Pit-to-port presentation - Investing in African ... - Royal Haskoning
Pit-to-port presentation - Investing in African ... - Royal Haskoning
Pit-to-port presentation - Investing in African ... - Royal Haskoning
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Access and M<strong>in</strong>e Haul Road <strong>to</strong> Trekkopje<br />
Uranium M<strong>in</strong>e<br />
Country:<br />
Client:<br />
Commodity:<br />
Year:<br />
Brief Description:<br />
Namibia<br />
Areva Resources<br />
Uranium<br />
2009 - 2012<br />
The proposed Trekkopje Access Road provides road access <strong>to</strong><br />
the m<strong>in</strong>e from the National Route B2 (Swakopmund – W<strong>in</strong>dhoek<br />
Road) and the rail sid<strong>in</strong>g at Arandis.<br />
The assignment entailed the prelim<strong>in</strong>ary and detail design for<br />
the new m<strong>in</strong>e access and haul road (±35km) plus the m<strong>in</strong>e<br />
railway sid<strong>in</strong>g <strong>to</strong> Trekkopje M<strong>in</strong>e, <strong>Royal</strong> Haskon<strong>in</strong>gDHV<br />
delivered the project requirements and <strong>to</strong>ok full responsibility for<br />
the successful execution of the project. Work was done <strong>in</strong><br />
conjunction with a Namibian based company (CSA) for local<br />
sup<strong>port</strong> and <strong>in</strong>puts where required.<br />
Services <strong>in</strong>cluded: Route location and traffic study, participation<br />
<strong>in</strong> public meet<strong>in</strong>g, <strong>to</strong>pographical survey, materials <strong>in</strong>vestigation<br />
prelim<strong>in</strong>ary and detailed design and tender documentation.<br />
<strong>Royal</strong> Haskon<strong>in</strong>gDHV - <strong>Pit</strong> <strong>to</strong> Port<br />
M<strong>in</strong><strong>in</strong>g Indaba February 2013 – South Africa<br />
Page 40