*Little Mermaid Ride @ Disney’s California Adventure in Anaheim, CA<br />

‐ Previous Goals:<br />

(i) Finalize Construction Management Team.<br />

Construction Management Team was fully staffed during March 2009: Sr. CM,<br />

Integration Manager, BIM Coordinator, <strong>Project</strong> Engineer, and <strong>Project</strong><br />

Superintendent.<br />

The Integration Manager (IM) manages the participation of all Design Team<br />

members in the BIM process as well as managing the efficient functioning of the<br />

“Big Room”. The IM is the “enforcer” of the Design Team ensuring an open<br />

collaborative and efficient operation of the “Big Room” as well as adherence to<br />

the Goals set by all Design Team participants at the formation of the Design<br />

Team.<br />

The BIM Coordinator (BC) manages the technical aspects of the BIM process<br />

including subcontractor input to the Design Team’s shared file site, Clash<br />

Detection <strong>Report</strong> procedures, documentation of solutions, as well as monitoring<br />

resolution of items on the Issues Log.<br />