10.11.2014 Views

m/s. shah alloys ltd. summary record of the proceeding - Board for ...

m/s. shah alloys ltd. summary record of the proceeding - Board for ...

m/s. shah alloys ltd. summary record of the proceeding - Board for ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Case No..13/2010<br />

M/S Shah Alloys Ltd<br />

BOARD FOR INDUSTRIAL AND FINANCIAL RECONSTRUCTION<br />

CASE NO. 1 3/2010 : M/S. SHAH ALLOYS LTD.<br />

SUMMARY RECORD OF THE PROCEEDINGS OF THE HEARING HELD<br />

ON 23.04.2012 BEFORE BENCH CONSISTING OF<br />

SHRI NIRMAL SINGH, CHAIRMAN AND SHRI Y.K.GAIHA, MEMBER<br />

BENCH<br />

I<br />

Present<br />

M/s. Shah Alloys Ltd.<br />

UBI<br />

SBI<br />

BOB<br />

IDBI<br />

PNB<br />

BOM<br />

Karur Vysya Bank Ltd.<br />

OBC<br />

IOB<br />

Name and Designation <strong>of</strong> <strong>the</strong><br />

Representative S/Shri/Ms<br />

Vivek Sibal, Advocate<br />

R.V.Shah, CMD<br />

Dr. H. M. Parikh, Consultant<br />

Yashpal Mehta, Fin. Consultant<br />

B Ghosh, Director<br />

Chandrashekhar Paliwal, AGM<br />

Dhiren Jain, CM<br />

Jay Kan Prasad, DGM<br />

Anil Tiwari, Advocate<br />

J.C.Patel, Chief Manager<br />

Neha Rastogi, Officer<br />

Ranjitha Godbole, GM<br />

Imran Khan, Manager<br />

Surinder Kumar, Sr. Manager<br />

Gaurav Tyagi, Law Officer<br />

A. Gopinath, AGM<br />

M. Balachandran, DGM<br />

N.K. Grover, DCM<br />

Inder Singh, Sr. Manager<br />

*****<br />

1.1 Ba s ed on its a u dited ba la n ce s h eet (ABS) a s on 30.9.2008 M/ s . Shah<br />

Alloys Ltd . filed a referen ce with BIFR u / s 15(1) <strong>of</strong> SICA. Th e referen ce wa s<br />

ta ken u p <strong>for</strong> con s idera tion s o a s to determ in e th e s ta tu s <strong>of</strong> com pa n y s<br />

1


Case No..13/2010<br />

M/S Shah Alloys Ltd<br />

s ickn es s on 31.5.2010 a n d 5.7.2010. In th e h ea rin g h eld on 31.8.2010, th e<br />

Ben ch decla red th e com pa n y a s a s ick in du s tria l com pa n y u / s 3(1)(o) <strong>of</strong><br />

SICA a n d a ppoin ted Un ion Ba n k <strong>of</strong> In dia (UBI) a s Opera tin g Agen cy u / s<br />

17(3) <strong>of</strong> SICA to prepa re a Dra ft Reh a bilita tion Sch em e (DRS) <strong>for</strong> th e<br />

com pa n y, a s per Section 18 <strong>of</strong> SICA a n d th e en clos ed gu idelin es , based on<br />

<strong>the</strong> DRS to be submitted by <strong>the</strong> company.<br />

1.2 The hearing in <strong>the</strong> case was held on 30.11.2011(MA) be<strong>for</strong>e <strong>the</strong> <strong>Board</strong>.<br />

1.3 In <strong>the</strong> last hearing held on 17.01.2012, <strong>the</strong> Bench issued <strong>the</strong> following<br />

directions :-<br />

(i) OA (UBI) to file a copy <strong>of</strong> TEV Stu dy report to th e Boa rd s <strong>of</strong>fice with in<br />

a period <strong>of</strong> 15 days, with copies to all secured creditors <strong>of</strong> <strong>the</strong> company.<br />

(ii) Th e com pa n y to n egotia te with a ll s ecu red creditors <strong>for</strong> s ettlem en t <strong>of</strong><br />

<strong>the</strong>ir dues and submit DRS to <strong>the</strong> OA within 30 days.<br />

(iii) Th erea fter, UBI (OA) to con ven e a join t m eetin g <strong>of</strong> a ll con cern ed a n d<br />

s u bm it a fu lly tied-u p DRS b e<strong>for</strong>e th e Boa rd s <strong>of</strong>fice with in a period <strong>of</strong> 08<br />

weeks.<br />

(iv) Th e Ben ch Officer, Ben ch -I to delete th e n a m e <strong>of</strong> J in da l Steel & Power<br />

Ltd from <strong>the</strong> mailing list, as <strong>the</strong>y are unsecured creditors <strong>of</strong> <strong>the</strong> company.<br />

(v) The next hearing in <strong>the</strong> case will be held on 24.04.2012.<br />

2.1 In toda y s h ea rin g (23.04.2012), th e repres en ta tive <strong>of</strong> Un ion Ba n k <strong>of</strong><br />

In dia (UBI) (OA) s ta ted th a t TEV Stu dy report h a s been received on ly on<br />

16.04.2012. OA (UBI) will convene a joint meeting <strong>of</strong> all <strong>the</strong> lenders and will<br />

s u bm it its report with in a period <strong>of</strong> on e m on th . On a query from <strong>the</strong> Bench<br />

w h eth er th e com pan y h as en tered in to s ettlem en t <strong>of</strong> its d ues , th e<br />

repres en ta tive <strong>of</strong> OA (UBI) s ta ted th a t th ey a re n ot a wa re <strong>of</strong> a n y s u ch<br />

settlement whe<strong>the</strong>r <strong>the</strong> company has done.<br />

2.2 Th e repres en ta tive <strong>of</strong> SBI s ta ted th a t th ey h a d filed a n a pplica tion in<br />

which certa in objection were ra is ed. He a dded th a t in th e Con cu rren t<br />

Au ditors Report, it wa s observed th a t th e com pa n y du rin g two qu a rters<br />

2


Case No..13/2010<br />

M/S Shah Alloys Ltd<br />

en din g Sep 2011 a n d Dec 2011 h a s pa id Rs .30.6 9 crores to grou p company<br />

(M/ s SAL Steels Ltd). Th e s a id pa ym en t were m a de in two in s ta llm en ts <strong>of</strong><br />

Rs .15.00 crores in Sep 2011 a n d a n oth er <strong>of</strong> Rs .15.69 crores in Dec 2011.<br />

These payments were m a de to M/ s SAL Steels Ltd on a ccou n t <strong>of</strong> less<br />

con s u m ption <strong>of</strong> power produ ced by M/ s SAL Steels Ltd. He a dded th a t a s<br />

per th e a greem en t en tered between th e s ick com pa n y a n d M/ s SAL Steels<br />

Ltd in 2005-06, th e s ick com pa n y is requ ired to pa y a tota l a m ou n t <strong>of</strong><br />

Rs .62.00 crores <strong>for</strong> towa rds les s dra wa l <strong>of</strong> power by th e s ick com pa n y. Ou t<br />

<strong>of</strong> th is Rs .62.00 crores , th e s ick com pa n y h a s a lrea dy pa id Rs .30.69 crores .<br />

Th e s ick com pa n y did n ot s h a re th is in <strong>for</strong>m a tion a bou t such agreement<br />

between th e s ick com pa n y a n d M/ s SAL Steel Ltd with th e Ba n ks a n d on ly<br />

recen tly on Feb 2012 th is lia bility wa s obs erved th rou gh Con cu rren t<br />

Au ditors report. Th u s , s u ch pa ym en t <strong>of</strong> du es to grou p com pa n ies a m ou n ts<br />

to divergen ce <strong>of</strong> fu n ds .<br />

Fu rth er, th e s ick com pa n y h a s in ves ted a pprox<br />

Rs .95.00 crores in M/ s SAL Steel Ltd during 2005-06. However, in term s <strong>of</strong><br />

CDR pa ck a ge, M/ s SAL Steel Ltd wa s requ ired to pa y ba ck Rs .15.00 crores<br />

to th e s ick com pa n y every yea r from FY 2010, wh erea s , th e s ick com pa n y<br />

h a s a lrea dy pa id M/ s SAL Steel Ltd a s u m <strong>of</strong> Rs .30.69 crores . No<br />

permission was taken from <strong>the</strong> secured creditors. On a qu ery from <strong>the</strong> Bench<br />

w h eth er S BI w ou ld lik e to file w ritten s ubm is s ion s on th e line <strong>of</strong> s ubm is s ion s<br />

m ad e in <strong>the</strong> hearin g, th e repres en ta tive <strong>of</strong> SBI a greed a n d s ta ted th a t th ey<br />

will file written s u bm is s ion s brin gin g ou t th eir objection s with in a period <strong>of</strong><br />

two weeks.<br />

2.3 Th e repres en ta tive <strong>of</strong> Ba n k <strong>of</strong> Ba roda (BOB) s ta ted th a t th ey received<br />

th e copy <strong>of</strong> TEV Stu dy report on ly on 16.04.2012. OA (UBI) be directed to<br />

convene a joint meeting at <strong>the</strong> earliest.<br />

2.4 Th e repres en ta tive <strong>of</strong> IDBI s ta ted th a t th e tota l expos u re <strong>of</strong> a ll <strong>the</strong><br />

Ba n ks a n d In s titu tion in th e com pa n y a m ou n ts to Rs .614.00 crores plu s a n<br />

interest <strong>the</strong>re<strong>of</strong>. She added that <strong>the</strong>y support <strong>the</strong> objection raised by SBI on<br />

th e ba s is <strong>of</strong> Con cu rren t Au ditors Report. Sh e a dded th e en tire tra n s a ction<br />

lea ds to divers ion <strong>of</strong> fu n ds . Th e com pa n y h a s a lrea dy s ou gh t two<br />

3


Case No..13/2010<br />

M/S Shah Alloys Ltd<br />

res tru ctu rin g u n der CDR pa ck a ge i.e. in 2006 a n d 2009. Sh e requ es ted <strong>the</strong><br />

Ben ch th a t even th ou gh TEV Stu dy report h a s been received, IDBI requ es ts<br />

th a t a n SIA (Special In ves tiga tive Au dit) be con du cted on th e a ccou n ts <strong>of</strong><br />

th e com pa n y on th e lin e <strong>of</strong> ca s h flow, debts etc. Th e com pa n y is s h owin g<br />

h u ge debts ou t <strong>of</strong> wh ich a pprox 50% <strong>of</strong> <strong>the</strong>se debts perta in s to th ree tra de<br />

creditors , wh ich looks like th ey a re group companies or gen eric com pa n y,<br />

wh ich n eeds to be a s certa in ed.<br />

In terven in g, th e ld a dvoca te represen tin g<br />

th e com pa n y s u bm itted IDBI n eed to file a ppropria te MA a pplica tion<br />

rega rdin g th is .<br />

regarding this.<br />

Ben ch observed th a t IDBI ca n a ls o file written s u bm is s ion s<br />

2.5 Th e repres en ta tive <strong>of</strong> Pu n ja b Na tion a l Ba n k (PNB) s ta ted th a t th ey<br />

had received <strong>the</strong> copy <strong>of</strong> TEV Study report on 19.04.2012. PNB will analysis<br />

and submit its comments in <strong>the</strong> joint lenders meeting.<br />

2.6 Th e repres en ta tive <strong>of</strong> Ba n k <strong>of</strong> Ma h a ra s h tra (BOM) s ta ted th a t <strong>the</strong>y<br />

received th e copy <strong>of</strong> TEV Stu dy report yes terda y a n d will s u bm it its<br />

comments in <strong>the</strong> joint lenders meeting, after analysis <strong>of</strong> <strong>the</strong> report.<br />

2.7 Th e repres en ta tive <strong>of</strong> Ka ru r Vya s a Ba n k Ltd (KVBL) s ta ted th a t th ey<br />

received <strong>the</strong> copy <strong>of</strong> TEV Study report only recently.<br />

2.8 Th e repres en ta tive <strong>of</strong> Orien ta l Ba n k <strong>of</strong> Com m erce (OBC) s ta ted th a t<br />

th ey h a d n ot received th e copy <strong>of</strong> TEV Stu dy report till da te. Th e ld<br />

a dvoca te repres en tin g th e com pa n y s ta ted th a t th e com pa n y h a s a lrea dy<br />

sent to all <strong>the</strong> creditors. The Bench obs erved th at a copy <strong>of</strong> TEV S tud y report<br />

to be provided to OBC.<br />

2.9 Th e repres en ta tive <strong>of</strong> IOB s ta ted th a t th e Ba n k h a s in ves ted in Bon ds<br />

and go by <strong>the</strong> stand <strong>of</strong> OA (UBI).<br />

2.10 Th e ld a dvoca te repres en tin g th e com pa n y s ta ted th a t M/ s MECON<br />

Ltd h a s con du cted th e TEV Stu dy a n d s u bm itted its report. Th e com pa n y,<br />

4


5<br />

Case No..13/2010<br />

M/S Shah Alloys Ltd<br />

in s pite <strong>of</strong> direction to OA (UBI) to circu la te a copy <strong>of</strong> TEV Stu dy report, th e<br />

com pa n y h a s circu la ted th e copy <strong>of</strong> TEV Stu dy report to a ll th e s ecu red<br />

creditors on 16.04.2012.<br />

In th e TEV Stu dy report, on pa ge 9, it is n oted<br />

that th e s ch em e is tech n ica lly a n d fin a n cia lly via ble. Th e ld a dvoca te<br />

repres en tin g th e com pa n y a dded th a t th e com pa n y a grees with th e view<br />

s u bm itted by IDBI th a t two CDR pa cka ge were fa iled a n d TEV Stu dy report<br />

h a s <strong>record</strong>ed th is rea s on s <strong>of</strong> CDR fa ilu re. Th e report its elf s h ows th a t th e<br />

com pa n y h a s followed a ll th e com m itm en t, wh erea s Ba n ks did n ot s ta n d to<br />

th e com m itm en t <strong>of</strong> both CDR package.<br />

IDBI wa s ta lkin g a bou t th ree<br />

creditors , th e tota l ou ts ta n d in g a ga in s t th es e th ree tra de creditors on ly<br />

a m ou n ts to Rs .90.00 la kh s a s a ga in s t th e tota l ou ts ta n din g <strong>of</strong> Rs .50.0 0<br />

crores . Th e a llega tion <strong>of</strong> th e s ick com pa n y givin g m on ey to grou p com pa n y<br />

M/ s SAL Steels Ltd is pu rely in term s <strong>of</strong> th e Power pu rch a s e agreement<br />

en tered by th e s ick com pa n y in 2005-06, wh erein , M/ s SAL Steels Ltd<br />

ca n n ot s ell th e power a lrea dy ea rm a rked <strong>for</strong> th e s ick com pa n y to a n y th ird<br />

pa rty. At th e s a m e tim e, if th e s ick com pa n y does n ot con s u m e its requ ired<br />

u tiliza tion , th e s ick com pa n y will pa y fixed ch a rges over th e s a m e. Th e ld<br />

a dvoca te a dded th a t s in ce SBI is goin g to s u bm it a written s u bm is s ion s on<br />

th e s u bm is s ion s m a de in th e h ea rin g, th e com pan y will file its reply to th e<br />

written s u bm is s ion s <strong>of</strong> SBI. On a query from <strong>the</strong> Bench abou t th e w ork ing <strong>of</strong><br />

th e com pan y , th e ld a dvoca te repres en tin g th e com pa n y s ta ted th a t th e<br />

com pa n y h a s a ch ieved a tu rn over <strong>of</strong> Rs .850.00 crores in th e FY 2011-2012<br />

a t a n 30% ca pa city u tiliza tion . Th e com pa n y is m a kin g ca s h los s <strong>of</strong> a pprox<br />

Rs.100.00 crores <strong>for</strong> <strong>the</strong> year. The company currently employs approx 3000<br />

workers . La s tly, th e ld a dvoca te drew th e a tten tion <strong>of</strong> th e Ben ch to th e fa ct<br />

th a t in s pite <strong>of</strong> TEV Stu dy con du cted a t th e in s ta n ce <strong>of</strong> len ders , SBI h a s<br />

a ga in is s u ed n otice u / s 13(2) <strong>of</strong> SARFEASI Act, 2002 vide th eir letter da ted<br />

14.02.2012 received on 16.02.2012. He a ls o a dded th a t SBI is h oldin g les s<br />

th a n 75% <strong>of</strong> th e s ecu red debts .<br />

Th e ld a dvoca te fu rth er a dded th a t th e<br />

la bou r on s eein g th is n otice h a s gon e to Labour Cou rt <strong>of</strong> Gu ja ra t a n d<br />

Labour Cou rt <strong>of</strong> Gu ja ra t h a s is s u ed a n in ju n ction , th a t la bou r h a s <strong>the</strong> first<br />

ch a rge on th e s a le <strong>of</strong> a n y a s s ets by th e com pa n y. Th e ld a dvoca te fu rth er<br />

a dded th a t du e to th is a ct <strong>of</strong> SBI, reh a bilita tion proces s h a s been


Case No..13/2010<br />

M/S Shah Alloys Ltd<br />

des ta bilized a n d lea d to grea t la bou r u n res t in th e com pa n y. Th e company<br />

has not been able to pay <strong>the</strong> wages <strong>of</strong> <strong>the</strong> labour <strong>for</strong> <strong>the</strong> last 3-4 months.<br />

2.11 Ha vin g con s idered th e s u bm is s ion s m a de in th e h ea rin g a n d m a teria l<br />

on <strong>record</strong>, <strong>the</strong> Bench issued <strong>the</strong> following directions :-<br />

(a) OA (UBI) to con ven e a join t m eetin g a n d s u bm it a fu lly tied-up<br />

DRS, a fter exa m in in g th e TEV Stu dy report s u bm itted by MECON Ltd<br />

to th e Boa rd <strong>of</strong>fice a n d OA with in a period <strong>of</strong> 45 da ys , a s a greed in<br />

<strong>the</strong> hearing.<br />

(b) Sta te Ba n k <strong>of</strong> In dia (SBI) to file written s u bm is s ion s on th e<br />

objection ra is ed by th e con cu rren t Au ditors Report, a s a greed in th e<br />

hearing, with in a period <strong>of</strong> two weeks with copy to OA (UBI) a n d th e<br />

company. Th erea fter, th e com pa n y to file its reply on th e written<br />

s u bm is s ion s <strong>of</strong> SBI, if a n y, with in a fu rth er period <strong>of</strong> two weeks with<br />

copy to SBI and OA (UBI).<br />

(c) IDBI to file written submissions as agreed in <strong>the</strong> hearing, if <strong>the</strong>y<br />

wis h rega rdin g SIA, with in a period <strong>of</strong> 15 da ys with copy to OA (UBI)<br />

a n d th e com pa n y. Th erea fter, th e com pa n y to file its reply on th e<br />

written s u bm is s ion s <strong>of</strong> SBI with in a fu rth er period <strong>of</strong> two weeks with<br />

copy to IDBI and OA (UBI).<br />

(d)<br />

Th e com pa n y to n egotia te a n d en ter in to s ettlem en t with a ll th e<br />

secured creditors.<br />

(e)<br />

Th e com pa n y to file copy <strong>of</strong> th e order <strong>of</strong> Labour Cou rt <strong>of</strong><br />

Gujarat, on <strong>the</strong> injunction order in respect <strong>of</strong> workers within 15 days.<br />

6


Case No..13/2010<br />

M/S Shah Alloys Ltd<br />

(f)<br />

The company to provide a copy <strong>of</strong> TEV Study report to OBC.<br />

(g) The next date <strong>of</strong> hearing in this case is fixed on 13.08.2012.<br />

(YK GAIHA)<br />

MEMBER<br />

(NIRMAL SINGH)<br />

CHAIRMAN<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!