installing multiple types <strong>of</strong> hardware and s<strong>of</strong>tware<br />

systems, including analytics. Are you looking for<br />

Systems designers yet?<br />

Please clarify preferred <strong>DB</strong>E/LBE participation<br />

levels and details. Some general information was<br />

given during the meeting but without sufficient<br />

specificity. Is there a particular certification<br />

program that the consultants have to participate in,<br />

in order to qualify, and if yes, how long does the<br />

certification process take for those who are not in<br />

that program yet? Please provide relevant<br />

program(s) contact information.<br />

Will agencies other than SMART (i.e. Cities and<br />

Counties) be involved in evaluation <strong>of</strong> future<br />

Proposals?<br />

Will design sub-consultants be locked out if they<br />

are not part <strong>of</strong> a <strong>DB</strong> team as <strong>of</strong> the deadline for the<br />

submittal <strong>of</strong> the statement <strong>of</strong> qualifications?<br />

Can SMART furnish the RFQ Forms in word<br />

format? This will facilitate our team members to fill<br />

out the required information.<br />

The RFQ does not provide for evaluation <strong>of</strong><br />

<strong>DB</strong>E/LBE participation as a condition to<br />

prequalification. However, the RFP will include<br />

requirements relating to local business and small<br />

business participation. In this regard, the District's<br />

General Conditions for the IOS-1 design-build<br />

contract included provisions regarding local<br />

business and small business that we anticipate will<br />

also be included in the contract documents for<br />

Contract Package 4.<br />

<strong>Addendum</strong> 2<br />

<strong>Solicitation</strong> <strong>No</strong>. <strong>CV</strong>-<strong>DB</strong>-<strong>12</strong>-<strong>001</strong> <strong>Page</strong> 2 <strong>of</strong> 3 <strong>11</strong>/5/20<strong>12</strong><br />

<strong>No</strong>.<br />

<strong>No</strong>; however, some key personnel and subs may<br />

not be substituted after the D/B team is prequalified,<br />

unless approved by SMART.<br />

The WORD forms from the Appendices are on the<br />

website.<br />

Will the Systems Contract be Design-Build? The Systems contract is not in Contract Package 4<br />

(CP4).<br />

Clarify if Electrical and Mechanical Engineers need<br />

to be included in P<strong>DB</strong>E pre-qualification form.<br />

May the Design-Builder prequalify several Rail<br />

Installation Subcontractors now, and later accept<br />

bids to perform these services?<br />

Based on the scope <strong>of</strong> the OMF and Haystack<br />

Landing Bridge, they may be key consultants and<br />

need to be prequalified.<br />

From the RFQ, "The Design-Builder may prequalify<br />

other (non-heavy and highway) subcontractors for<br />

the Project. In the event that the Design-Builder<br />

intends to include a Rail Installation Subcontractor<br />

on its team, in lieu <strong>of</strong> the General Contractor<br />

performing the rail installation or Moveable Bridge<br />

scope <strong>of</strong> work, the Rail Installation and/or<br />

Moveable Bridge Subcontractor shall be<br />

prequalified.<br />

"Principal Participant. Any <strong>of</strong> the following entities:<br />

(a) The Contractor (or Proposer);<br />

(b) An individual firm, all general partners, or JV<br />

members <strong>of</strong> the Contractor (or Proposer); or<br />

(c) All persons and legal entities holding (directly or<br />

indirectly) a 15% or greater interest in the<br />

Contractor (or Proposer)."<br />

You may prequalify more than one Rail Installation<br />

Subcontractor provided you follow the procedures<br />

in the RFQ. Once a Prequalified P<strong>DB</strong>E is included<br />

in the approved Prequalified P<strong>DB</strong>E list, no change<br />

may be made in the prequalified elements <strong>of</strong> the<br />

Prequalified P<strong>DB</strong>E's organization, including the<br />

joint venture itself, except upon written approval <strong>of</strong><br />

the District, and only in accordance with this<br />

section 18.0. In the event that a prequalified<br />

P<strong>DB</strong>E decides to request a change, the request<br />

shall be made in writing to the District no later than