m/s. shah alloys ltd. summary record of the proceeding - Board for ...
m/s. shah alloys ltd. summary record of the proceeding - Board for ...
m/s. shah alloys ltd. summary record of the proceeding - Board for ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Case No..13/2010<br />
M/S Shah Alloys Ltd<br />
s ickn es s on 31.5.2010 a n d 5.7.2010. In th e h ea rin g h eld on 31.8.2010, th e<br />
Ben ch decla red th e com pa n y a s a s ick in du s tria l com pa n y u / s 3(1)(o) <strong>of</strong><br />
SICA a n d a ppoin ted Un ion Ba n k <strong>of</strong> In dia (UBI) a s Opera tin g Agen cy u / s<br />
17(3) <strong>of</strong> SICA to prepa re a Dra ft Reh a bilita tion Sch em e (DRS) <strong>for</strong> th e<br />
com pa n y, a s per Section 18 <strong>of</strong> SICA a n d th e en clos ed gu idelin es , based on<br />
<strong>the</strong> DRS to be submitted by <strong>the</strong> company.<br />
1.2 The hearing in <strong>the</strong> case was held on 30.11.2011(MA) be<strong>for</strong>e <strong>the</strong> <strong>Board</strong>.<br />
1.3 In <strong>the</strong> last hearing held on 17.01.2012, <strong>the</strong> Bench issued <strong>the</strong> following<br />
directions :-<br />
(i) OA (UBI) to file a copy <strong>of</strong> TEV Stu dy report to th e Boa rd s <strong>of</strong>fice with in<br />
a period <strong>of</strong> 15 days, with copies to all secured creditors <strong>of</strong> <strong>the</strong> company.<br />
(ii) Th e com pa n y to n egotia te with a ll s ecu red creditors <strong>for</strong> s ettlem en t <strong>of</strong><br />
<strong>the</strong>ir dues and submit DRS to <strong>the</strong> OA within 30 days.<br />
(iii) Th erea fter, UBI (OA) to con ven e a join t m eetin g <strong>of</strong> a ll con cern ed a n d<br />
s u bm it a fu lly tied-u p DRS b e<strong>for</strong>e th e Boa rd s <strong>of</strong>fice with in a period <strong>of</strong> 08<br />
weeks.<br />
(iv) Th e Ben ch Officer, Ben ch -I to delete th e n a m e <strong>of</strong> J in da l Steel & Power<br />
Ltd from <strong>the</strong> mailing list, as <strong>the</strong>y are unsecured creditors <strong>of</strong> <strong>the</strong> company.<br />
(v) The next hearing in <strong>the</strong> case will be held on 24.04.2012.<br />
2.1 In toda y s h ea rin g (23.04.2012), th e repres en ta tive <strong>of</strong> Un ion Ba n k <strong>of</strong><br />
In dia (UBI) (OA) s ta ted th a t TEV Stu dy report h a s been received on ly on<br />
16.04.2012. OA (UBI) will convene a joint meeting <strong>of</strong> all <strong>the</strong> lenders and will<br />
s u bm it its report with in a period <strong>of</strong> on e m on th . On a query from <strong>the</strong> Bench<br />
w h eth er th e com pan y h as en tered in to s ettlem en t <strong>of</strong> its d ues , th e<br />
repres en ta tive <strong>of</strong> OA (UBI) s ta ted th a t th ey a re n ot a wa re <strong>of</strong> a n y s u ch<br />
settlement whe<strong>the</strong>r <strong>the</strong> company has done.<br />
2.2 Th e repres en ta tive <strong>of</strong> SBI s ta ted th a t th ey h a d filed a n a pplica tion in<br />
which certa in objection were ra is ed. He a dded th a t in th e Con cu rren t<br />
Au ditors Report, it wa s observed th a t th e com pa n y du rin g two qu a rters<br />
2