11.11.2014 Views

Addendum 2 Solicitation No. CV-DB-12-001 Page 1 of 3 11/5/2012 ...

Addendum 2 Solicitation No. CV-DB-12-001 Page 1 of 3 11/5/2012 ...

Addendum 2 Solicitation No. CV-DB-12-001 Page 1 of 3 11/5/2012 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SONOMA-MARIN AREA RAIL TRANSIT DISTRICT<br />

REQUEST FOR QUALIFICATIONS STATEMENT<br />

FOR<br />

PREQUALIFICATION OF PROSPECTIVE DESIGN-BUILD ENTITIES<br />

FOR DESIGN AND CONSTRUCTION OF<br />

CIVIL, STRUCTURES, AND ARCHITECTURAL IMPROVEMENTS<br />

CONTRACT PACKAGE 4 (CP4)<br />

Issued on October 22, 20<strong>12</strong><br />

<strong>Solicitation</strong> <strong>No</strong>. <strong>CV</strong>-<strong>DB</strong>-<strong>12</strong>-<strong>001</strong><br />

<strong>Addendum</strong> 2<br />

1. Corrections have been made to sign-in sheet for the CP4 RFQ Industry Information Meeting<br />

held on 10/26/20<strong>12</strong> (attached).<br />

2. Requests for Information after 10/26/20<strong>12</strong>:<br />

Will the existing geotechnical and tunnel<br />

engineering reports for rehabilitation <strong>of</strong> the Puerto<br />

Suello Tunnel be made available at this time for<br />

the RFQ stage?<br />

Will the existing geotechnical and tunnel<br />

engineering consultants who prepared the existing<br />

Puerto Suello Tunnel rehabilitation be allowed to<br />

propose with Design/Build teams, or is that<br />

considered to be a conflict <strong>of</strong> interest, possibly due<br />

to ongoing consultation to SMART?<br />

Can you please clarify what the District’s<br />

expectations will be in terms <strong>of</strong> anticipated design<br />

effort for the preparation <strong>of</strong> the future proposal (as<br />

opposed to qualifications)? Bill Gamlen mentioned<br />

the 20% or 30% design level, but this aspect is not<br />

addressed anywhere in the RFQ, even though it is<br />

very important for the Consultants to be aware <strong>of</strong>,<br />

in advance <strong>of</strong> submitting the qualifications and<br />

publishing <strong>of</strong> the RFP. Please clarify if advance<br />

design work will be expected to be included in the<br />

future Proposal; if yes, which parts <strong>of</strong> scope will be<br />

expected to be developed, and how far; and if<br />

there will be any compensation for the Teams for<br />

this effort.<br />

Approximately when in your construction timetable<br />

do you expect to advertise a Systems contract?<br />

We are a CCTV integrator with extensive transit<br />

project experience and would be interested in this<br />

portion <strong>of</strong> the project. We are also able to design<br />

systems and we have the real-world experience <strong>of</strong><br />

They will be available to pre-qualified teams in the<br />

RFP package. We may get some documents out<br />

earlier, but this hasn't been determined yet<br />

Dr Sauer and Jacobs are not excluded.<br />

Design at 20% to 30% is accurate and cannot be<br />

expanded upon.<br />

The Systems contract is not in Contract Package 4<br />

(CP4).<br />

<strong>Addendum</strong> 2<br />

<strong>Solicitation</strong> <strong>No</strong>. <strong>CV</strong>-<strong>DB</strong>-<strong>12</strong>-<strong>001</strong> <strong>Page</strong> 1 <strong>of</strong> 3 <strong>11</strong>/5/20<strong>12</strong>


installing multiple types <strong>of</strong> hardware and s<strong>of</strong>tware<br />

systems, including analytics. Are you looking for<br />

Systems designers yet?<br />

Please clarify preferred <strong>DB</strong>E/LBE participation<br />

levels and details. Some general information was<br />

given during the meeting but without sufficient<br />

specificity. Is there a particular certification<br />

program that the consultants have to participate in,<br />

in order to qualify, and if yes, how long does the<br />

certification process take for those who are not in<br />

that program yet? Please provide relevant<br />

program(s) contact information.<br />

Will agencies other than SMART (i.e. Cities and<br />

Counties) be involved in evaluation <strong>of</strong> future<br />

Proposals?<br />

Will design sub-consultants be locked out if they<br />

are not part <strong>of</strong> a <strong>DB</strong> team as <strong>of</strong> the deadline for the<br />

submittal <strong>of</strong> the statement <strong>of</strong> qualifications?<br />

Can SMART furnish the RFQ Forms in word<br />

format? This will facilitate our team members to fill<br />

out the required information.<br />

The RFQ does not provide for evaluation <strong>of</strong><br />

<strong>DB</strong>E/LBE participation as a condition to<br />

prequalification. However, the RFP will include<br />

requirements relating to local business and small<br />

business participation. In this regard, the District's<br />

General Conditions for the IOS-1 design-build<br />

contract included provisions regarding local<br />

business and small business that we anticipate will<br />

also be included in the contract documents for<br />

Contract Package 4.<br />

<strong>Addendum</strong> 2<br />

<strong>Solicitation</strong> <strong>No</strong>. <strong>CV</strong>-<strong>DB</strong>-<strong>12</strong>-<strong>001</strong> <strong>Page</strong> 2 <strong>of</strong> 3 <strong>11</strong>/5/20<strong>12</strong><br />

<strong>No</strong>.<br />

<strong>No</strong>; however, some key personnel and subs may<br />

not be substituted after the D/B team is prequalified,<br />

unless approved by SMART.<br />

The WORD forms from the Appendices are on the<br />

website.<br />

Will the Systems Contract be Design-Build? The Systems contract is not in Contract Package 4<br />

(CP4).<br />

Clarify if Electrical and Mechanical Engineers need<br />

to be included in P<strong>DB</strong>E pre-qualification form.<br />

May the Design-Builder prequalify several Rail<br />

Installation Subcontractors now, and later accept<br />

bids to perform these services?<br />

Based on the scope <strong>of</strong> the OMF and Haystack<br />

Landing Bridge, they may be key consultants and<br />

need to be prequalified.<br />

From the RFQ, "The Design-Builder may prequalify<br />

other (non-heavy and highway) subcontractors for<br />

the Project. In the event that the Design-Builder<br />

intends to include a Rail Installation Subcontractor<br />

on its team, in lieu <strong>of</strong> the General Contractor<br />

performing the rail installation or Moveable Bridge<br />

scope <strong>of</strong> work, the Rail Installation and/or<br />

Moveable Bridge Subcontractor shall be<br />

prequalified.<br />

"Principal Participant. Any <strong>of</strong> the following entities:<br />

(a) The Contractor (or Proposer);<br />

(b) An individual firm, all general partners, or JV<br />

members <strong>of</strong> the Contractor (or Proposer); or<br />

(c) All persons and legal entities holding (directly or<br />

indirectly) a 15% or greater interest in the<br />

Contractor (or Proposer)."<br />

You may prequalify more than one Rail Installation<br />

Subcontractor provided you follow the procedures<br />

in the RFQ. Once a Prequalified P<strong>DB</strong>E is included<br />

in the approved Prequalified P<strong>DB</strong>E list, no change<br />

may be made in the prequalified elements <strong>of</strong> the<br />

Prequalified P<strong>DB</strong>E's organization, including the<br />

joint venture itself, except upon written approval <strong>of</strong><br />

the District, and only in accordance with this<br />

section 18.0. In the event that a prequalified<br />

P<strong>DB</strong>E decides to request a change, the request<br />

shall be made in writing to the District no later than


ten (10) calendar days prior to the date Proposals<br />

are due in response to the RFP.<br />

Appendix A.1 Questionnaire Submittal Checklist Audited financial statements should be provided<br />

requests audited financial statements for the past 5 for five years. <strong>No</strong> financial statement should be<br />

years. Appendix A.2 Part 2 item 4 requests an more than two-years old.<br />

audited financial statement no more than 2 years<br />

old. Please clarify how many years <strong>of</strong> financial<br />

statements should be provided.<br />

3. The date and time (<strong>No</strong>vember 13, 20<strong>12</strong> prior to the hour <strong>of</strong> 5:00 p.m.) for receipt <strong>of</strong> the<br />

Qualifications Statements from P<strong>DB</strong>Es remains the same.<br />

NO OTHER CHANGES<br />

LaVon Allan, Contract Administrator<br />

<strong>11</strong>/5/20<strong>12</strong><br />

Attachments: Corrections to sign-in sheet for the CP4 RFQ Industry Information Meeting<br />

(contained all in one pdf)<br />

<strong>Addendum</strong> 2<br />

<strong>Solicitation</strong> <strong>No</strong>. <strong>CV</strong>-<strong>DB</strong>-<strong>12</strong>-<strong>001</strong> <strong>Page</strong> 3 <strong>of</strong> 3 <strong>11</strong>/5/20<strong>12</strong>


Sonoma-Marin Area Rail Transit District (corrected LIST 10/31/20<strong>12</strong>; items bolded)<br />

Contract Package 4 (CP4) Industry Information Meeting - 10/26/20<strong>12</strong> (10:00 a.m.)<br />

COMPANY Name Street Address City, State, Zip Code Telephone Number Alternate Number EMAIL ADDRESS Contract Interest Area<br />

AECOM John Maher 2101 Webster Street Oakland, CA 946<strong>12</strong> 510-419-6453<br />

john.mahr2@aecom.com<br />

Civil/Track<br />

AMEC E & I, Inc. Scott Alman 1465 N. McDowell Blvd., #200 Petaluma, CA 94954 707-783-3800 925-683-5025<br />

scott.alman@amec.com<br />

A/E<br />

Anil Verma Associates, Inc. John Sadorra 1970 Broadway, Ste. 668 Oakland, CA 946<strong>12</strong> 510-535-2537, x<strong>11</strong>9<br />

johns@anilverma.com<br />

g<br />

OR<br />

Subcontractor<br />

Anil Verma Associates, Inc. Vic Zikoor 1970 Broadway, Ste. 668 Oakland, CA 946<strong>12</strong> 510-535-2537<br />

Argonaut Constructors Dave Stanford P.O. Box 639/<strong>12</strong>36 Central Avenue Santa Rosa, CA 95402/95401 Phone-707-542-4862 daves@argonautconstructors.com<br />

ARUP Rich C<strong>of</strong>fin 560 Mission Street, 7th Fl San Francisco, CA 94105 415-946-0750<br />

415-957-9445<br />

richard.c<strong>of</strong>fin@arup.com<br />

Atkinson Construction Mark Padien San Leandro, CA 94574 949-204-7594<br />

mark.padien@atkin.com<br />

Atkinson Construction Don Arbis 27422 Portola Pkwy., Suite 250 Foothill Ranch, CA 92610 949-855-9755<br />

don.abris@atkin.com<br />

Paving/Grading/Underground<br />

Civil/Rail/MEP/FLS<br />

General Contractor<br />

Prime<br />

Balfour Beatty Infrastructure Inc. Keng Hay 5050 Business Center Drive, Ste. 250 Fairfield, CA 94534 T.707.427.8900 ext. 205 C.415.640.6218<br />

Balfour Beatty Rail, Inc. Paddy White 5<strong>12</strong> S. Airport Blvd. So. San Francisco Cell - (415)-871 1463<br />

Biggs Cardosa Assoc.<br />

Biggs Cardosa Assoc.<br />

Mahvash Harms 101 California Street, Ste. 875 San Francisco, CA 94<strong>11</strong>1 415-986-19<strong>11</strong> mharms@biggscardosa.com<br />

Troy Swenson 1330 Broadway, Ste. 730 Oakland, CA 946<strong>12</strong> 510-625-9900 tswenson@biggscardosa.com<br />

BKF Engineers Joscelyn Liewre 325 Tesconi Circle Santa Rosa, CA 707-583-8500 jlievore@bkf.com Civil/Track<br />

Brierly Assoc. Alan Howard 920 Country Club Dr. #24 Moraga, CA 94556 925-247-9000<br />

ahoward@brierlyassociates.com<br />

Brunsing Associates Erich Rauber 5468 Skylane Blvd. Santa Rosa, CA 95403 707-838-3027<br />

erauber@brunsing.com<br />

Geotech/Environmental<br />

Brunsing Associates Tom Brunsing 5469 Skylane Blvd. Santa Rosa, CA 95404 707-838-3027 707-291-3199<br />

tbrunsing@brunsing.com<br />

Geotech/Environmental<br />

Chaudhary & Assoc. Arvin Chaudary 2<strong>11</strong> Gateway W., #204 Napa, CA 94558 707-255-2729<br />

arvin@chaudhary.com<br />

Survey/Civil<br />

<strong>DB</strong>E<br />

Community Design & Architecture Jonah Chiarenza 350 Frank Ogawa Plz., #5 Oakland, CA 946<strong>12</strong> 510-839-4568<br />

jonah@community-design.com<br />

Finishing/UD<br />

COMSA EMTE Carlos Vilardell 315 Montgomery St. 9th Fl San Francisco, CA 94104 415-829-4260 Cell 415.844.0244<br />

clvilardell@comsaemte.com<br />

Consolidated Engineers Virgil Garver 7757 Bell Road Windsor, CA 707-732-6630<br />

vlg@ce-labs.com<br />

Inspection<br />

Contra Costa Electric Jim Hill 825 Howe Road Martinez, CA Cell 925-822-7338<br />

jim_hill@emcor.net<br />

Sub<br />

CSW Stuber Stroeh Jim Grossa 45 Leveroni Ct. <strong>No</strong>vato, CA 94949 415-883-9850<br />

jimg@cswst2.com<br />

Civil<br />

Disney Construction Fred Vaughn 875 Mahler Rd. Ste 188 Burlingame, CA 650-259-9545 415-694-0374<br />

DKS Associates Tom Krakow 1970 Broadway, Ste. 740 Oakland, CA 946<strong>12</strong> 510-459-3107<br />

fvaughn@disneyconstruction.com<br />

tjk@dksassociates.com<br />

Transportation Planning &<br />

Engineering<br />

Sub


Sonoma-Marin Area Rail Transit District (corrected LIST 10/31/20<strong>12</strong>; items bolded)<br />

Contract Package 4 (CP4) Industry Information Meeting - 10/26/20<strong>12</strong> (10:00 a.m.)<br />

COMPANY Name Street Address City, State, Zip Code Telephone Number Alternate Number EMAIL ADDRESS Contract Interest Area<br />

Gannett Fleming Barry Lemke 591 Redwood Highway, Ste. 220 Mill Valley, CA 94941 415-384-0821<br />

Gannett Fleming Bob Gave 591 Redwood Highway, Ste. 220 Mill Valley, CA 94941 415-384-0822 415-760-0344<br />

Gannett Fleming John Huginin 591 Redwood Highway, Ste. 220 Mill Valley, CA 94941 415-384-0822 415-755-3022<br />

Gannett Fleming Kam Shadan 591 Redwood Highway, Ste. 220 Mill Valley, CA 94941 415-384-0822 415-760-0346<br />

Ghilotti Bros, Inc.<br />

Kyle Jarmicki<br />

Direct: 415-256-2220<br />

Gordon N. Ball, Inc Hal Stobel 333 Camilla Ave Alamo, CA 925-838-5675 510-772-3448<br />

Granite Construction John Boies 1324 South State Street Ukiah, CA 95482 707-467-4<strong>11</strong>4<br />

Green Valley Jason Alandy 335 Tesconi Circle Santa Rosa, CA 95401 707-579-0388<br />

H&H Engineering Construction, Inc. David Koch 2<strong>12</strong> Industrial Blvd. Stockton, CA 95206 209-983-0708<br />

Hardesty & Hanover Raj Bharil 8640 Mortini Way E. Lacey, WA 98516 360-789-4255 360-943-4139<br />

HDR Engineering Steve Hiatt 2365 Iron Point Road, Ste. 300 Folsom, CA 95630 916-817-4981 cell 916-601-9106<br />

HDR Engineering Mike Strider 15 - 3rd Street Santa Rosa, CA 95401 707-318-2633<br />

Huffman Broadway Terry Huffman 828 Mission Ave. San Rafael, CA 94901 415-385-1045 415-925-2000<br />

J. L. Patterson & Assoc., Inc. Jay Craft 725 Town & Country Road, Suite 300 Orange, CA 92868 (714) 835-6355<br />

J. L. Patterson & Assoc., Inc. Charlene Palmer 725 Town & Country Road, Suite 300 Orange, CA 92868 (714) 835-6355<br />

Jacobs Associates Blake Rothfuss 465 California Street, Suite 1000 San Francisco, CA 94104 415-434-1822<br />

Keilani Tom Design Associates Keilani Tom 210 San Rafael Ave. San Rafael, CA 94901 415-269-9703 415-901-7232<br />

blemke@gfnet.com<br />

rgave@gfnet.com<br />

jhuginin@gfnet.com<br />

kshadan@gfnet.com<br />

Mobile: 415-902-0574 KyleJ@ghilottibros.com<br />

estimating@ballcmco.com<br />

Terry.Richards@gcinc.com<br />

jasona@gvalley.com<br />

davidk@hheng.com<br />

rbharil@hardesty-hanover.com<br />

steve.hiatt@hdrinc.com<br />

mike.strider@hdrinc.com<br />

thuffman@h-bgroup.com<br />

jcraft@jlpatterson.com<br />

cpalmer@jlpatterson.com<br />

rothfuss@jacobssf.com<br />

keilani@ktda.com<br />

Design OMF, etc.<br />

Civil/Systems<br />

Design OMF, etc.<br />

All Civil<br />

Civil/Survey<br />

Railroad Construction<br />

Environmental Compliance;<br />

Permits<br />

Tunnel Rehab<br />

Signage/Wayfinding<br />

g<br />

OR<br />

Subcontractor<br />

Sub<br />

Sub<br />

Kleinfelder Robert Fosse 1330 Broadway, Suite <strong>12</strong>00 Oakland, CA 946<strong>12</strong> 510-628-9000, x8130 c: 510-377-4230<br />

Kwan Henmi Sylvia Kwan 45 Montgomery San Francisco, CA 94104 415901-7203<br />

Mark Thomas & Company, Inc. Paul Price 3000 Oak Road, #650 Walnut Creek CA, 94597 925-938-0383, x226 949-477-9000<br />

NBA Eng. Inc Natalie Ala 897 Hyde Street San Francisco, CA 94109 415-202-9840 415-533-0407<br />

Overaa Construction Carl Overaa 200 Parr Blvd. Richmond, CA 94801 510-234-0926<br />

Pacific HDS GJ Harmina 140 2nd St., #3<strong>12</strong> Petaluma, CA 94952 707-762-3<strong>12</strong>2 415-827-6370<br />

Parsons Sampath Goolla 50 Fremont St. #1500 San Francisco, CA 94105 415-490-2427<br />

Rfosse@kleinfelder.com<br />

sylvia.kwan@kwanhenmi.com<br />

pprice@markthomas.com<br />

natalie@nbaeng.com<br />

carl@overaa.com<br />

gj@pacifichds.com<br />

sampath.goolla@parsons.com<br />

Arch<br />

Engineering<br />

Mechanical/Electrical/Systems<br />

Survey/HDS


Sonoma-Marin Area Rail Transit District (corrected LIST 10/31/20<strong>12</strong>; items bolded)<br />

Contract Package 4 (CP4) Industry Information Meeting - 10/26/20<strong>12</strong> (10:00 a.m.)<br />

COMPANY Name Street Address City, State, Zip Code Telephone Number Alternate Number EMAIL ADDRESS Contract Interest Area<br />

Parsons David Wemmer 50 Fremont St. #1500 San Francisco, CA 94105 415-490-2421<br />

david.wemmer@parsons.com<br />

Parsons Chukwuma Umola 50 Fremont Street, Suite 1500 San Francisco, CA 415-490-2419<br />

chukwuma.umola@parsons.com<br />

Civil/Systems<br />

PCL Civil Constructors, inc.<br />

Mark Erekson 10<strong>11</strong> NE High Street, Suite 215 | Issaquah, WA 98029 P 425.394.4200<br />

g<br />

OR<br />

Subcontractor<br />

PCL Civil Constructors, inc.<br />

Brooke Shore 10<strong>11</strong> NE High Street, Suite 215 | Issaquah, WA 98029 P 425.394.4200<br />

blshore@pcl.com<br />

PGH Wong Dale Fencken 182 2nd Street, #500 San Francisco, CA 415-556-0800<br />

PROINTEC USA Carlos Tarazaga 88 S. 3rd Street San Jose, CA 407-257-3080<br />

Questa Engineering Jeff Peters <strong>12</strong>20 Brickyard Cove Rd. Richmond, CA 94801 510-236-6<strong>11</strong>4 x206<br />

ROMA Design Group Ivana Micic 1527 Stockton Street San Francisco, CA 94133 415-616-9900<br />

Royston Hanamoto Alley &<br />

Abey/RHAA Landscape Architects Douglas Nelson 225 Miller Ave. Mill Valley, CA 94941 415-383-7900<br />

dfencken@pghwong.com<br />

ctarazaga@prointec.es<br />

jpeters@questaec.com<br />

ivanam@ROMA.com<br />

doug@rhaa.com<br />

All<br />

Public Access/Trails<br />

Architect<br />

Landscape Architecture<br />

RSE Ince Nasser Ashrafi 1075 Old County Rd. #D Belmont, CA 94002 650-637-9500 650-887-6615<br />

nashrafi@rsecorp.com<br />

Shimmick Construction Co., Inc. Lanford B. Pritchett<br />

8201 Edgewater Drive, Suite 202<br />

Oakland, CA 94621 510-390-5716 - Cell 510-777-5038 - Direct lpritchett@shimmick.com<br />

Skanska USA Civil West CAD John Hendrickson 1999 Harrison St. Suite 1950 Oakland, CA 946<strong>12</strong><br />

510.285.1838<br />

John.Hendrickson@skanska.com<br />

Southland Contracting Inc. Michael Cash 5<strong>12</strong>-934-<strong>11</strong>5<br />

M.Cash@scitunneling.com<br />

Stacy & Witbeck Scott Bowdish 2800 Harbor Bay Pkwy Alameda, CA 94502 510-748-1870 650-826-1848<br />

sbowdish@stacywitbeck.com<br />

Stacy & Witbeck Pat Darnell 2800 Harbor Bay Pkwy Alameda, CA 94502 510-748-1870<br />

pdarnell@stacywitbeck.com<br />

Stacy & Witbeck/Herzog Nicole English 5401 Old Redwood Hwy Petaluma, CA 94954 469-955-0519<br />

nenglish@herzog.com<br />

STV, Inc. Andy Sokol 1055 W. 7th Street, Suite 3150 Los Angeles, CA 213-430-0584<br />

andrew.sokol@stvinc.com<br />

STV, Inc. Sergio Magallon 1055 W. 7th Street, Suite 3150 Los Angeles, CA 714-414-8074<br />

sergio.magallon@stvinc.com<br />

STV, Inc. Mrika Simoni 1055 W. 7th Street, Suite 3150 Los Angeles, CA 917-602-6806<br />

mrika.simoni@stvinc.com<br />

Summit Signal, Inc. Pete Mihelcic 15<strong>11</strong> S Main St # B Willits, CA 95490-43<strong>11</strong> 707-456-9515<br />

pete@summitsignalinc.com<br />

SYSTRA Adrienne Taylor 617 7th Street, Suite 602 Los Angeles, CA 9<strong>001</strong>7 323-785-5727<br />

ataylor@systrausa.com<br />

T.Y. LIN INTERNATIONAL Carrie Pourvahidi 2 Harrison, Ste. 300 San Francisco, CA 94501 916.804.8930 (mobile)<br />

carrie.poorvahidi@tylin.com<br />

TranSystems Kit Wong 505 14th Street, #1000 Oakland, CA 946<strong>12</strong> 510-835-2761<br />

kimwong@transystems.com<br />

URS Corporation Walt LaFranchi 1380 Lead Hill Blvd., Ste. 100 Roseville, CA 95661 916-784-6855, ext. 249 Office: 916-784-3900 walt.lafranchi@urs.com<br />

Civil/Track/Survey<br />

Prime<br />

All<br />

Prime<br />

Civil/Track<br />

Prime<br />

Signal Team<br />

Design<br />

A/E


Sonoma-Marin Area Rail Transit District (corrected LIST 10/31/20<strong>12</strong>; items bolded)<br />

Contract Package 4 (CP4) Industry Information Meeting - 10/26/20<strong>12</strong> (10:00 a.m.)<br />

COMPANY Name Street Address City, State, Zip Code Telephone Number Alternate Number EMAIL ADDRESS Contract Interest Area<br />

VACC, Inc. Ahmad Bayat 490 Post St., #1427 San Francisco, CA 94102 415-693-0424 abayat@va-consult.com<br />

Walsh Construction<br />

Walsh Construction<br />

Webcor Builders<br />

West Coast General<br />

Whitlock & Weinberger<br />

Transportation, Inc. (W-Trans)<br />

Mark Petty<br />

William Faoro<br />

John Reynolds<br />

Nick Walters<br />

Dalene Whitlock<br />

1777 Oakland Blvd Ste.#300 Walnut Creek CA, 94596 PH: (925) 627-1752 CELL: (510) 772-0097 mpetty@walshgroup.com<br />

1777 Oakland Blvd Ste.#300 Walnut Creek CA, 94596 510-772-2599 wfaoro@walshgroup.com<br />

207 King Street Suite 300 San Francisco, CA 94107-5451 415-278-2024 650-218-4173<br />

13700 Stone Dr., Suite 100 Poway, CA 92064 619-561-4200<br />

490 Mendocino Ave., Suite 201 Santa Rosa, CA 95401 707-542-9500 cell 486-5792<br />

YEI Engineers Doug Yung 7700 Edgewater Drive, Suite <strong>12</strong>8 Oakland, CA 94621 510-957-1603<br />

jreynolds@webcor.com<br />

nwalters@wcgcorp.com<br />

dwhitlock@w-trans.com<br />

dyung@yeiengineers.com<br />

Vibration & <strong>No</strong>ise/EMI<br />

General Contractor<br />

<strong>DB</strong><br />

Electrical/Mechanical Design<br />

g<br />

OR<br />

Subcontractor

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!