12.07.2015 Views

1 BOARD FOR INDUSTRIAL AND FINANCIAL RECONSTRUCTION ...

1 BOARD FOR INDUSTRIAL AND FINANCIAL RECONSTRUCTION ...

1 BOARD FOR INDUSTRIAL AND FINANCIAL RECONSTRUCTION ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Case No. 149/1994 : M/s JK Jute Mills Ltd<strong>BOARD</strong> <strong>FOR</strong> <strong>INDUSTRIAL</strong> <strong>AND</strong> <strong>FINANCIAL</strong> <strong>RECONSTRUCTION</strong>CASE NO.149/94 : M/S. J.K.JUTE MILLS LTD.SUMMARY RECORD OF THE PROCEEDINGS OF THE HEARING HELD ON8.11.2010 BE<strong>FOR</strong>E THE BENCH CONSISTING OF SHRI NIRMAL SINGH,CHAIRMAN, SHRI V.K.MALHOTRA, MEMBER <strong>AND</strong> SMT SAROJ BALA,MEMBERBENCH-IPresentM/s. J.K.Jute Mills Ltd.IDBI (OA)Punjab National Bank (PNB)ESICJ.K.Jute Mill Mazdoor PanchayatJK Jute Mill Mazdoor MorchaJK Jute Mill Trade UnionSanyukta MorchaName & Designation of theRepresentatives S/Shri/MsNeha Singhal, ConsultantImran Khan, AMSurinder Kumar, Sr. ManagerSaurabh Chadda, Standing CounselDaulat Ram, PresidentRaju Prasad, General SecretaryAkshat Kumar, Advocate______________1.1 After declaring M/s. J.K.Jute Mills Ltd. (JKJML) (hereafter referred toa s `th e com pa n y ) a s a s ick in du s tria l com pa n y a s per th e provis ion s ofSection 3(1)(o) of th e Sick In du s tria l Com pa n ies (Specia l Provis ion s ) Act,1985 (h erein a fter referred to a s `SICA ), a s ch em e for reh a bilita tion of th ecom pa n y wa s s a n ction ed by th e Boa rd a t th e h ea rin g h eld on 20.11.1995,u/s 18(4) read with Section 19(3) of SICA.1.2 After observing the lack of revival in a number of review hearings, theBoard in the hearing held on 1.11.2000, declared the sanctioned scheme of20.11.1995 a s failed , a n d rea ppoin ted IFCI a s th e Opera tin g Agen cy (OA)to prepa re a reh a bilita tion s ch em e a s per RBI gu idelin es wh ich cou ld beoffered to in teres ted pa rties, a n d directed th e OA to is s u e a nadvertisement for ch a n ge in th e m a n a gem en t of th e com pan y. Aga in s t th is1


Case No. 149/1994 : M/s JK Jute Mills Ltdorder of th e Boa rd, th e com pa n y filed a n a ppea l before th e Hon bleAppella te Au th ority for In du s tria l a n d Fin a n cia l Recon s tru ction (AAIFR).Th e Hon ble AAIFR vide order da ted 9.2.2001 a llowed th e a ppeal, anddirected th e com pan y/ exis tin g prom oters to s u b m it th eir u pda ted m odifieds ch em e to th e OA. Th e OA wa s directed to exa m in e th e propos a l a n ds u bm it a report to th e BIFR. Th e AAIFR a ls o a ppoin ted PNB a s OA in pla ceof IFCI a s IFCI s du es h a d been paid off.1.3 In th e n ext h ea rin g h eld on 8.5.2001, th e Boa rd directed th ecom pa n y to s ort ou t th e ou ts ta n din g is s u es with PNB, a n d s u bm it a fu llytied up scheme to the OA.1.4 In th e h ea rin g h eld on 5.8.2003, th e Boa rd n oted th a t th ere wa s s tillno fully tied up scheme for their consideration. It therefore formed a primafacie opin ion for win din g u p th e com pan y, a n d a s h ow ca u s e n otice (SCN)was issued accordingly.1.5 Objection s / s u gges tion s to th e SCN were con s idered a t th e h ea rin gheld on 30.10.2003 wh en , a t th e requ es t of th e workers u n ion , th e Boa rdgra n ted th e com pa n y 15 da ys tim e for s ortin g ou t th e is s u e of workersdu es . As th ere wa s n o progres s in fin a lizin g reh a bilita tion s ch em e th eBoa rd, vide order da ted 5.1.2004, con firm ed th eir opin ion for win din g u pthe company.1.6 Ba s ed on th e com pa n y s a ppea l, Hon ble AAIFR vide order da ted5.9.2005 s et a s ide BIFR s order da ted 5.1.2004 a n d directed th e PNB (OA)and the company to submit a draft rehabilitation scheme before the BIFR.1.7 In th e h ea rin g h eld on 28.11.2007 th e Ben ch a llowed 15 da ys to th ecom pa n y to m a ke its s u bm is s ion a s to wh y th e a rra n gem en t en tered in toby th em with M/s Ra in ey Pa rk Su ppliers Pvt Ltd (RPSPL) s h ou ld n ot becon s idered to be Ch a n ge of Ma n a gem en t (COM) th rou gh ba ck door, andwh y th a t a rra n gem en t s h ou ld n ot be n u llified. Fu rth er, a s a greed by th e2


Case No. 149/1994 : M/s JK Jute Mills Ltdcom pa n y s repres en ta tive, on e-tim e OA fees of Rs .3.00 la kh s s h ou ld bepaid to PNB(OA) together with out of pocket expenses.1.8 In th e h ea rin g h eld on 18.9.2008, th e Ben ch is s u ed th e followin gdirections :-(i) Th e OA(PNB) h a d con firm ed th a t a tra n s pa ren t procedu re wa sfollowed by RPSPL for a cqu irin g m a jority s ta ke in th e com pa n y a n dth e SEBI gu idelin es were com plied with . Th e rem a in in g creditorsalso supported reviva l u n der th e RPSPL. Th e workers repres en ta tivea ls o h a d n o objection if th e com pa n y wou ld com e forwa rd to s ettletheir du es . In th e ligh t of th e a fores a id circu m s ta n ces , th e Ben chh a d ta ken n ote of th e ta ke over of th e m a n a gem en t of th e com pan yby RPSPL.(ii) Sta te Ba n k of In dia wa s a ppoin ted a s OA in th e pla ce of PNB. Th ecom pa n y wou ld pa y a n OA fee of Rs 3.00 la kh to SBI(OA) a n d Rs1.50 lakh to PNB as agreed by the company in the hearing.(iii) Th e com pa n y wou ld en ter in to a n a greem en t with th e workers u n ionJ .K.J u te Mill Ma zdoor Pa n ch a ya t (CITU) a n d s u bm it a fu lly tied u pdra ft reh a bilita tion s ch em e (DRS) to th e OA(SBI) with in 4 weeks .Th e OA wou ld con ven e a join t m eetin g of a ll con cern ed a n d s u bm it afu lly tied u p DRS/ s ta tu s report to BIFR with in a fu rth er period of 6weeks.(iv) The next date of hearing was fixed on 17.12.2008.1.9 In th e h ea rin g h eld on 17.12.2008, th e Ben ch is s u ed th e followin gdirections :-(i) Pu n ja b Na tion a l Ba n k (PNB) wa s re-a ppoin ted a s Opera tin g Agency(OA).(ii) Th e com pa n y wou ld expla in a s to wh y it h a d n ot s u bm itted th ecom m en ts a s a s ked for vide th e Boa rd s fa x da ted 10.11.2008.(iii) Th e com pa n y & OA (PNB) wou ld s u bm it th eir com m en ts on th edetailed submissions dated 16.12.2008 filed by JKJMMP.(iv) Th e com pa n y wa s directed to file a n a ffida vit with in 30 days givingdeta ils of in ven tory/ a s s ets of th e com pa n y h eld a n d th e com pa n y3


Case No. 149/1994 : M/s JK Jute Mills Ltdwou ld a ls o give th e deta ils of a s s ets dis pos ed of, if a n y s in ceregistered in the Board.(v) Th e com pa n y wou ld n ot en cu m ber/ a lien a te/ lea s e/ s ell a n y propertywithout the specific prior approval of the Board.(vi) Th e com pa n y wou ld n ot dis -crim in a te in s ettlem en t with u n -securedcreditors.(vii) J KJ MMP wou ld s u bm it th e deta ils of m em bers h ip of th eir u n ionwithin 15 days.(viii) PNB(OA) wou ld exa m in e th e dra ft reh a bilita tion propos a l s u bm ittedby th e com pa n y in a join t m eetin g a n d s u bm it a s ta tu s reportalongwith the DRS to the Board within two months.(ix) Th e n ext da te of h ea rin g wa s fixed on 11.3.2009 (wh ich wa spostponed and later fixed on 29.6.2009).1.10 In th e h ea rin g h eld on 29.6.2009, th e Ben ch h a d is s u ed followin gdirections :-(i) Th e com pa n y would submit its com m en ts on th e deta ileds u bm is s ion s da ted 16.12.2008 filed by J KJ MMP a s wa s directed inthe last hearing.(ii) J KJ MMP would s u bm it th e deta ils of m em bers h ip of th e u n ionwithin 15 days as was directed in the last hearing.(iii) PNB (OA) would examine the affidavit and also compare the propertieslis ted in a ffida vit with th e properties listed in Form A of th e com pa n ya n d m a ke a n in s pection a t th e com pa n y s s ite a n d s u bm it a report toth e Boa rd with in 15 da ys . Th e com pan y wou ld pa y to PNB(OA) theOA fees, and actual expenses incurred by it for inspection.(iv) The company would submit its written submissions on the reasons fors ign in g th e con vers ion (lea s e) a greem en t, with ou t th e con s en t of th eBoa rd. Th e com pa n y will ca n cel th e s a id con vers ion a greem en twith in 7 da ys fa ilin g wh ich th e Boa rd will be con s tra in ed to is s u en otice u / s 33 & 34 of SICA or de-regis ter th e com pa n y from th eBoard.(v) M/s AK Products was directed to attend the next hearing of the case.(vi) The next hearing of the case would be held on 20.7.2009.4


Case No. 149/1994 : M/s JK Jute Mills LtdMoreover, th e Com pa n y h a s s ou gh t protection u n der BIFR s in ce 1994, a n dh a s over th e yea rs rem a in ed u n der protection , a n d wh ile a m ple tim e a n dopportu n ity h a s been offered, it h a s regretta bly don e little to revive its elf.Boa rd does n ot vis u a lize th e Com pa n y revivin g its elf in th e fores eea blefu tu re. As a Ch a n ge of Ma n a gem en t ordered ea rlier h a s n ot produ ced th edes ired res u lts , th e Boa rd ca m e to th e con clu s ion th a t it wa s equ ita ble a n dju s t in p u blic in teres t to win d u p th e Com pa n y. Th e Boa rd th ereforedirects that(a ) a Sh ow Ca u s e Notice be is s u ed u n der s ection s 33 a n d 34 of SICAa ga in s t th e Com pa n y for willfu lly dis obeyin g th e orders of th e Cou rtby n ot ca n celin g th e lea s e ( con vers ion ) a greem en t with M/ s RTAPL.If n o reply is received with in 3 weeks , it will be pres u m ed th a t th eCompany has no comments to offer; and(b) a Sh ow Ca u s e Notice s h a ll be issued to th e Com pa n y to s ta tereasons why it should not be wound up u/s 20 of SICA.1.12 Th e com pa n y filed a n a ppea l No. 64/ 2009 before Hon ble AAIFRa ga in s t th e Boa rd s order da ted 17.12.2008. Hon ble AAIFR vide orderda ted 17.7.2009 (a copy of order received from th e com pa n y on 22.7.2009)h a d directed th a t At th is s tage, the ld couns els for the parties s ubm ittedth at the BIFR is tak in g up th is m atter on 20.7.2009 for further ord ers .Therefore, w e d irect th at B IFR s h all not pas s an y fin al ord ers till th e appealis fin ally d is pos ed of.1.13 Th e com pa n y vide letter da ted 14.9.2009 h a d s u bm itted a copy oforder of Hon ble AAIFR da ted 26.8.2009 in Appea l No. 64/ 2009. Hon bleAAIFR directed th a t Thus cons id ering the totality of th e facts andcircu m s tances of th e cas e, w e partly allow th is appeal w ith a d irection th atthe BIFR w ill appoin t IDB I as th e Operating Agency in place of PNB an dallow th e s ale of the s urplu s as s ets of th e com pan y s itu ated at four places inBih ar and u tiliz e th e s am e as per the provis ion s of the s anctioned s chem e forreh abilitation of the appellan t com pan y . W ith th e afores aid d irections , th isappeal as w ell as M.A No. 221/ 2009 is fin ally d is pos ed of accord ingly .Parties to appear before the B IFR on 15.9.2009 for further hearings .6


Case No. 149/1994 : M/s JK Jute Mills Ltd1.14 In th e h ea rin g h eld on 15.9.2009, th e Ben ch is s u ed th e followin gdirections:-(i) In com plia n ce with th e direction s of Hon ble AAIFR, th e Ben chappoints IDBI as the Operating Agency in place of PNB.(ii) Th e repres en ta tive of IDBI (OA) will a tten d th e n ext h ea rin g of th ecom pa n y s ca s e. PNB s h a ll a ls o a tten d th e n ext h ea rin g. A copy ofthese proceedings shall be sent to IDBI(ii) The next hearing of the case will be held on 5.11.2009.However, the hearing scheduled for 5.11.2009 was postponed.1.15 J K J u te Mills Tra de Un ion Sa n yu kta Morch a filed a W.P. No.32854/ 2010 before Hon ble High Cou rt of Alla h a ba d a ga in s t th e Hon bleAAIFR s order dt. 26.8.2009 a n d Hon ble High Cou rt of Alla h a ba d videorder dated 28.5.2010 directed that until further orders of the Hon ble HighCou rt, th e opera tion of th e im pu gn ed order dt. 26.8.2009 of AAIFR shallrem a in s ta yed in s o fa r a s it directs for s a le of th e s u rplu s a s s ets of th ecompany M/s J.K. Jute Mills Ltd.1.16 Th e com pa n y filed a n a ppea l No. 186/ 2009 before Hon ble AAIFRa ga in s t th e Boa rd s order da ted 20.7.2009. Hon b le AAIFR vide order da ted16.7.2010 had issued following directions :-S ince th e parties to the appeal h ave no objection to th e s tay of th eoperation of the im pugned ord er an d are oppos ed to the s tay of furtherproceed ings before th e BIFR, it is d irected th at in m od ification of th ein terim s tay ord er d t. 18.9.2009 gran ted by th is Au th ority , th at furth erproceed ings before th e BIFR w ill con tin ue in view of th e ord er of th isAu thority d ated 26.8.2009 pas s ed in Appeal No. 64/ 2009 s ubject tos tay ord er gran ted by th e Hon ble High Court of Allah abad an d th eoperation of the im pugned ord er d t. 20.7.2009 d irectin g is s ue of S CNund er S ection s 33 and 34 of S ICA as w ell as S CN for w ind ing up ofth e com pan y und er s ection 20 of S ICA s h all rem ain s tay ed untilfurther ord ers . The BIFR s h all be free to proceed further in th ereference cas e in view of th e ord er pas s ed by th is Au thority on7


Case No. 149/1994 : M/s JK Jute Mills Ltd26.8.2009 in Appeal No. 64/ 2009. The s ale of s urplus as s ets of th ecom pan y M/ s J.K.Jute Mills Ltd ., w h ich h as been s tay ed by th e ord erd ated 28.5.2010 pas s ed by the Hon ble High Court of Allah abad inWrit C.No.32854 of 2010, s h all be s ubject to th e fin al ou tcom e of thew rit before the Hon ble High Court. S h. Dhir als o s ubm itted th at h isWrit Petition again s t th e im plead m en t of one party in the appeal is als opend ing before the Hon ble High Court of Delhi in w h ich s tay h as beengranted. Parties are d irected to s ubm it th e ou tcom e of both th e WritPetitions pend ing before the Hon ble High Court of Delhi as w ell asHon ble High Court of Allah abad on the next d ate of hearing. Lis t th isappeal for completion of pleadings on 13.9.2010.1.17 In th e h ea rin g h eld on 6.9.2010, th e Ben ch is s u ed th e followin gdirections:-(i) Pu n ja b Na tion a l Ba n k (PNB) s h a ll s u bm it copy of Deed ofAs s ign m en t to th e Boa rd with in 30 da ys .(ii) As a s s u red, th e com pa n y s h a ll s u bm it a revis ed DRS to IDBI (OA)a n d th e Boa rd with in 15 da ys , with a n u n derta kin g to brin g bridgeloa n pen din g s a le of a s s ets a s propos ed by th e com pa n y a n d a greedin the hearing today.(iii) IDBI (OA) s h a ll exa m in e th e DRS, con du ct a J oin t Meetin g (J M) of a llth e con cern ed a gen cies from wh om th e com pa n y h a s s ou gh t reliefsa n d con ces s ion s a n d s u bm it a fu lly tied u p DRS, if it em erges to th eBoard within further 6 weeks.(iv) Th e com pa n y s h a ll keep th e Boa rd in form ed of th e progres s of ca s epen din g before Hon ble AAIFR in a ppea l No. 64/ 2009 filed by th ecom pa n y a ga in s t th e Boa rd s order da ted 17.12.2008.(v) Th e com pa n y s h a ll keep th e Boa rd in form ed of th e progres s of ca s ein Writ Petition No. 32854 of 2010 filed by J K Grou p Mill Tra d eUnion Sanyukta Morcha before Hon ble High Cou rt of Alla h a ba d.(vi) The next hearing in the case will be held on 8.11.2010.2.1 In th e h ea rin g h eld to-da y (8.11.2010), th e repres en ta tive of IDBI(OA) s ta ted th a t th e com pa n y h a s s u b m itted th e DRS of th e com pa n y on8


Case No. 149/1994 : M/s JK Jute Mills Ltd27.10.2010 wh ich wa s circu la ted by IDBI to a ll th e s ta keh olders a n d join tm eetin g wa s propos ed on 15.11.2010 for its fin a liza tion . Th e Ben chen qu ired th e repres en ta tive of OA (IDBI) a s to wh eth er th e com pa n y wou ldrevive with ou t th e s a le of a s s ets wh ich wa s s ta yed by Hon ble High Cou rtand also the Bridge loan required to be brought in by the company within aperiod of 15 da ys , if n ot in fu s ed, th e repres en ta tive of OA(IDBI) s ta ted th a ta ll th es e problem s wou ld be ta ken before th e join t m eetin g a n d th eou tcom e will be u pda ted. He requ es ted th a t th e Ben ch to fix th e n exthearing after two weeks.2.2 The representative of Punjab National Bank (PNB) submitted that thecom pa n y h a s pa id th eir du es a s per th e s ettlem en t a n d PNB m a y beexem pted from a tten din g th e Boa rd s fu tu re h ea rin gs in th is ca s e.2.3 The repres en ta tive of J K J u te Mill Ma zdoor Pa n ch a ya t(J KJ MMP),Kanpur s u bm itted th a t th e com pa n y wa s to s ta rt opera tion a s per th edirection s of th e Boa rd dt 18.09.2008 bu t th e com pa n y declared lock ou tfor 23 da ys a n d on e m on th s la y-off du rin g 2009 a n d a ga in from05.04.2010 th e m a n a gem en t of th e com pa n y decla red lock-out. Hes u bm itted th a t th e m a n a gem en t of th e com pa n y is relu cta n t to s ta rt th ecom pa n y a n d th ey a re pla yin g with th e fa te of 2300 workers . He requ es tedthe Board that stern action may be initiated against the management of thecompany and the operation may be started.2.4 The repres en ta tive of J K J u te Mill Ma zdoor Morch a (J KJ MMM),Ka n pu r s u bm itted th a t J KJ MMM wa s regis tered a s a u n ion on 01.10.2010a n d wa s im plea ded a s a pa rty in th is ca s e before th e Hon ble AAIFR. Herequ es ted th a t th e com pa n y m a y n ot b e perm itted to s ell th e a s s ets of th ecom pa n y till its reviva l a n d a ls o J KJ MMM be im plea ded a s a n eces s a ryparty before the BIFR.2.5 Th e ld a dvoca te of J K J u te Mill Tra de Un ion Sa n yu kta Morch as u bm itted th a t h is clien t wa s im plea ded a s a pa rty before th e Hon ble AAIFRand requested for impleadment before the BIFR.9


Case No. 149/1994 : M/s JK Jute Mills Ltd2.6 Th e ld con s u lta n t a ppea rin g on beh a lf of th e com pa n y s u bm itted th a tth e com pa n y h a d a lrea dy s u bm itted th e DRS to th e OA (IDBI) a n d th e OAwould convene the joint meeting of the stake holders on 15.11.2010 and timemay be granted to finalise the DRS by OA (IDBI) before taking any decision.2.7 Th e ld a dvoca te of ESIC s u b m itted th a t a n a m ou n t of Rs 34.00 la kh isoutstanding for payment.2.8 After con s iderin g th e s u bm is s ion s m a de a n d m a teria l on record th eBench obs erved th a t in term s of th e Boa rd s order dt 06.09.2010, th ecom pa n y s u bm itted a revis ed DRS to IDBI (OA) with ou t a n u n derta kin g tobrin g bridge loa n pen din g s a le of a s s ets wh ich wa s a greed by th e com pa n y.Th e Ben ch a ls o n oted th a t th e OA (IDBI) would con ven e a J M of th econcerned a gen cies on 15.11.2010, to obta in a clea r view on th e DRS. Th eBench issued the following directions:-(i) OA (IDBI) to s u b m it m in u tes of th e join t m eetin g s ch edu led on15.11.2010 a lon g with its com m en ts on th e DRS s u bm itted by th ecompany for consideration by the Bench.(ii) The com pa n y to file a written s u bm is s ion in rega rd to th e brin gin g ofbridge loa n a n d a ls o h ow th e com pa n y will revive with ou t it a s th e s a leof a s s ets h a s been s ta yed by Hon ble High Court of Allahabad.(iii) The J K J u te Mill Tra de Un ion Sa n yu kta Morch a to file th eim plea dm en t a pplica tion with a copy to th e com pa n y a n d OA (IDBI)with in a p eriod of 07 da ys a n d both th e com pa n y a n d OA to file th eirreply in this regard within a further period of 7 days.(iv) The next hearing in the case will be held on 06.12.2010.(SAROJ BALA) (V.K.MALHOTRA) (NIRMAL SINGH)MEMBER MEMBER CHAIRMAN10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!