Addendum 2 Solicitation No. CV-DB-12-001 Page 1 of 3 11/5/2012 ...
Addendum 2 Solicitation No. CV-DB-12-001 Page 1 of 3 11/5/2012 ...
Addendum 2 Solicitation No. CV-DB-12-001 Page 1 of 3 11/5/2012 ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SONOMA-MARIN AREA RAIL TRANSIT DISTRICT<br />
REQUEST FOR QUALIFICATIONS STATEMENT<br />
FOR<br />
PREQUALIFICATION OF PROSPECTIVE DESIGN-BUILD ENTITIES<br />
FOR DESIGN AND CONSTRUCTION OF<br />
CIVIL, STRUCTURES, AND ARCHITECTURAL IMPROVEMENTS<br />
CONTRACT PACKAGE 4 (CP4)<br />
Issued on October 22, 20<strong>12</strong><br />
<strong>Solicitation</strong> <strong>No</strong>. <strong>CV</strong>-<strong>DB</strong>-<strong>12</strong>-<strong>001</strong><br />
<strong>Addendum</strong> 2<br />
1. Corrections have been made to sign-in sheet for the CP4 RFQ Industry Information Meeting<br />
held on 10/26/20<strong>12</strong> (attached).<br />
2. Requests for Information after 10/26/20<strong>12</strong>:<br />
Will the existing geotechnical and tunnel<br />
engineering reports for rehabilitation <strong>of</strong> the Puerto<br />
Suello Tunnel be made available at this time for<br />
the RFQ stage?<br />
Will the existing geotechnical and tunnel<br />
engineering consultants who prepared the existing<br />
Puerto Suello Tunnel rehabilitation be allowed to<br />
propose with Design/Build teams, or is that<br />
considered to be a conflict <strong>of</strong> interest, possibly due<br />
to ongoing consultation to SMART?<br />
Can you please clarify what the District’s<br />
expectations will be in terms <strong>of</strong> anticipated design<br />
effort for the preparation <strong>of</strong> the future proposal (as<br />
opposed to qualifications)? Bill Gamlen mentioned<br />
the 20% or 30% design level, but this aspect is not<br />
addressed anywhere in the RFQ, even though it is<br />
very important for the Consultants to be aware <strong>of</strong>,<br />
in advance <strong>of</strong> submitting the qualifications and<br />
publishing <strong>of</strong> the RFP. Please clarify if advance<br />
design work will be expected to be included in the<br />
future Proposal; if yes, which parts <strong>of</strong> scope will be<br />
expected to be developed, and how far; and if<br />
there will be any compensation for the Teams for<br />
this effort.<br />
Approximately when in your construction timetable<br />
do you expect to advertise a Systems contract?<br />
We are a CCTV integrator with extensive transit<br />
project experience and would be interested in this<br />
portion <strong>of</strong> the project. We are also able to design<br />
systems and we have the real-world experience <strong>of</strong><br />
They will be available to pre-qualified teams in the<br />
RFP package. We may get some documents out<br />
earlier, but this hasn't been determined yet<br />
Dr Sauer and Jacobs are not excluded.<br />
Design at 20% to 30% is accurate and cannot be<br />
expanded upon.<br />
The Systems contract is not in Contract Package 4<br />
(CP4).<br />
<strong>Addendum</strong> 2<br />
<strong>Solicitation</strong> <strong>No</strong>. <strong>CV</strong>-<strong>DB</strong>-<strong>12</strong>-<strong>001</strong> <strong>Page</strong> 1 <strong>of</strong> 3 <strong>11</strong>/5/20<strong>12</strong>
installing multiple types <strong>of</strong> hardware and s<strong>of</strong>tware<br />
systems, including analytics. Are you looking for<br />
Systems designers yet?<br />
Please clarify preferred <strong>DB</strong>E/LBE participation<br />
levels and details. Some general information was<br />
given during the meeting but without sufficient<br />
specificity. Is there a particular certification<br />
program that the consultants have to participate in,<br />
in order to qualify, and if yes, how long does the<br />
certification process take for those who are not in<br />
that program yet? Please provide relevant<br />
program(s) contact information.<br />
Will agencies other than SMART (i.e. Cities and<br />
Counties) be involved in evaluation <strong>of</strong> future<br />
Proposals?<br />
Will design sub-consultants be locked out if they<br />
are not part <strong>of</strong> a <strong>DB</strong> team as <strong>of</strong> the deadline for the<br />
submittal <strong>of</strong> the statement <strong>of</strong> qualifications?<br />
Can SMART furnish the RFQ Forms in word<br />
format? This will facilitate our team members to fill<br />
out the required information.<br />
The RFQ does not provide for evaluation <strong>of</strong><br />
<strong>DB</strong>E/LBE participation as a condition to<br />
prequalification. However, the RFP will include<br />
requirements relating to local business and small<br />
business participation. In this regard, the District's<br />
General Conditions for the IOS-1 design-build<br />
contract included provisions regarding local<br />
business and small business that we anticipate will<br />
also be included in the contract documents for<br />
Contract Package 4.<br />
<strong>Addendum</strong> 2<br />
<strong>Solicitation</strong> <strong>No</strong>. <strong>CV</strong>-<strong>DB</strong>-<strong>12</strong>-<strong>001</strong> <strong>Page</strong> 2 <strong>of</strong> 3 <strong>11</strong>/5/20<strong>12</strong><br />
<strong>No</strong>.<br />
<strong>No</strong>; however, some key personnel and subs may<br />
not be substituted after the D/B team is prequalified,<br />
unless approved by SMART.<br />
The WORD forms from the Appendices are on the<br />
website.<br />
Will the Systems Contract be Design-Build? The Systems contract is not in Contract Package 4<br />
(CP4).<br />
Clarify if Electrical and Mechanical Engineers need<br />
to be included in P<strong>DB</strong>E pre-qualification form.<br />
May the Design-Builder prequalify several Rail<br />
Installation Subcontractors now, and later accept<br />
bids to perform these services?<br />
Based on the scope <strong>of</strong> the OMF and Haystack<br />
Landing Bridge, they may be key consultants and<br />
need to be prequalified.<br />
From the RFQ, "The Design-Builder may prequalify<br />
other (non-heavy and highway) subcontractors for<br />
the Project. In the event that the Design-Builder<br />
intends to include a Rail Installation Subcontractor<br />
on its team, in lieu <strong>of</strong> the General Contractor<br />
performing the rail installation or Moveable Bridge<br />
scope <strong>of</strong> work, the Rail Installation and/or<br />
Moveable Bridge Subcontractor shall be<br />
prequalified.<br />
"Principal Participant. Any <strong>of</strong> the following entities:<br />
(a) The Contractor (or Proposer);<br />
(b) An individual firm, all general partners, or JV<br />
members <strong>of</strong> the Contractor (or Proposer); or<br />
(c) All persons and legal entities holding (directly or<br />
indirectly) a 15% or greater interest in the<br />
Contractor (or Proposer)."<br />
You may prequalify more than one Rail Installation<br />
Subcontractor provided you follow the procedures<br />
in the RFQ. Once a Prequalified P<strong>DB</strong>E is included<br />
in the approved Prequalified P<strong>DB</strong>E list, no change<br />
may be made in the prequalified elements <strong>of</strong> the<br />
Prequalified P<strong>DB</strong>E's organization, including the<br />
joint venture itself, except upon written approval <strong>of</strong><br />
the District, and only in accordance with this<br />
section 18.0. In the event that a prequalified<br />
P<strong>DB</strong>E decides to request a change, the request<br />
shall be made in writing to the District no later than
ten (10) calendar days prior to the date Proposals<br />
are due in response to the RFP.<br />
Appendix A.1 Questionnaire Submittal Checklist Audited financial statements should be provided<br />
requests audited financial statements for the past 5 for five years. <strong>No</strong> financial statement should be<br />
years. Appendix A.2 Part 2 item 4 requests an more than two-years old.<br />
audited financial statement no more than 2 years<br />
old. Please clarify how many years <strong>of</strong> financial<br />
statements should be provided.<br />
3. The date and time (<strong>No</strong>vember 13, 20<strong>12</strong> prior to the hour <strong>of</strong> 5:00 p.m.) for receipt <strong>of</strong> the<br />
Qualifications Statements from P<strong>DB</strong>Es remains the same.<br />
NO OTHER CHANGES<br />
LaVon Allan, Contract Administrator<br />
<strong>11</strong>/5/20<strong>12</strong><br />
Attachments: Corrections to sign-in sheet for the CP4 RFQ Industry Information Meeting<br />
(contained all in one pdf)<br />
<strong>Addendum</strong> 2<br />
<strong>Solicitation</strong> <strong>No</strong>. <strong>CV</strong>-<strong>DB</strong>-<strong>12</strong>-<strong>001</strong> <strong>Page</strong> 3 <strong>of</strong> 3 <strong>11</strong>/5/20<strong>12</strong>
Sonoma-Marin Area Rail Transit District (corrected LIST 10/31/20<strong>12</strong>; items bolded)<br />
Contract Package 4 (CP4) Industry Information Meeting - 10/26/20<strong>12</strong> (10:00 a.m.)<br />
COMPANY Name Street Address City, State, Zip Code Telephone Number Alternate Number EMAIL ADDRESS Contract Interest Area<br />
AECOM John Maher 2101 Webster Street Oakland, CA 946<strong>12</strong> 510-419-6453<br />
john.mahr2@aecom.com<br />
Civil/Track<br />
AMEC E & I, Inc. Scott Alman 1465 N. McDowell Blvd., #200 Petaluma, CA 94954 707-783-3800 925-683-5025<br />
scott.alman@amec.com<br />
A/E<br />
Anil Verma Associates, Inc. John Sadorra 1970 Broadway, Ste. 668 Oakland, CA 946<strong>12</strong> 510-535-2537, x<strong>11</strong>9<br />
johns@anilverma.com<br />
g<br />
OR<br />
Subcontractor<br />
Anil Verma Associates, Inc. Vic Zikoor 1970 Broadway, Ste. 668 Oakland, CA 946<strong>12</strong> 510-535-2537<br />
Argonaut Constructors Dave Stanford P.O. Box 639/<strong>12</strong>36 Central Avenue Santa Rosa, CA 95402/95401 Phone-707-542-4862 daves@argonautconstructors.com<br />
ARUP Rich C<strong>of</strong>fin 560 Mission Street, 7th Fl San Francisco, CA 94105 415-946-0750<br />
415-957-9445<br />
richard.c<strong>of</strong>fin@arup.com<br />
Atkinson Construction Mark Padien San Leandro, CA 94574 949-204-7594<br />
mark.padien@atkin.com<br />
Atkinson Construction Don Arbis 27422 Portola Pkwy., Suite 250 Foothill Ranch, CA 92610 949-855-9755<br />
don.abris@atkin.com<br />
Paving/Grading/Underground<br />
Civil/Rail/MEP/FLS<br />
General Contractor<br />
Prime<br />
Balfour Beatty Infrastructure Inc. Keng Hay 5050 Business Center Drive, Ste. 250 Fairfield, CA 94534 T.707.427.8900 ext. 205 C.415.640.6218<br />
Balfour Beatty Rail, Inc. Paddy White 5<strong>12</strong> S. Airport Blvd. So. San Francisco Cell - (415)-871 1463<br />
Biggs Cardosa Assoc.<br />
Biggs Cardosa Assoc.<br />
Mahvash Harms 101 California Street, Ste. 875 San Francisco, CA 94<strong>11</strong>1 415-986-19<strong>11</strong> mharms@biggscardosa.com<br />
Troy Swenson 1330 Broadway, Ste. 730 Oakland, CA 946<strong>12</strong> 510-625-9900 tswenson@biggscardosa.com<br />
BKF Engineers Joscelyn Liewre 325 Tesconi Circle Santa Rosa, CA 707-583-8500 jlievore@bkf.com Civil/Track<br />
Brierly Assoc. Alan Howard 920 Country Club Dr. #24 Moraga, CA 94556 925-247-9000<br />
ahoward@brierlyassociates.com<br />
Brunsing Associates Erich Rauber 5468 Skylane Blvd. Santa Rosa, CA 95403 707-838-3027<br />
erauber@brunsing.com<br />
Geotech/Environmental<br />
Brunsing Associates Tom Brunsing 5469 Skylane Blvd. Santa Rosa, CA 95404 707-838-3027 707-291-3199<br />
tbrunsing@brunsing.com<br />
Geotech/Environmental<br />
Chaudhary & Assoc. Arvin Chaudary 2<strong>11</strong> Gateway W., #204 Napa, CA 94558 707-255-2729<br />
arvin@chaudhary.com<br />
Survey/Civil<br />
<strong>DB</strong>E<br />
Community Design & Architecture Jonah Chiarenza 350 Frank Ogawa Plz., #5 Oakland, CA 946<strong>12</strong> 510-839-4568<br />
jonah@community-design.com<br />
Finishing/UD<br />
COMSA EMTE Carlos Vilardell 315 Montgomery St. 9th Fl San Francisco, CA 94104 415-829-4260 Cell 415.844.0244<br />
clvilardell@comsaemte.com<br />
Consolidated Engineers Virgil Garver 7757 Bell Road Windsor, CA 707-732-6630<br />
vlg@ce-labs.com<br />
Inspection<br />
Contra Costa Electric Jim Hill 825 Howe Road Martinez, CA Cell 925-822-7338<br />
jim_hill@emcor.net<br />
Sub<br />
CSW Stuber Stroeh Jim Grossa 45 Leveroni Ct. <strong>No</strong>vato, CA 94949 415-883-9850<br />
jimg@cswst2.com<br />
Civil<br />
Disney Construction Fred Vaughn 875 Mahler Rd. Ste 188 Burlingame, CA 650-259-9545 415-694-0374<br />
DKS Associates Tom Krakow 1970 Broadway, Ste. 740 Oakland, CA 946<strong>12</strong> 510-459-3107<br />
fvaughn@disneyconstruction.com<br />
tjk@dksassociates.com<br />
Transportation Planning &<br />
Engineering<br />
Sub
Sonoma-Marin Area Rail Transit District (corrected LIST 10/31/20<strong>12</strong>; items bolded)<br />
Contract Package 4 (CP4) Industry Information Meeting - 10/26/20<strong>12</strong> (10:00 a.m.)<br />
COMPANY Name Street Address City, State, Zip Code Telephone Number Alternate Number EMAIL ADDRESS Contract Interest Area<br />
Gannett Fleming Barry Lemke 591 Redwood Highway, Ste. 220 Mill Valley, CA 94941 415-384-0821<br />
Gannett Fleming Bob Gave 591 Redwood Highway, Ste. 220 Mill Valley, CA 94941 415-384-0822 415-760-0344<br />
Gannett Fleming John Huginin 591 Redwood Highway, Ste. 220 Mill Valley, CA 94941 415-384-0822 415-755-3022<br />
Gannett Fleming Kam Shadan 591 Redwood Highway, Ste. 220 Mill Valley, CA 94941 415-384-0822 415-760-0346<br />
Ghilotti Bros, Inc.<br />
Kyle Jarmicki<br />
Direct: 415-256-2220<br />
Gordon N. Ball, Inc Hal Stobel 333 Camilla Ave Alamo, CA 925-838-5675 510-772-3448<br />
Granite Construction John Boies 1324 South State Street Ukiah, CA 95482 707-467-4<strong>11</strong>4<br />
Green Valley Jason Alandy 335 Tesconi Circle Santa Rosa, CA 95401 707-579-0388<br />
H&H Engineering Construction, Inc. David Koch 2<strong>12</strong> Industrial Blvd. Stockton, CA 95206 209-983-0708<br />
Hardesty & Hanover Raj Bharil 8640 Mortini Way E. Lacey, WA 98516 360-789-4255 360-943-4139<br />
HDR Engineering Steve Hiatt 2365 Iron Point Road, Ste. 300 Folsom, CA 95630 916-817-4981 cell 916-601-9106<br />
HDR Engineering Mike Strider 15 - 3rd Street Santa Rosa, CA 95401 707-318-2633<br />
Huffman Broadway Terry Huffman 828 Mission Ave. San Rafael, CA 94901 415-385-1045 415-925-2000<br />
J. L. Patterson & Assoc., Inc. Jay Craft 725 Town & Country Road, Suite 300 Orange, CA 92868 (714) 835-6355<br />
J. L. Patterson & Assoc., Inc. Charlene Palmer 725 Town & Country Road, Suite 300 Orange, CA 92868 (714) 835-6355<br />
Jacobs Associates Blake Rothfuss 465 California Street, Suite 1000 San Francisco, CA 94104 415-434-1822<br />
Keilani Tom Design Associates Keilani Tom 210 San Rafael Ave. San Rafael, CA 94901 415-269-9703 415-901-7232<br />
blemke@gfnet.com<br />
rgave@gfnet.com<br />
jhuginin@gfnet.com<br />
kshadan@gfnet.com<br />
Mobile: 415-902-0574 KyleJ@ghilottibros.com<br />
estimating@ballcmco.com<br />
Terry.Richards@gcinc.com<br />
jasona@gvalley.com<br />
davidk@hheng.com<br />
rbharil@hardesty-hanover.com<br />
steve.hiatt@hdrinc.com<br />
mike.strider@hdrinc.com<br />
thuffman@h-bgroup.com<br />
jcraft@jlpatterson.com<br />
cpalmer@jlpatterson.com<br />
rothfuss@jacobssf.com<br />
keilani@ktda.com<br />
Design OMF, etc.<br />
Civil/Systems<br />
Design OMF, etc.<br />
All Civil<br />
Civil/Survey<br />
Railroad Construction<br />
Environmental Compliance;<br />
Permits<br />
Tunnel Rehab<br />
Signage/Wayfinding<br />
g<br />
OR<br />
Subcontractor<br />
Sub<br />
Sub<br />
Kleinfelder Robert Fosse 1330 Broadway, Suite <strong>12</strong>00 Oakland, CA 946<strong>12</strong> 510-628-9000, x8130 c: 510-377-4230<br />
Kwan Henmi Sylvia Kwan 45 Montgomery San Francisco, CA 94104 415901-7203<br />
Mark Thomas & Company, Inc. Paul Price 3000 Oak Road, #650 Walnut Creek CA, 94597 925-938-0383, x226 949-477-9000<br />
NBA Eng. Inc Natalie Ala 897 Hyde Street San Francisco, CA 94109 415-202-9840 415-533-0407<br />
Overaa Construction Carl Overaa 200 Parr Blvd. Richmond, CA 94801 510-234-0926<br />
Pacific HDS GJ Harmina 140 2nd St., #3<strong>12</strong> Petaluma, CA 94952 707-762-3<strong>12</strong>2 415-827-6370<br />
Parsons Sampath Goolla 50 Fremont St. #1500 San Francisco, CA 94105 415-490-2427<br />
Rfosse@kleinfelder.com<br />
sylvia.kwan@kwanhenmi.com<br />
pprice@markthomas.com<br />
natalie@nbaeng.com<br />
carl@overaa.com<br />
gj@pacifichds.com<br />
sampath.goolla@parsons.com<br />
Arch<br />
Engineering<br />
Mechanical/Electrical/Systems<br />
Survey/HDS
Sonoma-Marin Area Rail Transit District (corrected LIST 10/31/20<strong>12</strong>; items bolded)<br />
Contract Package 4 (CP4) Industry Information Meeting - 10/26/20<strong>12</strong> (10:00 a.m.)<br />
COMPANY Name Street Address City, State, Zip Code Telephone Number Alternate Number EMAIL ADDRESS Contract Interest Area<br />
Parsons David Wemmer 50 Fremont St. #1500 San Francisco, CA 94105 415-490-2421<br />
david.wemmer@parsons.com<br />
Parsons Chukwuma Umola 50 Fremont Street, Suite 1500 San Francisco, CA 415-490-2419<br />
chukwuma.umola@parsons.com<br />
Civil/Systems<br />
PCL Civil Constructors, inc.<br />
Mark Erekson 10<strong>11</strong> NE High Street, Suite 215 | Issaquah, WA 98029 P 425.394.4200<br />
g<br />
OR<br />
Subcontractor<br />
PCL Civil Constructors, inc.<br />
Brooke Shore 10<strong>11</strong> NE High Street, Suite 215 | Issaquah, WA 98029 P 425.394.4200<br />
blshore@pcl.com<br />
PGH Wong Dale Fencken 182 2nd Street, #500 San Francisco, CA 415-556-0800<br />
PROINTEC USA Carlos Tarazaga 88 S. 3rd Street San Jose, CA 407-257-3080<br />
Questa Engineering Jeff Peters <strong>12</strong>20 Brickyard Cove Rd. Richmond, CA 94801 510-236-6<strong>11</strong>4 x206<br />
ROMA Design Group Ivana Micic 1527 Stockton Street San Francisco, CA 94133 415-616-9900<br />
Royston Hanamoto Alley &<br />
Abey/RHAA Landscape Architects Douglas Nelson 225 Miller Ave. Mill Valley, CA 94941 415-383-7900<br />
dfencken@pghwong.com<br />
ctarazaga@prointec.es<br />
jpeters@questaec.com<br />
ivanam@ROMA.com<br />
doug@rhaa.com<br />
All<br />
Public Access/Trails<br />
Architect<br />
Landscape Architecture<br />
RSE Ince Nasser Ashrafi 1075 Old County Rd. #D Belmont, CA 94002 650-637-9500 650-887-6615<br />
nashrafi@rsecorp.com<br />
Shimmick Construction Co., Inc. Lanford B. Pritchett<br />
8201 Edgewater Drive, Suite 202<br />
Oakland, CA 94621 510-390-5716 - Cell 510-777-5038 - Direct lpritchett@shimmick.com<br />
Skanska USA Civil West CAD John Hendrickson 1999 Harrison St. Suite 1950 Oakland, CA 946<strong>12</strong><br />
510.285.1838<br />
John.Hendrickson@skanska.com<br />
Southland Contracting Inc. Michael Cash 5<strong>12</strong>-934-<strong>11</strong>5<br />
M.Cash@scitunneling.com<br />
Stacy & Witbeck Scott Bowdish 2800 Harbor Bay Pkwy Alameda, CA 94502 510-748-1870 650-826-1848<br />
sbowdish@stacywitbeck.com<br />
Stacy & Witbeck Pat Darnell 2800 Harbor Bay Pkwy Alameda, CA 94502 510-748-1870<br />
pdarnell@stacywitbeck.com<br />
Stacy & Witbeck/Herzog Nicole English 5401 Old Redwood Hwy Petaluma, CA 94954 469-955-0519<br />
nenglish@herzog.com<br />
STV, Inc. Andy Sokol 1055 W. 7th Street, Suite 3150 Los Angeles, CA 213-430-0584<br />
andrew.sokol@stvinc.com<br />
STV, Inc. Sergio Magallon 1055 W. 7th Street, Suite 3150 Los Angeles, CA 714-414-8074<br />
sergio.magallon@stvinc.com<br />
STV, Inc. Mrika Simoni 1055 W. 7th Street, Suite 3150 Los Angeles, CA 917-602-6806<br />
mrika.simoni@stvinc.com<br />
Summit Signal, Inc. Pete Mihelcic 15<strong>11</strong> S Main St # B Willits, CA 95490-43<strong>11</strong> 707-456-9515<br />
pete@summitsignalinc.com<br />
SYSTRA Adrienne Taylor 617 7th Street, Suite 602 Los Angeles, CA 9<strong>001</strong>7 323-785-5727<br />
ataylor@systrausa.com<br />
T.Y. LIN INTERNATIONAL Carrie Pourvahidi 2 Harrison, Ste. 300 San Francisco, CA 94501 916.804.8930 (mobile)<br />
carrie.poorvahidi@tylin.com<br />
TranSystems Kit Wong 505 14th Street, #1000 Oakland, CA 946<strong>12</strong> 510-835-2761<br />
kimwong@transystems.com<br />
URS Corporation Walt LaFranchi 1380 Lead Hill Blvd., Ste. 100 Roseville, CA 95661 916-784-6855, ext. 249 Office: 916-784-3900 walt.lafranchi@urs.com<br />
Civil/Track/Survey<br />
Prime<br />
All<br />
Prime<br />
Civil/Track<br />
Prime<br />
Signal Team<br />
Design<br />
A/E
Sonoma-Marin Area Rail Transit District (corrected LIST 10/31/20<strong>12</strong>; items bolded)<br />
Contract Package 4 (CP4) Industry Information Meeting - 10/26/20<strong>12</strong> (10:00 a.m.)<br />
COMPANY Name Street Address City, State, Zip Code Telephone Number Alternate Number EMAIL ADDRESS Contract Interest Area<br />
VACC, Inc. Ahmad Bayat 490 Post St., #1427 San Francisco, CA 94102 415-693-0424 abayat@va-consult.com<br />
Walsh Construction<br />
Walsh Construction<br />
Webcor Builders<br />
West Coast General<br />
Whitlock & Weinberger<br />
Transportation, Inc. (W-Trans)<br />
Mark Petty<br />
William Faoro<br />
John Reynolds<br />
Nick Walters<br />
Dalene Whitlock<br />
1777 Oakland Blvd Ste.#300 Walnut Creek CA, 94596 PH: (925) 627-1752 CELL: (510) 772-0097 mpetty@walshgroup.com<br />
1777 Oakland Blvd Ste.#300 Walnut Creek CA, 94596 510-772-2599 wfaoro@walshgroup.com<br />
207 King Street Suite 300 San Francisco, CA 94107-5451 415-278-2024 650-218-4173<br />
13700 Stone Dr., Suite 100 Poway, CA 92064 619-561-4200<br />
490 Mendocino Ave., Suite 201 Santa Rosa, CA 95401 707-542-9500 cell 486-5792<br />
YEI Engineers Doug Yung 7700 Edgewater Drive, Suite <strong>12</strong>8 Oakland, CA 94621 510-957-1603<br />
jreynolds@webcor.com<br />
nwalters@wcgcorp.com<br />
dwhitlock@w-trans.com<br />
dyung@yeiengineers.com<br />
Vibration & <strong>No</strong>ise/EMI<br />
General Contractor<br />
<strong>DB</strong><br />
Electrical/Mechanical Design<br />
g<br />
OR<br />
Subcontractor