Addendum 2 Solicitation No. CV-DB-12-001 Page 1 of 3 11/5/2012 ...
Addendum 2 Solicitation No. CV-DB-12-001 Page 1 of 3 11/5/2012 ...
Addendum 2 Solicitation No. CV-DB-12-001 Page 1 of 3 11/5/2012 ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
installing multiple types <strong>of</strong> hardware and s<strong>of</strong>tware<br />
systems, including analytics. Are you looking for<br />
Systems designers yet?<br />
Please clarify preferred <strong>DB</strong>E/LBE participation<br />
levels and details. Some general information was<br />
given during the meeting but without sufficient<br />
specificity. Is there a particular certification<br />
program that the consultants have to participate in,<br />
in order to qualify, and if yes, how long does the<br />
certification process take for those who are not in<br />
that program yet? Please provide relevant<br />
program(s) contact information.<br />
Will agencies other than SMART (i.e. Cities and<br />
Counties) be involved in evaluation <strong>of</strong> future<br />
Proposals?<br />
Will design sub-consultants be locked out if they<br />
are not part <strong>of</strong> a <strong>DB</strong> team as <strong>of</strong> the deadline for the<br />
submittal <strong>of</strong> the statement <strong>of</strong> qualifications?<br />
Can SMART furnish the RFQ Forms in word<br />
format? This will facilitate our team members to fill<br />
out the required information.<br />
The RFQ does not provide for evaluation <strong>of</strong><br />
<strong>DB</strong>E/LBE participation as a condition to<br />
prequalification. However, the RFP will include<br />
requirements relating to local business and small<br />
business participation. In this regard, the District's<br />
General Conditions for the IOS-1 design-build<br />
contract included provisions regarding local<br />
business and small business that we anticipate will<br />
also be included in the contract documents for<br />
Contract Package 4.<br />
<strong>Addendum</strong> 2<br />
<strong>Solicitation</strong> <strong>No</strong>. <strong>CV</strong>-<strong>DB</strong>-<strong>12</strong>-<strong>001</strong> <strong>Page</strong> 2 <strong>of</strong> 3 <strong>11</strong>/5/20<strong>12</strong><br />
<strong>No</strong>.<br />
<strong>No</strong>; however, some key personnel and subs may<br />
not be substituted after the D/B team is prequalified,<br />
unless approved by SMART.<br />
The WORD forms from the Appendices are on the<br />
website.<br />
Will the Systems Contract be Design-Build? The Systems contract is not in Contract Package 4<br />
(CP4).<br />
Clarify if Electrical and Mechanical Engineers need<br />
to be included in P<strong>DB</strong>E pre-qualification form.<br />
May the Design-Builder prequalify several Rail<br />
Installation Subcontractors now, and later accept<br />
bids to perform these services?<br />
Based on the scope <strong>of</strong> the OMF and Haystack<br />
Landing Bridge, they may be key consultants and<br />
need to be prequalified.<br />
From the RFQ, "The Design-Builder may prequalify<br />
other (non-heavy and highway) subcontractors for<br />
the Project. In the event that the Design-Builder<br />
intends to include a Rail Installation Subcontractor<br />
on its team, in lieu <strong>of</strong> the General Contractor<br />
performing the rail installation or Moveable Bridge<br />
scope <strong>of</strong> work, the Rail Installation and/or<br />
Moveable Bridge Subcontractor shall be<br />
prequalified.<br />
"Principal Participant. Any <strong>of</strong> the following entities:<br />
(a) The Contractor (or Proposer);<br />
(b) An individual firm, all general partners, or JV<br />
members <strong>of</strong> the Contractor (or Proposer); or<br />
(c) All persons and legal entities holding (directly or<br />
indirectly) a 15% or greater interest in the<br />
Contractor (or Proposer)."<br />
You may prequalify more than one Rail Installation<br />
Subcontractor provided you follow the procedures<br />
in the RFQ. Once a Prequalified P<strong>DB</strong>E is included<br />
in the approved Prequalified P<strong>DB</strong>E list, no change<br />
may be made in the prequalified elements <strong>of</strong> the<br />
Prequalified P<strong>DB</strong>E's organization, including the<br />
joint venture itself, except upon written approval <strong>of</strong><br />
the District, and only in accordance with this<br />
section 18.0. In the event that a prequalified<br />
P<strong>DB</strong>E decides to request a change, the request<br />
shall be made in writing to the District no later than