(v) Schedule a kick‐off meeting with the project management and design teams,<br />

subcontractors, and construction management.<br />

Establish and track the team commitments and commitment reliability. The team<br />

utilizes SPS/Production Manager to track commitment reliability.<br />

Plan Start End CR Site CR Support CR Total Planned Compl. As Planned Not Compl. As Planned Unstatused<br />

1 1‐Apr‐09 7‐Apr‐09 30.00% 30.00% ‐ 20 6.0 14.0 0<br />

2 8‐Apr‐09 14‐Apr‐09 53.33% 53.33% ‐ 15 8.0 7.0 0<br />

3 15‐Apr‐09 21‐Apr‐09 85.71% 85.71% ‐ 14 12.0 2.0 0<br />

Average CR: 56.35% 56.35%<br />