ANNEXURE – B<br />
Terms & Conditions<br />
for Comprehensive Annual Maintenance Contract for maintenance of Servers,<br />
Computers and Networking Components etc<br />
1. Vendors are advised to visit CSIR-NML and inspect the condition of the listed<br />
machines prior to submitting quotation.<br />
2. AMC vendor will station 2 (two) service engineers (should be a permanent employee<br />
of the vendor/on contract specifically for CSIR-NML deputed by the vendor) at NML,<br />
Jamshedpur, with at least 1(one) CCNA or MCNA or MCSE engineer. Copy of<br />
certificate to be enclosed.<br />
Vendor selected shall ensure the following service norms:<br />
Service availability timings<br />
: 0930 hours to 1730 hours Monday to Friday<br />
& Saturday (if working day of NML)<br />
For Computers/Printers/Scanners related problems standby to be provided<br />
within 4 hours and case to be resolved within 12 hours (herein hours means<br />
office hours)<br />
For Servers/Network Switch/30KVA UPS related problems standby to be<br />
provided within 1 hours and case to be resolved within 8 hours. For other<br />
UPS/CVT related problems case to be resolved within 12 hours (herein hours<br />
means office hours).<br />
3. AMC vendor will ensure that operating system with necessary softwares as available<br />
in ICT-U are loaded.<br />
4. AMC vendor shall provide COMPREHENSIVE AMC for ALL ITEMS as in ANNEXURE-<br />
A including Networking components (Active & Passive), UPS (excluding battery) &<br />
laptops (excluding batteries) . AMC vendor will ensure that the replacement parts are<br />
the same or better configuration as that original of equipments at no extra cost to<br />
NML. In case the same make of component is obsolete, AMC vendor will replace the<br />
defective component with new one that is equivalent/better in configuration in<br />
consultation with his authorized representative.<br />
Offers received on Non-Comprehensive AMC basis will be considered as technically<br />
unresponsive and will not be evaluated.<br />
The obsolescence of components shall not be taken as an excuse for declaring<br />
faulty hardware “Repair Not Possible (RNP)”. In case it becomes impossible to<br />
maintain the hardware due to obsolescence of the technology, the vendor shall<br />
suitably upgrade them without any extra charge. Transportation and safety of<br />
hardware from NML site to repair centre (if required) and vice versa shall be sole<br />
responsibility of the vendor.<br />
Page 1 of 5
5. AMC vendor shall maintain the Passive components viz. CAT6/Fiber cables, IO<br />
boxes. Patch cords (CAT6 & Fiber), LIU patch panels (punching/ connectorization<br />
/splicing (if required) replacement with NEW passive components (if required),<br />
relaying of CAT6/Fiber cables and change the faulty cables (if required) & saddling of<br />
sagging network cables at no extra cost.<br />
6. Inclusion of items can be done on pro-rata basis:<br />
(a) During the course of AMC tenure, if a new item not in the AMC list (for those case<br />
for which warranty has expired) and needs to be included in the existing list of<br />
item under AMC, of the similar category, then a letter from NML shall be given to<br />
vendor (after any quarter) after which they have to provide maintenance for the<br />
item. The vendor can do necessary changes in their quarterly billing with a copy<br />
of letter from NML for inclusion of Items (if any).<br />
(b) During the course of AMC tenure, if a item needs to be removed from the existing<br />
list of item under AMC, then a letter from NML shall be given to vendor (after any<br />
quarter) after which they have to amend the list and bill for the remaining items only<br />
with a copy of letter from NML for deletion of Items (if any). Deletion or addition of<br />
items should be done with information to Purchase Section. Pl. note that any<br />
deletion of item from the AMC list can only be done based on the approval of Head,<br />
ICTU and the recommendations of the Standing Disposal Committee of NML.<br />
7. The vendor shall provide services at NML Main Building, Burmamines, Magnesium<br />
Pilot Plant, LSTF & MBPP Plant Area / MNP Division, Agrico & Tuiladungari<br />
Dispensary & of the Director, CSIR-NML residence.<br />
8. The vendor should have executed a single order value of such AMC job of not less<br />
than Rs.10,00,000/- (Rupees Ten Lakhs). The company should have the experience of<br />
maintaining a minimum of 500 PCs and Laptops or more with peripherals for more<br />
than three years in any Central Government Departments / Ministries/ Govt.<br />
undertakings/ Corporate offices like Tata Steel & Tata Motors along with<br />
maintenance of switched Ethernet LAN system, other than CSIR-NML Jamshedpur.<br />
9. The vendor should have a registered office at Jamshedpur or should give an<br />
undertaking for creating an office at Jamshedpur before the conclusion of the AMC<br />
Contract.<br />
10.Copy of Certificates to be enclosed with Quotation:<br />
• Certificate of vendor engineer’s CCNA or MCNA or MCSE to be posted at NML.<br />
• Trade license/ a certificate from your existing client that you have executed such<br />
AMC jobs having the value/volume as mentioned at Sl. No. 8 above.<br />
• Current work order copy issued to vendor by any Central Government<br />
Departments / Ministries/ Govt. undertakings/ Corporate offices like Tata Steel &<br />
Tata Motors maintenance of such AMC job of maintaining 500 Computers,<br />
Servers, Workstation, Printers, and Scanners including LAN system.<br />
Page 2 of 5
11. The vendor shall maintain the following Spares at NML Main Building at any time for<br />
which the necessary space would be provided by Head, ICTU :-<br />
Items<br />
Qty<br />
1) Almirah with Lock & Key 1 No.<br />
2) New Branded Computer (only CPU) 2 Nos.<br />
3) 15” TFT Monitor 3 Nos.<br />
4) B&W Laser Printer 2 Nos.<br />
5) A4 Scanner 2 No.<br />
6) 400w SMPS 6 Nos.<br />
7) SATA HDD 3 Nos.<br />
8) New Keyboard & Optical Mouse 4 Nos. each<br />
9) Motherboard 945 or equivalent 2 Nos.<br />
10) CMOS battery 12 Nos.<br />
11) 24p non-SNMP switch 2 Nos.<br />
12) Portable Hand Blower 1 No.<br />
13) All Network detection & repairing tools 1 set<br />
LAN tester, Crimping, Punching & Stripping tool<br />
14) Tools for detection & repairing of computers & 2 sets<br />
peripherals<br />
12.Payment will be made against invoice in four equal quarterly installments after<br />
satisfactory report duly signed by Head ICT-U & AMC coordinator, ICT-U.<br />
13. Please provide the following details in the invoice for payment by way of e-mode.<br />
This may please be treated as mandatory:-<br />
i) 11 digit core Banking Account Number<br />
ii) Type of Account (Saving/Current).<br />
iii) Name of Account Holder.<br />
iv) Name of Bank & Branch.<br />
v) IFSC Code Number.<br />
vi) MICR Number.<br />
14.E.M.D. (Earnest Money Deposit):<br />
The bidders must submit an EMD of Rs.1,00,000/- (Rupees One Lakh only) along with<br />
the Bids in the form of Demand Draft / banker cheque of any scheduled Bank drawn<br />
in favour of the Director, <strong>National</strong> <strong>Metallurgical</strong> <strong>Laboratory</strong> payable at Jamshedpur.<br />
Bank Guarantee as per enclosed format of similar amount valid for a period of six<br />
months may also be submitted as EMD. Bids submitted without EMD will not be valid<br />
or considered. Cheques are not acceptable as EMD and the Bids submitted with<br />
cheques as EMD will be not considered. EMD of unsuccessful bidders will be<br />
returned within 3 months of finalization of AMC. However, firms registered<br />
permanently with DGS & D and NSIC who are exempted from payment of EMD will be<br />
allowed exemption. The certificate to this effect should be enclosed along with the<br />
offer, if exemption is claimed.<br />
Page 3 of 5
15. P.B.G. (Performance Bank Guarantee):<br />
The Successful bidder has to submit a Performance Bank Guarantee (PBG) issued<br />
by any scheduled Bank as per the format enclosed for 10 % of Order Value in favour<br />
of the Director, <strong>National</strong> <strong>Metallurgical</strong> <strong>Laboratory</strong>, Jamshedpur. The PBG should be<br />
valid for a period of two months beyond the validity of AMC Order, i.e. for 14 months.<br />
The PBG should be submitted within one month from the date of issue of order. The<br />
EMD submitted by the successful bidder will be returned soon after receipt of the<br />
PBG.<br />
16. The Director, CSIR-<strong>National</strong> <strong>Metallurgical</strong> <strong>Laboratory</strong>, Jamshedpur reserves the right<br />
to reject any offer or all the offers received without assigning any reason thereof.<br />
17.Applicable Law : The contract shall be interpreted in accordance with Laws<br />
applicable in India and subject to jurisdiction of the court in Jamshedpur,<br />
Jharkhand, India only.<br />
18.Arbitration : All disputes will be referred to Director General, Council of Scientific &<br />
Industrial Research, New Delhi for arbitration. The decision of Director General will<br />
be final and binding on both supplier and CSIR-NML, Jamshedpur.<br />
19.Quotation to be submitted in the format given as per ANNEXURE – C. Failure to<br />
quote for any one item would lead to a technically unresponsive quote and their<br />
offer would be rejected.<br />
20.CST/VAT – The rate of Sales Tax/VAT should be clearly indicated wherever<br />
chargeable. This office is not eligible to issue C or D forms.<br />
21.NML is exempted from Central Excise Duty vide G.O.I. notification No. 10/97 dated<br />
01/03/1997 & the Excise Duty Exemption Certificate may be issued against the ANC<br />
Order if required.<br />
22.Road Permit : Declaration for Transit by Road will be provided on the written request<br />
from the vendor if required.<br />
23.Gate Pass will be issued by the user Division/Section/Unit in whose PIR of the<br />
material exists duly endorsed by the ICTU Division of CSIR-NML, Jamshedpur if<br />
required against the maintenance contract in order to take out the items for<br />
repairing/replacement work and a copy of the same will be sent to the Stores Section<br />
(S&P Division).<br />
24.Lightening, Mouse-Cut, Over voltage (Voltage above 250 volts certified by Electrical<br />
Department of NML) would not come under the purview of comprehensive AMC and<br />
the cost would be borne by CSIR-NML.<br />
25.Basis of Selection :<br />
(i) Selection of the offer will be done on the basis of lowest quoted consolidated<br />
rates/offer as per <strong>Annexure</strong> - C after taking all items into consideration.<br />
(ii) Firms are supposed to quote for all items as per <strong>Annexure</strong> – C so that their offers<br />
can be evaluated. Failure to quote for any one item would lead to a technically<br />
unresponsive quote and their offer would be rejected.<br />
(iii) In exceptional situations the Institute may not like to go for AMC for a particular<br />
Page 4 of 5
item. In such situations the Decision Making Committee may decide to delete one or<br />
more items from <strong>Annexure</strong>-C and then decide the lowest technically suitable quote<br />
as per NML’s requirement.<br />
26. It should be ensured by the vendor that the prices charged from CSIR-NML should not<br />
exceed prevailing market rates charged by the selected firm from other organizations<br />
for similar services offered.<br />
27. Pre-mature termination of contract on unsatisfactory performance:- CSIR-NML would<br />
terminate the contract based on unsatisfactory performance of the vendor.<br />
“Unsatisfactory Performance” would mean (i) Vendor unable to provide permanent<br />
solution to a problem within 15 working days of the lodging of complaint if such<br />
instances occur more than three times in a quarter or six times in a year then<br />
termination would be effected based on the recommendation of Head, ICTU and the<br />
approval of Purchase Committee and the Advisor Management.<br />
Termination/debarring the firm from business would be effected in such cases where<br />
serviceable and performing assets of CSIR- NML have been taken by the<br />
vendor/cannibalized and returned in unserviceable form “Not Fit for Use” or<br />
subsequently not returned even after three persistent reminders then CSIR-NML<br />
would initiate termination/debarring the firm from business for the period as decided<br />
by the Director, CSIR-NML.<br />
28. The contract can be extended beyond one year for a maximum period of six months<br />
or a minimum period of three months if the Decision Making Committee decides to<br />
call the existing lowest quoting firm for a negotiation to maintain the rates as it is as<br />
per AMC or to further lower the rates based on a market survey by the committee or<br />
on the basis of similar AMC order copies of Govt. Organizations/Corporate offices<br />
like Tata Steel/Tata Motors/Tinplate/Timken and then finalize on extension of the<br />
existing contract.<br />
29. Negotiations if at all shall be an exception but will be conducted wherever required<br />
with the lowest evaluated responsive bidder and the Decision Making Committee<br />
would record cogent reasons for conducting a price negotiation meeting.<br />
30. Force Majeure:- In case of an event or situation beyond the control of the<br />
supplier that is not foreseeable, is unavoidable, and its origin is not due to<br />
negligence or lack of care on the part of the supplier. Such events like wars,<br />
revolutions, fires, floods, epidemics, quarantine restrictions, and freight<br />
embargoes, thunderstorms, lightening may be considered as not foreseeable<br />
and unavoidable by the supplier and thus the vendor can approach the force<br />
majeure committee of the Institute for redress.<br />
31. Annual Maintenance Contract Performance Review Committee:- It is also<br />
proposed that the contract would be reviewed for its performance every six<br />
months. Since there is a provision for extension of the contract for a further<br />
period of six months after the completion of tenure of one year thus in such<br />
circumstance any extension beyond the original tenure would be provided on<br />
the basis of the recommendations of the committee as constituted by the<br />
institute. The same committee would also look into cases of Force Majeure as<br />
mentioned above at Clause 30.<br />