10.11.2014 Views

m/s. shah alloys ltd. summary record of the proceeding - Board for ...

m/s. shah alloys ltd. summary record of the proceeding - Board for ...

m/s. shah alloys ltd. summary record of the proceeding - Board for ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Case No..13/2010<br />

M/S Shah Alloys Ltd<br />

s ickn es s on 31.5.2010 a n d 5.7.2010. In th e h ea rin g h eld on 31.8.2010, th e<br />

Ben ch decla red th e com pa n y a s a s ick in du s tria l com pa n y u / s 3(1)(o) <strong>of</strong><br />

SICA a n d a ppoin ted Un ion Ba n k <strong>of</strong> In dia (UBI) a s Opera tin g Agen cy u / s<br />

17(3) <strong>of</strong> SICA to prepa re a Dra ft Reh a bilita tion Sch em e (DRS) <strong>for</strong> th e<br />

com pa n y, a s per Section 18 <strong>of</strong> SICA a n d th e en clos ed gu idelin es , based on<br />

<strong>the</strong> DRS to be submitted by <strong>the</strong> company.<br />

1.2 The hearing in <strong>the</strong> case was held on 30.11.2011(MA) be<strong>for</strong>e <strong>the</strong> <strong>Board</strong>.<br />

1.3 In <strong>the</strong> last hearing held on 17.01.2012, <strong>the</strong> Bench issued <strong>the</strong> following<br />

directions :-<br />

(i) OA (UBI) to file a copy <strong>of</strong> TEV Stu dy report to th e Boa rd s <strong>of</strong>fice with in<br />

a period <strong>of</strong> 15 days, with copies to all secured creditors <strong>of</strong> <strong>the</strong> company.<br />

(ii) Th e com pa n y to n egotia te with a ll s ecu red creditors <strong>for</strong> s ettlem en t <strong>of</strong><br />

<strong>the</strong>ir dues and submit DRS to <strong>the</strong> OA within 30 days.<br />

(iii) Th erea fter, UBI (OA) to con ven e a join t m eetin g <strong>of</strong> a ll con cern ed a n d<br />

s u bm it a fu lly tied-u p DRS b e<strong>for</strong>e th e Boa rd s <strong>of</strong>fice with in a period <strong>of</strong> 08<br />

weeks.<br />

(iv) Th e Ben ch Officer, Ben ch -I to delete th e n a m e <strong>of</strong> J in da l Steel & Power<br />

Ltd from <strong>the</strong> mailing list, as <strong>the</strong>y are unsecured creditors <strong>of</strong> <strong>the</strong> company.<br />

(v) The next hearing in <strong>the</strong> case will be held on 24.04.2012.<br />

2.1 In toda y s h ea rin g (23.04.2012), th e repres en ta tive <strong>of</strong> Un ion Ba n k <strong>of</strong><br />

In dia (UBI) (OA) s ta ted th a t TEV Stu dy report h a s been received on ly on<br />

16.04.2012. OA (UBI) will convene a joint meeting <strong>of</strong> all <strong>the</strong> lenders and will<br />

s u bm it its report with in a period <strong>of</strong> on e m on th . On a query from <strong>the</strong> Bench<br />

w h eth er th e com pan y h as en tered in to s ettlem en t <strong>of</strong> its d ues , th e<br />

repres en ta tive <strong>of</strong> OA (UBI) s ta ted th a t th ey a re n ot a wa re <strong>of</strong> a n y s u ch<br />

settlement whe<strong>the</strong>r <strong>the</strong> company has done.<br />

2.2 Th e repres en ta tive <strong>of</strong> SBI s ta ted th a t th ey h a d filed a n a pplica tion in<br />

which certa in objection were ra is ed. He a dded th a t in th e Con cu rren t<br />

Au ditors Report, it wa s observed th a t th e com pa n y du rin g two qu a rters<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!