12.11.2014 Views

Pit-to-port presentation - Investing in African ... - Royal Haskoning

Pit-to-port presentation - Investing in African ... - Royal Haskoning

Pit-to-port presentation - Investing in African ... - Royal Haskoning

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Feasibility Study for the Sadiola M<strong>in</strong>e<br />

Overhead Bridge and M<strong>in</strong>e Haul Road<br />

Country:<br />

Client:<br />

Commodity:<br />

Year:<br />

Brief Description:<br />

Mali<br />

SEMOS-SA / AngloGold Ashanti<br />

Gold<br />

2011 - 2012<br />

The project <strong>in</strong>volves the construction of a 40m bridge <strong>to</strong> provide a<br />

grate separation structure <strong>to</strong> carry Sadiola m<strong>in</strong>e haulage traffic<br />

across a public road. The m<strong>in</strong>e haulage is carried out by a<br />

number of different vehicle the largest of which are CAT 785<br />

dumpers which have a fully weight of 250 <strong>to</strong>ns. These dumpers<br />

also have a full laden height <strong>in</strong> the order of 10 metres.<br />

The feasibility study <strong>in</strong>cluded: Geometrics, Pavements and<br />

Materials Design.<br />

<strong>Royal</strong> Haskon<strong>in</strong>gDHV - <strong>Pit</strong> <strong>to</strong> Port<br />

M<strong>in</strong><strong>in</strong>g Indaba February 2013 – South Africa<br />

Page 42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!