip (home-work,<br />

home-study….),<br />

‣ List of PT lines used.<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

33


Surveys<br />

3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

34


Surveys<br />

3<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

35


4<br />

4. Objectives of the Masterplan<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

36


Stakes and challenges to <strong>Tbilisi</strong>’s development<br />

4<br />

Main stakes for <strong>Tbilisi</strong>’s <strong>sustainable</strong> development:<br />

- Remove main bottlenecks and improve accessibility to all parts of the city<br />

- Anticipate the growth of the motorization rate due to the economic development<br />

- Anticipate the growth in mobility due to the economic development<br />

- Keep the current modal split by reinforcing quality and attractiveness of public<br />

<strong>transport</strong> and promoting Transit-Oriented Development (TOD) & promote intermodal<br />

passenger <strong>transport</strong><br />

- Anticipate the new <strong>urban</strong> <strong>project</strong>s (housing and business centers) in order to<br />

propose <strong>project</strong>s suitable to future mobility needs.<br />

Total trips<br />

Car trips<br />

Public Transport trips<br />

Today 2025<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

37


Objectives<br />

4<br />

5 identified objectives:<br />

1. Improve efficiency of private <strong>transport</strong> (cars…),<br />

2. Complete the road network,<br />

3. Improve Public Transport quality and level of service,<br />

4. Extent the Public Transport network,<br />

5. Promote a pedestrian friendly strategy and the quality of life in <strong>Tbilisi</strong>.<br />

3 phases:<br />

- “Optimization” (short term)<br />

- “Development” (medium term)<br />

- “Ambitious” (long term)<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

38


Objectives<br />

4<br />

Projects already decided integrated into the Masterplan<br />

1. Vere River highway: rapid highway connection between Gmirta Moedani and<br />

Delisi Metro Station<br />

2. New bridge over the Mtkvari River: connecting Didube and the Right Bank<br />

between Digomi and Saburtalo<br />

3. Universiteti Metro extension: opening of the metro extension between Vaja<br />

Pshavela and Universiteti<br />

4. Gorgasali Tunnel: construction of a tunnel along Gorgasali street<br />

5. Removal of the railway line in the city center of <strong>Tbilisi</strong>: construction of a new<br />

highway/boulevard on the former rail right-of-way.<br />

6. Rike – Shavi Zgvis Kucha link<br />

7. Rustavi Highway <strong>urban</strong> link: new freeway/highway connecting Rustavi and<br />

<strong>Tbilisi</strong>.<br />

8. Traffic light management on Chavchavadze<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

39


Actions<br />

4<br />

Around 30 <strong>project</strong>s or policy proposed:<br />

- 10 <strong>project</strong>s for the Road network<br />

- 10 <strong>project</strong>s for Public <strong>transport</strong> network<br />

- 4-5 new Parking lots proposed<br />

- Intermodality: 3 main transfer stations<br />

- 2 soft modes <strong>project</strong><br />

- 1 <strong>urban</strong> boulevard <strong>project</strong><br />

PROJECTS ARE INTEGRATED AND INTER-RELATED<br />

TO BUILD A LONG TERM SUSTAINABLE MASTERPLAN<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

40


5<br />

5. Some <strong>project</strong>s being currently considered<br />

in the roadmap<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

41


Urban <strong>sustainable</strong> development on removed railway right-of-way 5<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

42


Urban <strong>sustainable</strong> development on removed railway right-of-way 5<br />

Transform the rail right of way into a <strong>urban</strong> boulevard to reduce barriers between<br />

neighborhoods<br />

View of a LRT system<br />

BRT line on an <strong>urban</strong> boulevard. Lyon,<br />

France<br />

Photo Google<br />

The Transmilenio: an <strong>urban</strong> Bus Rapid Transit<br />

system<br />

Bogota, Colombia<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

43


Urban <strong>sustainable</strong> development on removed railway right-of-way<br />

5<br />

Example of an <strong>urban</strong> boulevard with a BRT system: the Busway in Nantes<br />

Nantes, France<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

44


Urban <strong>sustainable</strong> development on removed railway right-of-way<br />

5<br />

Nantes, France<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

45


Urban <strong>sustainable</strong> development on removed railway right-of-way<br />

5<br />

Nantes, France<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

46


Urban <strong>sustainable</strong> development on removed railway<br />

infrastructure<br />

5<br />

Bordeaux, France<br />

Photo LA CUB©<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

47<br />

Barcelona, Spa


Regeneration of a Light Rail Network<br />

5<br />

Need for additional structuring Public <strong>transport</strong> network<br />

- Many areas not served by the Metro or a heavy PT system<br />

- Strong demand on some corridors served by many bus lines<br />

- Rationale for consolidating the demand into a LRT system with a high quality of<br />

service<br />

- Transforming the current “O/D system” into a “corridor system” with feeding lines<br />

- LRT lines are built in all modern cities<br />

- Municipality of <strong>Tbilisi</strong> showed a great interest in the <strong>project</strong><br />

- Complementary with some proposed Metro extension<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

48


Regeneration of a Light Rail Network<br />

5<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

49


Urban organization with LRT<br />

5<br />

Padova, Italy<br />

Source : Lohr Industry ©<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

50


Urban organization with LRT<br />

5<br />

Teda,China<br />

Source : Lohr Industry ©<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

51


Urban organization with LRT<br />

5<br />

Clermont-Ferrand, France<br />

Source : Lohr Industry ©<br />

Montpelier, France<br />

Source : RATP/D.JACKSON ©<br />

Bordeaux, France<br />

Source : La CUB ©<br />

Istanboul, Turkey<br />

Source : Bombardier©<br />

Teda,China<br />

Source : Lohr Industry ©<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

52


An high-tech and highly design solution for cities<br />

5<br />

Marseille, France<br />

Source :<br />

SYSTRA/L.CARDUCCI ©<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

53


An high-tech and highly design solution for cities<br />

5<br />

Orléans, France<br />

Source :<br />

SYSTRA/P.JOURDAIN ©<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

54


An environmentally responsible, modern and comfort way to<br />

travel<br />

5<br />

Clermont-Ferrand, France<br />

Source : SYSTRA<br />

Mulhouse, France<br />

Source : Alstom ©<br />

Grenoble, France<br />

Source : SYSTRA<br />

Dubaï, UAE<br />

Source : SYSTRA ©<br />

Bordeaux, France<br />

Source : La CUB ©<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

55


Public Transport Actions: Metro<br />

5<br />

Metro extensions to Universiteti,<br />

Gldani and Varketili<br />

Green line extension<br />

Red line extension<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

56


Limit local & regional transit traffic in the city center 5<br />

Regional transit traffic<br />

- <strong>Tbilisi</strong> located at the crossroads between several regions & countries: Turkey-<br />

Azerbaijan, Turkey-Armenia, Russia-Armenia<br />

- External ring road is not completed between Rustavi Highway and Marneuli<br />

Highway.<br />

Local transit traffic<br />

- Several bottlenecks in the city center while local thru traffic has to go through the<br />

city center (mainly on the embankments),<br />

- Rationale to propose an inner ring road for traffic between the suburbs.<br />

- Alignment possible along the <strong>Tbilisi</strong> Sea in the context of the <strong>Tbilisi</strong> Sea<br />

Development <strong>project</strong> and the railway bypass <strong>project</strong>.<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

57


Limit local & regional thru traffic in the city center 5<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

58


Other actions 5<br />

Several other actions proposed<br />

- Reorganization and rationalization of the bus network,<br />

- New integrated fare system,<br />

- Road traffic management in the city center,<br />

- New parking lots and new parking policy,<br />

- Reduced speed zone in the old city (long-term).<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

59


6<br />

6. Future work<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

60


Future work for Systra/Spectrum<br />

6<br />

Propose a strategic roadmap on short, medium and long term<br />

- Analysis the results of the surveys,<br />

- Propose a strategic roadmap based on actual and future trends of demand,<br />

- Phase <strong>project</strong>s and investment plan,<br />

- Detail short/medium term <strong>project</strong>s,<br />

- Traffic estimates based on performed surveys.<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

61


Future work for the municipality<br />

6<br />

Implementing of a household survey<br />

- Around 7,000 households (about 18,000<br />

persons) to be surveyed in <strong>Tbilisi</strong><br />

- International standard methodology to<br />

ensure quality monitoring and accuracy of<br />

results<br />

- Never performed before in the Caucasus<br />

Region<br />

- Provide important <strong>transport</strong>ation-related data<br />

such as mobility, motorized mobility<br />

depending on income, age, occupation, trip<br />

motive, motorization…<br />

- Provide information about <strong>Tbilisi</strong> inhabitant’s<br />

opinion on <strong>transport</strong>ation-related subject<br />

- Allow to calibrate a state-of-the art<br />

multimodal detailed <strong>transport</strong>ation model<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

62


Future work for the municipality<br />

6<br />

Building a multimodal model owned by the<br />

municipality<br />

- Based on the household survey and on<br />

counts performed, calibration of a detailed<br />

<strong>transport</strong>ation model (100 – 300 zones) using<br />

internationally recognized software (Cube,<br />

Visum…),<br />

- Socio-economic <strong>project</strong>ion at short, medium<br />

and long term taking into account land-use<br />

<strong>project</strong>s,<br />

- Test of proposed <strong>transport</strong>ation <strong>project</strong>s<br />

(road, LRT <strong>project</strong>s, bus lines<br />

restructuration…) & reliable results,<br />

- Training program for Municipality staff so that<br />

they can use the model and test all their<br />

<strong>project</strong>s on daily basis,<br />

- Update of the model every two years.<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

63


THANK YOU FOR YOUR ATTENTION<br />

Contacts<br />

Jean-Manuel GIELY - Project Manager, Systra: jmgiely@systra.com<br />

Asmat ABESADZE – Deputy Project Manager, Spectrum : info@spectrum.com.ge<br />

Marc-Olivier MAILLEFAUD – Deputy Project Manager, Systra : momaillefaud@systra.com<br />

Stephane COHEN – Transport Engineer and Planner, Systra : scohen@systra.com<br />

<strong>Tbilisi</strong> <strong>sustainable</strong> <strong>urban</strong> <strong>transport</strong> <strong>project</strong><br />

April, the 8th 2010<br />

64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!